HomeMy WebLinkAboutGN120 - MASTER PARKING PLAN - GD0.2PROPOSED NATATORIUM
BUILDING ADDITION
F.F.E.= 831.98
F.F.E.= 831.98
F.F.E.= 831.98
F.F.E.= 834.65
FH1
FH2
FH4
FH3
G
SMOKY ROW ROAD / E 136TH STREET
E MAIN STREET
K
E
Y
S
T
O
N
E
A
V
E
.
/
S
.
R
.
4
3
1
3
10
12
6
8
13
8
3
12
14
13
10
10
9
8
7
6
5
4
3
2
1
11
22
10
26
8
15
8
ATS
SLDP
ATS
UP
UP
UP
UP
UP
UP
UP
VES
T
I
B
U
L
E
B10
7
FIL
M
B10
8
EQU
I
P
.
S
T
O
R
A
G
E
B11
2
ICE
R
O
O
M
B12
2
CLA
S
S
R
O
O
M
B10
9
TAB
L
E
S
T
O
R
A
G
E
B12
6
MEE
T
I
N
G
A
R
E
A
B10
1
HAL
L
W
A
Y
A13
7
TRA
I
N
I
N
G
A12
9
VES
T
I
B
U
L
E
A12
7
FIR
E
P
U
M
P
A12
5
WOM
E
N
'
S
OFF
I
C
I
A
L
S
/
MAN
A
G
E
R
S
A12
6
CLA
S
S
R
O
O
M
A12
2
COR
R
I
D
O
R
A12
8
OFF
I
C
E
A13
8
IT/
D
A
T
A
C
L
O
S
E
T
A13
5
EQ
U
I
P
M
E
N
T
A10
1
HAL
L
W
A
Y
A10
5
CLA
S
S
R
O
O
M
A10
6
COA
C
H
E
S
O
F
F
I
C
E
A10
7
LOC
K
E
R
S
A10
9
BAT
H
R
O
O
M
A10
8
BAT
H
R
O
O
M
A11
2
SHO
W
E
R
S
A11
3
EQU
I
P
M
E
N
T
A10
2
LAU
N
D
R
Y
A10
3
LOC
K
E
R
R
O
O
M
A11
0
OFF
I
C
E
A11
7 VES
T
I
B
U
L
E
A11
1
WOM
E
N
S
/
OFFI
C
I
A
L
S
A12
0
ELE
C
T
R
I
C
A
L
A11
4
CLIN
I
C
A13
0ELE
V
.
E
Q
P
T
.
A13
4
REC
O
V
E
R
Y
A13
1
BAT
H
R
O
O
M
A13
9
BAT
H
R
O
O
M
A14
0
STO
.
A12
1
CHA
N
G
I
N
G
R
O
O
M
A11
5
COA
C
H
E
S
A12
4
CO
R
R
I
D
O
R
/
HAL
L
W
A
Y
A12
3
COA
C
H
E
S
'
LOC
K
E
R
B11
8
HEAD
C
O
A
C
H
OFFI
C
E
B11
9
??
WOM
E
N
S
/
OFF
I
C
I
A
L
S
BAT
H
R
O
O
M
A11
9
STO
R
A
G
E
B12
0
VES
T
I
B
U
L
E
B12
1
BAT
H
R
O
O
M
B11
6
CUST
O
D
I
A
L
B12
3
SHO
W
E
R
S
B11
5
HAL
L
W
A
Y
B12
5
LOC
K
E
R
R
O
O
M
B11
4
MEC
H
A
N
I
C
A
L
B11
3
BAT
H
R
O
O
M
B11
0
BAT
H
R
O
O
M
B11
1
PAS
S
A
G
E
B12
4
MEC
H
A
N
I
C
A
L
B10
2
0.86
:
1
2
0.8
6
:
1
2
0.8
6
:
1
2
0.86
:
1
2
EL.
8
1
0
.
0
7
EL.
8
1
1
.
5
9
EL.
8
1
3
.
9
1
EL.
8
1
6
.
2
3
EL.
8
1
8
.
7
3
EL.
8
0
6
.
4
0
EL.
8
0
9
.
7
0
EL.
8
0
6
.
