HomeMy WebLinkAboutCorrespondencePlan Review - Review Comments Report
Project Name: PZ-2024-00134 to 136 Beck Residence Variances
Workflow Started: 8/23/2024 8:48:11 AM
Report Generated: 10/14/2024 03:49 PM
REF #CYCLE REVIEWED BY TYPE FILENAME DISCUSSION STATUS
1 1 Planning & Zoning
Angie Conn
8/29/24 9:14 AM
Comment
Please respond in writing to the preliminary review comments listed at the
bottom of the 08/23 docket no. assignment email, and please do that before
noon Friday, September 13. For your convenience, they are listed again,
below: a) Please make checks payable to City of Carmel if you are paying via
check. b) Provide a copy of the Official List of Adjacent Property Owners from
the Hamilton County Auditors Office. (Make sure to check Carmel BZA on
their form.) c) *The Current in Carmel only prints on Tuesdays, and their filing
deadline is usually 14 days prior to their printing date. Please submit your
Microsoft Word file of the legal ad to them before Noon, Fri., August 30 so
that it prints on time. Their contact info is 317-489-4444 or
legals@youarecurrent.com. (Please refer to the Handout for a template of
wording to use for the legal ad and the mailings the Notice of Public
Hearing.) d) The mailings/notices to the adjacent property owners should be
done by first class mail with Certificate of Mailing (not Certified Mail). (Please
provide us with the stamped receipts of the certificate of mailings for the file
on or before Noon, Wed., September 18.) e) Please provide the filled out &
notarized Placement of Public Notice Sign Placement Affidavit form (found in
Handout) once the sign is placed. Provide the filled out, notarized Petitioners
Affidavit of Notice of Public Hearing form (found in Handout). g) Please
provide the filled out Notice of the Public Hearing form/template (found in
Handout). h) Please provide proof of notice, such as Publishers Affidavit from
the newspaper, once you receive them. i) Please make sure to list out your
practical difficulties and hardships associated with having to comply with the
zoning ordinance. j) Additional review comments (if any) will be issued
through ProjectDox, our online electronic plan review software.
Responded by: Michael Beck - 9/6/24 12:44 PM
Still working on mailing
Resolved
2 1 Planning & Zoning
Angie Conn
8/29/24 9:15 AM
Comment
Pool Pump equipment should be of a quiet design with low noise/vibrations.
Please provide specs/design details.
Responded by: Michael Beck - 9/6/24 12:45 PM
Uploaded
Resolved
REVIEW COMMENTS
Plan Review - Review Comments Report
Project Name: PZ-2024-00134 to 136 Beck Residence Variances
Workflow Started: 8/23/2024 8:48:11 AM
Report Generated: 10/14/2024 03:49 PM
REF #CYCLE REVIEWED BY TYPE FILENAME DISCUSSION STATUS
3 1 Planning & Zoning
Angie Conn
8/29/24 9:17 AM
Comment
Please also upload the swimming pool location and design details.
Coordinator Response: Angie Conn - 10/9/24 2:25 PM
The pool is going to run east to west.
----------------------------------------------------------
Responded by: Michael Beck - 10/9/24 2:03 PM
I believe this was already uploaded twice. I'm not sure
what else you need.
----------------------------------------------------------
Reviewer Response: Angie Conn - 9/24/24 1:47 PM
Upload to the Site Drawings folder, please.
----------------------------------------------------------
Responded by: Michael Beck - 8/30/24 1:56 PM
Which folder should this be uploaded to?
Resolved
4 1 Planning & Zoning
Angie Conn
8/29/24 9:18 AM
Comment
Since the site will be exceeding the allowed lot cover percentage, the Carmel
Engineering Dept. is also going to require on-site stormwater detention OR
payment into the Stormwater Fund/Fee.
Info Only
Shestak, Joe
From:Mike and Julie Beck <mjjrmbeck@gmail.com>
Sent:Tuesday, August 27, 2024 11:04 AM
To:Conn, Angelina V
Cc:Shestak, Joe
Subject:Re: Docket No. Assignment: Beck Residence Variances (#PZ-2024-00134 V; -00135 V;
-00136 V)
Thank you for the clarification. We will pay it.
