Loading...
HomeMy WebLinkAboutC710 - Storm SEWER PLAN AND PROFILES - SU3.1UP HALLWAY FD C ST-CO-2 ST-CO-1 ST-102 ST-103 ST-104-EX 6 LF OF 6" PVC Pipe @ 0.60% 25 LF OF 6" PVC Pipe @ 0.60% 115 LF OF 12" RCP @ 0.50% 4 8 L F O F 1 5 " R C P @ 0 . 5 5 % 3 LF OF 6" PVC Pipe @ 0.60% 6 LF OF 12" PVC Pipe @ 0.50% 28 LF OF 12" PVC Pipe @ 0.50% 10 + 0 0 11 + 0 0 11+63 20+00 LINE "ST-2" LINE "ST-1" LINE "ST-1" ST-200 795 800 805 810 815 795 800 805 810 815 10+00 11+00 T. C . = 8 0 9 . 6 8 ST R # 1 0 2 E 1 2 " P V C P i p e = 8 0 3 . 4 1 S 1 2 " R C P = 8 0 3 . 3 1 ST A . 1 0 + 0 0 T. C . = 8 0 8 . 9 9 ST R # 1 0 3 N 1 2 " R C P = 8 0 2 . 7 3 W 1 5 " R C P = 8 0 2 . 6 3 ST A . 1 1 + 1 5 T. C . = 8 0 7 . 8 2 ST R # 1 0 4 - E X E 1 5 " R C P = 8 0 2 . 3 7 W 2 4 " R C P = 8 0 2 . 3 7 N 3 6 " R C P = 8 0 2 . 3 7 S 3 6 " R C P = 8 0 2 . 3 7 ST A . 1 1 + 6 3 GRANULAR BACKFILL REQUIRED EXISTING PROFILE GRADE 115 LF OF 12" RCP @ 0.50% 48 LF OF 15" RCP @ 0.55% FINISH PROFILE GRADE GRANULAR BACKFILL REQUIRED HYDRAULIC GRADE LINE UP UP UP FDC FDC DRY ST-103 ST-202 ST-201 ST-203-EX 53 LF OF 1 2 " R C P @ 0 . 7 5 % 56 L F O F 1 2 " R C P @ 0 . 7 5 % 20 + 0 0 21+00 21+42 LINE "ST-2" ST-200 33 LF OF 12" HDPE Pipe @ 0.50% 795 800 805 810 815 795 800 805 810 815 20+00 21+00 T. C . = 8 0 6 . 2 6 ST R # 2 0 0 E 1 2 " H D P E P i p e = 8 0 1 . 5 7 W 6 " H D P E P i p e = 8 0 1 . 6 7 N 8 " H D P E P i p e = 8 0 1 . 6 7 ST A . 2 0 + 0 0 T. C . = 8 0 5 . 7 5 ST R # 2 0 1 E 1 2 " R C P = 8 0 1 . 3 1 W 1 2 " H D P E P i p e = 8 0 1 . 4 1 ST A . 2 0 + 3 3 T. C . = 8 0 6 . 0 1 ST R # 2 0 2 W 1 2 " R C P = 8 0 0 . 9 1 S 1 2 " R C P = 8 0 0 . 8 1 ST A . 2 0 + 8 6 T. C . = 8 0 5 . 3 6 ST R # 2 0 3 - E X N 1 2 " R C P = 8 0 0 . 3 9 E 1 8 " R C P = 8 0 0 . 2 9 W 6 " H D P E P i p e = 8 0 0 . 3 9 ST A . 2 1 + 4 2 56 LF OF 12" RCP @ 0.75% 53 LF OF 12" RCP @ 0.75% 33 LF OF 12" HDPE Pipe @ 0.50% GRANULAR BACKFILL REQUIRED GRANULAR BACKFILL REQUIREDEXISTING PROFILE GRADE FINISH PROFILE GRADE HYDRAULIC GRADE LINE UP UP VE S T I B U L E B1 0 7 FI L M B1 0 8 EQ U I P . S T O R A G E B1 1 2 IC E R O O M B1 2 2 CL A S S R O O M B1 0 9 ME C H A N I C A L B1 1 3 ST-300 ST-301-EX LINE "ST-3" 30 + 0 0 30 + 3 9 795 800 805 810 815 795 800 805 810 815 30+00 T. C . = 8 0 5 . 7 6 ST R # 3 0 1 - E X W 1 2 " H D P E P i p e = 8 0 2 . 8 6 E 1 2 " P V C P i p e = 8 0 2 . 7 6 ST A . 3 0 + 3 7 T. C . = 8 0 6 . 2 1 ST R # 3 0 0 E 1 2 " H D P E P i p e = 8 0 3 . 0 4 N 6 " P V C P i p e = 8 0 3 . 1 4 W 8 " H D P E P i p e = 8 0 3 . 1 4 ST A . 3 0 + 0 0 EXISTING PROFILE GRADE GRANULAR BACKFILL REQUIRED FINISH PROFILE GRADE 37 LF OF 12" HDPE Pipe @ 0.50% HYDRAULIC GRADE LINE 40 + 0 0 40 + 2 8 LINE "ST-4" 800 805 810 815 820 800 805 810 815 820 40+00 T. C . = 8 1 3 . 