4
0
UP
16
GD0.2
MASTER PARKING PLAN
1.SEE DRAWING GD0.1 FOR GENERAL NOTES AND ADDITIONAL LEGEND.
2.BOUNDARY AND TOPOGRAPHIC SURVEY INFORMATION SHOWN WERE
PROVIDED BY CIVIL ENVIRONMENTAL CONSULTANTS, INC.
3.CONTRACTOR SHALL VERIFY ALL EXISTING CONDITIONS IN THE PROJECT
AREA INCLUDING UNDERGROUND UTILITY CONDITIONS, LOCATION AND DEPTH
PRIOR TO ANY OTHER SITE CONSTRUCTION. REPORT ANY DISCREPANCIES TO
THE ENGINEER.
GENERAL NOTES
KEYNOTES
PROPOSED BICYCLE RACKS MOUNTED TO EXISTING SIDEWALKS
PROPOSED BICYCLE RACKS MOUNTED TO NEW SIDEWALKS
1
1
THE NUMBERS SHOWN IN THE SYMBOLS BELOW INDICATE THE QUANTITY OF
BICYCLE RACKS PROPOSED IN A PARTICULAR AREA.
1
THE NUMBERS SHOWN IN THE SYMBOL BELOW INDICATE DESIGNATED
PARKING LOT IDENTIFICATION.
PARKING LOT IDENTIFICATION NUMBER
BICYCLE RACK LOCATION SUMMARY TABLE
LOCATION BICYCLE RACKS
MAIN BUILDING 94
FOOTBALL STADIUM 32
8
3
137
TENNIS COURTS
MURRAY STADIUM
TOTAL BICYCLE RACKS
274TOTAL BICYCLE PARKING SPACES
THE ABOVE BICYCLE RACKS ACCOMMODATE 5,520 STUDENTS
BICYCLE SPACES REQUIRED = 1 PER 20 STUDENTS = 274
BUILDING AREA SUMMARY
YEAR
(2023 THROUGH 2024)
PROJECT EXIST. AREA SF.NEW AREA SF.TOTAL AREA SF.%ADDED REMARKS
2002 FRESHMAN CENTER
2004 LOCKER ROOM
2012 PHYSICAL EDUCATION
2019 POOL ENTRANCE #21
2021 DOCK STORAGE
2021 PERFORMING ARTS
776,647
950,591
953,243
980,852
981,547
982,955
173,944
2,652
27,609
695
1,408
25,464
950,591
953,243
980,852
981,547
982,955
1,008,419
22.40
0.28
2.90
0.07
0.14
2.59
BZA APPROVAL WITH VARIANCES
NO CLASSROOM IN ADDITION
NO CLASSROOM IN ADDITION
NO CLASSROOM IN ADDITION
NO CLASSROOM IN ADDITION
NO CLASSROOM IN ADDITION
2007 TENNIS BUILDING 1,700 SEPARATE BUILDING AT STADIUM SITE
2011 SECURE ENTRANCE 0 NO NEW CONSTRUCTION
2023 NATATORIUM 1,008,419 93,229 1,101,648 9.25 NO CLASSROOM IN ADDITION
OVERALL PARKING SUMMARY
LOT NO.LOT NAME STANDARD SPACE
OLD SENIOR LOT 651
EXIST.PROPOSED
65
ADA SPACE
0
EXIST.
0
POLICE SPACE
0
EXIST.
0
BUS SPACE
0
EXIST.