On Tue, Aug 27, 2024, 11:03 Conn, Angelina V <Aconn@carmel.in.gov> wrote:
Mike/Julie - Since the variance requests are on the bza hearing officer meeting agenda, it will most likely be
approved. That is where non-controversial petitions are heard (rather than by the full 5-member board). If you are
concerned about the variances being denied, you can always commit in writing to us that you will pay the
stormwater fee right after the variances get approved. (And we can also make that stormwater fund/fee payment
a condition of approval.)
Please note I will be out of the office Sept. 6-24.
Sincerely,
Angie Conn, AICP - Planning Administrator
Carmel Planning/Zoning Division – DOCS
rd
1 Civic Sq., 3 Flr., Carmel, IN 46202
O: 317.571.2417 W: carmeldocs.com
From: Mike and Julie Beck <mjjrmbeck@gmail.com>
Sent: Tuesday, August 27, 2024 10:45 AM
To: Conn, Angelina V <Aconn@carmel.in.gov>
Subject: Re: Docket No. Assignment: Beck Residence Variances (#PZ-2024-00134 V; -00135 V; -00136 V)
Good morning,
1
What happens if we pay the fee and then the variance gets denied at the hearing?
On Tue, Aug 27, 2024, 10:41 Conn, Angelina V <Aconn@carmel.in.gov> wrote:
Good morning, Mike –
Since you will be exceeding the allowed lot cover percentage for the lot, the Carmel Engineering Dept.
is requiring that you either provide on-site stormwater detention OR payment into the Stormwater Fund
($6,000). Please contact Alex Jordan or John Thomas in that Department with any questions about that.
They are also copied on this email. Thank you.
Please note I will be out of the office Sept. 6-24.
Sincerely,
Angie Conn, AICP - Planning Administrator
Carmel Planning/Zoning Division – DOCS
rd
1 Civic Sq., 3 Flr., Carmel, IN 46202
O: 317.571.2417 W: carmeldocs.com
From: Shestak, Joe <jshestak@carmel.in.gov>
Sent: Friday, August 23, 2024 8:50 AM
To: Mike and Julie Beck <mjjrmbeck@gmail.com>
Cc: Lopez, Alexia K <alopez@carmel.in.gov>; Warner, Caleb <cwarner@carmel.in.gov>; Hollibaugh,
Mike P <MHollibaugh@carmel.in.gov>; Jordan, Alex <ajordan@carmel.in.gov>; Kass, Joslyn
<jkass@carmel.in.gov>; Keeling, Adrienne M <AKeeling@carmel.in.gov>; Littlejohn, David W
<dlittlejohn@carmel.in.gov>; Mindham, Daren <dmindham@carmel.in.gov>; Mishler, Nicholas F
<nmishler@carmel.in.gov>; Motz, Lisa <lmotz@carmel.in.gov>; Thomas, John G
<jthomas@carmel.in.gov>; Krueskamp, Theresa A <TKrueskamp@carmel.in.gov>; McCoy, David W
<DMcCoy@carmel.in.gov>; Willie Hall <whall@crossroadengineers.com>;
'maggie.crediford@trico.eco' <maggie.crediford@trico.eco>; Shestak, Joe <jshestak@carmel.in.gov>;
'ryan.hartman@trico.eco' <ryan.hartman@trico.eco>; Jesse, Christina <cjesse@carmel.in.gov>;
Prader, Kelli <kprader@carmel.in.gov>; Grechukhin, Sergey <sgrechukhin@carmel.in.gov>; Shalit,
Aliza <ashalit@carmel.in.gov>; Worrell, Jeff <jworrell@carmel.in.gov>; Clark, Samuel
<Samuel.Clark@hamiltoncounty.in.gov>; Hohlt, William G <WHohlt@carmel.in.gov>; Lynch-Mcgrath,
2