Loading...
HomeMy WebLinkAboutA2.00 North and East ElevationsNEW OPEN -JOINT PRESSURE- EQUALIZED ALUMINUM COMPOSITE METAL FACADE INSTALLED OVER EXISTING BRICK ON GIRDERS. EDGES TO BE MITERED AND RETURNED TO GIRDER SYSTEM AS SHOWN EXISTING STOREFRONT WINDOWS GIRDER SYSTEM AND FASTENER ATTACHMENT PER MANUFACTURER TO REMAIN; CONTRACTOR TO VERIFY WATER EXISTING CAST STONE FEATURES o NEW BACKLIT BUILDING -MOUNTED TIGHTNESS AND RE -SEAL AS TO BE MAINTAINED, COORDINATE Q Q SIGNAGE, ELECTRICAL ROUGH -IN REQUIRED METAL PANEL GIRDER SYSTEM TO REQUIRED - AVOID. %/ II %/ II %/ II %/ %/ II %/ II %/ II %/ �TZ� CSC EXISTING MASONRY TO REMAIN AT FIRST FLOOR; METAL PANEL SYSTEM TO TERMINATE AT LOWER EDGE OF SOLDIER COURSE UNDER 2ND FLOOR WINDOWS TYPICAL. CONTRACTOR TO VERIFY WATER TIGHTNESS AND RE -SEAL; TUCK POINT AS REQUIRED FOR ALL EXISTING MASONRY NORTH ELEVATION 1 /8" = 1'-0" M 00 N N N 0 N Q O 'Vol' FZIZIIIA�g.o oil C0C�0 Z NEW OVER -FRAMED BEYOND, WRAP ALL I METAL PANEL AROUI REAR OF PARAPET EXISTING WINDOWS TO REMAIN; CONTRACTOR TO VERIFY WATER TIGHTNESS AND RE -SEAL AS REQUIRED %/ EXISTING CAST STONE FEATURES TO BE MAINTAINED, COORDINATE METAL PANEL GIRDER SYSTEM TO AVOID. LINE OF MECHANICAL SCREENING WALL BEYOND o 0 �� 0 � 20'-0„ o D NEW ELECTRICAL ROUGH -IN FOR LINEAR WALL SCONCES PER SPEC. FIELD VERIFY STRUCTURE AND DEMO EXISTING PARAPET TO F_ _1 ACCOMMODATE NEW OVERFRAMED PARAPET i FIELD VERIFY STRUCTURE AND DEMO EXISTING PARAPET TO ACCOMMODATE NEW OVERFRAMED PARAPET ALUMINUM COMPOSITE METAL CORNICE WITH COPING CAP PER MANUFACTURER- TYPICAL ON ALL OVERCLAD PARAPETS EXISTING STOREFRONT WINDOWS TO REMAIN; CONTRACTOR TO VERIFY WATER TIGHTNESS AND RE -SEAL AS REQUIRED NEW OPEN -JOINT PRESSURE- EQUALIZED ALUMINUM COMPOSITE METAL FACADE INSTALLED OVER EXISTING BRICK ON GIRDERS. EDGES TO BE MITERED AND RETURNED TO GIRDER SYSTEM AS SHOWN GIRDER SYSTEM AND FASTENER ATTACHMENT PER MANUFACTURER 0 0 Q Q N EN QN gm mm MEN ONE ------ MIN IxoNE Eli mmoNS11,111 110\00N I 1000"M 'mg No '00\00 NEW "STRUXURE" W NEW STOREFRONT SYSTEM, RE: SPEC., ALUMINUM AT BUILDING ENTRY ONLY; PERGOLA INSTALLATION PER MFTR. BY OTHERS INSTRUCTIONS TYP. LINE OF MECHANICAL SCREENING WALL BEYOND NEW ELECTRICAL EXISTING WINDOWS TO REMAIN; ROUGH -IN FOR LINEAR CONTRACTOR TO VERIFY WATER WALL SCONCES PER TIGHTNESS AND RE -SEAL AS REQUIRED SPEC. FIELD VERIFY STRUCTURE AND DEMO EXISTING PARAPET TO F_ ACCOMMODATE NEW OVERFRAMED PARAPET PARAPET EXTERIOR ND SIDES AND iPEN-JOINT PRESSURE- EQUALIZED ALUMINUM COMPOSITE METAL IE INSTALLED OVER EXISTING BRICK ON GIRDERS. i TO BE MITERED AND RETURNED TO GIRDER SYSTEM AS SHOWN R SYSTEM AND FASTENER ATTACHMENT PER MANUFACTURER IG MASONRY TO REMAIN AT FIRST FLOOR; METAL PANEL SYSTEM MINATE AT LOWER EDGE OF SOLDIER COURSE UNDER 2ND WINDOWS TYPICAL. 4CTOR TO VERIFY WATER TIGHTNESS AND RE -SEAL; TUCK POINT !UIRED FOR ALL EXISTING MASONRY CONTRACTOR TO VERIFY WATER I CONTRACTOR TO VERIFY WATERTIGHTNESS CONTRACTOR TO VERIFY WATER TIGHTNESS TIGHTNESS AND RE -SEAL AS AND RE -SEAL AS REQUIRED AND RE -SEAL AS REQUIRED REQUIRED EAST ELEVATION 1/8" = 1'-011 EXISTING STOREFRONT WINDOWS TO REMAIN; CONTRACTOR TO VERIFY WATER TIGHTNESS AND RE -SEAL AS REQUIRED n Pi� ARCHITECTS ARCHITECTURE L A N D S C A P E ARCHITECTURE P.913.831.1415 NSPJARCN.COM 9415 NALL AVE., #300 PRAIRIE VILLAGE, KANSAS,66207 \lililll NOT FOR CONSTRUCTION = O � LL J EXISTING MASONRY TO REMAIN AT FIRST FLOOR; METAL PANEL SYSTEM TO TERMINATE AT LOWER EDGE OF SOLDIER COURSE UNDER 2ND FLOOR WINDOWS TYPICAL. CONTRACTOR TO VERIFY WATER TIGHTNESS AND RE -SEAL; TUCK POINT LJJ W AS REQUIRED FOR ALL EXISTING MASONRY 0 Z U- co 0 Q N Lu � Q 0 Q Z LijZ Q o X Z Z �WI� Z > C� oW J J V) mWuj z Q U > Z Z H w H Q 00 0 Q V) �O Z DRAWING RELEASE LOG • 07.12.24 SCHEMATIC ELEVATIONS 0 REVISIONS JOB NO. DATE 745523 08.28.24 DRAWN BY CAB /CEE SHEET NAME BUILDING ELEVATIONS SHEET NO. PROGRESS SET A2.00