Loading...
HomeMy WebLinkAboutA002 - SECOND FLOOR CODE PLAN BUILDING A - A0-02UPUP | || || || || || || || || |B205 B 5 B204 UC 1 B201 AC 1 A207 B 6 A206 AC 1 CAP ACT 1500 1431 RAMP CAP ACT 1500 1431RAMP EXIT 1 EXIT 2 EXIT 3 EXIT 4 778 813 736 516 EXTERIOR CONCOURSE DOWN DOWN PARKING LEVEL UP UP COPYRIGHT 2024 BY FANNING/HOWEY ASSOCIATES, INC. KEY PLAN WWW.FHAI.COM ARCHITECT BUILDING "A" BUILDING "B" A B SOUTH SUPPORT BUILDING GREYHOUND ACTIVITIES CENTER 5201 E Main Street, Carmel, IN 46033 317-844-9961 8/13/2024 9:34:09 AM\\data1\citrixprofiles$\tvaughn\my documents\2023_ARCH_222154.02_tpvaughn.rvtPROJECT NUMBER: 222154.00 222154.00 CARMEL HIGH SCHOOL STADIUM GRANDSTAND RENOVATION PROJECT CARMEL CLAY SCHOOLS 2390 E. SMOKY ROW (HOME SIDE) 2450 E. SMOKY ROW (VISITOR SIDE) CARMEL, IN 46032 SECOND FLOOR CODE PLAN BUILDING A A0.02 PROJECT ISSUE DATE: 8.13.2024 TAC SUBMITTAL DRAWN BY: TPV / CJK 317.848.0966 350 E NEW YORK ST. SUITE 300, INDIANAPOLIS IN 46204 PROJECT MANAGER: MKS PLAN NORTH SCALE: 3/32" = 1'-0" 2 - SECOND FLOOR - CODE PLAN BUILDING A - HOME SIDE BLEACHERS ROOM LEGEND - SECOND FLOOR - UNIT A ROOM NO. ROOM NAME AREA (SF) A201 MECH. MEZZANINE 280 SF A202 CONCESSIONS 581 SF A203 MECHANICAL 836 SF A204 WOMENS BATHROOM 874 SF A205 FAMILY RESTROOM A205 82 SF A206 STORAGE 180 SF A207 SPIRIT SHOP 634 SF A208 CONCOURSE 3943 SF A209 ELE. LOBBY 67 SF ROOM LEGEND - SECOND FLOOR - UNIT B ROOM NO. ROOM NAME AREA (SF) B201 STORAGE 183 SF B202 FAMILY 82 SF B203 MENS BATHROOM 745 SF B204 CUSTODIAL 80 SF B205 CONCESSIONS 581 SF B206 CONCOURSE 4177 SF SEE DRAWING A0.03 FOR EXITING FROM GRANDSTAND REV. NO.DESCRIPTION DATE