Loading...
HomeMy WebLinkAboutA055-Revised Elevations Final DrawingKNOWLEDGE AND/OR CONSENT OF THE ARCHITECT OR IN CONTRADICTION TO THEM. FAILURE TO PROMPTLY NOTIFY THE ARCHITECT OF SUCH CONDITIONS DRAWINGS) BEYOND A REASONABLE DILIGENCE. IF ANY MISTAKE, OMISSIONS, THE DESIGNER AND HIS CONSULTANTS DO NOT WARRANTY OR GUARANTEE THE ARCHITECT'S WORK PRODUCT OR RECOMMENDATIONS SHALL NOT BE OPPORTUNITY TO TAKE WHATEVER STEPS ARE NECESSARY TO RESOLVE OR DISCREPANCIES ARE FOUND TO EXIT WITHIN THE WORK PRODUCT, THE LIMITATION OF WARRANTY OF DESIGNER WORK PRODUCTSHALL ABSOLVE THE ARCHITECT FROM ANY RESPONSIBILITY FOR THE CONSEQUENCES OF SUCH FAILURE. ACTIONS TAKEN WITH OUT THE ARCHITECT SHALL BE PROMPTLY NOTIFIED SO THAT HE MAY HAVE THE (DRAWINGS, ENGINEERING, SPECIFICATIONS AND REVIEW OF SHOP THE ACCURACY AND COMPLETENESS OF THE WORK PRODUCT HEREIN THE RESPONSIBILITY OF THE ARCHITECT.CONCEPT, THE DIMENSIONS OF THE BUILDING, THE MAJOR THE SCOPE OF THIS DOCUMENT SHALL BE FINAL.INDICATE OR DESCRIBE ALL WORK REQUIRED FOR FULL OF THE ARCHITECT AS TO THE ITEMS OF WORK INCLUDED WITHIN PROPER EXECUTION AND COMPLETION OF THE WORK. DECISIONS THE CONTRACTORS SHALL FURNISH ALL ITEMS REQUIRED FOR THE ON THE BASIS OF THE GENERAL SCOPE INDICATED OR DESCRIBED PERFORMANCE AND COMPLETION OF THE CONTRACT DOCUMENTS. THESE DRAWINGS AND SPECIFICATIONS DO NOT NECESSARILY MECHANICAL AND ELECTRICAL SYSTEMS. AS SCOPE DOCUMENTS ARCHITECTURAL ELEMENTS, AND THE TYPE OF STRUCTURAL, SCOPE OF THE PROJECT IN TERMS OF ARCHITECTURAL DESIGN THESE DRAWINGS AND SPECIFICATIONS INDICATE THE GENERAL SCOPE DOCUMENTA055-Revised Elevations Final Drawing