ELEVATION GENERAL NOTES
1. REFER TO THE ELECTRICAL AND TECHNOLOGY
DRAWINGS FOR CAMERA, LOCATIONS, SECURITY
DEVICES, RECEPTACLES, LIGHT FIXTURES, ETC.
COORDINATE LOCATIONS WITH VENEER
COURSING TO PROVIDE CONSISTENT MOUNTING
HEIGHTS.
2. REFER TO PLUMBING DRAWINGS FOR EXTERIOR
WALL HYDRANTS, SECONDARY ROOF DRAIN
OUTLETS, ETC. COORDINATE PENETRATIONS
THROUGH EXTERIOR ENVELOPE WITH OTHER
TRADES. PROVIDE TRANSITION MEMBRANE TO
MAINTAIN AIR BARRIER SYSTEM.
3. REFER TO MECHANICAL DRAWINGS FOR
EXTERIOR LOUVER LOCATIONS LOCATED IN
EXTERIOR WALL AND EXTERIOR SOFFITS.
COORDINATE PENETRATIONS THROUGH
EXTERIOR ENVELOPE WITH OTHER TRADES.
PROVIDE TRANSITION MEMBRANE TO MAINTAIN
AIR BARRIER SYSTEM.
1
2 3 4 5 6 7
27'-4" 10'-0" 28'-0" 28'-0" 10'-0" 28'-0"
6.7
3
A4.03 4
A4.03
1
A4.02
2
A4.02 5
A4.04
1
A10.03
5.1 1
A5.04
1
A10.05
CLEAN AND PREPARE EXISTING VERTICAL
CONCRETE SURFACES AND APPLY NEW
ELASTOMERIC COATING SYSTEM TO EXTEND
DOWN THE FACE THAT IS CONCEALED BY
GRANDSTAND (BOTH SIDES)
REFER TO VIEWING DECK
DRAWINGS FOR TRAFFIC
COATING EXTENTS
SITE FENCING AND GATES, REFER TO SITE
DRAWINGS
REFER TO VIEWING DECK
DRAWINGS FOR TRAFFIC
COATING EXTENTS
CLEAN AND PREPARE EXISTING VERTICAL
CONCRETE SURFACES AND APPLY NEW
ELASTOMERIC COATING SYSTEM TO EXTEND
DOWN THE FACE THAT IS CONCEALED BY
GRANDSTAND (BOTH SIDES)
REFER TO ENLARGED PRESSBOX
ELEVATIONS
CONCRETE SITE WALL WITH RUBBED
CONCRETE FINISH
1.1 1.9
CLEAN AND PREPARE EXISTING CONCRETE
WALL SURFACES AND APPLY NEW
ELASTOMERIC COATING SYSTEM
9
A10.04
ALUMINUM CLOSURE PANELS
ALUMINUM CLOSURE PANELS71'-8"7
8 9 10 11 12 137.3
6
A4.04
7
A4.05
8
A4.05
9
A4.05
8.9
4
A5.02
7
A10.04
13
A10.01
28'-0" 10'-0" 28'-0" 28'-0" 10'-0" 27'-4"
REFER TO VIEWING DECK
DRAWINGS FOR TRAFFIC
COATING EXTENTS
REFER TO ENLARGED PRESSBOX
ELEVATIONS
REFER TO VIEWING DECK
DRAWINGS FOR TRAFFIC
COATING EXTENTS
CLEAN AND PREPARE EXISTING CONCRETE
WALL SURFACES AND APPLY NEW
ELASTOMERIC COATING SYSTEM
CLEAN AND PREPARE EXISTING VERTICAL
CONCRETE SURFACES AND APPLY NEW
ELASTOMERIC COATING SYSTEM TO EXTEND
DOWN THE FACE THAT IS CONCEALED BY
GRANDSTAND (BOTH SIDES)
12.912.1
9
A10.04
ALUMINUM CLOSURE PANELS ALUMINUM CLOSURE PANELS71'-8"10' M AX. FROM CORNERSTYPICAL BRICK
EXPANSION JOINTS
EXPANSION JOINTS AT ALL
INTERIOR CORNERS AND
OFFSETS
EXPANSION JOINT AT ALL
CHANGES IN WALL HEIGHT
TYPICAL BRICK EXPANSION JOINT (EJ) LOCATIONS24' M AX. SPACING ON W ALL W /NO OPENINGSTYPICAL BRICK EXPANSION JOINT DETAIL
BRICK VENEER
VENEER WALL TIES AT 16"
O.C. EACH WAY
