Loading...
HomeMy WebLinkAboutA401 - BUILDING SECTIONS - A4-01VERIFICATION NOTE CONTRACTOR SHALL VERIFY ALL DIMENSIONS AND CLEARANCES AND ALL EXISTING FIELD CONDITIONS BEFORE STARTING CONSTRUCTION. COMMENCEMENT OF WORK CONSTITUTES ACCEPTANCE OF CONDITIONS. SHOULD DIFFERENT CONDITIONS BE ENCOUNTERED, CONTACT THE ARCHITECT BEFORE PROCEEDING WITH WORK. FIRST FLOOR EL 100'-0" SECOND FLOOR / CONCOURSE EL 112'-4 1/2" 1 2 3 4 5 6 7 8 9 27'-4" 10'-0" 28'-0" 28'-0" 10'-0" 28'-0" 28'-0" 10'-0" 270 SF BOYS 239 SF ELECTRICAL ? ?264 SF RESTROOM PRESS BOX LEVEL 1 (NEW) EL 143'-0" PRESS BOX LEVEL 2 (NEW) EL 155'-0" PRESS BOX TOP OF STEEL EL 167'-4" A2.02 9 PRESS BOX LOWER LEVEL EL 139'-8" 7.36.7 3 A5.02 A5.02 2 3 A4.03 4 A4.03 1 A4.02 2 A4.02 5 A4.04 6 A4.04 1 A10.03 5.1 8.9 1 A5.04 6 A2.02 7 A2.02 5 A5.01 1 A5.03 3 A5.03 1.1 1.9 FIRST FLOOR EL 100'-0" SECOND FLOOR / CONCOURSE EL 112'-4 1/2" 10 11 12 13 28'-0" 10'-0" 27'-4" 264 SF RESTROOM 95 SF SHOWERS 80 SF CUSTODIAL PRESS BOX LEVEL 1 (NEW) EL 143'-0" PRESS BOX LEVEL 2 (NEW) EL 155'-0" PRESS BOX TOP OF STEEL EL 167'-4" PRESS BOX LOWER LEVEL EL 139'-8" 7 A4.05 8 A4.05 9 A4.05 4 A5.02 A10.05 5 12.912.1 COPYRIGHT 2024 BY FANNING/HOWEY ASSOCIATES, INC. KEY PLAN WWW.FHAI.COM ARCHITECT BUILDING "A" BUILDING "B" A B SOUTH SUPPORT BUILDING GREYHOUND ACTIVITIES CENTER 5201 E Main Street, Carmel, IN 46033 317-844-9961 8/13/2024 9:37:45 AM\\data1\citrixprofiles$\tvaughn\my documents\2023_ARCH_222154.02_tpvaughn.rvtPROJECT NUMBER: 222154.00 222154.00 CARMEL HIGH SCHOOL STADIUM GRANDSTAND RENOVATION PROJECT CARMEL CLAY SCHOOLS 2390 E. SMOKY ROW (HOME SIDE) 2450 E. SMOKY ROW (VISITOR SIDE) CARMEL, IN 46032 BUILDING SECTIONS A4.01 PROJECT ISSUE DATE: 8.13.2024 TAC SUBMITTAL DRAWN BY: TPV 317.848.0966 350 E NEW YORK ST. SUITE 300, INDIANAPOLIS IN 46204 PROJECT MANAGER: MKS SCALE: 1/8" = 1'-0" BUILDING A SECTIONA SCALE: 1/8" = 1'-0" BUILDING A SECTION (continued)AA PLAN NORTH REV. NO.DESCRIPTION DATE