HomeMy WebLinkAboutKeystone Parkway #07-08D Full Size Road Plans2007
2030
2030
A.A.D.T.
A.A.D.T.
D.H.V.
DIRECTIONAL DISTRIBUTION
TRUCKS % D.H.V.
%
V.P.H.
V.P.D.
V.P.D.
TRAFFIC DATA
4
KEYSTONE PARKWAY - LINE "E"
38,015
53,540
8,035
55/45
07-08D
No.
STATE OF
INDIA NA
REGISTERED
P
R
OFE
S
SIONAL ENGIN
EER10505104
J. SAMUEL B
ALO
G
173
DESIGNATION NO.
BRIDGE FILE
SHEETS
CONTRACT PROJECT NO.
of
PHONE NUMBER
PREPARED BY:
PLANS
CERTIFIED BY:
DATE
(317) 547-5580
ROAD PLANS
PROJECT LOCATION SHOWN BY
R/W CODE:XXX
7260 SHADELAND STATION
INDIANAPOLIS, IN 46256-3957
TEL 317.547.5580 FAX 317.543.0270
www.structurepoint.com
American Structurepoint, Inc.
aedwards 3:44:04 PM3/20/2008 P:\IN2003\0661\D. Drawings\IN20030661.RD.C2.TS01.dgn
LOCATION MAP
1
CITY OF CARMEL
BOARD OF PUBLIC
WORKS & SAFETY
CITY OF CARMEL AND INDIANA DEPARTMENT OF
TRANSPORTATION STANDARD SPECIFICATIONS
DATED 2008 TO BE USED WITH THESE PLANS
KEYSTONE PARKWAY AND 126th STREET
CITY OF CARMEL PROJECT NO. 07-08D
03-21-08
40+00 45+00 50+00 55+00
2
N/A
N/A
KDS AJE
JSB JSB
2007
2030
2030
A.A.D.T.
A.A.D.T.
D.H.V.
DIRECTIONAL DISTRIBUTION
TRUCKS % D.H.V.
%
V.P.H.
V.P.D.
V.P.D.
TRAFFIC DATA
-
2007
2030
2030
A.A.D.T.
A.A.D.T.
D.H.V.
DIRECTIONAL DISTRIBUTION
TRUCKS % D.H.V.
%
V.P.H.
V.P.D.
V.P.D.
TRAFFIC DATA
2007
2030
2030
A.A.D.T.
A.A.D.T.
D.H.V.
DIRECTIONAL DISTRIBUTION
TRUCKS % D.H.V.
%
V.P.H.
V.P.D.
V.P.D.
TRAFFIC DATA
2007
2030
2030
A.A.D.T.
A.A.D.T.
D.H.V.
DIRECTIONAL DISTRIBUTION
TRUCKS % D.H.V.
%
V.P.H.
V.P.D.
V.P.D.
TRAFFIC DATA
2007
2030
2030
A.A.D.T.
A.A.D.T.
D.H.V.
DIRECTIONAL DISTRIBUTION
TRUCKS % D.H.V.
%
V.P.H.
V.P.D.
V.P.D.
TRAFFIC DATARAMP "NER"
RAMP "NWR"
RAMP "SER"
RAMP "SWR"
10,540
14,845
745
50/50
N/A
155
100
N/A
5,890
100
100
75
3,740
N/A
N/A
6,820
205
100
126TH STREET - LINE "S-7-E"
5,170
120
-
-
-
-
**
**
The paper relocation will be cross sectioned by the Engineer before construction.
Existing asphalt pavement located outside the construction limits, between Sta. __________ and
Sta. __________, shall be removed as directed.
**
** REPRESENTS GENERAL NOTES REQUIRED
All earth shoulders, median areas, and cut and fill slopes shall be plain or mulch seeded
except where sodding is specified
The final cross sections of the grading contract will be the original cross sections of the
paving contract. However, partial or complete cross sections shall be taken if necessary to
determine the actual excavation quantities.
The quantity of peat excavation shown on the plans has been estimated on the basis of
theoretical cross sections by using treatment of existing fills, treatment by removal, or
treatment by displacement, where each treatment applies.
SHEET NO.DRAWING INDEX
REVISIONS
SHEET NO.DATE REVISED
INDEX TO SHEETSGENERAL NOTESUTILITIES
HORIZONTAL SCALE
DESIGNATION NO.
BRIDGE FILE
VERTICAL SCALE
SURVEY BOOK SHEETS
CONTRACT PROJECT NO.
of
DESIGNED:DRAWN:
CHECKED:CHECKED:
DESIGN ENGINEER
RECOMMENDED
FOR APPROVAL
DATE
aedwards 3:44:09 PM3/20/2008 P:\IN2003\0661\D. Drawings\IN20030661.RD.C2.IN01.dgn
INDEX AND
GENERAL NOTES
CITY OF CARMEL
All limited access right-of-way (L.A. R/W) is to be fenced with farm field type fence (FFTF)
where specified in the plans.
Temporary Retaining wall details are provided for information only. Final wall limits and design are the
responsibility of the contractor.
07-08D
No.
STATE OF
INDIAN A
REGISTERED
P
R
OFE
S
SIONAL ENGIN
EER10505104
J. SAMUEL B
ALO
G
03/21/2008
173
1"=5’
N/A
ALT
3
ALT
JSB JSB
HORIZONTAL SCALE
DESIGNATION NO.
BRIDGE FILE
VERTICAL SCALE
SURVEY BOOK SHEETS
CONTRACT PROJECT NO.
of
DESIGNED:DRAWN:
CHECKED:CHECKED:
DESIGN ENGINEER
RECOMMENDED
FOR APPROVAL
DATE
TYPICAL CROSS SECTION
aedwards 3:44:15 PM3/20/2008 P:\IN2003\0661\D. Drawings\IN20030661.RD.C2.TY01.DGN
CITY OF CARMEL
07-08D
No.
STATE OF
INDIAN A
REGISTERED
P
R
OFE
S
SIONAL ENGIN
EER10505104
J. SAMUEL B
ALO
G
03/21/2008
173
ALT
4
HORIZONTAL SCALE
DESIGNATION NO.
BRIDGE FILE
VERTICAL SCALE
SURVEY BOOK SHEETS
CONTRACT PROJECT NO.
of
DESIGNED:DRAWN:
CHECKED:CHECKED:
DESIGN ENGINEER
RECOMMENDED
FOR APPROVAL
DATE
TYPICAL CROSS SECTION
aedwards 3:44:20 PM3/20/2008 P:\IN2003\0661\D. Drawings\IN20030661.RD.C2.TY02.dgn
CITY OF CARMEL
07-08D
No.
STATE OF
INDIAN A
REGISTERED
P
R
OFE
S
SIONAL ENGIN
EER10505104
J. SAMUEL B
ALO
G
03/21/2008
173
ALT
5
HORIZONTAL SCALE
DESIGNATION NO.
BRIDGE FILE
VERTICAL SCALE
SURVEY BOOK SHEETS
CONTRACT PROJECT NO.
of
DESIGNED:DRAWN:
CHECKED:CHECKED:
DESIGN ENGINEER
RECOMMENDED
FOR APPROVAL
DATE
TYPICAL CROSS SECTION
aedwards 3:44:26 PM3/20/2008 P:\IN2003\0661\D. Drawings\IN20030661.RD.C2.TY03.DGN
CITY OF CARMEL
07-08D
No.
STATE OF
INDIAN A
REGISTERED
P
R
OFE
S
SIONAL ENGIN
EER10505104
J. SAMUEL B
ALO
G
03/21/2008
173
ALT
6
HORIZONTAL SCALE
DESIGNATION NO.
BRIDGE FILE
VERTICAL SCALE
SURVEY BOOK SHEETS
CONTRACT PROJECT NO.
of
DESIGNED:DRAWN:
CHECKED:CHECKED:
DESIGN ENGINEER
RECOMMENDED
FOR APPROVAL
DATE
TYPICAL CROSS SECTION
aedwards 3:44:32 PM3/20/2008 P:\IN2003\0661\D. Drawings\IN20030661.RD.C2.TY04.dgn
CITY OF CARMEL
07-08D
No.
STATE OF
INDIAN A
REGISTERED
P
R
OFE
S
SIONAL ENGIN
EER10505104
J. SAMUEL B
ALO
G
03/21/2008
173
7
ALT ALT
JSB JSB
1"=5’
N/A
2%2%
4%
4%2%2%
2%2%2%
2%2%2%
2%
2%
2%2%
4%
HORIZONTAL SCALE
DESIGNATION NO.
BRIDGE FILE
VERTICAL SCALE
SURVEY BOOK SHEETS
CONTRACT PROJECT NO.
of
DESIGNED:DRAWN:
CHECKED:CHECKED:
DESIGN ENGINEER
RECOMMENDED
FOR APPROVAL
DATE
TYPICAL CROSS SECTION
aedwards 3:44:38 PM3/20/2008 P:\IN2003\0661\D. Drawings\IN20030661.RD.C2.TY05.DGN
CITY OF CARMEL
07-08D
No.
STATE OF
INDIAN A
REGISTERED
P
R
OFE
S
SIONAL ENGIN
EER10505104
J. SAMUEL B
ALO
G
03/21/2008
173
ALT
8
***
HORIZONTAL SCALE
DESIGNATION NO.
BRIDGE FILE
VERTICAL SCALE
SURVEY BOOK SHEETS
CONTRACT PROJECT NO.
of
DESIGNED:DRAWN:
CHECKED:CHECKED:
DESIGN ENGINEER
RECOMMENDED
FOR APPROVAL
DATE
TYPICAL CROSS SECTION
aedwards 3:44:44 PM3/20/2008 P:\IN2003\0661\D. Drawings\IN20030661.RD.C2.TY06.dgn
CITY OF CARMEL
07-08D
No.
STATE OF
INDIAN A
REGISTERED
P
R
OFE
S
SIONAL ENGIN
EER10505104
J. SAMUEL B
ALO
G
03/21/2008
173
ALT
9
***
HORIZONTAL SCALE
DESIGNATION NO.
BRIDGE FILE
VERTICAL SCALE
SURVEY BOOK SHEETS
CONTRACT PROJECT NO.
of
DESIGNED:DRAWN:
CHECKED:CHECKED:
DESIGN ENGINEER
RECOMMENDED
FOR APPROVAL
DATE
TYPICAL CROSS SECTION
aedwards 3:44:50 PM3/20/2008 P:\IN2003\0661\D. Drawings\IN20030661.RD.C2.TY07.dgn
CITY OF CARMEL
07-08D
No.
STATE OF
INDIAN A
REGISTERED
P
R
OFE
S
SIONAL ENGIN
EER10505104
J. SAMUEL B
ALO
G
03/21/2008
173
MISCELLANEOUS DETAILS 10
AS NOTED
2%
HORIZONTAL SCALE
DESIGNATION NO.
BRIDGE FILE
VERTICAL SCALE
SURVEY BOOK SHEETS
CONTRACT PROJECT NO.
of
DESIGNED:DRAWN:
CHECKED:CHECKED:
DESIGN ENGINEER
RECOMMENDED
FOR APPROVAL
DATE
aedwards 3:44:56 PM3/20/2008 P:\IN2003\0661\D. Drawings\IN20030661.RD.C2.TY08.dgn
N/A
CITY OF CARMEL
07-08D
No.
STATE OF
INDIAN A
REGISTERED
P
R
OFE
S
SIONAL ENGIN
EER10505104
J. SAMUEL B
ALO
G
03/21/2008
173
Polyethylene Identification Tape
Directly Over Conduit
MISCELLANEOUS DETAILS 11
1"=1’-0
HORIZONTAL SCALE
DESIGNATION NO.
BRIDGE FILE
VERTICAL SCALE
SURVEY BOOK SHEETS
CONTRACT PROJECT NO.
of
DESIGNED:DRAWN:
CHECKED:CHECKED:
DESIGN ENGINEER
RECOMMENDED
FOR APPROVAL
DATE
aedwards 3:45:04 PM3/20/2008 P:\IN2003\0661\D. Drawings\IN20030661.RD.C2.TY09.dgn
N/A
CITY OF CARMEL
07-08D
No.
STATE OF
INDIAN A
REGISTERED
P
R
OFE
S
SIONAL ENGIN
EER10505104
J. SAMUEL B
ALO
G
03/21/2008
173
MISCELLANEOUS DETAILS 12
AS NOTED
No.
STATE OF
INDIANA
REGISTE
RED
P
R
OFE
S
SIONAL ENGIN
EER860409
MI CHAEL H. W
E
NNIN
G
HORIZONTAL SCALE
DESIGNATION NO.
BRIDGE FILE
VERTICAL SCALE
SURVEY BOOK SHEETS
CONTRACT PROJECT NO.
of
DESIGNED:DRAWN:
CHECKED:CHECKED:
DESIGN ENGINEER
RECOMMENDED
FOR APPROVAL
DATE
aedwards 3:45:13 PM3/20/2008 P:\IN2003\0661\D. Drawings\IN20030661.RD.C2.TY10.dgn
N/A
CITY OF CARMEL
07-08D
No.
STATE OF
INDIAN A
REGISTERED
P
R
OFE
S
SIONAL ENGIN
EER10505104
J. SAMUEL B
ALO
G
03/21/2008
173
MISCELLANEOUS DETAILS 13
AS NOTED
**
No.
STATE OF
INDIANA
REGISTERED
P
R
OFE
S
SIONAL ENGIN
EER860409
M I CHAEL H. W
ENNIN
G
HORIZONTAL SCALE
DESIGNATION NO.
BRIDGE FILE
VERTICAL SCALE
SURVEY BOOK SHEETS
CONTRACT PROJECT NO.
of
DESIGNED:DRAWN:
CHECKED:CHECKED:
DESIGN ENGINEER
RECOMMENDED
FOR APPROVAL
DATE
aedwards 3:45:20 PM3/20/2008 P:\IN2003\0661\D. Drawings\IN20030661.RD.C2.TY11.dgn
N/A
CITY OF CARMEL
07-08D
No.
STATE OF
INDIAN A
REGISTERED
P
R
OFE
S
SIONAL ENGIN
EER10505104
J. SAMUEL B
ALO
G
03/21/2008
173
MISCELLANEOUS DETAILS 14
1"=1’-0
No.
STATE OF
INDIANA
REGISTERED
P
R
OFE
S
SIONAL ENGIN
EER860409
MI CHAEL H. W
ENNI
N
G
HORIZONTAL SCALE
DESIGNATION NO.
BRIDGE FILE
VERTICAL SCALE
SURVEY BOOK SHEETS
CONTRACT PROJECT NO.
of
DESIGNED:DRAWN:
CHECKED:CHECKED:
DESIGN ENGINEER
RECOMMENDED
FOR APPROVAL
DATE
aedwards 3:45:27 PM3/20/2008 P:\IN2003\0661\D. Drawings\IN20030661.RD.C2.TY12.dgn
N/A
CITY OF CARMEL
07-08D
No.
STATE OF
INDIAN A
REGISTERED
P
R
OFE
S
SIONAL ENGIN
EER10505104
J. SAMUEL B
ALO
G
03/21/2008
173
MISCELLANEOUS DETAILS 15
AS NOTED
No.
STATE OF
INDIAN A
REGISTE
RED
P
R
OFE
S
SIONAL ENGIN
EER
860409
M I CHAEL H. W
E
NNIN
G
HORIZONTAL SCALE
DESIGNATION NO.
BRIDGE FILE
VERTICAL SCALE
SURVEY BOOK SHEETS
CONTRACT PROJECT NO.
of
DESIGNED:DRAWN:
CHECKED:CHECKED:
DESIGN ENGINEER
RECOMMENDED
FOR APPROVAL
DATE
aedwards 3:45:33 PM3/20/2008 P:\IN2003\0661\D. Drawings\IN20030661.RD.C2.TY13.dgn
N/A
CITY OF CARMEL
07-08D
No.
STATE OF
INDIAN A
REGISTERED
P
R
OFE
S
SIONAL ENGIN
EER10505104
J. SAMUEL B
ALO
G
03/21/2008
173
PLAT NO.1
1"=100’
AJEKDS
16
JSB JSB
PC
S
t
a
.
5
4
2
+
5
0
.
0
0
PC
S
t
a
.
5
4
2
+
5
0
.
0
0
PC
S
t
a
.
5
4
2
+
5
0
.
0
0
PC
S
t
a
.
5
4
2
+
5
0
.
0
0
15
’U
n
d
e
r
g
r
o
u
n
d
El
e
c
t
r
i
c
E
a
s
e
.
B
k
.
2
6
9
,
P
g
.
1
3
1
A
p
p
r
o
x
.
5
0
0
’
t
o
th
e
g
r
a
n
t
o
r
’
s
e
a
s
t
e
r
n
p
l
(b
e
g
i
n
n
i
n
g
@
ti
p
o
f
a
r
r
o
w
)
UN
A
B
L
E
T
O
B
E
P
L
O
T
T
E
D
HORIZONTAL SCALE
DESIGNATION NO.
BRIDGE FILE
VERTICAL SCALE
SURVEY BOOK SHEETS
CONTRACT PROJECT NO.
of
DESIGNED:DRAWN:
CHECKED:CHECKED:
DESIGN ENGINEER
RECOMMENDED
FOR APPROVAL
DATE
aedwards 3:45:40 PM3/20/2008 P:\IN2003\0661\D. Drawings\IN20030661.RD.C2.PL01.dgn
N/A
CITY OF CARMEL
07-08D
No.
STATE OF
INDIANA
REGISTERED
P
R
OFE
S
SIONAL ENGIN
EER10505104
J. SAMUEL B
ALO
G
03/21/2008
173
PLAT NO. 1
1"=100’
AJEKDS
17
JSB JSB
HORIZONTAL SCALE
DESIGNATION NO.
BRIDGE FILE
VERTICAL SCALE
SURVEY BOOK SHEETS
CONTRACT PROJECT NO.
of
DESIGNED:DRAWN:
CHECKED:CHECKED:
DESIGN ENGINEER
RECOMMENDED
FOR APPROVAL
DATE
aedwards 3:45:47 PM3/20/2008 P:\IN2003\0661\D. Drawings\IN20030661.RD.C2.PL02.dgn
N/A
CITY OF CARMEL
07-08D
No.
STATE OF
INDIANA
REGISTERED
P
R
OFE
S
SIONAL ENGIN
EER10505104
J. SAMUEL B
ALO
G
03/21/2008
173
N/A
N/A
18GEOMETRIC TIE UP
REFERENCES
AJEKDS
JSB JSB
Mag (Set)
Mag (Set)Mag (Set)
(Traffic)
Center of MH
(0.2’ Below)
MAG (Set)
24" Tree
6
2
.
6
6
’
Line "E"
24" Tree
N.O.R.A.
(0.1’ Above)
MAG (Set)
40.51’
4
1
.
1
9
’
69.50’
3
1
.
9
2
’
0
A
z
.
280Az.
14.45’
9" Tree
MAG (Set)
N
o
r
t
h
"Polaris RLS9600005"
3.90’
90Az.
2
3
0
A
z
.
00Az.
150Az.
4
0
A
z
.
Mag (Set)
Mag (Set)
Mag (Set)
Mag (Set)
F. Hyd.
F. Hyd.
115Az.
3
3
0
A
z
.
5
1
.
0
5
’
56.45’
49
.
9
0
’
Wood Fence Cor.
Steel Post
M. Box
24" Tree
MAG (Set)30" Tree
MAG (Set)
XXN.W. Cor.
Fence Cor.
(0.35’ Below)
Fence Post
19
5
A
z
.
41
.
4
5
’
(0.5’ Below)
N
o
r
t
h
(S. Face)
56.17’
0
A
z
.
2
5
.
3
5
’
91.10’
300A
z
.
(N.E. Cor.)N
o
r
t
h
Brick Bldg.
(Flush)5
8
.
2
3
’
5
9
.
0
0
’
Brick Bldg.
47.25’
245Az
.
"Foolery"
1
5
5
A
z
.
31.27’
185Az.
28.98’
= 530’29" Lt.
3
3
0
A
z
.
7
0
.
6
5
’
67.70’
24
5
A
z
.
310
A
z
.
55.5
9
’
Control Box
S.W. Cor.
Traffic
Clock Base
LINE "S-7-E"
69.4
5
’
290A
z
.
Line "E"
1
8
0
A
z
.
36" Tree
65.90’
Fence
Cor.
T.S.S. (S. Bolt)
T.S.S. (E. Bolt)
103.33’
230Az.
102.32
’
104.55’
125A
z
.
T.S.S. (N.W. Bolt)
T.S.S. (S.E. Bolt)
300A
z
.
105.51’
32
0
A
z
.
49
.
0
5
Fence
Cor.
LINE "S-7-E"LINE "S-7-E"
3
3
.
3
7
’
Chainlink Fence
(Vinyl Gated)
5Az.
60Az.50Az.
35A
z
.
55Az.
55Az.
Mag (Set)
Mag (Set)
(0.3’ Below)
73.75’1
2
.
