Loading...
HomeMy WebLinkAboutA308 - BUILDING B ELEVATIONS - A3-08K IJ CLEAN AND PREPARE EXISTING VERTICAL CONCRETE SURFACES AND APPLY NEW ELASTOMERIC COATING SYSTEM TO EXTEND DOWN THE FACE THAT IS CONCEALED BY GRANDSTAND (BOTH SIDES) KIJ CLEAN AND PREPARE EXISTING VERTICAL CONCRETE SURFACES AND APPLY NEW ELASTOMERIC COATING SYSTEM TO EXTEND DOWN THE FACE THAT IS CONCEALED BY GRANDSTAND (BOTH SIDES) KJ CLEAN AND PREPARE EXISTING VERTICAL CONCRETE SURFACES AND APPLY NEW ELASTOMERIC COATING SYSTEM TO EXTEND DOWN THE FACE THAT IS CONCEALED BY GRANDSTAND (BOTH SIDES) TRAFFIC COATING EXTENTS OF TRAFFIC COATING K J TRAFFIC COATING CLEAN AND PREPARE EXISTING VERTICAL CONCRETE SURFACES AND APPLY NEW ELASTOMERIC COATING SYSTEM TO EXTEND DOWN THE FACE THAT IS CONCEALED BY GRANDSTAND (BOTH SIDES) EXTENTS OF TRAFFIC COATING STAIRS TO GRADE VERIFICATION NOTE CONTRACTOR SHALL VERIFY ALL DIMENSIONS AND CLEARANCES AND ALL EXISTING FIELD CONDITIONS BEFORE STARTING CONSTRUCTION. COMMENCEMENT OF WORK CONSTITUTES ACCEPTANCE OF CONDITIONS. SHOULD DIFFERENT CONDITIONS BE ENCOUNTERED, CONTACT THE ARCHITECT BEFORE PROCEEDING WITH WORK. ELEVATION GENERAL NOTES 1. REFER TO THE ELECTRICAL AND TECHNOLOGY DRAWINGS FOR CAMERA, LOCATIONS, SECURITY DEVICES, RECEPTACLES, LIGHT FIXTURES, ETC. COORDINATE LOCATIONS WITH VENEER COURSING TO PROVIDE CONSISTENT MOUNTING HEIGHTS. 2. REFER TO PLUMBING DRAWINGS FOR EXTERIOR WALL HYDRANTS, SECONDARY ROOF DRAIN OUTLETS, ETC. COORDINATE PENETRATIONS THROUGH EXTERIOR ENVELOPE WITH OTHER TRADES. PROVIDE TRANSITION MEMBRANE TO MAINTAIN AIR BARRIER SYSTEM. 3. REFER TO MECHANICAL DRAWINGS FOR EXTERIOR LOUVER LOCATIONS LOCATED IN EXTERIOR WALL AND EXTERIOR SOFFITS. COORDINATE PENETRATIONS THROUGH EXTERIOR ENVELOPE WITH OTHER TRADES. PROVIDE TRANSITION MEMBRANE TO MAINTAIN AIR BARRIER SYSTEM. TRAFFIC COATING SEE SHEETS A1.06 AND A1.07 FOR ADDITIONAL INFORMATION ELASTOMERIC COATING TYPICAL AT ALL SIDES, TOP, FRONT, BACK AND BOTTOM CONCRETE COATING LEGEND COPYRIGHT 2024 BY FANNING/HOWEY ASSOCIATES, INC. KEY PLAN WWW.FHAI.COM ARCHITECT BUILDING "A" BUILDING "B" A B SOUTH SUPPORT BUILDING GREYHOUND ACTIVITIES CENTER 5201 E Main Street, Carmel, IN 46033 317-844-9961 8/13/2024 9:37:30 AM\\data1\citrixprofiles$\tvaughn\my documents\2023_ARCH_222154.02_tpvaughn.rvtPROJECT NUMBER: 222154.00 222154.00 CARMEL HIGH SCHOOL STADIUM GRANDSTAND RENOVATION PROJECT CARMEL CLAY SCHOOLS 2390 E. SMOKY ROW (HOME SIDE) 2450 E. SMOKY ROW (VISITOR SIDE) CARMEL, IN 46032 BUILDING B ELEVATIONS A3.08 PROJECT ISSUE DATE: 8.13.2024 TAC SUBMITTAL DRAWN BY: TPV / CJK 317.848.0966 350 E NEW YORK ST. SUITE 300, INDIANAPOLIS IN 46204 PROJECT MANAGER: MKS PLAN NORTH SCALE: 1/8" = 1'-0" NORTH ELEVATION BUILDING B1 SCALE: 1/8" = 1'-0" SOUTH ELEVATIN BUILDING B2 SCALE: 1/4" = 1'-0" VOMITORY NORTH ELEVATION BUILDING B (EXIT 1) SCALE: 1/4" = 1'-0" VOMITORY SOUTH ELEVATION BUILDING B (EXIT 1)12EXIT 2 VOMITORY SIMILAR EXIT 2 VOMITORY SIMILAR EXISTING CONCRETE WALL (TYPICAL) EXISTING CONCRETE WALL (TYPICAL) EXISTING CONCRETE WALL (TYPICAL) EXISTING CONCRETE WALL (TYPICAL) REV. NO.DESCRIPTION DATE