HomeMy WebLinkAboutSite Plan_Stamped ApprovedSteven Jenison10520 Shelbourne Carmel, IN 46032FBi Buildings, Inc.3823 W 1800 SRemington, IN 47977219-261-2157www.fbibuildings.comDate :
Name:
PRELIMINARY
THESE DRAWINGS
ARE FOR
REVIEW
ONLY
These drawings are
not complete and
are not to be used
for construction.
5/12/24
DJLX:___________________________________________ ____________ Purchaser Approval DateX:____________________________________________ _____________ Seller Approval Date Drawing # ____________________________________ Copyright:
FBi Buildings, Inc.
Building may not be shown to scale.
(Colors shown may not match actual colors.
Refer to color samples for actual colors.)Construction ZoneCZ-101North
Construction Zone Checklist:
Site Access (location, width, and type)
Perimeter Access & Grade (dimensions, type, and grade)
Building Pad (location, dimensions, and type)
Staging Area (location, dimensions, and type)
Dig in Considerations (specified)
Gravel Backfill __Yes __No
Spoils __Inside __Outisde
Obstructions/ Safety Hazards (location and type)
Site Sign (location)
Off Limit Areas (location)
Purchaser understands excess soil will be generated during the construction
process, and takes responsibility for its removal. Purchaser Initials_______
Purchaser understands that any deviations from the defined site conditions when
FBi mobilizes could result in a change order. Purchaser Initials_______
Construction Zone Checklist:
Site Access (location, width, and type)
Perimeter Access & Grade (dimensions, type, and grade)
Building Pad (location, dimensions, and type)
Staging Area (location, dimensions, and type)
Dig in Considerations (specified)
Gravel Backfill __Yes __No
Spoils __Inside __Outisde
Obstructions/ Safety Hazards (location and type)
Site Sign (location)
Off Limit Areas (location)
Purchaser understands excess soil will be generated during the construction
process, and takes responsibility for its removal. Purchaser Initials_______
Purchaser understands that any deviations from the defined site conditions when
FBi mobilizes could result in a change order. Purchaser Initials_______
Proposed
Building
Construction Zone Gravel Drive lane
Crew entrance
8/27/2024
Steven Jenison10520 Shelbourne Carmel, IN 46032FBi Buildings, Inc.3823 W 1800 SRemington, IN 47977219-261-2157www.fbibuildings.comDate :
Name:
PRELIMINARY
THESE DRAWINGS
ARE FOR
REVIEW
ONLY
These drawings are
not complete and
are not to be used
for construction.
5/12/24
DJLX:___________________________________________ ____________ Purchaser Approval DateX:____________________________________________ _____________ Seller Approval Date Drawing # ____________________________________ Copyright:
FBi Buildings, Inc.
Building may not be shown to scale.
(Colors shown may not match actual colors.
Refer to color samples for actual colors.)Floor PlanA-101
48'
3'
16'
8'
8'
5'
40'
Door Schedule:
D1 - 3' x 6'-8" Steel Insulated Walk Door
D2 - 16' x 14' OHD Frame Out (Door Not Included)
D3 - 8' x 8' OHD Frame Out (Door Not Included)
FLOOR PLAN
FBi Building 40' x 48' x 18' I.C.
Sidewall Columns & Trusses Space at 8' O.C. Designed for 20 psf Ground Snow Load
General Notes:
Gutters - Yes, 6 "
Wainscot - Yes, Depth 36"
Continuous Vented Ridge
10,000 PSI Perma-Column System
Included on Entire Building
12" Sidewall Overhangs
With Vented Aluminum Soffit
12" Endwall Overhangs With
Non-Vented Aluminum Soffit
D1
D2
D3
8/27/2024
Steven Jenison10520 Shelbourne Carmel, IN 46032FBi Buildings, Inc.3823 W 1800 SRemington, IN 47977219-261-2157www.fbibuildings.comDate :
Name:
PRELIMINARY
THESE DRAWINGS
ARE FOR
REVIEW
ONLY
These drawings are
not complete and
are not to be used
for construction.
5/12/24
DJLX:___________________________________________ ____________ Purchaser Approval DateX:____________________________________________ _____________ Seller Approval Date Drawing # ____________________________________ Copyright:
FBi Buildings, Inc.
Building may not be shown to scale.
(Colors shown may not match actual colors.
Refer to color samples for actual colors.)Elevation PlanA-201
WEST ELEVATION
SOUTH ELEVATION
100'-0"
T/ Finish Floor
Steel Gutters
Steel Wainscot
Galvalume Steel Siding
With Kynar 500 Paint
Steel Vented Ridge
Galvalume Steel Roofing
With Kynar 500 Paint3.5
12
118'-0"
B/ Truss
8/27/2024
Steven Jenison10520 Shelbourne Carmel, IN 46032FBi Buildings, Inc.3823 W 1800 SRemington, IN 47977219-261-2157www.fbibuildings.comDate :
Name:
PRELIMINARY
THESE DRAWINGS
ARE FOR
REVIEW
ONLY
These drawings are
not complete and
are not to be used
for construction.
5/12/24
DJLX:___________________________________________ ____________ Purchaser Approval DateX:____________________________________________ _____________ Seller Approval Date Drawing # ____________________________________ Copyright:
FBi Buildings, Inc.
Building may not be shown to scale.
(Colors shown may not match actual colors.
Refer to color samples for actual colors.)Elevation PlanA-202
EAST ELEVATION
SOUTH ELEVATION
8/27/2024
Steven Jenison10520 Shelbourne Carmel, IN 46032FBi Buildings, Inc.3823 W 1800 SRemington, IN 47977219-261-2157www.fbibuildings.comDate :
Name:
PRELIMINARY
THESE DRAWINGS
ARE FOR
REVIEW
ONLY
These drawings are
not complete and
are not to be used
for construction.
5/12/24
DJLX:___________________________________________ ____________ Purchaser Approval DateX:____________________________________________ _____________ Seller Approval Date Drawing # ____________________________________ Copyright:
FBi Buildings, Inc.
Building may not be shown to scale.
(Colors shown may not match actual colors.
Refer to color samples for actual colors.)3D ViewA-203
8/27/2024
Steven Jenison10520 Shelbourne Carmel, IN 46032FBi Buildings, Inc.3823 W 1800 SRemington, IN 47977219-261-2157www.fbibuildings.comDate :
Name:
PRELIMINARY
THESE DRAWINGS
ARE FOR
REVIEW
ONLY
These drawings are
not complete and
are not to be used
for construction.
5/12/24
DJLX:___________________________________________ ____________ Purchaser Approval DateX:____________________________________________ _____________ Seller Approval Date Drawing # ____________________________________ Copyright:
FBi Buildings, Inc.
Building may not be shown to scale.
(Colors shown may not match actual colors.
Refer to color samples for actual colors.)Sections and DetailsA-401
"Conceptual
Only actual
details may
vary"
8/27/2024