0
9
’
59.69’
Line "E"
2
3
.
8
5
’
9
0
A
z
.
Top Center Inlet
"12486"
(0.4’ Below)
44
.
4
0
’
13
0
A
z
.
80.80’
86
.
1
0
’
31
0
A
z
.
46.50’
245Az
.
P.K. (Fnd.)
Pwp.P.K. (Fnd.)
Pwp.
15" Tree
MAG (Set)
MAG (Set)
9" Tree
N
o
r
t
h
Sign Post (SE Cor.)
"Wrong Way"
355 Az.2
8
0
A
z
.
180 Az.70Az.
Mag (Set)
Mag (Set)
Mag (Set)
Mag (Set)
Mag (Set)
Mag (Set)Mag (Set)
5Az.
9
.
8
8
’
2
4
0
A
z
.
170Az.
8.47’
LINE "E"
86.45’
(Flush)
N.O.R.A.
36
.
3
1
’
Line "E"
35.82’
2
3
.
6
7
’
140Az.38.80’35.96’315Az.
Line "E"
(0.2’ Below)
37.9
4
’
50
A
z
.
"12611"
Top Center Inlet
(0.2’ Below)
38
.
3
0
’
36
.
9
0
’
23
0
A
z
.
114.36’
120Az.
107.89
’
T.S.S. (W. Bolt)
(N.W. Bolt)
Light Pole
Light Pole
3
4
.
9
5
’
3
4
0
A
z
.
48.3
5
’
130A
z
.
51.2
0
’
220A
z
.
Mag (Set)
(N. Cor.)
M. Box
260Az.
78.85’
(S.E. Cor.)
(751)
M. Box
Wood Fence Post
93.98’
235Az
.
T.S.S. (N. Bolt)
N.O.R.A.Stop
Sign
1
8
0
A
z
.
3
5
.
0
0
’
96.37’
260Az.
P.K. (Fnd.)
Pwp.
54
.
9
5
’
31
0
A
z
.
(Flush)
N
o
r
t
h
LINE "S-8-E"
LINE "S-8-E"
Light Pole
MAG (Set)
55Az.
45
A
z
.
9
5
A
z
.
31
5
A
z
.
185Az.
HORIZONTAL SCALE
DESIGNATION NO.
BRIDGE FILE
VERTICAL SCALE
SURVEY BOOK SHEETS
CONTRACT PROJECT NO.
of
DESIGNED:DRAWN:
CHECKED:CHECKED:
DESIGN ENGINEER
RECOMMENDED
FOR APPROVAL
DATE
aedwards 3:45:53 PM3/20/2008 P:\IN2003\0661\D. Drawings\IN20030661.RD.C2.DS06.dgn
CITY OF CARMEL
07-08D
No.
STATE OF
INDIAN A
REGISTERED
P
R
OFE
S
SIONAL ENGIN
EER10505104
J. SAMUEL B
ALO
G
03/21/2008
173
DETOURDETOURDETOURDETOURDETOUR
126th
STREET
126th
STREET
126th
STREET
126th
STREET
126th
STREET
END
DETOUR
126th
STREET
DETOUR
END
126th
STREET
DETOUR
AHEAD
ROAD
AHEAD
CLOSED
DETOURDETOUR
ROAD CLOSED
THRU TRAFFIC
TO
ROAD CLOSED
THRU TRAFFIC
TO ROAD
CLOSED
1" = 1000’
DETOUR PLAN
CKW CKW
19
JSB JSB
END
CONSTRUCTION
HORIZONTAL SCALE
DESIGNATION NO.
BRIDGE FILE
VERTICAL SCALE
SURVEY BOOK SHEETS
CONTRACT PROJECT NO.
of
DESIGNED:DRAWN:
CHECKED:CHECKED:
DESIGN ENGINEER
RECOMMENDED
FOR APPROVAL
DATE
aedwards 3:45:59 PM3/20/2008 P:\IN2003\0661\D. Drawings\IN20030661.RD.C2.DPL.dgn
N/A
CITY OF CARMEL
07-08D
No.
STATE OF
INDIAN A
REGISTERED
P
R
OFE
S
SIONAL ENGIN
EER10505104
J. SAMUEL B
ALO
G
03/21/2008
173
CKWCKW
N/A
1" = 30’
20
CONSTRUCTION
END
ROAD
CONSTRUCTION
AHEAD
JSB JSB
MAINTENANCE OF TRAFFIC DETAILS
PHASE %%151
SPEED
LIMIT
40
SPEED
LIMIT
40
CLOSED
AHEAD
RIGHT LANE
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
HORIZONTAL SCALE
DESIGNATION NO.
BRIDGE FILE
VERTICAL SCALE
SURVEY BOOK SHEETS
CONTRACT PROJECT NO.
of
DESIGNED:DRAWN:
CHECKED:CHECKED:
DESIGN ENGINEER
RECOMMENDED
FOR APPROVAL
DATE
aedwards 3:46:20 PM3/20/2008 P:\IN2003\0661\D. Drawings\IN20030661.RD.C2.TP.PH1.01.dgn
CITY OF CARMEL
07-08D
No.
STATE OF
INDIANA
REGISTERED
P
R
OFE
S
SIONAL ENGIN
EER10505104
J. SAMUEL B
ALO
G
03/21/2008
173
X
CKWCKW
N/A
1" = 30’
21
JSBJSB
MAINTENANCE OF TRAFFIC DETAILS
PHASE %%151
SPEED
LIM IT
40 CLOSED
AHEAD
RIGHT LANE
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
P
XXX
FP
FP
FP
RT
RT
RT
RT
RT
RT
TH
H
RT
RT
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
HORIZONTAL SCALE
DESIGNATION NO.
BRIDGE FILE
VERTICAL SCALE
SURVEY BOOK SHEETS
CONTRACT PROJECT NO.
of
DESIGNED:DRAWN:
CHECKED:CHECKED:
DESIGN ENGINEER
RECOMMENDED
FOR APPROVAL
DATE
aedwards 3:46:35 PM3/20/2008 P:\IN2003\0661\D. Drawings\IN20030661.RD.C2.TP.PH1.02.dgn
CITY OF CARMEL
07-08D
No.
STATE OF
INDIANA
REGISTERED
P
R
OFE
S
SIONAL ENGIN
EER10505104
J. SAMUEL B
ALO
G
03/21/2008
173
X
CKWCKW
N/A
1" = 30’
ROAD
CONSTRUCTION
AHEAD
22
CONSTRUCTION
END
JSB JSB
MAINTENANCE OF TRAFFIC DETAILS
PHASE %%151
SPEED
LIMIT
40
CLOSED
AHEAD
RIGHT LANE
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
TR
W
II
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
I
X
TR
TR
TR
RT
RT
HORIZONTAL SCALE
DESIGNATION NO.
BRIDGE FILE
VERTICAL SCALE
SURVEY BOOK SHEETS
CONTRACT PROJECT NO.
of
DESIGNED:DRAWN:
CHECKED:CHECKED:
DESIGN ENGINEER
RECOMMENDED
FOR APPROVAL
DATE
aedwards 3:46:50 PM3/20/2008 P:\IN2003\0661\D. Drawings\IN20030661.RD.C2.TP.PH1.03.dgn
CITY OF CARMEL
07-08D
No.
STATE OF
INDIANA
REGISTERED
P
R
OFE
S
SIONAL ENGIN
EER10505104
J. SAMUEL B
ALO
G
03/21/2008
173
X
CKWCKW
N/A
1" = 30’
23
CONSTRUCTION
END
ROAD
CONSTRUCTION
1000 FT
ROAD
CONSTRUCTION
AHEAD
ROAD
NARROWS
JSB JSB
MAINTENANCE OF TRAFFIC DETAILS
PHASE %%151%%151
SPEED
LIMIT
40
SPEED
LIMIT
40
15 " VCP 15 " V CP
12
" R
CP
15
" R
C
P
15
" R
C
P
15 " V CP
15 " V CP
12
" V
C
P
12
" R
C
P
6
" C
MP
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
SS
S
S
12
" R
C
P
6" P VC
1
2"
R
C
P
18 " R CP 18 " R CP
15 " V CP15" V CP
12
" R
C
P
12 " R CP
15 " VCP
15" VCP
S
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
TR
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
HORIZONTAL SCALE
DESIGNATION NO.
BRIDGE FILE
VERTICAL SCALE
SURVEY BOOK SHEETS
CONTRACT PROJECT NO.
of
DESIGNED:DRAWN:
CHECKED:CHECKED:
DESIGN ENGINEER
RECOMMENDED
FOR APPROVAL
DATE
aedwards 3:47:06 PM3/20/2008 P:\IN2003\0661\D. Drawings\IN20030661.RD.C2.TP.PH2.01.dgn
CITY OF CARMEL
07-08D
No.
STATE OF
INDIAN A
REGISTERED
P
R
OFE
S
SIONAL ENGIN
EER10505104
J. SAMUEL B
ALO
G
03/21/2008
173
X
2%
2%2%
CKWCKW
N/A
1" = 30’
ROAD
NARROWS
24MAINTENANCE OF TRAFFIC DETAILS
PHASE IIJSBJSB
SPEED
LIM IT
40
S
S
S
66
" C
MP
48
" C
MP
Ex . Conc
. Dit ch
18 " R CP
18 " R CP
12
" R
C
P
Ex. Co
n
c
. Dit
ch
Ex . Conc . Dit ch
8" VCP (San.)
18"
C
M
P
10
"
C
M
P
8" VCP (San.)
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
TR
P
XXX
FP
FP
FP
TR
RT
RT
RT
RT
RT
RT
TH
H
TR
RT
RT
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
15
" R
C
P
Ex . Conc . Dit ch
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
HORIZONTAL SCALE
DESIGNATION NO.
BRIDGE FILE
VERTICAL SCALE
SURVEY BOOK SHEETS
CONTRACT PROJECT NO.
of
DESIGNED:DRAWN:
CHECKED:CHECKED:
DESIGN ENGINEER
RECOMMENDED
FOR APPROVAL
DATE
aedwards 3:47:22 PM3/20/2008 P:\IN2003\0661\D. Drawings\IN20030661.RD.C2.TP.PH2.02.dgn
CITY OF CARMEL
07-08D
No.
STATE OF
INDIAN A
REGISTERED
P
R
OFE
S
SIONAL ENGIN
EER10505104
J. SAMUEL B
ALO
G
03/21/2008
173
X
2%
2%2%
CKWCKW
N/A
1" = 30’
ROAD
CONSTRUCTION
AHEAD
CONSTRUCTION
END
25
ROAD
CONSTRUCTION
1000 FT
JSB JSB
MAINTENANCE OF TRAFFIC DETAILS
PHASE %%151%%151
SPEED
LIM IT
40
18
" R
CP
12 " R CP
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
TR
W
II
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
I
X
TR
TR
TR
RT
RT
HORIZONTAL SCALE
DESIGNATION NO.
BRIDGE FILE
VERTICAL SCALE
SURVEY BOOK SHEETS
CONTRACT PROJECT NO.
of
DESIGNED:DRAWN:
CHECKED:CHECKED:
DESIGN ENGINEER
RECOMMENDED
FOR APPROVAL
DATE
aedwards 3:47:36 PM3/20/2008 P:\IN2003\0661\D. Drawings\IN20030661.RD.C2.TP.PH2.03.dgn
CITY OF CARMEL
07-08D
No.
STATE OF
INDIANA
REGISTERED
P
R
OFE
S
SIONAL ENGIN
EER10505104
J. SAMUEL B
ALO
G
03/21/2008
173
X
2%2%
CKWCKW
N/A
1" = 30’
26
CONSTRUCTION
END
ROAD
CONSTRUCTION
AHEAD
JSB JSB
MAINTENANCE OF TRAFFIC DETAILS
PHASE %%151%%151%%151
SPEED
LIMIT
40
ROAD
CONSTRUCTION
1000 FT
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
TR
HORIZONTAL SCALE
DESIGNATION NO.
BRIDGE FILE
VERTICAL SCALE
SURVEY BOOK SHEETS
CONTRACT PROJECT NO.
of
DESIGNED:DRAWN:
CHECKED:CHECKED:
DESIGN ENGINEER
RECOMMENDED
FOR APPROVAL
DATE
aedwards 3:47:52 PM3/20/2008 P:\IN2003\0661\D. Drawings\IN20030661.RD.C2.TP.PH3.01.dgn
CITY OF CARMEL
07-08D
No.
STATE OF
INDIAN A
REGISTERED
P
R
OFE
S
SIONAL ENGIN
EER10505104
J. SAMUEL B
ALO
G
03/21/2008
173
X
CKWCKW
N/A
1" = 30’
27
JSB JSB
MAINTENANCE OF TRAFFIC DETAILS
PHASE %%151%%151%%151
ROAD
CLOSED
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
FP
FP
FP
(Gras s)
TR
RT
RT
RT
RT
TH
H
TR
RT
RT
XXXXXXXXXX
HORIZONTAL SCALE
DESIGNATION NO.
BRIDGE FILE
VERTICAL SCALE
SURVEY BOOK SHEETS
CONTRACT PROJECT NO.
of
DESIGNED:DRAWN:
CHECKED:CHECKED:
DESIGN ENGINEER
RECOMMENDED
FOR APPROVAL
DATE
aedwards 3:48:05 PM3/20/2008 P:\IN2003\0661\D. Drawings\IN20030661.RD.C2.TP.PH3.02.dgn
CITY OF CARMEL
07-08D
No.
STATE OF
INDIAN A
REGISTERED
P
R
OFE
S
SIONAL ENGIN
EER10505104
J. SAMUEL B
ALO
G
03/21/2008
173
X
CKWCKW
N/A
1" = 30’
ROAD
CONSTRUCTION
AHEAD
CONSTRUCTION
END
28
ROAD
CONSTRUCTION
1000 FT
JSB JSB
MAINTENANCE OF TRAFFIC DETAILS
PHASE %%151%%151%%151
SPEED
LIM IT
40
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
TR
W
II
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
I
X
TR
TR
TR
RT
RT
HORIZONTAL SCALE
DESIGNATION NO.
BRIDGE FILE
VERTICAL SCALE
SURVEY BOOK SHEETS
CONTRACT PROJECT NO.
of
DESIGNED:DRAWN:
CHECKED:CHECKED:
DESIGN ENGINEER
RECOMMENDED
FOR APPROVAL
DATE
aedwards 3:48:20 PM3/20/2008 P:\IN2003\0661\D. Drawings\IN20030661.RD.C2.TP.PH3.03.dgn
CITY OF CARMEL
07-08D
No.
STATE OF
INDIANA
REGISTERED
P
R
OFE
S
SIONAL ENGIN
EER10505104
J. SAMUEL B
ALO
G
03/21/2008
173
X
CKW CKW
JSB JSB
29
PHASE %%151%%151%%151
MAINTENANCE OF TRAFFIC DETAILS
1"=10’
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
TR
TR
P
XXX
FP
FP
(Gras s)
(Woode d)
(Gras s)
(Gras s)
(Bit . Mat .)
(B
i
t
. M
a
t
.
)
(Bit . Mat .)
(Gras s)
(Bit . Mat .)
(Gras s)
(R
i
p
R
a
p
)
Parkin g L ot
(Bit . Mat .)
(Gras s)
Shoul
d
e
r (
C
-
S
t
n .)
TR
RT
RT
RT
RT
RT
RT
TH
H
TR
RT
RT
XXX
HORIZONTAL SCALE
DESIGNATION NO.
BRIDGE FILE
VERTICAL SCALE
SURVEY BOOK SHEETS
CONTRACT PROJECT NO.
of
DESIGNED:DRAWN:
CHECKED:CHECKED:
DESIGN ENGINEER
RECOMMENDED
FOR APPROVAL
DATE
aedwards 3:48:34 PM3/20/2008 P:\IN2003\0661\D. Drawings\IN20030661.RD.C2.TP.PH3.04.dgn
CITY OF CARMEL
1"=1’
1"=30’
PLAN & PROFILE
07-08D
No.
STATE OF
INDIANA
REGISTERED
P
R
OFE
S
SIONAL ENGIN
EER10505104
J. SAMUEL B
ALO
G
03/21/2008
173
X
CKW CKW
1"=30’
N/A
MAINTENANCE OF TRAFFIC DETAILS
PHASE %%151%%151%%151JSBJSB
ROAD
CLOSED
ROAD
CLOSED
ROAD
CLOSED
30
X
HORIZONTAL SCALE
DESIGNATION NO.
BRIDGE FILE
VERTICAL SCALE
SURVEY BOOK SHEETS
CONTRACT PROJECT NO.
of
DESIGNED:DRAWN:
CHECKED:CHECKED:
DESIGN ENGINEER
RECOMMENDED
FOR APPROVAL
DATE
aedwards 3:48:47 PM3/20/2008 P:\IN2003\0661\D. Drawings\IN20030661.RD.C2.TP.PH3.05.dgn
CITY OF CARMEL
07-08D
No.
STATE OF
INDIANA
REGISTERED
P
R
OFE
S
SIONAL ENGIN
EER10505104
J. SAMUEL B
ALO
G
03/21/2008
173
TEMPORARY RETAINING
WALL DETAILS - PHASE %%151%%151%%151
31
1" = 20’
1" = 20’
CKWKDS
JSB JSB
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
TR
XXX
FP
FP
FP
(Gras s)
(Gras s)
(Bit . Mat .)
T
R
RT
RT
RT
RT
TH
H
T
R
RT
RT
XXX
HORIZONTAL SCALE
DESIGNATION NO.
BRIDGE FILE
VERTICAL SCALE
SURVEY BOOK SHEETS
CONTRACT PROJECT NO.
of
DESIGNED:DRAWN:
CHECKED:CHECKED:
DESIGN ENGINEER
RECOMMENDED
FOR APPROVAL
DATE
aedwards 3:49:00 PM3/20/2008 P:\IN2003\0661\D. Drawings\IN20030661.RD.C2.TP.PH3.RET.01.dgn
N/A
CITY OF CARMEL
07-08D
No.
STATE OF
INDIANA
REGISTERED
P
R
OFE
S
SIONAL ENGIN
EER10505104
J. SAMUEL B
ALO
G
03/21/2008
173
8
3
0
.
0
8
2
8
.
6
82
7
.
1
8
2
4
.
5
8
2
3
.
2
82
2
.
1
82
1
.
1
8
2
0
.
6
82
0
.
1
8
1
9
.
8
TEMPORARY RETAINING
WALL DETAILS - PHASE %%151%%151%%151
32
CKWKDS
JSB JSB
1" = 20’
1" = 20’
TR
XXX
(Bit . Mat .)
(Gras s)
(Bit . Mat .)
(Woode d)
(Gras s)
(Gras s)
(Woode d)
(Gras s)
RTRT
XXXX
HORIZONTAL SCALE
DESIGNATION NO.
BRIDGE FILE
VERTICAL SCALE
SURVEY BOOK SHEETS
CONTRACT PROJECT NO.
of
DESIGNED:DRAWN:
CHECKED:CHECKED:
DESIGN ENGINEER
RECOMMENDED
FOR APPROVAL
DATE
aedwards 3:49:12 PM3/20/2008 P:\IN2003\0661\D. Drawings\IN20030661.RD.C2.TP.PH3.RET.02.dgn
N/A
CITY OF CARMEL
07-08D
No.
STATE OF
INDIANA
REGISTERED
P
R
OFE
S
SIONAL ENGIN
EER10505104
J. SAMUEL B
ALO
G
03/21/2008
173
8
1
9
.
8
8
1
9
.
8
8
1
9
.
9
8
2
0
.
2
8
2
0
.
7
8
2
1
.
4
8
2
2
.
3
8
2
3
.
4
8
2
5
.
9
8
2
7
.
4
8
2
9
.
0
X
WALL DETAILS - PHASE %%151%%151%%151
TEMPORARY RETAINING 33
CKW
1" = 20’
1" = 20’
KDS
JSB JSB
(Gras s)
(Woode d)
(Gras s)(Gras s)
(Gras s)
HORIZONTAL SCALE
DESIGNATION NO.
BRIDGE FILE
VERTICAL SCALE
SURVEY BOOK SHEETS
CONTRACT PROJECT NO.
of
DESIGNED:DRAWN:
CHECKED:CHECKED:
DESIGN ENGINEER
RECOMMENDED
FOR APPROVAL
DATE
aedwards 3:49:23 PM3/20/2008 P:\IN2003\0661\D. Drawings\IN20030661.RD.C2.TP.PH3.RET.03.dgn
N/A
CITY OF CARMEL
07-08D
No.
STATE OF
INDIANA
REGISTERED
P
R
OFE
S
SIONAL ENGIN
EER10505104
J. SAMUEL B
ALO
G
03/21/2008
173
8
2
9
.
0
8
3
0
.
6
8
3
2
.
3
8
3
3
.
9
8
3
5
.
5
8
3
7
.
1
8
3
8
.
