Loading...
HomeMy WebLinkAboutGN120 - MASTER PARKING PLAN - GD0.2PROPOSED NATATORIUM BUILDING ADDITION F.F.E.= 831.98 F.F.E.= 831.98 F.F.E.= 831.98 F.F.E.= 834.65 FH1 FH2 FH4 FH3 G SMOKY ROW ROAD / E 136TH STREET E MAIN STREET K E Y S T O N E A V E . / S . R . 4 3 1 3 10 12 6 8 13 8 3 12 14 13 10 10 9 8 7 6 5 4 3 2 1 11 22 10 26 8 15 8 ATS SLDP ATS UP UP UP UP UP UP UP VES T I B U L E B10 7 FIL M B10 8 EQU I P . S T O R A G E B11 2 ICE R O O M B12 2 CLA S S R O O M B10 9 TAB L E S T O R A G E B12 6 MEE T I N G A R E A B10 1 HAL L W A Y A13 7 TRA I N I N G A12 9 VES T I B U L E A12 7 FIR E P U M P A12 5 WOM E N ' S OFF I C I A L S / MAN A G E R S A12 6 CLA S S R O O M A12 2 COR R I D O R A12 8 OFF I C E A13 8 IT/ D A T A C L O S E T A13 5 EQ U I P M E N T A10 1 HAL L W A Y A10 5 CLA S S R O O M A10 6 COA C H E S O F F I C E A10 7 LOC K E R S A10 9 BAT H R O O M A10 8 BAT H R O O M A11 2 SHO W E R S A11 3 EQU I P M E N T A10 2 LAU N D R Y A10 3 LOC K E R R O O M A11 0 OFF I C E A11 7 VES T I B U L E A11 1 WOM E N S / OFFI C I A L S A12 0 ELE C T R I C A L A11 4 CLIN I C A13 0ELE V . E Q P T . A13 4 REC O V E R Y A13 1 BAT H R O O M A13 9 BAT H R O O M A14 0 STO . A12 1 CHA N G I N G R O O M A11 5 COA C H E S A12 4 CO R R I D O R / HAL L W A Y A12 3 COA C H E S ' LOC K E R B11 8 HEAD C O A C H OFFI C E B11 9 ?? WOM E N S / OFF I C I A L S BAT H R O O M A11 9 STO R A G E B12 0 VES T I B U L E B12 1 BAT H R O O M B11 6 CUST O D I A L B12 3 SHO W E R S B11 5 HAL L W A Y B12 5 LOC K E R R O O M B11 4 MEC H A N I C A L B11 3 BAT H R O O M B11 0 BAT H R O O M B11 1 PAS S A G E B12 4 MEC H A N I C A L B10 2 0.86 : 1 2 0.8 6 : 1 2 0.8 6 : 1 2 0.86 : 1 2 EL. 8 1 0 . 0 7 EL. 8 1 1 . 5 9 EL. 8 1 3 . 9 1 EL. 8 1 6 . 2 3 EL. 8 1 8 . 7 3 EL. 8 0 6 . 4 0 EL. 8 0 9 . 7 0 EL. 8 0 6 . 4 0 UP 16 GD0.2 MASTER PARKING PLAN 1.SEE DRAWING GD0.1 FOR GENERAL NOTES AND ADDITIONAL LEGEND. 2.BOUNDARY AND TOPOGRAPHIC SURVEY INFORMATION SHOWN WERE PROVIDED BY CIVIL ENVIRONMENTAL CONSULTANTS, INC. 3.CONTRACTOR SHALL VERIFY ALL EXISTING CONDITIONS IN THE PROJECT AREA INCLUDING UNDERGROUND UTILITY CONDITIONS, LOCATION AND DEPTH PRIOR TO ANY OTHER SITE CONSTRUCTION. REPORT ANY DISCREPANCIES TO THE ENGINEER. GENERAL NOTES KEYNOTES PROPOSED BICYCLE RACKS MOUNTED TO EXISTING SIDEWALKS PROPOSED BICYCLE RACKS MOUNTED TO NEW SIDEWALKS 1 1 THE NUMBERS SHOWN IN THE SYMBOLS BELOW INDICATE THE QUANTITY OF BICYCLE RACKS PROPOSED IN A PARTICULAR AREA. 1 THE NUMBERS SHOWN IN THE SYMBOL BELOW INDICATE DESIGNATED PARKING LOT IDENTIFICATION. PARKING LOT IDENTIFICATION NUMBER BICYCLE RACK LOCATION SUMMARY TABLE LOCATION BICYCLE RACKS MAIN BUILDING 94 FOOTBALL STADIUM 32 8 3 137 TENNIS COURTS MURRAY STADIUM TOTAL BICYCLE RACKS 274TOTAL BICYCLE PARKING SPACES THE ABOVE BICYCLE RACKS ACCOMMODATE 5,520 STUDENTS BICYCLE SPACES REQUIRED = 1 PER 20 STUDENTS = 274 BUILDING AREA SUMMARY YEAR (2023 THROUGH 2024) PROJECT EXIST. AREA SF.NEW AREA SF.TOTAL AREA SF.