PROVIDE BACKER ROD IN CAVITY AT CONTROL
JOINT LOCATIONS TO COMPARTMENTALIZE
THE CAVITY AIR SPACE AND REDUCE
HORIZONTAL AIR FLOW
BACKER ROD AND SEALANT
COMPRESSIBLE FILL
REFER TO SECTIONS AND DETAILS FOR
BACKUP WALL CONSTRUCTION
TYPICAL BRICK EXPANSION JOINT AT OPENINGS
BRICK VENEER
COMPRESSIBLE FILL
REFER TO SECTIONS AND DETAILS FOR
BACKUP WALL CONSTRUCTION
EXPANSION JOINT AT OPENINGS ONLY WHEN
THERE IS 8' OR LESS OF BRICK ABOVE
PROVIDE BACKER ROD AND SEALANT AT FRONT AND
EXPOSED END OF LINTEL
CAVITY WALL FLASHING AND
ACCESSORIES, REFER TO TYPICAL DETAIL
NOTE: DETAIL SHOWN
STEPPED BACK FOR
CLARITY
BACKER ROD AND SEALANT
COMPRESSIBLE FILL
PLACE THE EXPANSION JOINT
BETWEEN THE WINDOWS IF THE
WINDOWS ARE AT LEAST 4' APART20' M AX. SPACING ON W ALL W ITH OPENINGSLOCATE EXPANSION JOINT AT OPENING ONLY
WHEN THERE IS 8' OR LESS OF BRICK ABOVE,
OTHERWISE LOCATE 2' MIN FROM OPENING
PROVIDE FOAM BACKER ROD IN
CAVITY AT CONTROL JOINT
LOCATIONS
TYPICAL BRICK EXPANSION JOINT AT SHELF ANGLES
BRICK VENEER
COMPRESSIBLE FILLREFER TO SECTIONS AND DETAILS FOR
BACKUP WALL CONSTRUCTION
EXPANSION JOINT AT BOTH SIDES OF OPENINGS
WHERE VENEER IS SUPPORTED BY SHELF ANGLE
OR STEEL PLATE ATTACHED TO BACKUP WALL
CAVITY WALL FLASHING AND
ACCESSORIES, REFER TO TYPICAL DETAIL
NOTE: DETAIL SHOWN
STEPPED BACK FOR
CLARITY
BACKER ROD
AND SEALANT
COMPRESSIBLE FILL
BACKER ROD AND SEALANT
PROVIDE BACKER ROD IN CAVITY AT
CONTROL JOINT LOCATIONS
END OF FLASHING W/END DAM IN HEAD JOINT
STOP SHELF ANGLE 3/8" SHORT OF VENEER
TRAFFIC COATING
SEE SHEETS A1.06 AND A1.07 FOR ADDITIONAL
INFORMATION
ELASTOMERIC COATING
TYPICAL AT ALL SIDES, TOP, FRONT, BACK AND
BOTTOM
CONCRETE COATING LEGEND
COPYRIGHT 2024 BY FANNING/HOWEY ASSOCIATES, INC.
KEY PLAN
WWW.FHAI.COM
ARCHITECT
BUILDING "A"
BUILDING "B"
A B
SOUTH
SUPPORT
BUILDING
GREYHOUND
ACTIVITIES
CENTER
5201 E Main Street, Carmel, IN 46033
317-844-9961
8/13/2024 9:35:00 AM\\data1\citrixprofiles$\tvaughn\my documents\2023_ARCH_222154.02_tpvaughn.rvtPROJECT NUMBER: 222154.00
222154.00
CARMEL HIGH
SCHOOL STADIUM
GRANDSTAND
RENOVATION
PROJECT
CARMEL CLAY SCHOOLS
2390 E. SMOKY ROW (HOME SIDE)
2450 E. SMOKY ROW (VISITOR SIDE)
CARMEL, IN 46032
BUILDING A ELEVATIONS
A3.01
PROJECT ISSUE DATE: 8.13.2024
TAC SUBMITTAL
DRAWN BY: TPV
317.848.0966
350 E NEW YORK ST. SUITE 300, INDIANAPOLIS IN 46204
PROJECT MANAGER: MKS
PLAN
NORTH
SCALE: 1/8" = 1'-0"
EAST ELEVATION BUILDING A -UNIT A1
SCALE: 1/8" = 1'-0"
EAST ELEVATION BUILDING A -UNIT B2
1 2
REV.
NO.DESCRIPTION DATE