8
X
CKWCKW
N/A
1" = 30’
34
CONSTRUCTION
END
ROAD
CONSTRUCTION
AHEAD
JSB JSB
MAINTENANCE OF TRAFFIC DETAILS
PHASE %%151%%175
SPEED
LIMIT
40
ROAD
CONSTRUCTION
1000 FT
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
HORIZONTAL SCALE
DESIGNATION NO.
BRIDGE FILE
VERTICAL SCALE
SURVEY BOOK SHEETS
CONTRACT PROJECT NO.
of
DESIGNED:DRAWN:
CHECKED:CHECKED:
DESIGN ENGINEER
RECOMMENDED
FOR APPROVAL
DATE
aedwards 3:49:38 PM3/20/2008 P:\IN2003\0661\D. Drawings\IN20030661.RD.C2.TP.PH4.01.dgn
CITY OF CARMEL
07-08D
No.
STATE OF
INDIAN A
REGISTERED
P
R
OFE
S
SIONAL ENGIN
EER10505104
J. SAMUEL B
ALO
G
03/21/2008
173
X
2%
CKWCKW
N/A
1" = 30’
35
JSB JSB
MAINTENANCE OF TRAFFIC DETAILS
PHASE %%151%%175
HORIZONTAL SCALE
DESIGNATION NO.
BRIDGE FILE
VERTICAL SCALE
SURVEY BOOK SHEETS
CONTRACT PROJECT NO.
of
DESIGNED:DRAWN:
CHECKED:CHECKED:
DESIGN ENGINEER
RECOMMENDED
FOR APPROVAL
DATE
aedwards 3:49:49 PM3/20/2008 P:\IN2003\0661\D. Drawings\IN20030661.RD.C2.TP.PH4.02.dgn
CITY OF CARMEL
07-08D
No.
STATE OF
INDIAN A
REGISTERED
P
R
OFE
S
SIONAL ENGIN
EER10505104
J. SAMUEL B
ALO
G
03/21/2008
173
X
2%
2%
CKWCKW
N/A
1" = 30’
ROAD
CONSTRUCTION
AHEAD
CONSTRUCTION
END
36
ROAD
CONSTRUCTION
1000 FT
JSB JSB
MAINTENANCE OF TRAFFIC DETAILS
PHASE %%151%%175
SPEED
LIM IT
40
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
TR
W
II
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
I
X
TR
TR
TR
RT
RT
HORIZONTAL SCALE
DESIGNATION NO.
BRIDGE FILE
VERTICAL SCALE
SURVEY BOOK SHEETS
CONTRACT PROJECT NO.
of
DESIGNED:DRAWN:
CHECKED:CHECKED:
DESIGN ENGINEER
RECOMMENDED
FOR APPROVAL
DATE
aedwards 3:50:08 PM3/20/2008 P:\IN2003\0661\D. Drawings\IN20030661.RD.C2.TP.PH4.03.dgn
CITY OF CARMEL
07-08D
No.
STATE OF
INDIANA
REGISTERED
P
R
OFE
S
SIONAL ENGIN
EER10505104
J. SAMUEL B
ALO
G
03/21/2008
173
X
2%
1’=30’
N/A
CKW
JSB JSB
CKW MAINTENANCE OF TRAFFIC DETAILS
PHASE %%151%%175
37
ROAD
CLOSED
ROAD
CLOSED
HORIZONTAL SCALE
DESIGNATION NO.
BRIDGE FILE
VERTICAL SCALE
SURVEY BOOK SHEETS
CONTRACT PROJECT NO.
of
DESIGNED:DRAWN:
CHECKED:CHECKED:
DESIGN ENGINEER
RECOMMENDED
FOR APPROVAL
DATE
aedwards 3:50:21 PM3/20/2008 P:\IN2003\0661\D. Drawings\IN20030661.RD.C2.TP.PH4.05.dgn
CITY OF CARMEL
07-08D
No.
STATE OF
INDIANA
REGISTERED
P
R
OFE
S
SIONAL ENGIN
EER10505104
J. SAMUEL B
ALO
G
03/21/2008
173
X
CKW CKW
JSBJSB
1"=30’
N/A
MAINTENANCE OF TRAFFIC DETAILS
PHASE %%175
EXIT
CLOSED
38
HORIZONTAL SCALE
DESIGNATION NO.
BRIDGE FILE
VERTICAL SCALE
SURVEY BOOK SHEETS
CONTRACT PROJECT NO.
of
DESIGNED:DRAWN:
CHECKED:CHECKED:
DESIGN ENGINEER
RECOMMENDED
FOR APPROVAL
DATE
aedwards 3:50:34 PM3/20/2008 P:\IN2003\0661\D. Drawings\IN20030661.RD.C2.TP.PH5.01.dgn
CITY OF CARMEL
07-08D
No.
STATE OF
INDIANA
REGISTERED
P
R
OFE
S
SIONAL ENGIN
EER10505104
J. SAMUEL B
ALO
G
03/21/2008
173
X
CKW
JSB
CKW
JSB
1"=30’
N/A
MAINTENANCE OF TRAFFIC DETAILS
PHASE %%175
39
EXIT
CLOSED
HORIZONTAL SCALE
DESIGNATION NO.
BRIDGE FILE
VERTICAL SCALE
SURVEY BOOK SHEETS
CONTRACT PROJECT NO.
of
DESIGNED:DRAWN:
CHECKED:CHECKED:
DESIGN ENGINEER
RECOMMENDED
FOR APPROVAL
DATE
aedwards 3:50:48 PM3/20/2008 P:\IN2003\0661\D. Drawings\IN20030661.RD.C2.TP.PH5.02.dgn
CITY OF CARMEL
07-08D
No.
STATE OF
INDIANA
REGISTERED
P
R
OFE
S
SIONAL ENGIN
EER10505104
J. SAMUEL B
ALO
G
03/21/2008
173
X
CKW CKW
JSB JSB
1"=30’
N/A
MAINTENANCE OF TRAFFIC DETAILS
PHASE %%175
ROAD CLOSED
THRU TRAFFIC
TO
40
ROAD
CLOSED
ROAD
CLOSED
ROAD
CLOSED
HORIZONTAL SCALE
DESIGNATION NO.
BRIDGE FILE
VERTICAL SCALE
SURVEY BOOK SHEETS
CONTRACT PROJECT NO.
of
DESIGNED:DRAWN:
CHECKED:CHECKED:
DESIGN ENGINEER
RECOMMENDED
FOR APPROVAL
DATE
aedwards 3:51:02 PM3/20/2008 P:\IN2003\0661\D. Drawings\IN20030661.RD.C2.TP.PH5.03.dgn
CITY OF CARMEL
07-08D
No.
STATE OF
INDIANA
REGISTERED
P
R
OFE
S
SIONAL ENGIN
EER10505104
J. SAMUEL B
ALO
G
03/21/2008
173
X
5
2
8
+
9
9
.
6
2
,
8
6
.
9
2
’
,
T
r
e
e
5
2
9
+
1
8
.
3
8
,
9
8
.
8
6
’
,
S
a
n
i
t
a
r
y
M
.
H
.
+
5
6
.
5
2
,
8
5
.
9
5
’
,
T
r
e
e
+
7
6
.
9
5
,
1
0
1
.
2
2
’
,
T
e
l
.
P
e
d
e
s
t
a
l
+
9
4
.
8
0
,
1
0
4
.
7
1
’
,
P
i
n
e
5
3
0
+
2
6
.
2
7
,
1
0
2
.
7
6
’
,
T
e
l
.
P
e
d
e
s
t
a
l
5
3
0
+
5
2
.
5
3
,
1
0
2
.
1
2
’
,
P
i
n
e
+
9
6
.
7
9
,
9
5
.
0
4
’
,
P
i
n
e
5
3
1
+
3
3
.
0
7
,
8
7
.
8
9
’
,
P
i
n
e
5
3
1
+
4
8
.
0
5
,
9
9
.
7
6
’
,
T
e
l
.
P
e
d
e
s
t
a
l
+
5
7
.
2
2
,
0
.
0
6
’
,
C
n
t
r
l
.
P
n
t
.
+
8
2
.
5
4
,
1
1
3
.
6
2
’
,
S
a
n
i
t
a
r
y
M
.
H
.
+
8
8
.
4
0
,
9
9
.
2
9
’
,
P
i
n
e
+
9
8
.
3
6
,
1
0
2
.
7
4
’
,
S
a
n
i
t
a
r
y
M
.
H
.
5
3
2
+
0
3
.
5
1
,
9
8
.
5
7
’
,
P
i
n
e
+
1
5
.
1
0
,
9
7
.
6
6
’
,
B
u
s
h
+
2
0
.
4
0
,
9
9
.
2
7
’
,
B
u
s
h
+
3
4
.
8
5
,
9
6
.
5
2
’
,
T
r
e
e
+
5
6
.
6
3
,
1
0
2
.
7
9
’
,
T
r
e
e
5
3
2
+
9
6
.
0
2
,
0
.
4
3
’
,
B
e
e
h
i
v
e
I
n
l
.
5
3
3
+
3
2
.
2
4
,
1
0
2
.
6
5
’
,
T
e
l
.
P
e
d
e
s
t
a
l
5
3
3
+
4
3
.
9
8
,
9
7
.
9
2
’
,
T
r
e
e
+
5
6
.
3
5
,
1
0
5
.
6
7
’
,
B
u
s
h
+
5
6
.
8
0
,
9
4
.
1
6
’
,
T
r
e
e
+
5
9
.
4
9
,
1
0
5
.
0
2
’
,
B
u
s
h
+
7
1
.
7
0
,
9
8
.
4
1
’
,
T
r
e
e
+
9
0
.
3
0
,
1
0
4
.
0
4
’
,
T
e
l
.
P
e
d
e
s
t
a
l
5
3
4
+
3
0
.
2
5
,
1
0
0
.
3
4
’
,
T
e
l
.
P
e
d
e
s
t
a
l
+
4
8
.
1
4
,
9
9
.
0
7
’
,
T
r
e
e
+
6
2
.
6
1
,
9
7
.
9
8
’
,
P
i
n
e
+
7
1
.
3
4
,
9
6
.
9
2
’
,
P
i
n
e
+
7
1
.
8
4
,
9
3
.
5
9
’
,
T
r
e
e
5
3
5
+
2
0
.
9
8
,
9
0
.
0
7
’
,
T
e
l
.
P
e
d
e
s
t
a
l
+
2
6
.
0
7
,
1
0
.
1
7
’
,
T
e
l
.
M
.
H
.
+
4
7
.
1
0
,
9
8
.
5
9
’
,
P
i
n
e
+
7
9
.
3
9
,
9
7
.
4
8
’
,
T
r
e
e
5
3
6
+
0
4
.
7
4
,
9
4
.
2
0
’
,
P
o
s
t
5
3
6
+
1
0
.
7
9
,
1
0
0
.
1
8
’
,
T
r
e
e
+
5
6
.
3
9
,
9
5
.
8
9
’
,
P
i
n
e
+
5
9
.
1
8
,
9
4
.
7
5
’
,
T
r
e
e
+
9
1
.
7
0
,
9
3
.
0
0
’
,
T
e
m
p
.
B
e
n
c
h
M
r
k
.
+
9
2
.
2
8
,
9
3
.
4
7
’
,
T
r
e
e
5
3
7
+
0
7
.
9
2
,
9
3
.
0
7
’
,
T
r
e
e
+
1
3
.
7
2
,
1
0
0
.
4
1
’
,
T
r
e
e
+
5
1
.
8
9
,
1
0
7
.
8
8
’
,
T
r
e
e
+
5
7
.
7
3
,
9
8
.
9
2
’
,
B
u
s
h
+
7
4
.
6
3
,
1
1
2
.
1
3
’
,
P
i
n
e
5
3
8
+
0
9
.
5
5
,
9
4
.
1
9
’
,
T
r
e
e
5
3
8
+
2
5
.
1
7
,
9
.
6
1
’
,
T
e
l
.
M
.
H
.
+
2
7
.
5
1
,
1
0
0
.
5
4
’
,
P
i
n
e
+
4
9
.
7
5
,
9
9
.
8
1
’
,
P
i
n
e
+
6
1
.
4
6
,
9
0
.
4
4
’
,
P
i
n
e
+
6
6
.
5
6
,
9
4
.
0
5
’
,
P
i
n
e
+
7
0
.
3
6
,
9
4
.
9
5
’
,
T
r
e
e
+
8
9
.
2
7
,
9
5
.
1
9
’
,
P
i
n
e
KDS AJE
JSB JSB
41
LINE "E"
S S
S
15 " VCP 15 " VCP
12
" R
CP
15
" R
C
P
15
" R
C
P
15 " V CP
15 " V CP
12
" V
C
P
12
" R
C
P
6
" C
MP
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
(Woode d)
(Gras s)
(Gras s)
(Gras s)
(Gras s)
(Gras s)
(Gras s)
(Bit . Mat .)
(Bit . Mat .)
(Gras s)
(Gras s)
(Gras s)
(Gras s)
(Gras s)
T
T
T
T T
TT
T
T
82
9
.
7
82
9
.
9
83
0
.
2
83
0
.
3
8
3
0
.
4
83
0
.
6
83
0
.
8
83
0
.
7
83
0
.
8
83
1
.
0
83
1
.
2
83
1
.
2
83
1
.
2
83
1
.
3
83
1
.
4
83
1
.
6
83
1
.
7
83
1
.
8
83
1
.
9
83
2
.
0
HORIZONTAL SCALE
DESIGNATION NO.
BRIDGE FILE
VERTICAL SCALE
SURVEY BOOK SHEETS
CONTRACT PROJECT NO.
of
DESIGNED:DRAWN:
CHECKED:CHECKED:
DESIGN ENGINEER
RECOMMENDED
FOR APPROVAL
DATE
aedwards 3:51:23 PM3/20/2008 P:\IN2003\0661\D. Drawings\IN20030661.RD.C2.PP01.dgn
PLAN & PROFILE
CITY OF CARMEL 1" = 40’
1" = 10’
07-08D
No.
STATE OF
INDIANA
REGISTERED
P
R
OFE
S
SIONAL ENGIN
EER10505104
J. SAMUEL B
ALO
G
03/21/2008
173
5
3
9
+
4
1
.
9
6
,
9
4
.
4
8
’
,
T
r
e
e
5
3
9
+
5
2
.
3
4
,
9
5
.
8
2
’
,
P
i
n
e
+
8
1
.
3
8
,
9
7
.
9
1
’
,
T
r
e
e
+
9
4
.
9
6
,
0
.
0
9
’
,
B
e
e
h
i
v
e
I
n
l
.
+
9
5
.
0
4
,
9
2
.
3
6
’
,
C
n
t
r
l
.
P
n
t
.
5
4
1
+
2
4
.
9
1
,
1
0
.
6
2
’
,
T
e
l
.
M
.
H
.
+
2
5
.
6
4
,
9
6
.
4
4
’
,
S
a
n
i
t
a
r
y
M
.
H
.
+
8
0
.
5
8
,
1
0
0
.
5
3
’
,
T
e
l
.
P
e
d
e
s
t
a
l
5
4
2
+
1
1
.
6
9
,
9
8
.
5
7
’
,
P
i
n
e
+
1
8
.
3
4
,
8
6
.
8
9
’
,
T
r
e
e
+
2
9
.
4
1
,
9
7
.
6
2
’
,
T
r
e
e
54
4
+
2
4
.
0
9
,
6
.
3
9
’
,
T
e
l
.
M
.
H
.
5
4
4
+
5
7
.
0
4
,
9
9
.
6
2
’
,
T
r
e
e
+
8
1
.
0
4
,
1
0
1
.
1
3
’
,
P
i
n
e
+
8
9
.
6
6
,
9
3
.
9
8
’
,
P
i
n
e
+
9
7
.
9
5
,
9
1
.
5
8
’
,
S
a
n
i
t
a
r
y
M
.
H
.
5
4
5
+
0
9
.
0
5
,
9
3
.
6
8
’
,
P
i
n
e
5
4
5
+
0
9
.
7
2
,
9
6
.
3
1
’
,
S
a
n
i
t
a
r
y
M
.
H
.
+
0
9
.
7
2
,
9
6
.
3
1
’
,
S
a
n
i
t
a
r
y
M
.
H
.
+
1
1
.
2
7
,
1
3
1
.
4
9
’
,
S
a
n
i
t
a
r
y
M
.
H
.
+
1
1
.
2
7
,
1
3
1
.
4
9
’
,
S
a
n
i
t
a
r
y
M
.
H
.
+
2
3
.
1
9
,
8
.
8
7
’
,
T
r
a
f
.
M
.
H
.
+
2
6
.
9
1
,
9
4
.
3
9
’
,
P
i
n
e
+
2
9
.
8
0
,
9
2
.
5
2
’
,
T
r
e
e
+
3
8
.
4
5
,
9
4
.
4
7
’
,
P
i
n
e
+
5
8
.
8
3
,
9
4
.
5
8
’
,
P
i
n
e
+
7
6
.
5
2
,
8
7
.
9
4
’
,
T
r
e
e
5
4
6
+
0
0
.
3
7
,
8
4
.
8
1
’
,
T
r
e
e
+
4
4
.
8
0
,
9
3
.
8
7
’
,
T
r
e
e
+
5
8
.
3
3
,
8
8
.
9
5
’
,
T
e
l
.
P
e
d
e
s
t
a
l
5
4
6
+
7
2
.
4
5
,
3
.
4
2
’
,
S
i
g
n
+
8
4
.
2
7
,
9
4
.
6
8
’
,
T
r
e
e
5
4
7
+
4
5
.
6
2
,
8
7
.
4
2
’
,
C
n
t
r
l
.
P
n
t
.
+
4
5
.
9
1
,
8
7
.
6
2
’
,
C
n
t
r
l
.
P
n
t
.
+
4
7
.
2
4
,
7
5
.
0
8
’
,
C
n
t
r
l
.
P
n
t
.
5
4
7
+
4
9
.
7
1
,
1
5
6
.
4
9
’
,
T
r
e
e
+
5
6
.
1
5
,
1
1
0
.
8
9
’
,
F
l
a
g
p
o
l
e
+
6
4
.
4
5
,
1
7
9
.
8
9
’
,
L
u
m
i
n
a
r
y
P
o
l
e
+
6
5
.
6
7
,
1
3
5
.
5
7
’
,
S
a
n
i
t
a
r
y
M
.
H
.
+
6
5
.
6
7
,
1
3
5
.
5
7
’
,
S
a
n
i
t
a
r
y
M
.
H
.
+
6
5
.
6
8
,
1
3
5
.
8
0
’
,
S
a
n
i
t
a
r
y
M
.
H
.
+
6
6
.
2
8
,
1
1
9
.
5
8
’
,
F
l
a
g
p
o
l
e
+
6
7
.
1
7
,
1
8
4
.
2
5
’
,
B
u
s
h
+
7
3
.
5
7
,
1
2
4
.
9
0
’
,
F
l
a
g
p
o
l
e
+
8
3
.
9
0
,
1
1
.
0
9
’
,
D
e
t
e
c
t
o
r
H
o
u
s
i
n
g
+
9
3
.
7
7
,
9
3
.
3
8
’
,
T
r
a
f
.
P
e
d
e
s
t
a
l
+
9
8
.
0
5
,
8
4
.
4
2
’
,
T
r
a
f
.
P
o
l
e
5
4
8
+
0
1
.
0
8
,
8
7
.
4
0
’
,
T
r
a
f
.
P
o
l
e
5
4
8
+
0
1
.
4
9
,
8
9
.
2
4
’
,
T
r
a
f
.
M
.
H
.
+
0
5
.
3
5
,
4
.
7
0
’
,
S
i
g
n
+
0
7
.
5
5
,
7
6
.
7
3
’
,
S
i
g
n
+
1
1
.
4
7
,
9
7
.
0
0
’
,
L
u
m
i
n
a
r
y
P
o
l
e
+
1
1
.
7
3
,
9
8
.
4
0
’
,
L
u
m
i
n
a
r
y
P
o
l
e
+
1
3
.
9
9
,
1
4
5
.
8
1
’
,
P
w
p
.
+
1
4
.
7
6
,
1
4
5
.
4
9
’
,
P
w
p
.
+
2
0
.
0
4
,
9
1
.
2
9
’
,
S
a
n
i
t
a
r
y
M
.
H
.
+
2
0
.
0
4
,
9
1
.
2
9
’
,
S
a
n
i
t
a
r
y
M
.
H
.
+
2
1
.
3
7
,
1
4
9
.
9
7
’
,
S
t
a
n
d
p
i
p
e
+
2
1
.
4
6
,
1
4
9
.
2
8
’
,
P
o
s
t
+
2
2
.
8
0
,
1
4
9
.
6
0
’
,
G
a
s
M
a
r
k
e
r
+
2
4
.
2
3
,
1
5
0
.
5
1
’
,
C
n
t
r
l
.
P
n
t
.
+
2
4
.
2
9
,
1
5
0
.
6
1
’
,
C
n
t
r
l
.
