8 8
5
10
10
129 6
10
6
4
6
13
9
C101A
JOB#: SCB.004SITE PLANDATE: 03/10/23DRAWN BY: RCW (317) 251-1738 (FAX) 251-1923INDIANAPOLIS, INDIANA 462206555 CARROLLTON AVENUEwww.rw-engineering.comCIVIL ENGINEERS - LAND SURVEYORS - DEVELOPMENT CONSULTANTS11575 N. PENNSYLVANIA STREETPENNWOOD OFFICE PARKCARMEL, INDIANA 19PICKLEBALL COURTSW
DAMAGE TO THE EXISTING RIGHT-OF-WAY SHALL
BE RESTORED/REPAIRED TO THE SATISFACTION
OF THE CITY AT THE COMPLETION OF THE
PROJECT. THE CONTRACTOR IS ENCOURAGED
TO INSPECT THE RIGHT-OF-WAY WITH THE CITY
PRIOR TO THE START OF THE CONSTRUCTION
TO DOCUMENT THE EXISTING CONDITION OF THE
RIGHT-OF-WAY.
EX. BUILDING SIZE = 9,396 SF
PR. BUILDING SIZE = 24,722 SF
SITE AREA = 3.77 AC+/-
ZONING = B-5
FRONT SETBACK = 15 FT
SIDE SETBACK = 10 FT
REAR SETBACK = 30 FT
% LOT COVERAGE = 2.23/ 3.77 = 59.2%
PARKING NORMALLY REQUIRED:
1 SPACE PER 250 SF OF FLOOR AREA
FLOOR AREA = 34,118 / 250 = 136 SPACES
PARKING REQUIRED PER VARIANCE:
122 TOTAL SPACES
N-SITE PARKING PROVIDED:
STANDARD SPACES = 118
ACCESSIBLE SPACES = 4
TOTAL: 122 SPACES PROVIDED
DEVELOPMENT SUMMARY
08/11/23