HomeMy WebLinkAboutA002 - SECOND FLOOR CODE PLAN BUILDING A - A0-02UPUP
| || || || || || || || || |B205
B
5
B204
UC
1
B201
AC
1
A207
B
6
A206
AC
1
CAP
ACT
1500
1431
RAMP
CAP
ACT
1500
1431RAMP
EXIT 1 EXIT 2 EXIT 3 EXIT 4
778 813
736 516
EXTERIOR CONCOURSE
DOWN DOWN
PARKING LEVEL
UP UP
COPYRIGHT 2024 BY FANNING/HOWEY ASSOCIATES, INC.
KEY PLAN
WWW.FHAI.COM
ARCHITECT
BUILDING "A"
BUILDING "B"
A B
SOUTH
SUPPORT
BUILDING
GREYHOUND
ACTIVITIES
CENTER
5201 E Main Street, Carmel, IN 46033
317-844-9961
8/13/2024 9:34:09 AM\\data1\citrixprofiles$\tvaughn\my documents\2023_ARCH_222154.02_tpvaughn.rvtPROJECT NUMBER: 222154.00
222154.00
CARMEL HIGH
SCHOOL STADIUM
GRANDSTAND
RENOVATION
PROJECT
CARMEL CLAY SCHOOLS
2390 E. SMOKY ROW (HOME SIDE)
2450 E. SMOKY ROW (VISITOR SIDE)
CARMEL, IN 46032
SECOND FLOOR CODE PLAN
BUILDING A
A0.02
PROJECT ISSUE DATE: 8.13.2024
TAC SUBMITTAL
DRAWN BY: TPV / CJK
317.848.0966
350 E NEW YORK ST. SUITE 300, INDIANAPOLIS IN 46204
PROJECT MANAGER: MKS
PLAN
NORTH
SCALE: 3/32" = 1'-0"
2 - SECOND FLOOR - CODE PLAN BUILDING A - HOME SIDE BLEACHERS
ROOM LEGEND - SECOND FLOOR - UNIT A
ROOM NO. ROOM NAME AREA (SF)
A201 MECH. MEZZANINE 280 SF
A202 CONCESSIONS 581 SF
A203 MECHANICAL 836 SF
A204 WOMENS BATHROOM 874 SF
A205 FAMILY RESTROOM A205 82 SF
A206 STORAGE 180 SF
A207 SPIRIT SHOP 634 SF
A208 CONCOURSE 3943 SF
A209 ELE. LOBBY 67 SF
ROOM LEGEND - SECOND FLOOR - UNIT B
ROOM NO. ROOM NAME AREA (SF)
B201 STORAGE 183 SF
B202 FAMILY 82 SF
B203 MENS BATHROOM 745 SF
B204 CUSTODIAL 80 SF
B205 CONCESSIONS 581 SF
B206 CONCOURSE 4177 SF
SEE DRAWING A0.03 FOR EXITING FROM GRANDSTAND
REV.
NO.DESCRIPTION DATE