P
n
t
.
+
2
6
.
2
1
,
1
6
5
.
9
0
’
,
T
e
l
.
P
e
d
e
s
t
a
l
+
2
6
.
5
8
,
1
6
5
.
7
2
’
,
T
e
l
.
P
e
d
e
s
t
a
l
+
2
7
.
5
7
,
1
9
2
.
9
8
’
,
B
e
e
h
i
v
e
I
n
l
.
+
2
7
.
5
7
,
1
9
2
.
9
8
’
,
B
e
e
h
i
v
e
I
n
l
.
+
2
7
.
7
5
,
1
6
5
.
3
4
’
,
C
o
m
b
.
P
o
l
e
+
2
7
.
8
4
,
1
6
6
.
7
8
’
,
C
o
m
b
.
P
o
l
e
+
2
8
.
5
0
,
1
7
4
.
8
4
’
,
C
o
m
b
.
P
o
l
e
+
2
8
.
8
1
,
1
6
3
.
6
6
’
,
P
w
p
.
+
3
0
.
3
4
,
8
6
.
4
6
’
,
D
e
t
e
c
t
o
r
H
o
u
s
i
n
g
+
3
1
.
9
3
,
9
8
.
8
2
’
,
T
e
l
.
M
a
r
k
e
r
+
3
9
.
2
1
,
8
7
.
9
0
’
,
E
x
.
T
r
a
f
.
L
o
o
p
+
4
0
.
3
8
,
1
0
1
.
5
5
’
,
E
x
.
T
r
a
f
.
L
o
o
p
+
4
8
.
2
4
,
1
3
2
.
4
0
’
,
E
x
.
T
r
a
f
.
L
o
o
p
+
4
9
.
0
3
,
1
1
8
.
1
8
’
,
E
x
.
T
r
a
f
.
L
o
o
p
+
4
9
.
5
7
,
1
0
3
.
4
7
’
,
E
x
.
T
r
a
f
.
L
o
o
p
+
5
0
.
7
3
,
9
5
.
0
6
’
,
D
e
t
e
c
t
o
r
H
o
u
s
i
n
g
+
5
0
.
9
8
,
8
8
.
3
5
’
,
E
x
.
T
r
a
f
.
L
o
o
p
+
5
7
.
7
3
,
7
6
.
7
2
’
,
P
K
N
a
i
l
F
n
d
.
+
6
0
.
2
8
,
1
0
0
.
8
7
’
,
E
x
.
T
r
a
f
.
L
o
o
p
+
6
0
.
3
9
,
0
.
0
2
’
,
C
n
t
r
l
.
P
n
t
.
+
6
0
.
8
6
,
1
3
2
.
3
6
’
,
E
x
.
T
r
a
f
.
L
o
o
p
+
6
2
.
1
9
,
8
8
.
2
9
’
,
E
x
.
T
r
a
f
.
L
o
o
p
+
6
2
.
3
7
,
1
1
0
.
6
6
’
,
D
e
t
e
c
t
o
r
H
o
u
s
i
n
g
+
6
3
.
8
6
,
1
0
5
.
1
6
’
,
D
e
t
e
c
t
o
r
H
o
u
s
i
n
g
+
7
5
.
7
7
,
1
3
4
.
0
0
’
,
W
a
t
.
V
a
l
v
e
+
8
0
.
2
3
,
1
0
6
.
5
5
’
,
D
e
t
e
c
t
o
r
H
o
u
s
i
n
g
+
8
5
.
9
1
,
7
8
.
3
2
’
,
W
a
t
.
V
a
l
v
e
+
9
4
.
0
6
,
1
2
9
.
8
1
’
,
W
a
t
.
V
a
l
v
e
+
9
5
.
3
4
,
1
3
4
.
8
7
’
,
C
n
t
r
l
.
P
n
t
.
5
4
9
+
0
1
.
2
0
,
1
4
8
.
2
0
’
,
C
o
m
b
.
P
o
l
e
5
4
9
+
0
1
.
3
4
,
1
5
3
.
2
5
’
,
C
n
t
r
l
.
P
n
t
.
+
0
1
.
3
4
,
1
7
0
.
5
1
’
,
G
u
y
W
i
r
e
+
0
1
.
6
2
,
1
5
3
.
3
0
’
,
R
W
M
o
n
u
m
e
n
t
+
0
1
.
6
4
,
1
5
3
.
3
4
’
,
R
W
M
o
n
u
m
e
n
t
+
0
2
.
1
7
,
1
4
6
.
7
2
’
,
C
o
m
b
.
P
o
l
e
+
0
2
.
1
7
,
1
7
3
.
4
6
’
,
C
o
m
b
.
P
o
l
e
+
0
2
.
4
2
,
1
9
3
.
8
3
’
,
G
u
y
W
i
r
e
+
0
2
.
7
7
,
1
4
9
.
7
6
’
,
C
n
t
r
l
.
P
n
t
.
+
0
2
.
8
1
,
1
7
4
.
2
0
’
,
C
o
m
b
.
P
o
l
e
+
0
6
.
4
9
,
1
6
1
.
0
0
’
,
G
u
y
W
i
r
e
+
1
1
.
2
5
,
8
1
.
9
8
’
,
S
i
g
n
+
1
3
.
1
0
,
9
8
.
8
6
’
,
L
u
m
i
n
a
r
y
P
o
l
e
+
1
4
.
9
4
,
8
.
0
7
’
,
S
i
g
n
+
1
6
.
4
1
,
9
0
.
7
0
’
,
L
u
m
i
n
a
r
y
P
o
l
e
+
1
9
.
2
1
,
1
3
6
.
9
7
’
,
G
u
y
W
i
r
e
+
1
9
.
6
3
,
8
8
.
6
5
’
,
T
r
a
f
.
P
o
l
e
+
2
0
.
1
1
,
7
.
4
7
’
,
B
e
e
h
i
v
e
I
n
l
.
+
2
0
.
1
9
,
7
.
8
3
’
,
C
a
t
c
h
B
a
s
i
n
+
2
0
.
1
9
,
7
.
8
3
’
,
C
a
t
c
h
B
a
s
i
n
+
2
3
.
9
2
,
7
9
.
9
2
’
,
T
r
a
f
.
P
o
l
e
+
5
7
.
0
3
,
1
8
.
9
1
’
,
E
x
.
T
r
a
f
.
L
o
o
p
+
6
2
.
6
7
,
6
8
.
9
9
’
,
L
u
m
i
n
a
r
y
P
o
l
e
+
7
0
.
8
9
,
1
8
.
5
9
’
,
E
x
.
T
r
a
f
.
L
o
o
p
+
7
3
.
7
8
,
9
8
.
4
5
’
,
C
n
t
r
l
.
P
n
t
.
+
8
9
.
8
5
,
1
5
8
.
4
8
’
,
B
u
s
h
+
9
3
.
2
2
,
0
.
0
8
’
,
C
n
t
r
l
.
P
n
t
.
+
9
5
.
6
5
,
1
5
0
.
0
2
’
,
B
u
s
h
5
5
0
+
0
2
.
6
8
,
1
3
8
.
3
0
’
,
B
u
s
h
+
1
3
.
4
9
,
1
0
7
.
9
6
’
,
S
a
n
i
t
a
r
y
M
.
H
.
5
5
0
+
5
2
.
9
5
,
2
.
3
3
’
,
S
i
g
n
+
6
5
.
4
2
,
1
0
5
.
8
9
’
,
T
r
e
e
KDS AJE
F
+
3
7
.
6
6
,
1
3
.
0
7
’
,
D
e
t
.
H
o
u
s
i
n
g
42
JSB JSB LINE "E"
S
S
S
S
S
S
S
S
12
" R
C
P
6" P VC
1
2"
R
C
P
18 " R CP 18" R CP
6" V
CP
6"
V
CP
15 " V CP15" VCP
12
" R
CP
18 " R CP
12 " R CP
Ex. Co
n
c
. Dit
ch
8" VCP (San.)
8" VCP (San.)
18
"
C
M
P
10
"
C
M
P
S
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
TR
P
XXX
FP
FP
FP
(Gras s)
(Bit . Mat .)
(Bit. Mat .)
(Gras s)
(Woode d)
(Gras s)
(Grass)
(Bit . Mat.)
(B
i
t
. M
a
t
.
)
(B
i
t
.
M
a
t
.)
(Bit . Mat .)
(Gras s)
(Bit . Mat.)
(Gras s)
(Wooded)
(Gras s)
Shoulde
r (C-
S
t
n .)
TR
RT
RT
RT
RT
RT
RT
TH
H
TR
RT
RT
XXXXTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTT
T
T
T
T
TTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTOH EOH EOH EOH EOH EOH EOH EOH EOH EOH EOH EOH EOH EOH EOH EOH EGGGGGGGGGGGGGGGGGGGGGGGTTTTTWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWOH EOH EOH EOH EOH EOH EOH EOH EOH EOH EOH EOH EOH EOH EOH EOH EGGGGGGGGGGGGGGGGGGGGGGGTTTTTWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWW
T
WV
WV
WV
OH EOH EOH EOH EOH E
TH
H
OH EOH EOH EOH EOH EOH EOH E
TH
H
OH EOH E
83
2
.
0
83
2
.
1
83
2
.
1
83
2
.
4
83
2
.
5
83
2
.
7
83
2
.
8
83
2
.
8
83
2
.
9
83
3
.
0
83
3
.
2
83
3
.
8
83
4
.
2
83
4
.
4
83
4
.
6
83
4
.
8
83
5
.
2
83
5
.
9
83
6
.
3
83
5
.
8
83
7
.
2
83
5
.
8
83
6
.
2
83
6
.
4
83
6
.
8
HORIZONTAL SCALE
DESIGNATION NO.
BRIDGE FILE
VERTICAL SCALE
SURVEY BOOK SHEETS
CONTRACT PROJECT NO.
of
DESIGNED:DRAWN:
CHECKED:CHECKED:
DESIGN ENGINEER
RECOMMENDED
FOR APPROVAL
DATE
aedwards 3:51:39 PM3/20/2008 P:\IN2003\0661\D. Drawings\IN20030661.RD.C2.PP02.dgn
PLAN & PROFILE
CITY OF CARMEL 1" = 40’
1" = 10’
07-08D
No.
STATE OF
INDIAN A
REGISTERED
P
R
OFE
S
SIONAL ENGIN
EER10505104
J. SAMUEL B
ALO
G
03/21/2008
173
5
5
1
+
1
0
.
4
4
,
1
1
2
.
2
0
’
,
S
a
n
i
t
a
r
y
M
.
H
.
+
7
4
.
9
5
,
1
1
1
.
8
8
’
,
T
r
e
e
5
5
1
+
9
0
.
8
5
,
1
1
3
.
8
7
’
,
P
i
n
e
+
9
2
.
3
7
,
1
0
7
.
3
5
’
,
C
n
t
r
l
.
P
n
t
.
+
9
5
.
4
5
,
1
1
1
.
7
1
’
,
P
i
n
e
+
9
8
.
0
8
,
5
.
3
3
’
,
T
r
a
f
.
M
.
H
.
5
5
2
+
0
2
.
8
5
,
1
1
4
.
7
0
’
,
P
i
n
e
+
0
5
.
9
2
,
1
1
2
.
1
1
’
,
P
i
n
e
5
5
2
+
0
6
.
1
4
,
6
4
.
8
0
’
,
S
i
g
n
+
1
6
.
1
4
,
1
1
1
.
6
5
’
,
P
i
n
e
+
1
8
.
6
6
,
1
1
8
.
6
3
’
,
T
r
e
e
+
2
0
.
1
0
,
1
1
7
.
2
3
’
,
P
i
n
e
+
3
0
.
2
9
,
1
1
7
.
8
3
’
,
T
r
e
e
+
3
3
.
6
6
,
1
2
3
.
1
0
’
,
P
i
n
e
+
3
6
.
9
3
,
1
4
5
.
0
1
’
,
T
r
e
e
+
3
8
.
1
0
,
1
1
7
.
7
6
’
,
P
i
n
e
+
4
2
.
7
2
,
1
2
2
.
6
0
’
,
P
i
n
e
+
4
8
.
9
6
,
1
3
0
.
9
4
’
,
T
r
e
e
+
6
4
.
4
9
,
1
0
7
.
1
9
’
,
T
r
e
e
5
5
3
+
0
2
.
5
0
,
1
2
2
.
0
0
’
,
G
u
y
W
i
r
e
+
0
2
.
7
8
,
1
3
5
.
2
4
’
,
C
o
m
b
.
P
o
l
e
+
2
1
.
4
2
,
1
0
8
.
9
7
’
,
C
o
m
b
.
P
o
l
e
+
8
1
.
1
4
,
1
3
8
.
2
3
’
,
T
r
e
e
+
8
1
.
3
4
,
1
4
6
.
5
7
’
,
T
r
e
e
+
9
7
.
6
7
,
1
1
5
.
8
1
’
,
P
i
n
e
5
5
4
+
9
5
.
0
0
,
0
.
1
7
’
,
B
e
e
h
i
v
e
I
n
l
.
5
5
4
+
9
6
.
0
6
,
1
0
5
.
1
1
’
,
C
o
m
b
.
P
o
l
e
+
9
6
.
7
1
,
1
1
.
4
0
’
,
T
e
l
.
M
.
H
.
5
5
5
+
3
0
.
9
4
,
0
.
1
0
’
,
C
n
t
r
l
.
P
n
t
.
55
5
+
3
7
.
4
9
,
1
0
6
.
8
5
’
,
P
w
p
.
+
3
8
.
3
2
,
1
0
3
.
6
6
’
,
T
r
e
e
+
6
8
.
9
5
,
1
0
7
.
4
5
’
,
P
w
p
.
5
5
7
+
9
5
.
0
5
,
1
1
.
1
5
’
,
T
e
l
.
M
.
H
.
5
5
8
+
4
2
.
7
7
,
9
7
.
7
6
’
,
T
r
e
e
+
9
7
.
9
1
,
9
5
.
2
2
’
,
C
o
m
b
.
P
o
l
e
5
5
9
+
1
2
.
0
2
,
9
9
.
7
2
’
,
P
w
p
.
5
5
9
+
4
2
.
6
6
,
9
3
.
5
5
’
,
T
r
e
e
5
6
0
+
4
8
.
0
4
,
9
1
.
8
4
’
,
T
r
e
e
5
6
0
+
9
3
.
8
5
,
0
.
2
7
’
,
B
e
e
h
i
v
e
I
n
l
.
5
6
1
+
3
2
.
3
5
,
9
1
.
1
3
’
,
C
o
m
b
.
P
o
l
e
5
6
1
+
8
8
.
9
6
,
8
9
.
8
6
’
,
P
w
p
.
5
6
2
+
9
2
.
0
1
,
8
8
.
2
7
’
,
P
w
p
.
KDS AJE
43
JSB JSB LINE "E"
S
66
" C
MP
48
" C
MP
Ex. Conc . Dit ch
18" R CP
15
" R
C
P
12
" R
C
P
12
" R
C
P
15
" R
CP
Ex . Conc. Dit ch
Ex . Conc. Ditch
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
TR
Parkin g Lot
(Bit . Mat .)
(Gras s)
(Wooded)
(Grass)
(Grass)(Gras s)
(Grass)
(Gras s)(Grass)
(Wooded)
(Gras s)
(Gras s)
(Bit. Mat.)
(Bit . Mat .)
Sh ed
(Garden)Sh ed
TT
-
83
6
.
8
83
7
.
1
83
7
.
5
83
8
.
0
83
8
.
3
83
8
.
7
83
9
.
0
83
9
.
5
84
0
.
0
84
0
.
8
84
1
.
3
84
1
.
8
84
2
.
3
84
2
.
8
84
3
.
2
84
3
.
7
84
4
.
2
84
4
.
7
84
5
.
2
84
5
.
6
8
4
5
.
4
84
6
.
2
84
6
.
7
84
7
.
2
84
7
.
6
HORIZONTAL SCALE
DESIGNATION NO.
BRIDGE FILE
VERTICAL SCALE
SURVEY BOOK SHEETS
CONTRACT PROJECT NO.
of
DESIGNED:DRAWN:
CHECKED:CHECKED:
DESIGN ENGINEER
RECOMMENDED
FOR APPROVAL
DATE
aedwards 3:51:57 PM3/20/2008 P:\IN2003\0661\D. Drawings\IN20030661.RD.C2.PP03.dgn
PLAN & PROFILE
CITY OF CARMEL 1" = 40’
1" = 10’
07-08D
No.
STATE OF
INDIANA
REGISTERED
P
R
OFE
S
SIONAL ENGIN
EER10505104
J. SAMUEL B
ALO
G
03/21/2008
173
5
6
3
+
9
7
.
4
5
,
1
0
.
9
9
’
,
T
e
l
.
M
.
H
.
5
6
4
+
4
9
.
6
0
,
8
4
.
8
9
’
,
T
e
m
p
.
B
e
n
c
h
M
r
k
.
+
9
9
.
9
5
,
0
.
0
7
’
,
C
n
t
r
l
.
P
n
t
.
5
6
5
+
4
2
.
6
0
,
8
6
.
2
6
’
,
T
r
e
e
5
6
6
+
3
8
.
9
6
,
8
6
.
2
0
’
,
T
r
e
e
5
6
6
+
9
5
.
3
9
,
1
2
.
1
0
’
,
T
e
l
.
M
.
H
.
5
6
7
+
2
1
.
7
7
,
8
6
.
4
7
’
,
T
r
e
e
+
2
6
.
1
6
,
8
7
.
0
8
’
,
I
r
o
n
P
i
n
F
n
d
.
+
2
6
.
2
4
,
8
6
.
8
7
’
,
I
r
o
n
P
i
n
F
n
d
.
5
6
8
+
1
7
.
5
2
,
0
.
2
9
’
,
B
e
e
h
i
v
e
I
n
l
.
5
6
8
+
2
9
.
6
2
,
8
6
.
6
1
’
,
T
r
e
e
5
6
9
+
2
1
.
0
5
,
8
9
.
9
6
’
,
C
o
m
b
.
P
o
l
e
5
6
9
+
3
7
.
6
7
,
8
6
.
4
4
’
,
T
r
e
e
+
6
7
.
6
2
,
8
1
.
1
4
’
,
T
r
e
e
+
9
4
.
6
9
,
1
1
.
4
1
’
,
T
e
l
.
M
.
H
.
5
7
0
+
0
4
.
0
0
,
8
0
.
8
8
’
,
T
r
e
e
5
7
0
+
0
4
.
7
1
,
7
2
.
8
8
’
,
T
r
e
e
+
2
7
.
1
9
,
1
0
1
.
1
7
’
,
W
e
l
l
+
3
1
.
6
0
,
1
0
1
.
2
5
’
,
W
a
t
.
V
a
l
v
e
+
5
8
.
5
7
,
7
6
.
8
6
’
,
T
r
e
e
57
1
+
1
5
.
7
3
,
9
4
.
6
2
’
,
G
u
y
W
i
r
e
+
2
8
.
3
4
,
9
4
.
7
5
’
,
C
o
m
b
.
P
o
l
e
+
2
9
.
4
8
,
8
7
.
6
5
’
,
P
o
s
t
57
1
+
4
5
.
4
8
,
7
.
5
8
’
,
T
r
a
f
.
M
.
H
.
5
7
2
+
2
8
.
8
1
,
6
5
.
3
5
’
,
S
i
g
n
+
3
2
.
6
1
,
1
0
0
.
9
4
’
,
P
w
p
.
5
7
2
+
3
7
.
2
0
,
9
6
.
6
8
’
,
T
r
e
e
+
6
8
.
9
0
,
7
6
.
7
5
’
,
S
i
g
n
+
7
1
.
0
3
,
3
.
4
8
’
,
S
i
g
n
5
7
3
+
3
6
.
1
3
,
1
0
4
.
2
2
’
,
T
r
e
e
5
7
3
+
3
6
.
9
1
,
1
0
2
.
2
5
’
,
P
i
n
e
+
3
7
.
8
3
,
1
0
4
.
4
9
’
,
C
o
m
b
.
P
o
l
e
5
7
4
+
0
3
.
7
3
,
1
1
6
.
7
3
’
,
P
i
n
e
5
7
4
+
0
9
.
0
4
,
1
4
1
.
3
6
’
,
T
r
e
e
+
1
6
.
5
2
,
1
5
5
.
1
7
’
,
T
r
e
e
+
2
6
.
8
5
,
0
.
3
5
’
,
T
r
a
f
.
M
.
H
.
+
2
9
.
6
7
,
7
5
.
3
6
’
,
S
i
g
n
+
3
1
.
4
0
,
1
6
0
.
0
5
’
,
P
i
n
e
+
3
4
.
8
1
,
2
.
9
3
’
,
P
K
N
a
i
l
F
n
d
.
+
3
6
.
3
5
,
7
.
1
5
’
,
S
i
g
n
+
4
2
.
8
1
,
0
.
0
8
’
,
C
n
t
r
l
.
