HomeMy WebLinkAboutSite PlanKNOWLEDGE AND/OR CONSENT OF THE ARCHITECT OR IN CONTRADICTION TO
THEM. FAILURE TO PROMPTLY NOTIFY THE ARCHITECT OF SUCH CONDITIONS
DRAWINGS) BEYOND A REASONABLE DILIGENCE. IF ANY MISTAKE, OMISSIONS,
THE DESIGNER AND HIS CONSULTANTS DO NOT WARRANTY OR GUARANTEE
THE ARCHITECT'S WORK PRODUCT OR RECOMMENDATIONS SHALL NOT BE
OPPORTUNITY TO TAKE WHATEVER STEPS ARE NECESSARY TO RESOLVE
OR DISCREPANCIES ARE FOUND TO EXIT WITHIN THE WORK PRODUCT, THE
LIMITATION OF WARRANTY OF DESIGNER WORK PRODUCT
SHALL ABSOLVE THE ARCHITECT FROM ANY RESPONSIBILITY FOR THE
CONSEQUENCES OF SUCH FAILURE. ACTIONS TAKEN WITH OUT THE
ARCHITECT SHALL BE PROMPTLY NOTIFIED SO THAT HE MAY HAVE THE
(DRAWINGS, ENGINEERING, SPECIFICATIONS AND REVIEW OF SHOP
THE ACCURACY AND COMPLETENESS OF THE WORK PRODUCT HEREIN
THE RESPONSIBILITY OF THE ARCHITECT.
CONCEPT, THE DIMENSIONS OF THE BUILDING, THE MAJOR
THE SCOPE OF THIS DOCUMENT SHALL BE FINAL.
INDICATE OR DESCRIBE ALL WORK REQUIRED FOR FULL
OF THE ARCHITECT AS TO THE ITEMS OF WORK INCLUDED WITHIN
PROPER EXECUTION AND COMPLETION OF THE WORK. DECISIONS
THE CONTRACTORS SHALL FURNISH ALL ITEMS REQUIRED FOR THE
ON THE BASIS OF THE GENERAL SCOPE INDICATED OR DESCRIBED
PERFORMANCE AND COMPLETION OF THE CONTRACT DOCUMENTS.
THESE DRAWINGS AND SPECIFICATIONS DO NOT NECESSARILY
MECHANICAL AND ELECTRICAL SYSTEMS. AS SCOPE DOCUMENTS
ARCHITECTURAL ELEMENTS, AND THE TYPE OF STRUCTURAL,
SCOPE OF THE PROJECT IN TERMS OF ARCHITECTURAL DESIGN
THESE DRAWINGS AND SPECIFICATIONS INDICATE THE GENERAL
SCOPE DOCUMENT
8/16/2024