HomeMy WebLinkAboutA2.00 North and East ElevationsNEW OPEN -JOINT PRESSURE- EQUALIZED ALUMINUM COMPOSITE
METAL FACADE INSTALLED OVER EXISTING BRICK ON GIRDERS.
EDGES TO BE MITERED AND RETURNED TO GIRDER SYSTEM AS SHOWN
EXISTING STOREFRONT WINDOWS GIRDER SYSTEM AND FASTENER ATTACHMENT PER MANUFACTURER
TO REMAIN;
CONTRACTOR TO VERIFY WATER EXISTING CAST STONE FEATURES o NEW BACKLIT BUILDING -MOUNTED
TIGHTNESS AND RE -SEAL AS TO BE MAINTAINED, COORDINATE Q Q SIGNAGE, ELECTRICAL ROUGH -IN
REQUIRED METAL PANEL GIRDER SYSTEM TO REQUIRED -
AVOID.
%/ II %/ II %/ II %/
%/ II %/ II %/ II %/
�TZ� CSC
EXISTING MASONRY TO REMAIN AT FIRST FLOOR; METAL PANEL SYSTEM
TO TERMINATE AT LOWER EDGE OF SOLDIER COURSE UNDER 2ND
FLOOR WINDOWS TYPICAL.
CONTRACTOR TO VERIFY WATER TIGHTNESS AND RE -SEAL; TUCK POINT
AS REQUIRED FOR ALL EXISTING MASONRY
NORTH ELEVATION
1 /8" = 1'-0"
M
00
N
N
N
0
N
Q
O
'Vol' FZIZIIIA�g.o
oil
C0C�0 Z
NEW OVER -FRAMED
BEYOND, WRAP ALL I
METAL PANEL AROUI
REAR OF PARAPET
EXISTING WINDOWS TO REMAIN;
CONTRACTOR TO VERIFY WATER TIGHTNESS
AND RE -SEAL AS REQUIRED
%/
EXISTING CAST STONE FEATURES
TO BE MAINTAINED, COORDINATE
METAL PANEL GIRDER SYSTEM TO
AVOID.
LINE OF MECHANICAL
SCREENING WALL BEYOND o
0
��
0
�
20'-0„
o
D
NEW ELECTRICAL
ROUGH -IN FOR LINEAR
WALL SCONCES PER
SPEC.
FIELD VERIFY STRUCTURE AND
DEMO EXISTING PARAPET TO
F_ _1 ACCOMMODATE NEW OVERFRAMED
PARAPET
i
FIELD VERIFY STRUCTURE AND
DEMO EXISTING PARAPET TO
ACCOMMODATE NEW OVERFRAMED
PARAPET
ALUMINUM COMPOSITE METAL
CORNICE WITH COPING CAP PER
MANUFACTURER- TYPICAL ON ALL
OVERCLAD PARAPETS
EXISTING STOREFRONT WINDOWS
TO REMAIN;
CONTRACTOR TO VERIFY WATER
TIGHTNESS AND RE -SEAL AS
REQUIRED
NEW OPEN -JOINT PRESSURE- EQUALIZED ALUMINUM COMPOSITE
METAL FACADE INSTALLED OVER EXISTING BRICK ON GIRDERS.
EDGES TO BE MITERED AND RETURNED TO GIRDER SYSTEM AS SHOWN
GIRDER SYSTEM AND FASTENER ATTACHMENT PER MANUFACTURER
0 0
Q Q
N
EN QN
gm
mm MEN
ONE ------
MIN
IxoNE Eli mmoNS11,111 110\00N I 1000"M
'mg No
'00\00
NEW "STRUXURE" W NEW STOREFRONT SYSTEM, RE: SPEC.,
ALUMINUM AT BUILDING ENTRY ONLY;
PERGOLA INSTALLATION PER MFTR.
BY OTHERS INSTRUCTIONS TYP.
LINE OF MECHANICAL
SCREENING WALL BEYOND
NEW ELECTRICAL EXISTING WINDOWS TO REMAIN;
ROUGH -IN FOR LINEAR CONTRACTOR TO VERIFY WATER
WALL SCONCES PER TIGHTNESS AND RE -SEAL AS REQUIRED
SPEC.
FIELD VERIFY STRUCTURE AND
DEMO EXISTING PARAPET TO
F_ ACCOMMODATE NEW OVERFRAMED
PARAPET
PARAPET
EXTERIOR
ND SIDES AND
iPEN-JOINT PRESSURE- EQUALIZED ALUMINUM COMPOSITE METAL
IE INSTALLED OVER EXISTING BRICK ON GIRDERS.
i TO BE MITERED AND RETURNED TO GIRDER SYSTEM AS SHOWN
R SYSTEM AND FASTENER ATTACHMENT PER MANUFACTURER
IG MASONRY TO REMAIN AT FIRST FLOOR; METAL PANEL SYSTEM
MINATE AT LOWER EDGE OF SOLDIER COURSE UNDER 2ND
WINDOWS TYPICAL.
4CTOR TO VERIFY WATER TIGHTNESS AND RE -SEAL; TUCK POINT
!UIRED FOR ALL EXISTING MASONRY
CONTRACTOR TO VERIFY WATER I CONTRACTOR TO VERIFY WATERTIGHTNESS CONTRACTOR TO VERIFY WATER TIGHTNESS
TIGHTNESS AND RE -SEAL AS AND RE -SEAL AS REQUIRED AND RE -SEAL AS REQUIRED
REQUIRED
EAST ELEVATION
1/8" = 1'-011
EXISTING STOREFRONT
WINDOWS TO REMAIN;
CONTRACTOR TO VERIFY
WATER TIGHTNESS AND
RE -SEAL AS REQUIRED
n
Pi�
ARCHITECTS
ARCHITECTURE
L A N D S C A P E
ARCHITECTURE
P.913.831.1415
NSPJARCN.COM
9415 NALL AVE., #300
PRAIRIE VILLAGE,
KANSAS,66207
\lililll
NOT FOR
CONSTRUCTION =
O �
LL
J
EXISTING MASONRY TO REMAIN AT FIRST FLOOR; METAL PANEL SYSTEM
TO TERMINATE AT LOWER EDGE OF SOLDIER COURSE UNDER 2ND
FLOOR WINDOWS TYPICAL.
CONTRACTOR TO VERIFY WATER TIGHTNESS AND RE -SEAL; TUCK POINT LJJ W
AS REQUIRED FOR ALL EXISTING MASONRY
0 Z
U- co
0 Q N
Lu
� Q
0 Q Z
LijZ Q o
X Z Z
�WI�
Z > C�
oW J J
V)
mWuj
z Q
U > Z Z
H w
H Q
00 0
Q V) �O Z
DRAWING RELEASE LOG
• 07.12.24 SCHEMATIC ELEVATIONS
0 REVISIONS
JOB NO. DATE
745523 08.28.24
DRAWN BY
CAB /CEE
SHEET NAME
BUILDING
ELEVATIONS
SHEET NO.
PROGRESS SET A2.00