P
n
t
.
+
4
5
.
2
6
,
1
0
7
.
7
1
’
,
W
a
t
.
V
a
l
v
e
+
5
1
.
7
3
,
9
9
.
0
9
’
,
T
r
a
f
.
M
.
H
.
+
5
9
.
3
4
,
1
7
6
.
6
6
’
,
T
e
l
.
M
.
H
.
+
8
0
.
6
2
,
0
.
0
8
’
,
C
n
t
r
l
.
P
n
t
.
KDS AJE
44
JSB JSB LINE "E"
D
18
" R
CP
Ex. Conc
. Dit ch
12" R CP
30" CM P
12
"
C
M
P
6" CM P
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
TR
W
II
(Gras s)
(Woode d)
(Grass)
(Grass)
(Gras s)
(Grass)
(Gras s)
(Wooded)
Shoulder (Bit . Mat.)
Ya rd
Ba rn
1-St
y.Fr
. Hs
e.
(Bit . Mat.)
(Bit. Mat.)
(Grass)
(Gras s)
(Grass)
Si
d
e
w
a
l
k
(
C
o
n
c
.)
(Grass)
(Gras s)
Si
d
e
w
a
l
k
(
C
o
n
c
.)
(Grass)
(Gras s)
Si
d
e
w
a
l
k
(
C
o
n
c
.)
(Grass)
(Gras s)
Si
d
e
w
a
l
k
(
C
o
n
c
.)
TR
TR
WV
TTT
WWWWWWWWWWWWWWWWWWWWWWWWWWWTTTTTTTTTTTTTTTTGGOH TOH TOH TOH EOH EOH E
WV
84
7
.
6
84
8
.
0
84
8
.
2
84
8
.
3
8
4
8
.
4
84
8
.
5
8
4
8
.
4
8
4
8
.
4
84
8
.
2
84
8
.
0
84
7
.
8
84
7
.
9
HORIZONTAL SCALE
DESIGNATION NO.
BRIDGE FILE
VERTICAL SCALE
SURVEY BOOK SHEETS
CONTRACT PROJECT NO.
of
DESIGNED:DRAWN:
CHECKED:CHECKED:
DESIGN ENGINEER
RECOMMENDED
FOR APPROVAL
DATE
aedwards 3:52:13 PM3/20/2008 P:\IN2003\0661\D. Drawings\IN20030661.RD.C2.PP04.dgn
PLAN & PROFILE
CITY OF CARMEL 1" = 40’
1" = 10’
07-08D
No.
STATE OF
INDIANA
REGISTERED
P
R
OFE
S
SIONAL ENGIN
EER10505104
J. SAMUEL B
ALO
G
03/21/2008
173
4
2
+
0
0
.
0
3
,
0
.
0
0
’
,
C
n
t
r
l
.
P
n
t
.
+
0
2
.
7
0
,
5
1
.
3
5
’
,
S
t
a
n
d
p
i
p
e
+
0
2
.
9
4
,
5
0
.
1
9
’
,
S
t
a
n
d
p
i
p
e
+
1
4
.
9
3
,
6
3
.
7
1
’
,
P
i
n
e
+
2
5
.
3
7
,
3
6
.
3
7
’
,
T
r
e
e
+
3
6
.
0
5
,
4
1
.
7
8
’
,
T
r
e
e
+
4
9
.
0
1
,
3
3
.
1
0
’
,
T
r
e
e
+
6
6
.
5
9
,
4
1
.
6
5
’
,
T
r
e
e
+
7
1
.
2
7
,
1
0
1
.
0
7
’
,
A
C
U
n
i
t
+
7
4
.
2
3
,
3
9
.
2
4
’
,
B
u
s
h
+
7
4
.
8
8
,
4
9
.
5
0
’
,
T
r
e
e
+
7
7
.
5
9
,
9
9
.
1
5
’
,
E
l
e
c
.
M
e
t
e
r
B
o
x
+
7
9
.
3
8
,
4
5
.
9
3
’
,
T
r
e
e
+
8
0
.
9
1
,
4
1
.
3
1
’
,
B
u
s
h
+
8
4
.
2
6
,
9
9
.
7
5
’
,
G
a
s
M
e
t
e
r
+
8
6
.
9
1
,
4
0
.
7
7
’
,
B
u
s
h
+
8
9
.
0
0
,
4
7
.
2
5
’
,
T
r
e
e
+
9
8
.
1
1
,
4
6
.
6
2
’
,
T
r
e
e
4
3
+
0
7
.
9
1
,
7
8
.
0
5
’
,
W
a
t
.
M
e
t
e
r
+
0
9
.
2
2
,
4
7
.
6
6
’
,
T
r
e
e
+
1
7
.
0
6
,
4
7
.
4
6
’
,
T
r
e
e
+
2
3
.
1
0
,
6
7
.
5
8
’
,
T
r
e
e
+
2
5
.
6
7
,
4
0
.
6
7
’
,
B
u
s
h
+
3
2
.
3
7
,
4
8
.
1
1
’
,
P
i
n
e
+
4
1
.
1
9
,
4
1
.
9
6
’
,
P
i
n
e
+
4
4
.
7
0
,
5
6
.
2
1
’
,
P
i
n
e
+
4
4
.
9
4
,
3
9
.
2
3
’
,
C
o
m
b
.
P
o
l
e
+
4
6
.
2
0
,
3
8
.
8
1
’
,
C
o
m
b
.
P
o
l
e
+
4
6
.
8
0
,
4
8
.
1
5
’
,
S
a
n
i
t
a
r
y
M
.
H
.
+
4
8
.
8
7
,
6
3
.
7
9
’
,
P
i
n
e
+
5
3
.
1
5
,
4
3
.
7
5
’
,
P
i
n
e
+
5
5
.
9
5
,
5
7
.
0
1
’
,
P
i
n
e
+
5
8
.
4
6
,
7
9
.
6
6
’
,
M
a
i
l
b
o
x
+
6
7
.
0
2
,
1
1
.
2
3
’
,
W
a
t
.
V
a
l
v
e
+
6
8
.
0
2
,
6
0
.
7
4
’
,
F
i
r
e
H
y
d
r
a
n
t
+
6
8
.
6
7
,
6
1
.
3
3
’
,
F
i
r
e
H
y
d
r
a
n
t
+
7
4
.
9
0
,
5
7
.
1
4
’
,
T
r
e
e
+
7
5
.
7
1
,
2
7
.
3
9
’
,
W
a
t
.
V
a
l
v
e
+
7
6
.
3
2
,
5
3
.
6
9
’
,
W
a
t
.
V
a
l
v
e
+
7
7
.
2
2
,
4
6
.
8
2
’
,
L
u
m
i
n
a
r
y
P
o
l
e
+
8
9
.
0
5
,
3
9
.
2
3
’
,
S
i
g
n
+
9
4
.
6
8
,
1
0
3
.
2
1
’
,
S
a
n
i
t
a
r
y
M
.
H
.
+
9
4
.
6
8
,
1
0
3
.
2
1
’
,
S
a
n
i
t
a
r
y
M
.
H
.
4
4
+
1
7
.
5
9
,
7
5
.
6
2
’
,
C
n
t
r
l
.
P
n
t
.
+
1
8
.
1
6
,
4
0
.
7
6
’
,
S
i
g
n
+
3
2
.
4
3
,
7
4
.
4
7
’
,
C
n
t
r
l
.
P
n
t
.
+
3
4
.
0
4
,
9
1
.
9
1
’
,
S
i
g
n
+
3
7
.
6
8
,
9
8
.
4
4
’
,
L
u
m
i
n
a
r
y
P
o
l
e
+
4
5
.
8
0
,
5
8
.
1
2
’
,
C
n
t
r
l
.
P
n
t
.
+
5
1
.
9
7
,
4
3
.
9
3
’
,
T
r
e
e
+
5
9
.
7
7
,
1
0
2
.
1
0
’
,
L
u
m
i
n
a
r
y
P
o
l
e
+
5
9
.
7
8
,
4
6
.
0
9
’
,
L
u
m
i
n
a
r
y
P
o
l
e
+
8
4
.
2
5
,
5
3
.
8
2
’
,
T
r
e
e
+
8
8
.
9
8
,
3
9
.
0
0
’
,
T
r
e
e
+
9
8
.
3
8
,
4
8
.
5
6
’
,
E
l
e
c
.
M
e
t
e
r
B
o
x
4
5
+
0
3
.
6
1
,
4
8
.
1
7
’
,
T
r
e
e
+
1
4
.
5
7
,
4
7
.
8
5
’
,
T
r
e
e
+
1
6
.
4
5
,
3
8
.
5
4
’
,
C
o
m
b
.
P
o
l
e
+
1
7
.
6
7
,
3
8
.
2
2
’
,
C
o
m
b
.
P
o
l
e
+
2
6
.
1
2
,
4
7
.
8
4
’
,
T
r
e
e
+
2
6
.
2
9
,
9
8
.
0
4
’
,
W
a
t
.
M
e
t
e
r
+
2
7
.
3
1
,
1
0
0
.
9
8
’
,
B
u
s
h
+
2
9
.
7
2
,
1
0
1
.
7
8
’
,
T
e
l
.
P
e
d
e
s
t
a
l
+
3
0
.
8
4
,
1
0
1
.
8
8
’
,
T
e
l
.
P
e
d
e
s
t
a
l
+
3
1
.
0
6
,
1
0
0
.
9
5
’
,
E
l
e
c
.
P
e
d
e
s
t
a
l
+
3
1
.
8
8
,
8
7
.
3
2
’
,
M
a
i
l
b
o
x
+
3
1
.
9
7
,
1
0
2
.
1
1
’
,
B
u
s
h
+
3
2
.
5
0
,
1
0
0
.
1
8
’
,
B
u
s
h
+
3
2
.
8
6
,
1
0
1
.
2
6
’
,
B
u
s
h
+
3
6
.
6
6
,
4
7
.
4
7
’
,
T
r
e
e
+
4
8
.
4
4
,
4
6
.
8
8
’
,
T
r
e
e
+
5
9
.
1
0
,
4
7
.
0
5
’
,
T
r
e
e
+
6
3
.
5
9
,
8
6
.
5
5
’
,
M
a
i
l
b
o
x
+
6
9
.
7
8
,
4
6
.
6
4
’
,
T
r
e
e
+
7
2
.
1
1
,
9
6
.
9
5
’
,
W
a
t
.
M
e
t
e
r
+
7
2
.
5
1
,
9
8
.
9
2
’
,
T
r
e
e
+
8
0
.
7
8
,
4
6
.
8
8
’
,
T
r
e
e
+
9
0
.
5
0
,
4
7
.
2
4
’
,
T
r
e
e
4
6
+
0
2
.
9
7
,
1
0
2
.
5
9
’
,
L
O
B
J
+
1
0
.
2
9
,
8
5
.
8
1
’
,
M
a
i
l
b
o
x
+
1
2
.
3
4
,
1
0
1
.
4
9
’
,
L
O
B
J
+
1
6
.
8
8
,
1
1
1
.
7
1
’
,
L
O
B
J
+
2
0
.
1
9
,
1
0
2
.
3
8
’
,
T
e
l
.
P
e
d
e
s
t
a
l
+
2
1
.
4
0
,
1
0
3
.
4
6
’
,
S
p
r
i
n
k
.
C
n
t
r
l
.
V
a
l
v
e
+
2
1
.
9
2
,
1
0
0
.
6
5
’
,
T
r
a
n
s
f
o
r
m
e
r
+
2
2
.
7
4
,
1
1
4
.
6
2
’
,
L
O
B
J
+
2
3
.
2
8
,
1
0
2
.
3
8
’
,
T
e
l
.
P
e
d
e
s
t
a
l
+
2
4
.
1
3
,
1
1
5
.
6
1
’
,
W
a
t
.
M
e
t
e
r
+
3
7
.
3
3
,
1
0
5
.
7
7
’
,
B
u
s
h
+
4
5
.
0
0
,
3
9
.
8
8
’
,
C
n
t
r
l
.
P
n
t
.
+
5
1
.
1
0
,
3
6
.
8
3
’
,
T
r
e
e
+
5
1
.
2
9
,
4
2
.
5
1
’
,
R
W
M
o
n
u
m
e
n
t
+
5
1
.
4
0
,
4
2
.
2
8
’
,
C
n
t
r
l
.
P
n
t
.
+
5
2
.
2
1
,
1
1
5
.
6
8
’
,
B
u
s
h
+
5
2
.
3
4
,
1
1
2
.
8
7
’
,
B
u
s
h
+
5
3
.
1
0
,
1
0
8
.
1
7
’
,
B
u
s
h
+
7
5
.
8
8
,
1
1
5
.
8
9
’
,
M
a
i
l
b
o
x
+
8
9
.
2
3
,
4
0
.
2
8
’
,
C
o
m
b
.
P
o
l
e
+
8
9
.
6
3
,
4
0
.
6
0
’
,
C
o
m
b
.
P
o
l
e
+
9
5
.
5
0
,
1
5
.
8
7
’
,
S
i
g
n
4
7
+
0
2
.
1
1
,
9
0
.
9
6
’
,
C
n
t
r
l
.
P
n
t
.
+
0
9
.
9
3
,
9
5
.
6
0
’
,
C
n
t
r
l
.
P
n
t
.
+
1
7
.
1
0
,
1
3
3
.
3
3
’
,
C
u
r
b
I
n
l
e
t
+
1
7
.
1
0
,
1
3
3
.
3
3
’
,
C
u
r
b
I
n
l
e
t
+
2
8
.
3
6
,
3
5
.
5
3
’
,
W
a
t
.
V
a
l
v
e
+
2
8
.
5
3
,
3
5
.
3
6
’
,
W
a
t
.
V
a
l
v
e
+
2
8
.
6
2
,
3
8
.
9
3
’
,
F
i
r
e
H
y
d
r
a
n
t
+
2
8
.
7
1
,
3
7
.
9
8
’
,
F
i
r
e
H
y
d
r
a
n
t
+
2
8
.
7
1
,
3
5
.
3
7
’
,
W
a
t
.
V
a
l
v
e
+
3
0
.
4
3
,
1
7
.
9
7
’
,
S
i
g
n
+
4
5
.
2
7
,
5
7
.
2
2
’
,
W
a
t
.
V
a
l
v
e
+
4
6
.
9
7
,
5
7
.
3
2
’
,
F
i
r
e
H
y
d
r
a
n
t
+
5
3
.
1
5
,
3
6
.
8
1
’
,
T
r
e
e
+
5
7
.
9
3
,
1
0
7
.
4
1
’
,
E
l
e
c
.
P
e
d
e
s
t
a
l
+
6
1
.
2
0
,
1
0
7
.
7
9
’
,
W
a
t
.
M
e
t
e
r
+
6
6
.
6
8
,
1
0
7
.
0
3
’
,
S
a
n
i
t
a
r
y
M
.
H
.
+
6
6
.
6
8
,
1
0
7
.
0
3
’
,
S
a
n
i
t
a
r
y
M
.
H
.
4
8
+
2
9
.
7
0
,
4
1
.
6
0
’
,
G
u
y
W
i
r
e
+
5
0
.
4
5
,
4
2
.
9
5
’
,
C
n
t
r
l
.
P
n
t
.
+
5
2
.
0
1
,
4
1
.
3
8
’
,
C
o
m
b
.
P
o
l
e
+
5
3
.
4
8
,
4
2
.
3
3
’
,
C
o
m
b
.
P
o
l
e
+
6
3
.
3
0
,
5
9
.
2
2
’
,
G
u
y
W
i
r
e
+
6
7
.
6
5
,
1
.
2
6
’
,
E
x
.
T
r
a
f
.
L
o
o
p
+
7
0
.
3
7
,
3
4
.
2
1
’
,
W
a
t
.
V
a
l
v
e
+
8
9
.
3
5
,
2
.
6
2
’
,
D
e
t
e
c
t
o
r
H
o
u
s
i
n
g
+
9
9
.
1
3
,
0
.
4
9
’
,
E
x
.
T
r
a
f
.
L
o
o
p
4
9
+
0
1
.
3
9
,
5
3
.
0
2
’
,
L
u
m
i
n
a
r
y
P
o
l
e
+
1
1
.
6
2
,
5
9
.
4
9
’
,
T
r
a
f
.
P
o
l
e
+
1
1
.
7
2
,
2
.
3
1
’
,
E
x
.
T
r
a
f
.
L
o
o
p
+
2
1
.
8
1
,
2
5
.
8
8
’
,
W
a
t
.
V
a
l
v
e
+
8
1
.
4
3
,
9
6
.
6
5
’
,
E
x
.
T
r
a
f
.
L
o
o
p
+
8
1
.
7
6
,
1
1
0
.
5
0
’
,
E
x
.
T
r
a
f
.
L
o
o
p
+
8
7
.
2
4
,
7
7
.
2
8
’
,
D
e
t
e
c
t
o
r
H
o
u
s
i
n
g
+
9
7
.
9
6
,
1
9
2
.
5
5
’
,
S
i
g
n
5
0
+
0
0
.
4
3
,
1
3
2
.
8
2
’
,
C
n
t
r
l
.
P
n
t
.
+
0
7
.
7
4
,
5
9
.
6
8
’
,
B
e
e
h
i
v
e
I
n
l
.
+
0
8
.
1
0
,
5
9
.
7
6
’
,
C
a
t
c
h
B
a
s
i
n
+
0
8
.
1
0
,
5
9
.
7
6
’
,
C
a
t
c
h
B
a
s
i
n
+
0
8
.
3
2
,
5
4
.
5
1
’
,
S
i
g
n
+
6
9
.
3
3
,
1
0
2
.
2
2
’
,
L
u
m
i
n
a
r
y
P
o
l
e
+
8
0
.
2
0
,
6
3
.
3
0
’
,
T
r
a
f
.
P
o
l
e
+
8
2
.
2
1
,
5
0
.
5
7
’
,
S
i
g
n
+
9
0
.
9
6
,
5
5
.
7
2
’
,
L
u
m
i
n
a
r
y
P
o
l
e
+
9
8
.
8
0
,
1
1
3
.
3
7
’
,
C
n
t
r
l
.
P
n
t
.
5
1
+
0
5
.
1
8
,
2
.
8
4
’
,
D
e
t
e
c
t
o
r
H
o
u
s
i
n
g
+
0
6
.
6
5
,
1
9
.
3
0
’
,
D
e
t
e
c
t
o
r
H
o
u
s
i
n
g
+
0
8
.
2
9
,
1
5
3
.
1
8
’
,
S
a
n
i
t
a
r
y
M
.
H
.
+
3
4
.
0
8
,
1
4
.
6
6
’
,
W
a
t
.
V
a
l
v
e
+
3
5
.
0
4
,
3
4
.
3
7
’
,
C
n
t
r
l
.
P
n
t
.
+
3
8
.
6
4
,
1
4
2
.
4
0
’
,
B
u
s
h
+
5
0
.
3
6
,
1
3
5
.
3
8
’
,
B
u
s
h
+
5
3
.
4
5
,
4
0
.
3
4
’
,
C
n
t
r
l
.
P
n
t
.
+
5
3
.
5
0
,
4
0
.
6
2
’
,
R
W
M
o
n
u
m
e
n
t
+
5
3
.
5
4
,
4
0
.
6
4
’
,
R
W
M
o
n
u
m
e
n
t
+
5
8
.
8
3
,
1
2
9
.
5
6
’
,
B
u
s
h
+
6
1
.
2
2
,
4
5
.
5
0
’
,
G
u
y
W
i
r
e
+
7
3
.
6
6
,
4
1
.
1
0
’
,
C
o
m
b
.
P
o
l
e
+
7
4
.
4
1
,
4
1
.
7
3
’
,
C
o
m
b
.
P
o
l
e
+
9
4
.
0
4
,
4
1
.
2
7
’
,
G
u
y
W
i
r
e
5
2
+
0
0
.
6
9
,
5
7
.
2
7
’
,
T
r
e
e
+
0
9
.
1
1
,
9
7
.
5
5
’
,
B
u
s
h
+
1
5
.
6
6
,
9
3
.
1
9
’
,
B
u
s
h
+
1
6
.
5
0
,
5
7
.
8
5
’
,
T
r
e
e
+
1
7
.
2
7
,
1
6
.
0
1
’
,
W
a
t
.
V
a
l
v
e
+
1
7
.
6
6
,
1
5
.
5
1
’
,
W
a
t
.
V
a
l
v
e
+
5
4
.
6
9
,
6
6
.
2
0
’
,
T
r
e
e
+
6
7
.
3
9
,
5
7
.
0
9
’
,
T
r
e
e
+
8
0
.
8
2
,
5
5
.
9
6
’
,
T
r
e
e
+
9
5
.
5
4
,
1
1
0
.
8
9
’
,
B
u
s
h
5
3
+
0
2
.
8
5
,
1
0
4
.
1
0
’
,
B
u
s
h
+
0
5
.
2
2
,
4
0
.
7
8
’
,
G
u
y
W
i
r
e
+
0
5
.