0
TOTAL SPACES
65
EXIST.PROPOSED
65
2
3
4
5
6
7
8
9
10
12
13
14
15
DOOR 7 19 19 4 4 0 0 0 0 23 23
FRONT LOT 103 103 7 7 3 3 0 0 113 113
AUDITORIUM LOT 0 0 0 0 0 0 0 0 0 0
WEST LOT 69 69 0 0 0 0 0 0 69 69
FRESHMAN CENTER LOT 114 114 6 6 1 1 0 0 121 121
FIELDHOUSE LOT 29 29
FITNESS CENTER LOT 0 0 0
POOL LOT 0 0 0 0 0 0 0 0 0
TRAIL LOT 221 221 7 7 1 1 4 4 229 229
SUBTOTAL 634 634 26 26 5 5 4 4 665 665
FOOTBALL HOME LOT 942 908 18 18 0 0 0 0 960 926
FOOTBALL SOUTH LOT 162 162 4 4 0 0 20 = 40 20 = 40 166 166
FOOTBALL VISITOR LOT 536 510 6 6 0 0 0 0 542 516
FOOTBALL NORTH LOT 29 29 0 0 0 0 0 0 29 29
29 0 0 0 0 0 0 29
0 0 0 0 0 0 0
0
PROPOSED PROPOSED PROPOSED
2,3002,362TOTAL
CITY OF CARMEL REQUIRED PARKING SPACES (174 CLASSROOMS x 10) + (583 EMPLOYEES) = 2,323
(UPON COMPLETION OF THE STADIUM GRANDSTAND RENOVATION PROJECT)
SUBTOTAL 1,669 1,634 28 28 0 0 1,697 1,66220 = 40 20 = 40
PERMIT PARKING SPACES = 1334 (STUDENTS) + 583 (EMPLOYEES) = 1,917
NOTES:
1.THE CARMEL HIGH SCHOOL PARKING POLICY IS BASED ON PERMIT ISSUED PARKING. THERE ARE 1,917 PERMITS ISSUED.
2.ENROLLMENT IS EXPECTED TO DROP BY 75 STUDENTS IN 2022 AND REMAIN LEVEL THROUGH 2029.
3.BUS PARKING AT THE FOOTBALL STADIUM IS CURRENTLY 21 SPACES. THESE SPACES CAN ALSO BE USED FOR STUDENT PARKING AT TWO (2)
STANDARD VEHICLE SPACES FOR EACH BUS SPACE. THE 21 BUS PARKING SPACES ALLOWS FOR 42 STUDENT PARKING SPACES.
4.THE CLASSROOM COUNT OF 174 EXCLUDES LABS AND OTHER EXTENDED LEARNING AREAS AS THE LATTER ARE SUPPLEMENTAL TO
CLASSROOMS, AND ARE NOT OCCUPIED AT THE SAME TIME AS CLASSROOMS.
11 MURRAY FIELD LOT 14 14 2 2 0 0 0 0 16 16
200 6000200400
100% CONSTRUCTION DOCUMENTS
COPYRIGHT 2024 BY FANNING/HOWEY ASSOCIATES, INC.
WWW.FHAI.COM
ARCHITECT
CONSULTANT
KEY PLAN
BUILDING "A"
BUILDING "B"
A B
SOUTH
SUPPORT
BUILDING
GREYHOUND
ACTIVITIES
CENTER
5201 E Main Street, Carmel, IN 46033
317-844-9961
PROJECT NUMBER: 222154.00
PROJECT ISSUE DATE: 7.26.2024
DRAWN BY: ARS
317.848.0966
350 E NEW YORK ST. SUITE 300, INDIANAPOLIS IN 46204
PROJECT MANAGER: PMR
222154.00
CARMEL HIGH
SCHOOL STADIUM
GRANDSTAND
RENOVATION
PROJECT
CARMEL CLAY SCHOOLS
2390 E. SMOKY ROW (HOME SIDE)
2450 E. SMOKY ROW (VISITOR SIDE)
CARMEL, IN 46032
PLAN
NORTH
REV.
NO.DESCRIPTION DATE
19700317
No.
CITY SUBMITTAL 08-14-20241
STADIUM - GREYHOUND
ACTIVITY CENTER PROJECT
STADIUM - SOUTH SUPPORT
BUILDING
NATATORIUM
(UNDER CONSTRUCTION)
POLYTECHNIC ADDITION & RENOVATION
(UNDER CONSTRUCTION)
2024 POLYTECHNIC 1,101,648 16,000 1,117,648 1.45 LABORATORIES/CLASSROOMS
STADIUM ADDITION &
RENOVATION PROJECT
FOOTBALL NORTHWEST LOT 0 25 0 0 0 0 0 0 0 2516
ADDENDUM NO. 2 08.23.20242
TAC COMMENTS 10-14-20243
TOTAL BICYCLE RACKS REQUIRED 137