4 6 ST R # 4 0 1 - E X W 1 2 " R C P = 8 0 8 . 4 4 S 1 2 " R C P = 8 0 8 . 3 3 ST A . 4 0 + 2 8 T. C . = 8 1 3 . 3 0 ST R # 4 0 0 E 1 2 " R C P = 8 0 8 . 5 8 ST A . 4 0 + 0 0 28 LF OF 12" RCP @ 0.50% EXISTING PROFILE GRADE FINISH PROFILE GRADE GRANULAR BACKFILL REQUIRED HYDRAULIC GRADE LINE 100% CONSTRUCTION DOCUMENTS COPYRIGHT 2024 BY FANNING/HOWEY ASSOCIATES, INC. WWW.FHAI.COM ARCHITECT CONSULTANT KEY PLAN BUILDING "A" BUILDING "B" A B SOUTH SUPPORT BUILDING GREYHOUND ACTIVITIES CENTER 5201 E Main Street, Carmel, IN 46033 317-844-9961 PROJECT NUMBER: 222154.00 PROJECT ISSUE DATE: 7.26.2024 DRAWN BY: ARS 317.848.0966 350 E NEW YORK ST. SUITE 300, INDIANAPOLIS IN 46204 PROJECT MANAGER: PMR 222154.00 CARMEL HIGH SCHOOL STADIUM GRANDSTAND RENOVATION PROJECT CARMEL CLAY SCHOOLS 2390 E. SMOKY ROW (HOME SIDE) 2450 E. SMOKY ROW (VISITOR SIDE) CARMEL, IN 46032 PLAN NORTH REV. NO.DESCRIPTION DATE 19700317 No. CITY SUBMITTAL 08-14-20241 SU3.1 STORM SEWER PLAN AND PROFILES PLAN 1" = 20 STORM SEWER PROFILE SCALE: VERT.: 1" = 5' HORIZ.: 1" = 20' LINE "ST-1" PLAN 1" = 20 STORM SEWER PROFILE SCALE: VERT.: 1" = 5' HORIZ.: 1" = 20' LINE "ST-2" NORTH PLAN 1" = 20 STORM SEWER PROFILE SCALE: VERT.: 1" = 5' HORIZ.: 1" = 20' LINE "ST-3" NORTH STORM SEWER PROFILE SCALE: VERT.: 1" = 5' HORIZ.: 1" = 20' LINE "ST-4" PLAN 1" = 20 NORTH NORTH GENERAL NOTES LEGEND APPROXIMATE LIMITS OF GRANULAR BACKFILL (REFER TO STORM SEWER TRENCH DETAILS ON DWG SU2.1) INLETS, VALVES, AND MARKS MADE UPON THE GROUND BY ALSO BE OTHER EXISTING UNDERGROUND UTILITIES FOR WHICH THERE IS NO ABOVE GROUND EVIDENCE OR FOR EXACT LOCATIONS OF EXISTING UNDERGROUND UTILITIES SHALL BE VERIFIED BY CONTRACTOR PRIOR TO ANY AND WHICH NO ABOVE GROUND EVIDENCE WAS OBSERVED. THE OTHERS) AND ARE SPECULATIVE IN NATURE. THERE MAY ALL CONSTRUCTION. THE LOCATIONS OF ALL EXISTING UNDERGROUND UTILITIES EVIDENCE (INCLUDING, BUT NOT LIMITED TO, MANHOLES, SHOWN ON THE PLAN ARE BASED UPON ABOVE GROUND CAUTION !! Know what's below. before you dig.Call R Call 811 or 1-800-382-5544 Before You Begin Any Digging Project. Call 48 hours or 2 working days before you dig. It's Fast, It's Easy and It's the Law in the state of Indiana! 1.SEE DRAWING GD0.1 FOR GENERAL NOTES AND ADDITIONAL LEGEND. 2.TOPOGRAPHIC CONDITIONS AND EXISTING UTILITIES SHOWN WERE PROVIDED BY CEC CIVIL & ENVIRONMENTAL CONSULTANTS DATED MAY 17, 2022. THE ENGINEER MAKES NO GUARANTEES THAT THE UNDERGROUND UTILITIES SHOWN COMPRISE ALL SUCH UTILITIES IN THE AREA, EITHER IN SERVICE OR ABANDONED. 3.CONTRACTOR SHALL VERIFY ALL EXISTING CONDITIONS IN THE PROJECT AREA INCLUDING UNDERGROUND UTILITY CONDITIONS, LOCATION AND DEPTH PRIOR TO ANY OTHER SITE CONSTRUCTION. REPORT ANY DISCREPANCIES TO THE ENGINEER. 