7
3
,
3
9
.
9
5
’
,
G
u
y
W
i
r
e
+
1
5
.
9
3
,
1
0
3
.
1
2
’
,
B
u
s
h
+
2
4
.
5
2
,
4
0
.
7
4
’
,
C
o
m
b
.
P
o
l
e
+
2
5
.
0
7
,
3
9
.
5
6
’
,
C
o
m
b
.
P
o
l
e
+
3
9
.
7
0
,
1
0
0
.
0
3
’
,
B
u
s
h
+
5
3
.
8
0
,
9
9
.
6
3
’
,
B
u
s
h
+
5
7
.
5
0
,
1
1
7
.
5
7
’
,
B
u
s
h
+
5
8
.
9
7
,
1
0
4
.
4
7
’
,
B
u
s
h
+
7
4
.
8
4
,
4
9
.
8
6
’
,
T
r
e
e
+
8
1
.
0
7
,
1
1
8
.
3
5
’
,
C
a
t
c
h
B
a
s
i
n
+
8
1
.
0
7
,
1
1
8
.
3
5
’
,
C
a
t
c
h
B
a
s
i
n
+
8
8
.
7
8
,
2
4
.
8
5
’
,
T
r
e
e
+
9
1
.
4
0
,
4
9
.
0
4
’
,
T
r
e
e
4
2
+
0
6
.
3
0
,
2
7
.
7
2
’
,
P
i
n
e
+
3
5
.
4
8
,
6
7
.
4
2
’
,
L
u
m
i
n
a
r
y
P
o
l
e
+
4
6
.
5
0
,
2
1
.
4
4
’
,
C
n
t
r
l
.
P
n
t
.
+
4
9
.
8
4
,
3
1
.
5
4
’
,
T
r
a
f
.
P
o
l
e
+
5
0
.
9
6
,
2
3
.
8
2
’
,
T
e
m
p
.
B
e
n
c
h
M
r
k
.
+
5
1
.
1
3
,
2
3
.
5
5
’
,
F
i
r
e
H
y
d
r
a
n
t
+
5
1
.
5
7
,
2
4
.
5
2
’
,
F
i
r
e
H
y
d
r
a
n
t
+
5
3
.
9
9
,
8
.
3
0
’
,
W
a
t
.
V
a
l
v
e
+
5
4
.
1
6
,
7
.
5
2
’
,
W
a
t
.
V
a
l
v
e
+
6
0
.
0
3
,
2
9
.
8
6
’
,
W
a
t
.
V
a
l
v
e
+
7
1
.
3
9
,
9
6
.
9
0
’
,
L
u
m
i
n
a
r
y
P
o
l
e
+
7
3
.
0
7
,
3
4
.
7
4
’
,
B
e
e
h
i
v
e
I
n
l
.
+
7
3
.
0
7
,
3
4
.
7
4
’
,
B
e
e
h
i
v
e
I
n
l
.
+
7
8
.
0
4
,
1
0
8
.
1
5
’
,
P
i
n
e
4
3
+
2
4
.
7
3
,
1
1
4
.
5
2
’
,
T
r
e
e
+
2
5
.
7
9
,
2
7
.
3
3
’
,
S
t
u
m
p
+
6
5
.
4
8
,
8
9
.
0
7
’
,
S
i
g
n
+
7
2
.
3
3
,
1
1
7
.
4
3
’
,
B
u
s
h
+
7
2
.
9
4
,
3
3
.
9
5
’
,
C
u
r
b
I
n
l
e
t
+
7
2
.
9
4
,
3
3
.
9
5
’
,
C
u
r
b
I
n
l
e
t
+
7
6
.
8
7
,
1
0
0
.
4
5
’
,
L
u
m
i
n
a
r
y
P
o
l
e
+
7
7
.
2
1
,
9
7
.
8
6
’
,
S
i
g
n
4
4
+
5
1
.
8
7
,
3
4
.
3
5
’
,
I
n
l
e
t
+
5
1
.
8
7
,
3
4
.
3
5
’
,
C
u
r
b
I
n
l
e
t
+
5
4
.
6
8
,
3
5
.
6
5
’
,
S
i
g
n
+
5
6
.
3
4
,
1
2
6
.
2
2
’
,
C
n
t
r
l
.
P
n
t
.
+
5
7
.
5
8
,
9
4
.
0
0
’
,
S
i
g
n
+
5
8
.
5
9
,
1
0
0
.
6
3
’
,
L
u
m
i
n
a
r
y
P
o
l
e
+
6
1
.
4
5
,
4
1
.
9
9
’
,
S
i
g
n
+
7
6
.
6
2
,
2
0
.
2
0
’
,
S
i
g
n
+
7
6
.
9
7
,
2
0
.
0
0
’
,
S
i
g
n
+
7
7
.
0
7
,
9
2
.
5
8
’
,
P
i
n
e
4
5
+
1
2
.
9
9
,
7
9
.
0
1
’
,
S
i
g
n
+
1
4
.
5
2
,
1
0
7
.
4
6
’
,
F
i
r
e
H
y
d
r
a
n
t
+
1
4
.
6
3
,
1
1
0
.
4
9
’
,
W
a
t
.
V
a
l
v
e
+
1
9
.
5
4
,
3
1
.
9
7
’
,
S
t
u
m
p
+
2
7
.
7
4
,
3
1
.
8
2
’
,
S
t
u
m
p
+
3
0
.
9
3
,
8
4
.
7
7
’
,
T
r
e
e
+
8
5
.
8
3
,
9
7
.
3
0
’
,
T
r
e
e
4
6
+
0
9
.
1
9
,
1
0
6
.
4
0
’
,
S
i
g
n
+
2
3
.
3
8
,
4
3
.
7
1
’
,
S
t
u
m
p
+
3
4
.
3
3
,
4
3
.
6
3
’
,
S
t
u
m
p
+
4
0
.
1
0
,
4
3
.
2
9
’
,
S
t
u
m
p
+
9
0
.
4
6
,
1
1
4
.
5
6
’
,
B
u
s
h
+
9
4
.
6
9
,
1
0
6
.
3
8
’
,
S
i
g
n
4
7
+
0
1
.
1
2
,
1
1
4
.
8
9
’
,
B
u
s
h
+
0
2
.
0
3
,
9
2
.
9
1
’
,
B
u
s
h
+
8
4
.
9
1
,
9
9
.
8
1
’
,
T
r
e
e
+
9
8
.
4
9
,
4
9
.
2
1
’
,
C
n
t
r
l
.
P
n
t
.
+
9
9
.
1
5
,
7
0
.
8
7
’
,
C
a
t
c
h
B
a
s
i
n
+
9
9
.
1
5
,
7
0
.
8
7
’
,
C
a
t
c
h
B
a
s
i
n
4
8
+
0
6
.
7
9
,
3
1
.
3
3
’
,
B
e
e
h
i
v
e
I
n
l
.
+
0
6
.
7
9
,
3
1
.
3
3
’
,
B
e
e
h
i
v
e
I
n
l
.
+
1
4
.
9
6
,
9
1
.
2
1
’
,
B
u
s
h
+
1
9
.
3
0
,
9
3
.
9
5
’
,
L
u
m
i
n
a
r
y
P
o
l
e
+
3
3
.
0
0
,
3
1
.
2
7
’
,
C
o
m
b
.
P
o
l
e
+
3
3
.
8
7
,
3
2
.
8
9
’
,
T
e
l
.
P
e
d
e
s
t
a
l
+
3
4
.
0
5
,
3
2
.
5
2
’
,
T
e
l
.
P
e
d
e
s
t
a
l
+
3
4
.
4
4
,
3
1
.
3
7
’
,
C
o
m
b
.
P
o
l
e
+
4
2
.
5
3
,
1
0
8
.
8
3
’
,
T
r
e
e
+
4
9
.
7
6
,
3
7
.
8
2
’
,
S
t
a
n
d
p
i
p
e
+
5
0
.
1
4
,
3
6
.
4
0
’
,
G
a
s
M
a
r
k
e
r
+
5
0
.
4
5
,
3
7
.
7
3
’
,
P
o
s
t
+
5
3
.
8
6
,
4
5
.
1
7
’
,
P
w
p
.
+
5
4
.
1
8
,
4
4
.
4
1
’
,
P
w
p
.
+
6
3
.
4
0
,
9
3
.
2
2
’
,
S
a
n
i
t
a
r
y
M
.
H
.
+
6
3
.
6
3
,
9
3
.
2
3
’
,
S
a
n
i
t
a
r
y
M
.
H
.
+
6
3
.
6
3
,
9
3
.
2
3
’
,
S
a
n
i
t
a
r
y
M
.
H
.
+
6
7
.
5
3
,
1
1
.
2
8
’
,
E
x
.
T
r
a
f
.
L
o
o
p
+
7
4
.
3
8
,
8
5
.
5
1
’
,
F
l
a
g
p
o
l
e
+
7
9
.
6
2
,
9
2
.
8
0
’
,
F
l
a
g
p
o
l
e
+
8
1
.
7
5
,
1
0
.
5
9
’
,
E
x
.
T
r
a
f
.
L
o
o
p
+
8
8
.
2
0
,
1
0
2
.
9
7
’
,
F
l
a
g
p
o
l
e
+
9
6
.
4
7
,
1
0
.
1
4
’
,
E
x
.
T
r
a
f
.
L
o
o
p
+
9
8
.
3
2
,
1
9
.
2
9
’
,
E
x
.
T
r
a
f
.
L
o
o
p
4
9
+
0
0
.
9
9
,
2
7
.
7
3
’
,
T
e
l
.
M
a
r
k
e
r
+
0
1
.
2
5
,
4
7
.
8
2
’
,
L
u
m
i
n
a
r
y
P
o
l
e
+
0
3
.
4
5
,
1
7
4
.
6
7
’
,
T
r
e
e
+
0
4
.
8
8
,
9
.
0
5
’
,
D
e
t
e
c
t
o
r
H
o
u
s
i
n
g
+
0
6
.
1
1
,
6
5
.
7
4
’
,
T
r
a
f
.
P
e
d
e
s
t
a
l
+
0
8
.
4
2
,
3
9
.
6
1
’
,
S
a
n
i
t
a
r
y
M
.
H
.
+
0
8
.
4
2
,
3
9
.
6
1
’
,
S
a
n
i
t
a
r
y
M
.
H
.
+
1
0
.
3
1
,
5
8
.
1
0
’
,
T
r
a
f
.
M
.
H
.
+
1
1
.
5
9
,
8
.
8
4
’
,
E
x
.
T
r
a
f
.
L
o
o
p
+
1
1
.
9
6
,
2
0
.
5
6
’
,
E
x
.
T
r
a
f
.
L
o
o
p
+
1
3
.
3
3
,
2
9
.
4
0
’
,
D
e
t
e
c
t
o
r
H
o
u
s
i
n
g
+
1
5
.
1
0
,
6
1
.
5
6
’
,
T
r
a
f
.
P
o
l
e
+
2
2
.
8
8
,
5
2
.
1
7
’
,
S
i
g
n
+
9
4
.
8
8
,
5
5
.
0
0
’
,
S
i
g
n
5
0
+
0
0
.
0
2
,
0
.
0
1
’
,
C
n
t
r
l
.
P
n
t
.
+
0
1
.
3
5
,
1
8
8
.
0
0
’
,
S
i
g
n
+
1
0
.
4
8
,
7
6
.
6
1
’
,
D
e
t
e
c
t
o
r
H
o
u
s
i
n
g
+
7
4
.
0
5
,
1
1
4
.
0
6
’
,
C
n
t
r
l
.
P
n
t
.
+
7
6
.
7
0
,
3
.
1
5
’
,
P
K
N
a
i
l
F
n
d
.
+
8
6
.
3
8
,
1
1
5
.
8
3
’
,
C
n
t
r
l
.
P
n
t
.
+
8
6
.
5
8
,
1
1
5
.
5
4
’
,
C
n
t
r
l
.
P
n
t
.
+
8
6
.
9
5
,
6
0
.
1
2
’
,
T
r
a
f
.
P
o
l
e
+
9
6
.
6
4
,
4
9
.
7
7
’
,
L
u
m
i
n
a
r
y
P
o
l
e
5
1
+
5
0
.
2
5
,
3
7
.
3
7
’
,
C
n
t
r
l
.
P
n
t
.
+
5
0
.
3
6
,
3
7
.
3
1
’
,
C
n
t
r
l
.
P
n
t
.
+
6
3
.
4
4
,
3
2
.
8
5
’
,
P
w
p
.
+
7
4
.
6
1
,
3
3
.
2
6
’
,
C
o
m
b
.
P
o
l
e
5
3
+
9
8
.
0
5
,
8
6
.
1
5
’
,
C
n
t
r
l
.
P
n
t
.
+
0
0
.
1
0
,
7
0
.
2
9
’
,
P
i
n
e
+
0
0
.
6
4
,
5
1
.
2
3
’
,
L
i
d
+
0
0
.
6
4
,
5
1
.
2
3
’
,
L
i
d
KDS AJE
G
45
JSB JSB
+
8
5
LINE "S-7-E"
SS
S
S
S
S
Lift Station
6" V
CP
6" V
C P
12
" R
CP
12
" R
C
P
12 " R CP
Ex . Conc . Dit ch
Ex
. C
o
n
c
. D
i
t
ch
8" PVC (San .)
8" PV
C (S
a
n
.)
8
" P
V
C (
S
a
n
.
)
8" PV C (San .)
12 " RCP 12 " R CP
8"
V
C
P
(
S
a
n
.
)
18
"
C
M
P 6
"
P
V
C
10" CM P
12
"
C
M
P
15
"
C
M
P
Lift Station
8" CM P Shoulder (Bit. Mat.)
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
P
XXXXXXXXXXXXXXX
FP
FP
FP
VCS
AC
(W
o
o
d
e
d
)
(Bit. Mat .)
(Bit . Mat.)
(Grass)
(B
i
t
. M
a
t
.)
(B
i
t
.
M
a
t
.)
(Grass)(Bit . Mat .)
Sidewal k (Conc .)
Sidewal k (Conc .)
(Bit. Mat .)
(Gras s)
(Bit . Mat .)
Sidewal k (Conc .)
Sidewal k (Conc.)
(Gras s)
(B
i
t
. M
a
t
.)
(G
r
a
s
s
)
(B
i
t
. M
a
t
.)(G
r
a
s
s
)
(Rip Rap)
(Rip Ra p)
Parkin g L ot
(Bit . Mat.)
Sidewal k (Conc .)
(G
r
a
s
s
)
Sh
o
u
l
d
e
r (C
-
S
t
n
.)
(Grass)
(Gras s)
(Gras s)
Sidewal k (Conc .)
Sidewal k (Conc .)
Sidewal k (Conc .)
1 Sty. Brick Bldg.
TR
RT
RT
RT
RT
RT
RT
THH
TR
RT
RT
XXXXXTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTOH EOH EOH EOH EOH EOH EOH EOH EOH EOH EOH EOH EOH EOH EOH EOH EOH EOH EOH EOH EOH EOH EOH EOH EOH EOH EGGGGGGGGGGGGGGGGGGGGGGGGGGGGGOH TOH TTTTTTWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWOH EOH EOH EOH EOH EOH EOH EOH EOH EOH EOH EOH EOH EOH EOH EOH EOH EOH EOH EOH EOH EOH EOH EOH EOH EOH EGGGGGGGGGGGGGGGGGGGGGGGGGGGGGOH TOH TTTTTTWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWW
T
WV
WV
WV
WV
WE
E
W
TT
W
ETT
W
WV
E G
WV
WV
T
W
WV WV
WV
OH EOH EOH EOH EOH E
THH
OH EOH EOH EOH EOH EOH EOH E
THH
OH EOH E
HORIZONTAL SCALE
DESIGNATION NO.
BRIDGE FILE
VERTICAL SCALE
SURVEY BOOK SHEETS
CONTRACT PROJECT NO.
of
DESIGNED:DRAWN:
CHECKED:CHECKED:
DESIGN ENGINEER
RECOMMENDED
FOR APPROVAL
DATE
aedwards 3:52:30 PM3/20/2008 P:\IN2003\0661\D. Drawings\IN20030661.RD.C2.PP05.dgn
PLAN & PROFILE
CITY OF CARMEL 1" = 40’
1" = 10’
07-08D
No.
STATE OF
INDIANA
REGISTERED
P
R
OFE
S
SIONAL ENGIN
EER10505104
J. SAMUEL B
ALO
G
03/21/2008
173
+
0
7
.
9
4
,
4
6
.
2
5
’
,
T
r
e
e
+
4
3
.
3
3
,
4
3
.
4
0
’
,
B
u
s
h
+
4
3
.
7
6
,
5
0
.
8
3
’
,
G
a
s
V
a
l
v
e
+
7
9
.
9
5
,
5
0
.
1
8
’
,
C
n
t
r
l
.
P
n
t
.
+
8
4
.
5
5
,
2
6
.
1
7
’
,
F
i
r
e
H
y
d
r
a
n
t
+
8
9
.
1
4
,
4
0
.
6
1
’
,
B
u
s
h
+
9
1
.
2
3
,
4
0
.
1
4
’
,
C
o
m
b
.
P
o
l
e
+
9
1
.
7
7
,
3
9
.
7
6
’
,
C
o
m
b
.
P
o
l
e
+
9
3
.
6
2
,
6
7
.
5
6
’
,
C
a
t
c
h
B
a
s
i
n
+
9
3
.
6
2
,
6
7
.
5
6
’
,
C
a
t
c
h
B
a
s
i
n
5
5
+
2
1
.
0
7
,
8
1
.
2
0
’
,
M
a
i
l
b
o
x
+
2
1
.
1
0
,
8
1
.
5
7
’
,
M
a
i
l
b
o
x
+
2
2
.
3
9
,
9
0
.
7
1
’
,
B
u
s
h
+
2
2
.
4
1
,
8
7
.
0
6
’
,
B
u
s
h
+
2
2
.
4
7
,
7
9
.
2
5
’
,
B
u
s
h
+
2
2
.
6
6
,
6
7
.
7
2
’
,
B
u
s
h
+
2
2
.
8
9
,
7
3
.
6
9
’
,
B
u
s
h
+
3
9
.
5
2
,
9
3
.
4
0
’
,
T
r
e
e
+
4
2
.
2
6
,
6
6
.
2
1
’
,
T
r
e
e
+
5
2
.
1
0
,
7
6
.
7
9
’
,
T
r
e
e
+
5
7
.
7
0
,
5
8
.
3
3
’
,
T
r
e
e
+
6
1
.
4
1
,
1
1
0
.
5
9
’
,
T
r
e
e
+
8
9
.
8
5
,
1
5
.
8
9
’
,
S
i
g
n
5
6
+
0
3
.
7
1
,
2
9
.
1
0
’
,
C
n
t
r
l
.
P
n
t
.
5
6
+
0
5
.
9
0
,
3
9
.
4
1
’
,
C
n
t
r
l
.
P
n
t
.
+
0
7
.
2
6
,
3
8
.
2
4
’
,
C
o
m
b
.
P
o
l
e
+
0
8
.
3
7
,
6
1
.
9
3
’
,
C
o
m
b
.
P
o
l
e
+
0
8
.
8
3
,
6
1
.
6
7
’
,
C
o
m
b
.
P
o
l
e
+
0
9
.
8
0
,
5
2
.
1
5
’
,
G
u
y
W
i
r
e
+
0
9
.
8
7
,
5
0
.
6
6
’
,
G
u
y
W
i
r
e
+
0
9
.
9
6
,
4
8
.
6
6
’
,
G
u
y
W
i
r
e
+
1
0
.
1
3
,
9
9
.
9
8
’
,
B
u
s
h
+
1
0
.
7
9
,
3
9
.
4
1
’
,
C
o
m
b
.
P
o
l
e
+
1
8
.
4
0
,
5
7
.
3
3
’
,
P
i
n
e
+
3
2
.
0
8
,
6
3
.
4
3
’
,
T
r
e
e
+
3
7
.
9
2
,
5
5
.
8
9
’
,
T
r
e
e
+
3
9
.
1
0
,
5
5
.
0
8
’
,
T
r
e
e
+
4
6
.
3
1
,
1
0
7
.
8
8
’
,
C
n
t
r
l
.
P
n
t
.
+
5
3
.
0
5
,
7
8
.
1
5
’
,
B
u
s
h
+
5
9
.
1
8
,
7
9
.
4
2
’
,
B
u
s
h
+
5
9
.
4
3
,
5
4
.
9
9
’
,
T
r
e
e
+
6
4
.
8
1
,
8
0
.
7
5
’
,
B
u
s
h
+
6
9
.
2
9
,
8
4
.
8
8
’
,
B
u
s
h
+
8
8
.
4
1
,
6
0
.
1
0
’
,
T
r
e
e
5
7
+
0
0
.
0
9
,
5
4
.
3
8
’
,
C
n
t
r
l
.
P
n
t
.
5
7
+
3
2
.
