Loading...
HomeMy WebLinkAboutA306 - PRESS BOX ELEVATIONS - A3-06PRESS BOX LEVEL 1 (NEW) EL 143'-0" PRESS BOX LEVEL 2 (NEW) EL 155'-0" PRESS BOX TOP OF STEEL EL 167'-4" ADAB 2 A5.05 3 A5.05 PRESS BOX LOWER LEVEL EL 139'-8" A A4.01 6 A5.06 STRUCTURAL STEEL FRAMING (PAINT) STRUCTURAL STEEL FRAMING (PAINT) GLAZED ALUMINUM CURTAIN WALL GLAZED ALUMINUM CURTAIN WALL METAL COPING FORMED METAL WALL PANEL -COLOR A FORMED METAL WALL PANEL -COLOR B FORMED METAL WALL PANEL -COLOR A FORMED METAL WALL PANEL SPLICE JOINT COVER TRIM FORMED METAL WALL PANEL -COLOR B FORMED METAL WALL PANEL -COLOR A ALL FORMED METAL PANELS CORNERS TO BE MITERED ALUMINUM PIPE AND TUBE RAILING STEEL STRINGER, CONCRETE FILLED METAL PAN STAIRS. PROVIDE TRAFFIC COATING ON CONCRETE WALKING SURFACES, PAINT STEEL SURFACES ALUMINUM PIPE AND TUBE RAILING TRAFFIC COATING ON NEW CONCRETE AA AC PRESS BOX LEVEL 1 (NEW) EL 143'-0" PRESS BOX LEVEL 2 (NEW) EL 155'-0" PRESS BOX TOP OF STEEL EL 167'-4" AD AB PRESS BOX LOWER LEVEL EL 139'-8" A A4.011 A5.06 GLAZED ALUMINUM CURTAIN WALL GLAZED ALUMINUM CURTAIN WALL FORMED METAL WALL PANEL SPLICE JOINT COVER TRIM METAL COPING FORMED METAL WALL PANEL -COLOR A FORMED METAL WALL PANEL -COLOR B FORMED METAL WALL PANEL -COLOR A FORMED METAL WALL PANEL -COLOR A FORMED METAL WALL PANEL -COLOR A FORMED METAL WALL PANEL -COLOR B FORMED METAL WALL PANEL -COLOR A STRUCTURAL STEEL FRAMING (PAINT) FORMED METAL WALL PANEL SPLICE JOINT COVER TRIM ALUMINUM PIPE AND TUBE RAILING STRUCTURAL STEEL FRAMING (PAINT) STEEL STRINGER, CONCRETE FILLED METAL PAN STAIRS. PROVIDE TRAFFIC COATING ON CONCRETE WALKING SURFACES, PAINT STEEL SURFACES ALUMINUM PIPE AND TUBE RAILING TRAFFIC COATING ON NEW CONCRETE ELECTRICAL LIGHT FIXTURE -REFER TO ELEC. DRAWINGS. FIRE DEPARTMENT RISER, REFER TO PLUMBING DRAWINGS AA AC VERIFICATION NOTE CONTRACTOR SHALL VERIFY ALL DIMENSIONS AND CLEARANCES AND ALL EXISTING FIELD CONDITIONS BEFORE STARTING CONSTRUCTION. COMMENCEMENT OF WORK CONSTITUTES ACCEPTANCE OF CONDITIONS. SHOULD DIFFERENT CONDITIONS BE ENCOUNTERED, CONTACT THE ARCHITECT BEFORE PROCEEDING WITH WORK. ELEVATION GENERAL NOTES 1. REFER TO THE ELECTRICAL AND TECHNOLOGY DRAWINGS FOR CAMERA, LOCATIONS, SECURITY DEVICES, RECEPTACLES, LIGHT FIXTURES, ETC. COORDINATE LOCATIONS WITH VENEER COURSING TO PROVIDE CONSISTENT MOUNTING HEIGHTS. 2. REFER TO PLUMBING DRAWINGS FOR EXTERIOR WALL HYDRANTS, SECONDARY ROOF DRAIN OUTLETS, ETC. COORDINATE PENETRATIONS THROUGH EXTERIOR ENVELOPE WITH OTHER TRADES. PROVIDE TRANSITION MEMBRANE TO MAINTAIN AIR BARRIER SYSTEM. 3. REFER TO MECHANICAL DRAWINGS FOR EXTERIOR LOUVER LOCATIONS LOCATED IN EXTERIOR WALL AND EXTERIOR SOFFITS. COORDINATE PENETRATIONS THROUGH EXTERIOR ENVELOPE WITH OTHER TRADES. PROVIDE TRANSITION MEMBRANE TO MAINTAIN AIR BARRIER SYSTEM. TRAFFIC COATING SEE SHEETS A1.06 AND A1.07 FOR ADDITIONAL INFORMATION ELASTOMERIC COATING TYPICAL AT ALL SIDES, TOP, FRONT, BACK AND BOTTOM CONCRETE COATING LEGEND COPYRIGHT 2024 BY FANNING/HOWEY ASSOCIATES, INC. KEY PLAN WWW.FHAI.COM ARCHITECT BUILDING "A" BUILDING "B" A B SOUTH SUPPORT BUILDING GREYHOUND ACTIVITIES CENTER 5201 E Main Street, Carmel, IN 46033 317-844-9961 8/13/2024 9:36:49 AM\\data1\citrixprofiles$\tvaughn\my documents\2023_ARCH_222154.02_tpvaughn.rvtPROJECT NUMBER: 222154.00 222154.00 CARMEL HIGH SCHOOL STADIUM GRANDSTAND RENOVATION PROJECT CARMEL CLAY SCHOOLS 2390 E. SMOKY ROW (HOME SIDE) 2450 E. SMOKY ROW (VISITOR SIDE) CARMEL, IN 46032 PRESS BOX ELEVATIONS A3.06 PROJECT ISSUE DATE: 8.13.2024 TAC SUBMITTAL DRAWN BY: TPV 317.848.0966 350 E NEW YORK ST. SUITE 300, INDIANAPOLIS IN 46204 PROJECT MANAGER: MKS PLAN NORTH SCALE: 1/4" = 1'-0" PRESS BOX NORTH ELEVATION1 SCALE: 1/4" = 1'-0" PRESS BOX SOUTH ELEVATION2 12REV. NO.DESCRIPTION DATE