%ADDED REMARKS 2002 FRESHMAN CENTER 2004 LOCKER ROOM 2012 PHYSICAL EDUCATION 2019 POOL ENTRANCE #21 2021 DOCK STORAGE 2021 PERFORMING ARTS 776,647 950,591 953,243 980,852 981,547 982,955 173,944 2,652 27,609 695 1,408 25,464 950,591 953,243 980,852 981,547 982,955 1,008,419 22.40 0.28 2.90 0.07 0.14 2.59 BZA APPROVAL WITH VARIANCES NO CLASSROOM IN ADDITION NO CLASSROOM IN ADDITION NO CLASSROOM IN ADDITION NO CLASSROOM IN ADDITION NO CLASSROOM IN ADDITION 2007 TENNIS BUILDING 1,700 SEPARATE BUILDING AT STADIUM SITE 2011 SECURE ENTRANCE 0 NO NEW CONSTRUCTION 2023 NATATORIUM 1,008,419 93,229 1,101,648 9.25 NO CLASSROOM IN ADDITION OVERALL PARKING SUMMARY LOT NO.LOT NAME STANDARD SPACE OLD SENIOR LOT 651 EXIST.PROPOSED 65 ADA SPACE 0 EXIST. 0 POLICE SPACE 0 EXIST. 0 BUS SPACE 0 EXIST. 0 TOTAL SPACES 65 EXIST.PROPOSED 65 2 3 4 5 6 7 8 9 10 12 13 14 15 DOOR 7 19 19 4 4 0 0 0 0 23 23 FRONT LOT 103 103 7 7 3 3 0 0 113 113 AUDITORIUM LOT 0 0 0 0 0 0 0 0 0 0 WEST LOT 69 69 0 0 0 0 0 0 69 69 FRESHMAN CENTER LOT 114 114 6 6 1 1 0 0 121 121 FIELDHOUSE LOT 29 29 FITNESS CENTER LOT 0 0 0 POOL LOT 0 0 0 0 0 0 0 0 0 TRAIL LOT 221 221 7 7 1 1 4 4 229 229 SUBTOTAL 634 634 26 26 5 5 4 4 665 665 FOOTBALL HOME LOT 942 908 18 18 0 0 0 0 960 926 FOOTBALL SOUTH LOT 162 162 4 4 0 0 20 = 40 20 = 40 166 166 FOOTBALL VISITOR LOT 536 510 6 6 0 0 0 0 542 516 FOOTBALL NORTH LOT 29 29 0 0 0 0 0 0 29 29 29 0 0 0 0 0 0 29 0 0 0 0 0 0 0 0 PROPOSED PROPOSED PROPOSED 2,3002,362TOTAL CITY OF CARMEL REQUIRED PARKING SPACES (174 CLASSROOMS x 10) + (583 EMPLOYEES) = 2,323 (UPON COMPLETION OF THE STADIUM GRANDSTAND RENOVATION PROJECT) SUBTOTAL 1,669 1,634 28 28 0 0 1,697 1,66220 = 40 20 = 40 PERMIT PARKING SPACES = 1334 (STUDENTS) + 583 (EMPLOYEES) = 1,917 NOTES: 1.THE CARMEL HIGH SCHOOL PARKING POLICY IS BASED ON PERMIT ISSUED PARKING. THERE ARE 1,917 PERMITS ISSUED. 2.ENROLLMENT IS EXPECTED TO DROP BY 75 STUDENTS IN 2022 AND REMAIN LEVEL THROUGH 2029. 3.BUS PARKING AT THE FOOTBALL STADIUM IS CURRENTLY 21 SPACES. THESE SPACES CAN ALSO BE USED FOR STUDENT PARKING AT TWO (2) STANDARD VEHICLE SPACES FOR EACH BUS SPACE. THE 21 BUS PARKING SPACES ALLOWS FOR 42 STUDENT PARKING SPACES. 4.THE CLASSROOM COUNT OF 174 EXCLUDES LABS AND OTHER EXTENDED LEARNING AREAS AS THE LATTER ARE SUPPLEMENTAL TO CLASSROOMS, AND ARE NOT OCCUPIED AT THE SAME TIME AS CLASSROOMS. 11 MURRAY FIELD LOT 14 14 2 2 0 0 0 0 16 16 200 6000200400 100% CONSTRUCTION DOCUMENTS COPYRIGHT 2024 BY FANNING/HOWEY ASSOCIATES, INC. WWW.FHAI.COM ARCHITECT CONSULTANT KEY PLAN BUILDING "A" BUILDING "B" A B SOUTH SUPPORT BUILDING GREYHOUND ACTIVITIES CENTER 5201 E Main Street, Carmel, IN 46033 317-844-9961 PROJECT NUMBER: 222154.00 PROJECT ISSUE DATE: 7.26.2024 DRAWN BY: ARS 317.848.0966 350 E NEW YORK ST. SUITE 300, INDIANAPOLIS IN 46204 PROJECT MANAGER: PMR 222154.00 CARMEL HIGH SCHOOL STADIUM GRANDSTAND RENOVATION PROJECT CARMEL CLAY SCHOOLS 2390 E. SMOKY ROW (HOME SIDE) 2450 E. SMOKY ROW (VISITOR SIDE) CARMEL, IN 46032 PLAN NORTH REV. NO.DESCRIPTION DATE 19700317 No. CITY SUBMITTAL 08-14-20241 STADIUM - GREYHOUND ACTIVITY CENTER PROJECT STADIUM - SOUTH SUPPORT BUILDING NATATORIUM (UNDER CONSTRUCTION) POLYTECHNIC ADDITION & RENOVATION (UNDER CONSTRUCTION) 2024 POLYTECHNIC 1,101,648 16,000 1,117,648 1.45 LABORATORIES/CLASSROOMS STADIUM ADDITION & RENOVATION PROJECT FOOTBALL NORTHWEST LOT 0 25 0 0 0 0 0 0 0 2516 ADDENDUM NO. 2 08.23.20242 TAC COMMENTS 10-14-20243 TOTAL BICYCLE RACKS REQUIRED 137