8
6
,
6
1
.
2
9
’
,
T
r
e
e
+
4
8
.
4
3
,
3
8
.
5
9
’
,
C
o
m
b
.
P
o
l
e
+
4
8
.
5
0
,
3
9
.
1
3
’
,
C
o
m
b
.
P
o
l
e
+
4
8
.
8
3
,
7
9
.
4
3
’
,
T
r
e
e
+
5
0
.
5
1
,
2
8
.
7
6
’
,
C
n
t
r
l
.
P
n
t
.
+
5
1
.
9
5
,
1
8
.
3
4
’
,
B
e
e
h
i
v
e
I
n
l
.
+
5
1
.
9
5
,
1
8
.
3
4
’
,
B
e
e
h
i
v
e
I
n
l
.
+
6
0
.
0
6
,
4
3
.
1
4
’
,
L
u
m
i
n
a
r
y
P
o
l
e
+
6
4
.
1
0
,
3
8
.
6
0
’
,
L
u
m
i
n
a
r
y
P
o
l
e
+
6
4
.
3
8
,
3
8
.
7
8
’
,
L
u
m
i
n
a
r
y
P
o
l
e
+
6
5
.
6
4
,
6
3
.
7
8
’
,
C
u
r
b
I
n
l
e
t
+
6
5
.
6
4
,
6
3
.
7
8
’
,
C
u
r
b
I
n
l
e
t
+
6
5
.
6
5
,
5
6
.
6
1
’
,
C
u
r
b
I
n
l
e
t
+
6
5
.
6
5
,
5
6
.
6
1
’
,
C
u
r
b
I
n
l
e
t
+
6
5
.
8
4
,
1
4
.
1
6
’
,
W
a
t
.
V
a
l
v
e
+
6
6
.
2
1
,
1
4
.
7
1
’
,
W
a
t
.
V
a
l
v
e
+
6
7
.
7
3
,
7
7
.
3
4
’
,
M
a
i
l
b
o
x
+
6
8
.
7
6
,
2
6
.
3
5
’
,
W
a
t
.
V
a
l
v
e
+
6
8
.
7
9
,
2
6
.
7
7
’
,
W
a
t
.
V
a
l
v
e
+
6
9
.
1
7
,
5
3
.
9
9
’
,
S
i
g
n
5
8
+
0
1
.
4
6
,
5
5
.
0
2
’
,
C
u
r
b
I
n
l
e
t
+
0
1
.
4
6
,
5
5
.
0
2
’
,
C
u
r
b
I
n
l
e
t
+
0
1
.
7
9
,
6
2
.
2
8
’
,
C
u
r
b
I
n
l
e
t
+
0
1
.
7
9
,
6
2
.
2
8
’
,
C
u
r
b
I
n
l
e
t
+
0
2
.
7
8
,
5
0
.
9
0
’
,
S
i
g
n
5
8
+
0
8
.
4
4
,
1
7
5
.
4
9
’
,
C
n
t
r
l
.
P
n
t
.
+
0
8
.
5
2
,
4
0
.
0
2
’
,
C
n
t
r
l
.
P
n
t
.
+
0
8
.
7
7
,
4
0
.
1
6
’
,
R
W
M
o
n
u
m
e
n
t
+
1
2
.
6
7
,
3
9
.
3
6
’
,
G
a
s
M
a
r
k
e
r
+
1
4
.
8
4
,
8
4
.
0
2
’
,
W
a
t
.
M
e
t
e
r
+
1
7
.
7
6
,
6
7
.
5
2
’
,
T
r
e
e
5
9
+
5
5
.
3
9
,
3
8
.
0
3
’
,
T
e
m
p
.
B
e
n
c
h
M
r
k
.
6
1
+
0
8
.
8
0
,
4
0
.
0
2
’
,
C
n
t
r
l
.
P
n
t
.
5
4
+
0
0
.
2
8
,
2
7
.
0
0
’
,
W
a
t
.
V
a
l
v
e
KDS AJE
46
JSB JSB LINE "S-7-E"
18
" C
MP
18
" R
C
P
4
" F
I
E
L
D T
I
LE
6 " FI
E
L
D T
I
L E
3
" P
I
P
E
2
7
"
X 4
2
"
EL
L
. C
MP
42" X 54" CM P
42" X 54" CM P
6
"
P
V
C
6" PVC
(Gras s)Comm . D r.
(Bit . Mat.)
(Grass)
S
i
d
e
w
a
l
k (
C
o
n
c
.
)
(B
i
t
. M
a
t
.
)
Si
d
e
w
a
l
k
(
C
o
n
c
.)
(Gras s)
(Gras s)
(Woode d)
S
i
d
e
w
a
l
k
(
C
o
n
c
.
)
(
B
i
t
.
M
a
t
.
)
S
i
d
e
w
a
l
k
(
C
o
n
c
.
)
(Woode d)
(Grass)
1 Sty. Brick Bldg.
2 Sty.
Ston e & Brick Bld g.
TTTTTTTTTTTTTTTTTTTTTT
W
TTTTTTTTTTTTTTTTTTTTTTOH EOH EOH EOH EOH EOH EOH EOH EOH EOH EOH EGGGGGGWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWOH EOH EOH EOH EOH EOH EOH EOH EOH EOH EOH EGGGGGGWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWW
GV
WV
WV
G
OH E
G
OH EGGGG
821.12
HORIZONTAL SCALE
DESIGNATION NO.
BRIDGE FILE
VERTICAL SCALE
SURVEY BOOK SHEETS
CONTRACT PROJECT NO.
of
DESIGNED:DRAWN:
CHECKED:CHECKED:
DESIGN ENGINEER
RECOMMENDED
FOR APPROVAL
DATE
aedwards 3:52:49 PM3/20/2008 P:\IN2003\0661\D. Drawings\IN20030661.RD.C2.PP06.dgn
PLAN & PROFILE
CITY OF CARMEL 1" = 40’
1" = 10’
07-08D
No.
STATE OF
INDIANA
REGISTERED
P
R
OFE
S
SIONAL ENGIN
EER10505104
J. SAMUEL B
ALO
G
03/21/2008
173
1" = 5’-0"
LINE "CI-1"
KDS CKW
47
JSB JSB
HORIZONTAL SCALE
DESIGNATION NO.
BRIDGE FILE
VERTICAL SCALE
SURVEY BOOK SHEETS
CONTRACT PROJECT NO.
of
DESIGNED:DRAWN:
CHECKED:CHECKED:
DESIGN ENGINEER
RECOMMENDED
FOR APPROVAL
DATE
aedwards 3:53:02 PM3/20/2008 P:\IN2003\0661\D. Drawings\IN20030661.RD.C2.PRO.RAB_126.DGN
PLAN & PROFILE
CITY OF CARMEL 1" = 40’
1" = 10’
07-08D
No.
STATE OF
INDIAN A
REGISTERED
P
R
OFE
S
SIONAL ENGIN
EER10505104
J. SAMUEL B
ALO
G
03/21/2008
173
Shoulder (Bit. Mat.)
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
P
XXXXXXXXXX
FP
FP
FPVCS(G
r
a
s
s
)
(W
o
o
d
e
d
)
(G
r
a
s
s
)
(G
r
a
s
s
)
(B
i
t
. M
a
t
.)
(W
o
o
d
e
d
)
(Bit . Mat .)
(Bit . Mat.)
(B
i
t
. M
a
t
.)
(Bit . Mat .)
(Bit . Mat .)
(Gras s)
(Bit . Mat .)
Sidewal k (Conc.)
Sidewal k (Conc.)
(Grass)
(B
i
t
. M
a
t
.)
(G
r
a
s
s
)
(B
i
t
. M
a
t
.)(G
r
a
s
s
)
(Ri p Ra p)
(Ri p Rap)
Parkin g Lot
(Bit . Mat .)
Sidewal k (Conc.)
(Gras s)Comm . D r.
(Bit. Mat.)
(G
r
a
s
s
)
Sh
o
u
l
d
e
r (C
-
S
t
n
.)
(Grass)
(Grass)
Sidewal k (Conc .)
Sidewal k (Conc.)
TR
RT
RT
RT
RT
RT
RT
THH
TR
RT
RT
XXXXXTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTOH EOH EOH EOH EOH EOH EOH EOH EOH EOH EOH EOH EOH EOH EOH EOH EOH EOH EOH EOH EOH EOH EOH EOH EOH EOH EOH EGGGGGGGGGGGGGGGGGGGGGGGGGGGGGTTTTTWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWOH EOH EOH EOH EOH EOH EOH EOH EOH EOH EOH EOH EOH EOH EOH EOH EOH EOH EOH EOH EOH EOH EOH EOH EOH EOH EOH EGGGGGGGGGGGGGGGGGGGGGGGGGGGGGTTTTTWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWW
T
WV
WV
WV
WV
WE
E
W
TT
W
ETT
W
WV WV
GV
WV
OH EOH EOH EOH EOH E
THH
OH EOH EOH EOH EOH EOH EOH E
THH
OH EOH EGGGG
S
S
S
S
S
6" V
CP
6" V
C P
12
" R
CP
12
" R
CP
12 " R CP
6 " FI
E
L
D TI
L E
3
" P
I
P
E
2
7
"
X 4
2
"
EL
L
. C
MP
Ex . Conc . Dit ch
Ex
. C
o
n
c
. D
i
t
ch
8" PVC (San .)
12 " R CP
8"
V
C
P
(
S
a
n
.
)
18
"
CM
P 6
"
P
V
C
6" PVC10" CM P
12
"
C
M
P
15
"
C
M
P
8" CM P
6" V
CP
6" V C P
8" PVC (San.)
8"
V
C
P
(
S
a
n
.
)
12
" R
CP
12
" R
CP
12" RCP
6" FIE
L
D TI
LE
3
" P
I
PE
27
"
X 4
2
"
EL
L
. C
MP
Ex. Conc. Ditch
Ex
. C
o
n
c
. D
i
t
ch
12" RCP
18"
CM
P
6"
P
V
C
6" PVC10" CMP
12"
CM
P
15
"
C
M
P
8" CMP
CKWKDS RAMP PROFILE
JSB JSB
48
LINE "SWR"
+
+
HORIZONTAL SCALE
DESIGNATION NO.
BRIDGE FILE
VERTICAL SCALE
SURVEY BOOK SHEETS
CONTRACT PROJECT NO.
of
DESIGNED:DRAWN:
CHECKED:CHECKED:
DESIGN ENGINEER
RECOMMENDED
FOR APPROVAL
DATE
1" = 50’
1" = 2’
aedwards 3:53:17 PM3/20/2008 P:\IN2003\0661\D. Drawings\IN20030661.RD.C2.PRO.SWR.DGN
CITY OF CARMEL
07-08D
No.
STATE OF
INDIAN A
REGISTERED
P
R
OFE
S
SIONAL ENGIN
EER10505104
J. SAMUEL B
ALO
G
03/21/2008
173
CKWKDS RAMP PROFILE
JSB JSB
49
LINE "SER"
+
+
HORIZONTAL SCALE
DESIGNATION NO.
BRIDGE FILE
VERTICAL SCALE
SURVEY BOOK SHEETS
CONTRACT PROJECT NO.
of
DESIGNED:DRAWN:
CHECKED:CHECKED:
DESIGN ENGINEER
RECOMMENDED
FOR APPROVAL
DATE
1" = 50’
1" = 2’
aedwards 3:53:27 PM3/20/2008 P:\IN2003\0661\D. Drawings\IN20030661.RD.C2.PRO.SER.DGN
CITY OF CARMEL
07-08D
No.
STATE OF
INDIAN A
REGISTERED
P
R
OFE
S
SIONAL ENGIN
EER10505104
J. SAMUEL B
ALO
G
03/21/2008
173
CKWKDS RAMP PROFILE 50
JSB JSB LINE "NWR"
825
830
835
840
845
++
HORIZONTAL SCALE
DESIGNATION NO.
BRIDGE FILE
VERTICAL SCALE
SURVEY BOOK SHEETS
CONTRACT PROJECT NO.
of
DESIGNED:DRAWN:
CHECKED:CHECKED:
DESIGN ENGINEER
RECOMMENDED
FOR APPROVAL
DATE
1" = 50’
1" = 2’
aedwards 3:53:40 PM3/20/2008 P:\IN2003\0661\D. Drawings\IN20030661.RD.C2.PRO.NWR.DGN
CITY OF CARMEL
07-08D
No.
STATE OF
INDIAN A
REGISTERED
P
R
OFE
S
SIONAL ENGIN
EER10505104
J. SAMUEL B
ALO
G
03/21/2008
173
KDS CKW RAMP PROFILE 51
JSB JSB LINE "NER"
+
+
HORIZONTAL SCALE
DESIGNATION NO.
BRIDGE FILE
VERTICAL SCALE
SURVEY BOOK SHEETS
CONTRACT PROJECT NO.
of
DESIGNED:DRAWN:
CHECKED:CHECKED:
DESIGN ENGINEER
RECOMMENDED
FOR APPROVAL
DATE
1" = 50’
1" = 2’
aedwards 3:53:50 PM3/20/2008 P:\IN2003\0661\D. Drawings\IN20030661.RD.C2.PRO.NER.DGN
CITY OF CARMEL
07-08D
No.
STATE OF
INDIAN A
REGISTERED
P
R
OFE
S
SIONAL ENGIN
EER10505104
J. SAMUEL B
ALO
G
03/21/2008
173
CONSTRUCTION DETAILS
1"=20’
AJEKDS
52
JSB JSB LINE "E"
S
S
S
15 " VCP
15 " V CP
12
" R
CP
15
" R
C
P
15
" R
C
P
15 " V CP
15 " V CP
12
" V
CP
12
" R
CP
6
" C
MP
HORIZONTAL SCALE
DESIGNATION NO.
BRIDGE FILE
VERTICAL SCALE
SURVEY BOOK SHEETS
CONTRACT PROJECT NO.
of
DESIGNED:DRAWN:
CHECKED:CHECKED:
DESIGN ENGINEER
RECOMMENDED
FOR APPROVAL
DATE
aedwards 3:54:04 PM3/20/2008 P:\IN2003\0661\D. Drawings\IN20030661.RD.C2.CD01.dgn
N/A
CITY OF CARMEL
07-08D
No.
STATE OF
INDIAN A
REGISTERED
P
R
OFE
S
SIONAL ENGIN
EER10505104
J. SAMUEL B
ALO
G
03/21/2008
173
CONSTRUCTION DETAILS
1"=20’
AJEKDS
JSB JSB
53
LINE "E"
12
" R
CP
6
" C
MP
HORIZONTAL SCALE
DESIGNATION NO.
BRIDGE FILE
VERTICAL SCALE
SURVEY BOOK SHEETS
CONTRACT PROJECT NO.
of
DESIGNED:DRAWN:
CHECKED:CHECKED:
DESIGN ENGINEER
RECOMMENDED
FOR APPROVAL
DATE
aedwards 3:54:15 PM3/20/2008 P:\IN2003\0661\D. Drawings\IN20030661.RD.C2.CD02.dgn
N/A
CITY OF CARMEL
07-08D
No.
STATE OF
INDIANA
REGISTERED
P
R
OFE
S
SIONAL ENGIN
EER10505104
J. SAMUEL B
ALO
G
03/21/2008
173
CONSTRUCTION DETAILS
1"=20’
AJEKDS
54
JSB JSB LINE "E"
S
S
S
S15" V CP
15 " V CP
12
" R
C
P
6" P VC
1
2"
R
CP
18 " R CP
12 " R CP
HORIZONTAL SCALE
DESIGNATION NO.
BRIDGE FILE
VERTICAL SCALE
SURVEY BOOK SHEETS
CONTRACT PROJECT NO.
of
DESIGNED:DRAWN:
CHECKED:CHECKED:
DESIGN ENGINEER
RECOMMENDED
FOR APPROVAL
DATE
aedwards 3:54:26 PM3/20/2008 P:\IN2003\0661\D. Drawings\IN20030661.RD.C2.CD03.dgn
N/A
CITY OF CARMEL
07-08D
No.
STATE OF
INDIANA
REGISTERED
P
R
OFE
S
SIONAL ENGIN
EER10505104
J. SAMUEL B
ALO
G
03/21/2008
173
CONSTRUCTION DETAILS
1"=20’
AJEKDS
55
JSB JSB
+
LINE "E"
S
S
S
S
S
S
S
6" V
CP
6"
V
CP
8" VCP (San.)
8" VCP (San.)
1
2
"
R
C
P
18 " R CP
12
" R
C
P
18 " R CP
Ex. Co
n
c
. Dit
ch
18"
C
M
P
10
"
C
M
P
12"
C
M
P
S
HORIZONTAL SCALE
DESIGNATION NO.
BRIDGE FILE
VERTICAL SCALE
SURVEY BOOK SHEETS
CONTRACT PROJECT NO.
of
DESIGNED:DRAWN:
CHECKED:CHECKED:
DESIGN ENGINEER
RECOMMENDED
FOR APPROVAL
DATE
aedwards 3:54:40 PM3/20/2008 P:\IN2003\0661\D. Drawings\IN20030661.RD.C2.CD04.dgn
N/A
CITY OF CARMEL
07-08D
No.
STATE OF
INDIAN A
REGISTERED
P
R
OFE
S
SIONAL ENGIN
EER10505104
J. SAMUEL B
ALO
G
03/21/2008
173
CONSTRUCTION DETAILS
1"=20’
AJEKDS
56
JSB JSB LINE "E"
S
66
" C
MP
48
" C
MP
Ex. Conc
. Dit ch
18" R CP
15
" R
C
P
12
" R
C
P
12
" R
CP
Ex . Conc. Ditch
T
HORIZONTAL SCALE
DESIGNATION NO.
BRIDGE FILE
VERTICAL SCALE
SURVEY BOOK SHEETS
CONTRACT PROJECT NO.
of
DESIGNED:DRAWN:
CHECKED:CHECKED:
DESIGN ENGINEER
RECOMMENDED
FOR APPROVAL
DATE
aedwards 3:54:52 PM3/20/2008 P:\IN2003\0661\D. Drawings\IN20030661.RD.C2.CD05.dgn
N/A
CITY OF CARMEL
07-08D
No.
STATE OF
INDIANA
REGISTERED
P
R
OFE
S
SIONAL ENGIN
EER10505104
J. SAMUEL B
ALO
G
03/21/2008
173
CONSTRUCTION DETAILS
1"=20’
AJEKDS
57
JSB JSB LINE "E"
15
" R
C
P
Ex . Conc . Dit ch
HORIZONTAL SCALE
DESIGNATION NO.
BRIDGE FILE
VERTICAL SCALE
SURVEY BOOK SHEETS
CONTRACT PROJECT NO.
of
DESIGNED:DRAWN:
CHECKED:CHECKED:
DESIGN ENGINEER
RECOMMENDED
FOR APPROVAL
DATE
aedwards 3:55:02 PM3/20/2008 P:\IN2003\0661\D. Drawings\IN20030661.RD.C2.CD06.dgn
N/A
CITY OF CARMEL
07-08D
No.
STATE OF
INDIANA
REGISTERED
P
R
OFE
S
SIONAL ENGIN
EER10505104
J. SAMUEL B
ALO
G
03/21/2008
173
CONSTRUCTION DETAILS
1’=20’
AJEKDS
58
JSB JSB
+
LINE "E"
18
" R
CP12" R CP
HORIZONTAL SCALE
DESIGNATION NO.
BRIDGE FILE
VERTICAL SCALE
SURVEY BOOK SHEETS
CONTRACT PROJECT NO.
of
DESIGNED:DRAWN:
CHECKED:CHECKED:
DESIGN ENGINEER
RECOMMENDED
FOR APPROVAL
DATE
aedwards 3:55:10 PM3/20/2008 P:\IN2003\0661\D. Drawings\IN20030661.RD.C2.CD07.dgn
N/A
CITY OF CARMEL
07-08D
No.
STATE OF
INDIANA
REGISTERED
P
R
OFE
S
SIONAL ENGIN
EER10505104
J. SAMUEL B
ALO
G
03/21/2008
173
CONSTRUCTION DETAILS
1"=20’
AJEKDS
59
JSB JSB LINE "S-7-E"
S
S
S
Lift Station
8" PVC (San .)
8 " PV
C (S
a
n
.)
8
" P
V
C (
S
a
n
.
)
8" PVC (San .)
Lift Statio n
12 " R CP12" R CP 12 " R CP
HORIZONTAL SCALE
DESIGNATION NO.
BRIDGE FILE
VERTICAL SCALE
SURVEY BOOK SHEETS
CONTRACT PROJECT NO.
of
DESIGNED:DRAWN:
CHECKED:CHECKED:
DESIGN ENGINEER
RECOMMENDED
FOR APPROVAL
DATE
aedwards 3:55:19 PM3/20/2008 P:\IN2003\0661\D. Drawings\IN20030661.RD.C2.CD09.dgn
N/A
CITY OF CARMEL
07-08D
No.