4.SEE SHEET SU1.2 FOR NEW SANITARY SEWER LATERAL, FIRE PROTECTION, DOMESTIC WATER, GAS, ELECTRICAL/POWER AND TELECOMMUNICATION INFORMATION. 5.THE PROPOSED STORM SEWER SYSTEM FOR THIS PROJECT WILL BE PRIVATE OWNED. 6.NO EARTH DISTURBING ACTIVITY MAY COMMENCE WITHOUT AN APPROVED STORM WATER MANAGEMENT PERMIT. 8.UTILITY RELOCATIONS REQUIRED BY THE PROJECT SHALL BE THE RESPONSIBILITY OF THE DEVELOPER. UTILITY LINE RELOCATIONS REQUIRED FOR ROAD PROJECTS THAT RESULT IN A CONFLICT WITH PROPOSED DEVELOPMENT SHALL BE THE DEVELOPERS RESPONSIBILITY TO RESOLVE WITH THE UTILITY. EXISTING POLE LINES REQUIRED TO BE RELOCATED TO WITHIN ONE FOOT OF PROPOSED RIGHT-OF-WAY LINE. 9.DAMAGE TO THE EXISTING RIGHT-OF-WAY SHALL RESTORED/REPAIRED TO THE SATISFACTION OF THE CITY AT THE COMPLETION OF THE PROJECT. THE CONTRACTOR IS ENCOURAGED TO INSPECT THE RIGHT-OF-WAY WITH THE CITY PRIOR TO THE START OF CONSTRUCTION TO DOCUMENT THE EXISTING CONDITION OF THE RIGHT-OF-WAY. SEE SHEET G0.1 FOR ADDITIONAL INFORMATION ON THE CITY OF CARMEL'S PAVING AND CURB POLICIES. 10.ALL PAVING WITHIN THE EXISTING AND PROPOSED CITY RIGHT -OF-WAY SHALL CONFORM TO THE REQUIREMENTS OF THE DEPARTMENT OF ENGINEERING. THE CONTRACTOR SHALL CONTACT THE DEPARTMENT OF ENGINEERING TO SCHEDULE A PRE-CONSTRUCTION MEETING TO REVIEW THE DEPARTMENT'S CONSTRUCTION REQUIREMENTS, STAFF NOTIFICATION REQUIREMENTS, REQUIRED INSPECTIONS FOR CERTAIN STAGES OF THE WORK AND TO REVIEW THE AUTHORITY OF THE DEPARTMENT AS IT RELATES TO WORK WITHIN THE EXISTING AND PROPOSED RIGHT-OF-WAY. 11.CONTRACTOR SHALL CALL CENTERPOINT ENERGY AT 1-800-990-1930 TO CREATE A WORK ORDER TO RELOCATE GAS SERVICE AND METER. 12.THE STORM SEWER SYSTEM SHALL BE CONSTRUCTED PER DESIGN SPECIFIED AND AS APPROVED BY THE CITY OF CARMEL ON THE FINAL APPROVED CONSTRUCTION PLANS. DEVIATIONS FROM THE APPROVED DESIGN SHALL ONLY BE PERMITTED DUE TO SPECIAL CIRCUMSTANCES OR DIFFICULTY DURING CONSTRUCTION AND WILL REQUIRE PRIOR FIELD APPROVAL FROM A DESIGNATED REPRESENTATIVE OF THE CITY OF CARMEL IN ADDITION TO SUPPLEMENTAL APPROVAL BY THE DESIGN ENGINEER. AN EXPLANATION OF ANY SUCH DEVIATION SHALL BE INCLUDED AS A REQUIREMENT ON AS-BUILT/RECORD DRAWINGS SUBMITTED FOR RELEASE OF PERFORMANCE GUARANTEES. APPROVED DESIGN SLOPES IDENTIFIED AS GENERATING VELOCITIES OF 2.5 fps OR LESS OR 10 fps OR GREATER (AT FULL FLOW CAPACITY) SHALL REQUIRE AS-BUILT CERTIFICATION AT THE TIME OF CONSTRUCTION, PRIOR TO BACKFILLING THE PIPE. THE CONTRACTOR IS INSTRUCTED TO AS-BUILT EACH SECTION OF STORM PIPE AS IT IS BEING INSTALLED TO ENSURE COMPLIANCE WITH THE DESIGN PLANS AND AS APPROVED BY THE CITY OF CARMEL. TAC COMMENTS 10-14-20242 TP T P TP TREE PROTECTION - PER DETAIL F/L1.2 TP T P TP TP T P TP