STATE OF
INDIANA
REGISTERED
P
R
OFE
S
SIONAL ENGIN
EER10505104
J. SAMUEL B
ALO
G
03/21/2008
173
CONSTRUCTION DETAILS
1"=20’
AJEKDS
60
JSB JSB LINE "S-7-E"
S
S
S
S
S
6" V
CP
6" V
C P
8"
V
C
P
(
S
a
n
.
)
12
" R
C
P
12
" R
C
P
Ex. Conc . Ditch
Ex
. C
o
n
c
. D
i
t
ch
18
"
C
M
P
10" CM P
12
"
C
M
P
15
"
C
M
P
8" CM P
HORIZONTAL SCALE
DESIGNATION NO.
BRIDGE FILE
VERTICAL SCALE
SURVEY BOOK SHEETS
CONTRACT PROJECT NO.
of
DESIGNED:DRAWN:
CHECKED:CHECKED:
DESIGN ENGINEER
RECOMMENDED
FOR APPROVAL
DATE
aedwards 3:55:30 PM3/20/2008 P:\IN2003\0661\D. Drawings\IN20030661.RD.C2.CD10.dgn
N/A
CITY OF CARMEL
07-08D
No.
STATE OF
INDIA NA
REGISTE
RED
P
R
OFE
S
SIONAL ENGIN
EER
10505104
J. SAMUEL B
ALO
G
03/21/2008
173
CONSTRUCTION DETAILS
1"=20’
AJEKDS
61
JSB JSB LINE "S-7-E"
S
18
" C
MP
18
" R
C
P
4
" F
I
E
L
D T
I
LE
6 " FI
E
L
D T
I
L E
3
" P
I
P
E
27
"
X 4
2
"
EL
L
.
C
MP
42" X 54" CM P
42" X 54" CM P
6
"
P
V
C
6" PVC
HORIZONTAL SCALE
DESIGNATION NO.
BRIDGE FILE
VERTICAL SCALE
SURVEY BOOK SHEETS
CONTRACT PROJECT NO.
of
DESIGNED:DRAWN:
CHECKED:CHECKED:
DESIGN ENGINEER
RECOMMENDED
FOR APPROVAL
DATE
aedwards 3:55:44 PM3/20/2008 P:\IN2003\0661\D. Drawings\IN20030661.RD.C2.CD11.dgn
N/A
CITY OF CARMEL
07-08D
No.
STATE OF
INDIA NA
REGISTE
RED
P
R
OFE
S
SIONAL ENGIN
EER
10505104
J. SAMUEL B
ALO
G
03/21/2008
173
CKW
XXX
N/A
CKW
JSB JSB EAST CARMEL DRIVE
1" = 20’
CONSTRUCTION DETAILS 62
HORIZONTAL SCALE
DESIGNATION NO.
BRIDGE FILE
VERTICAL SCALE
SURVEY BOOK SHEETS
CONTRACT PROJECT NO.
of
DESIGNED:DRAWN:
CHECKED:CHECKED:
DESIGN ENGINEER
RECOMMENDED
FOR APPROVAL
DATE
aedwards 3:55:53 PM3/20/2008 P:\IN2003\0661\D. Drawings\IN20030661.RD.C2.CD12.dgn
N/A
CITY OF CARMEL
07-08D
No.
STATE OF
INDIAN A
REGISTERED
P
R
OFE
S
SIONAL ENGIN
EER10505104
J. SAMUEL B
ALO
G
03/21/2008
173
XXXX
(B
i
t
. M
a
t
.)
(B
i
t
. M
a
t
.)
(
G
r
a
s
s
)
(
G
r
a
s
s
)
Parkin g L ot
(Bit . Mat .)
Media n (Conc .)
Media n (Conc .)
(Bit . Mat .)
Media n (Conc .)
Sidewal k (Conc .)
Parkin g L ot
(Bit . Mat .)
(
B
i
t
.
M
a
t
.
)
(
G
r
a
s
s
)
Comm . D r.
(Bit . Mat .)
(
B
i
t
.
M
a
t
.
)
Parkin g L ot
(Bit . Mat .)
(Gras s)
P
a
r
k
i
n
g
L
o
t
(
B
i
t
.
M
a
t
.
)
(
G
r
a
s
s
)
(
G
r
a
s
s
)
Parkin g L ot
(Bit . Mat .)
Media n (Conc .)
Media n (Conc .)
(Bit . Mat .)
Media n (Conc .)
Sidewal k (Conc .)
Parkin g L ot
(Bit . Mat .)
(
B
i
t
.
M
a
t
.
)
(
G
r
a
s
s
)
Comm . D r.
(Bit . Mat .)
(
B
i
t
.
M
a
t
.
)
Parkin g L ot
(Bit . Mat .)
(Gras s)VCSVCSVCSRT
RT
RT
CONSTRUCTION DETAILS
1"=20’
AJEKDS
JSB JSB MOHAWK HILLS DRIVE
63
SS
S
6" V
CP
6" V
C P
8"
V
C
P
(
S
a
n
.
)
12
" R
CP
12
" R
CP
Ex
. C
o
n
c
. D
i
t
ch
HORIZONTAL SCALE
DESIGNATION NO.
BRIDGE FILE
VERTICAL SCALE
SURVEY BOOK SHEETS
CONTRACT PROJECT NO.
of
DESIGNED:DRAWN:
CHECKED:CHECKED:
DESIGN ENGINEER
RECOMMENDED
FOR APPROVAL
DATE
aedwards 3:56:05 PM3/20/2008 P:\IN2003\0661\D. Drawings\IN20030661.RD.C2.CD13.dgn
N/A
CITY OF CARMEL
07-08D
No.
STATE OF
INDIAN A
REGISTERED
P
R
OFE
S
SIONAL ENGIN
EER10505104
J. SAMUEL B
ALO
G
03/21/2008
173
XXX
N/A
CKW CKW
1" = 20’
ROUNDABOUT SPOT ELEVATIONS
LINE "S-7-E"JSB JSB
64
HORIZONTAL SCALE
DESIGNATION NO.
BRIDGE FILE
VERTICAL SCALE
SURVEY BOOK SHEETS
CONTRACT PROJECT NO.
of
DESIGNED:DRAWN:
CHECKED:CHECKED:
DESIGN ENGINEER
RECOMMENDED
FOR APPROVAL
DATE
aedwards 3:56:12 PM3/20/2008 P:\IN2003\0661\D. Drawings\IN20030661.RD.C2.DS03.dgn
N/A
CITY OF CARMEL
07-08D
No.
STATE OF
INDIAN A
REGISTERED
P
R
OFE
S
SIONAL ENGIN
EER10505104
J. SAMUEL B
ALO
G
03/21/2008
173
LINE "S-7-E"
ROUNDABOUT SPOT ELEVATIONS XXX
1" = 20’
CKWKDS
JSB JSB
65
HORIZONTAL SCALE
DESIGNATION NO.
BRIDGE FILE
VERTICAL SCALE
SURVEY BOOK SHEETS
CONTRACT PROJECT NO.
of
DESIGNED:DRAWN:
CHECKED:CHECKED:
DESIGN ENGINEER
RECOMMENDED
FOR APPROVAL
DATE
aedwards 3:56:19 PM3/20/2008 P:\IN2003\0661\D. Drawings\IN20030661.RD.C2.DS04.dgn
N/A
CITY OF CARMEL
07-08D
No.
STATE OF
INDIAN A
REGISTERED
P
R
OFE
S
SIONAL ENGIN
EER10505104
J. SAMUEL B
ALO
G
03/21/2008
173
1"=20’
AJEKDS
66
JSB JSB
SPOT ELEVATON DETAILS
SOUTH GRADING
S
S
S
15 " VCP
15 " V CP
12
" R
CP
15
" R
C
P
15
" R
C
P
15 " V CP
15 " V CP
12
" V
CP
12
" R
CP
6
" C
MP
HORIZONTAL SCALE
DESIGNATION NO.
BRIDGE FILE
VERTICAL SCALE
SURVEY BOOK SHEETS
CONTRACT PROJECT NO.
of
DESIGNED:DRAWN:
CHECKED:CHECKED:
DESIGN ENGINEER
RECOMMENDED
FOR APPROVAL
DATE
aedwards 3:56:34 PM3/20/2008 P:\IN2003\0661\D. Drawings\IN20030661.RD.C2.GP01.dgn
N/A
CITY OF CARMEL
07-08D
No.
STATE OF
INDIAN A
REGISTERED
P
R
OFE
S
SIONAL ENGIN
EER10505104
J. SAMUEL B
ALO
G
03/21/2008
173
1"=20’
N/A
CKW CKW
KEYSTONE PARKWAYJSBJSB
SPOT ELEVATION DETAIL 67
HORIZONTAL SCALE
DESIGNATION NO.
BRIDGE FILE
VERTICAL SCALE
SURVEY BOOK SHEETS
CONTRACT PROJECT NO.
of
DESIGNED:DRAWN:
CHECKED:CHECKED:
DESIGN ENGINEER
RECOMMENDED
FOR APPROVAL
DATE
aedwards 3:56:45 PM3/20/2008 P:\IN2003\0661\D. Drawings\IN20030661.RD.C2.GP02.dgn
CITY OF CARMEL
07-08D
No.
STATE OF
INDIANA
REGISTERED
P
R
OFE
S
SIONAL ENGIN
EER10505104
J. SAMUEL B
ALO
G
03/21/2008
173
1"=20’
AJEKDS
68
JSB JSB
SPOT ELEVATION DETAILS
NORTH CROSSOVER
15
" R
C
P
Ex . Conc . Dit ch
HORIZONTAL SCALE
DESIGNATION NO.
BRIDGE FILE
VERTICAL SCALE
SURVEY BOOK SHEETS
CONTRACT PROJECT NO.
of
DESIGNED:DRAWN:
CHECKED:CHECKED:
DESIGN ENGINEER
RECOMMENDED
FOR APPROVAL
DATE
aedwards 3:57:00 PM3/20/2008 P:\IN2003\0661\D. Drawings\IN20030661.RD.C2.GP03.dgn
N/A
CITY OF CARMEL
07-08D
No.
STATE OF
INDIANA
REGISTERED
P
R
OFE
S
SIONAL ENGIN
EER10505104
J. SAMUEL B
ALO
G
03/21/2008
173
N/A
KRO
SUBSURFACE DRAINAGE DETAILS
KDS
JSB JSB
69
AS NOTED
6
I
N
P
E
R
F
O
R
A
T
E
D
OU
T
L
E
T
P
I
P
E
N/A
CITY OF CARMEL
07-08D
SUBSURFACE DRAIN TABLE
HORIZONTAL SCALE
DESIGNATION NO.
BRIDGE FILE
VERTICAL SCALE
SURVEY BOOK SHEETS
CONTRACT PROJECT NO.
of
DESIGNED:DRAWN:
CHECKED:CHECKED:
DESIGN ENGINEER
RECOMMENDED
FOR APPROVAL
DATE
HORIZONTAL SCALE
DESIGNATION NO.
BRIDGE FILE
VERTICAL SCALE
SURVEY BOOK SHEETS
CONTRACT PROJECT NO.
of
DESIGNED:DRAWN:
CHECKED:CHECKED:
DESIGN ENGINEER
RECOMMENDED
FOR APPROVAL
DATE
UNDERDRAIN TABLE
U
N
D
E
R
D
R
A
I
N
P
I
P
E
L
I
M
I
T
S
TYPE 4 PIPE
4
I
N
.
6
I
N
.
FT.SYS.CYS.TON
SP
E
C
I
A
L
G
R
A
D
E
(%)(Y/N)
UNDERDRAIN PIPE
6
I
N
O
U
T
L
E
T
P
I
P
E
FT.
O
U
T
L
E
T
S
T
A
T
I
O
N
OU
T
L
E
T
E
L
E
V
A
T
I
O
N
CYS.TON
OUTLET PIPE
O
U
T
L
E
T
P
R
O
T
E
C
T
O
R
T
Y
P
E
LOCATION
O
U
T
S
I
D
E
L
E
F
T
M
E
D
I
A
N
L
E
F
T
ME
D
I
A
N
R
I
G
H
T
OU
T
S
I
D
E
R
I
G
H
T
OUTLET PROTECTORS
REMARKS
OU
T
L
E
T
P
R
O
T
E
C
T
O
R
N
O
.
_
_
_
G
E
O
T
E
X
T
I
L
E
S
F
O
R
UN
D
E
R
D
R
A
I
N
S
AG
G
R
E
G
A
T
E
F
O
R
UN
D
E
R
D
R
A
I
N
S
HM
A
F
O
R
UN
D
E
R
D
R
A
I
N
S
FL
O
W
L
I
N
E
E
L
E
V
A
T
I
O
N
@
UN
D
E
R
D
R
A
I
N
P
I
P
E
L
I
M
I
T
OU
T
L
E
T
P
I
P
E
RE
Q
U
I
R
E
D
CO
N
N
E
C
T
U
N
D
E
R
D
R
A
I
N
PI
P
E
T
O
S
T
R
U
C
T
U
R
E
N
O
.
_
_
_
_
_
ST
R
U
C
T
U
R
E
I
N
V
E
R
T
EL
E
V
A
T
I
O
N
45
D
E
G
R
E
E
E
L
B
O
W
S
R
E
Q
U
I
R
E
D
(
1
O
R
2
)
OU
T
L
E
T
A
T
O
U
T
L
E
T
P
R
O
T
E
C
T
O
R
N
O
.
_
_
_
DI
T
C
H
F
L
O
W
L
I
N
E
EL
E
V
A
T
I
O
N
A
T
O
U
T
L
E
T
P
R
O
T
E
C
T
O
R
C
O
N
N
E
C
T
O
U
T
L
E
T
P
I
P
E
T
O
S
T
R
U
C
T
U
R
E
N
O
.
_
_
_
ST
R
U
C
T
U
R
E
I
N
V
E
R
T
EL
E
V
A
T
I
O
N
B
B
O
R
R
O
W
F
O
R
ST
R
U
C
T
U
R
E
B
A
C
K
F
I
L
L
HM
A
F
O
R
UN
D
E
R
D
R
A
I
N
S
FT.
aedwards 3:57:06 PM3/20/2008 P:\IN2003\0661\D. Drawings\IN20030661.RD.C2.DS05.dgn
N/A
CITY OF CARMEL
07-08D
UNDERDRAIN TABLE
N/A
N/ANo.
STATE OF
INDIAN A
REGISTERED
P
R
OFE
S
SIONAL ENGIN
EER10505104
J. SAMUEL B
ALO
G
03/21/2008
173
1"=30’
CKWKDS
70
JSB JSB
INTERCHANGE GEOMETRIC TIE-UP
HORIZONTAL SCALE
DESIGNATION NO.
BRIDGE FILE
VERTICAL SCALE
SURVEY BOOK SHEETS
CONTRACT PROJECT NO.
of
DESIGNED:DRAWN:
CHECKED:CHECKED:
DESIGN ENGINEER
RECOMMENDED
FOR APPROVAL
DATE
aedwards 3:57:13 PM3/20/2008 P:\IN2003\0661\D. Drawings\IN20030661.RD.C2.DS01.dgn
N/A
CITY OF CARMEL
07-08D
No.
STATE OF
INDIAN A
REGISTERED
P
R
OFE
S
SIONAL ENGIN
EER10505104
J. SAMUEL B
ALO
G
03/21/2008
173
1"=60’
CKWKDS
71
JSB JSB
INTERCHANGE GEOMETRIC TIE-UP
HORIZONTAL SCALE
DESIGNATION NO.
BRIDGE FILE
VERTICAL SCALE
SURVEY BOOK SHEETS
CONTRACT PROJECT NO.
of
DESIGNED:DRAWN:
CHECKED:CHECKED:
DESIGN ENGINEER
RECOMMENDED
FOR APPROVAL
DATE
aedwards 3:57:19 PM3/20/2008 P:\IN2003\0661\D. Drawings\IN20030661.RD.C2.DS02.dgn
N/A
CITY OF CARMEL
07-08D
No.
STATE OF
INDIAN A
REGISTERED
P
R
OFE
S
SIONAL ENGIN
EER10505104
J. SAMUEL B
ALO
G
03/21/2008
173
CKW CKW EROSION CONTROL PHASE I
KEYSTONE PARKWAY
1" = 30’
N/A
JSB JSB
72
S
S
12
"
V
C
P
15 " V CP
15 " V CP
15 " V CP
15 " V CP
12
" V
CP
60
" C
MP
15 " V CP
12 " R CP
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
II
I
I
(Gras s)
(Gras s)
(Gras s)
Parkin g L ot
(Bit . Mat .)
(Woode d)
(Bit . Mat .)
(Bit . Mat .)
(Bit . Mat .)
(Woode d)
(Ri p Ra p)
(Woode d)
(Gras s)
(Gras s)
(Gras s)
Sh ed
820
825
825
825 825 825
825
825
825
825
825
825825
825825
825
830830830830830
830
830
830
830
830
830 830 830 830 830
830
830
830
830
830830830
830830
830
830
830
830
830
830
830 830 830 830
8
3
0
830
830
8
3
0
830
830
8
3
5
G
E
O
R
G
E
N
A
E
E
T
U
X
.
I
N
S
T
R
U
M
E
N
T
N
U
M
B
E
R
2
0
0
6
0
0
0
2
5
1
5
1
L
O
T
1
1
5
E
D
E
N
E
S
T
A
T
E
S
S
E
C
T
I
O
N
F
O
U
R
P
L
A
T
B
O
O
K
5
,
P
A
G
E
1
8
7
E
D
E
N
P
A
R
K
S
E
C
T
I
O
N
S
I
X
P
L
A
T
B
O
O
K
6
,
P
A
G
E
4
1
J
A
C
K
T
.
S
R
.
&
C
O
N
N
I
E
L
.
B
U
R
N
S
M
A
T
T
H
E
W
R
.
&
S
T
E
P
H
A
N
I
E
T
.
C
O
F
F
M
A
N
H
.
A
L
A
N
S
T
E
P
H
E
N
S
D
A
V
I
D
L
.
&
D
O
N
N
A
L
.
H
A
N
N
I
N
G
S S
S
15 " V CP 15 " V CP
12
" R
CP
15
" R
C
P
15
" R
C
P
15 " V CP
15 " V CP
12
" V
CP
12
" R
C
P
6
" C
MP
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
(Gras s)
(Gras s)
(Gras s)
(Bit . Mat .)
(Bit . Mat .)
(Gras s)
(Gras s)
(Gras s)
830
830 830
830
830 830
830830
830
830
830
830
830
830
830 830 830 830 830830
830
830830
8
3
0
830
830
830 830
835
835835835
835
835
835
835
835
835
835
8
3
5
83
5
L
O
T
1
7
3
L
O
T
1
7
4
E
D
E
N
E
S
T
A
T
E
S
S
E
C
T
I
O
N
E
I
G
H
T
P
L
A
T
B
O
O
K
6
,
P
A
G
E
4
5
L
O
T
1
4
9
R
O
N
A
L
D
&
K
A
R
E
N
L
.
P
E
A
R
S
O
N
R
I
C
H
A
R
D
K
E
I
T
H
&
S
H
E
L
L
Y
A
N
N
J
O
N
E
S
F
R
A
N
C
E
S
L
Y
N
N
K
A
I
S
E
R
H
A
R
O
L
D
A
.
M
A
R
L
E
Y
J
A
S
O
N
A
.
&
C
A
R
R
I
E
T
.
M
c
G
U
I
R
E
J
T
/
R
S
M
A
R
T
I
N
J
E
N
N
I
F
E
R
W
A
R
D
HORIZONTAL SCALE
DESIGNATION NO.
BRIDGE FILE
VERTICAL SCALE
SURVEY BOOK SHEETS
CONTRACT PROJECT NO.
of
DESIGNED:DRAWN:
CHECKED:CHECKED:
DESIGN ENGINEER
RECOMMENDED
FOR APPROVAL
DATE
aedwards 3:57:43 PM3/20/2008 P:\IN2003\0661\D. Drawings\IN20030661.RD.C2.EC01.dgn
CITY OF CARMEL
07-08D
No.
STATE OF
INDIANA
REGISTERED
P
R
OFE
S
SIONAL ENGIN
EER10505104
J. SAMUEL B
ALO
G
03/21/2008
173
PP
CKWCKW
1" = 30’
N/A
EROSION CONTROL PHASE I
KEYSTONE PARKWAYJSBJSB
73
S
S
S
S
12
" R
C
P
6" P VC
1
2"
R
CP
18 " R CP 18 " R CP
15 " V CP15" V CP
1
2
" R
C
P
12 " R CP
8" VCP (San.)
8" VCP (San.)
S
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
TR
(Gras s)
(Gras s)
(Gras s)
(Bit . Mat .)
(Bit . Mat .)
(Gras s)
(Woode d)
(Gras s)
(Gras s)
(Bit . Mat .)
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
TR
P
XXX
FP
FP
(Gras s)
(Gras s)
(Gras s)
(
B
i
t
.
M
a
t
.
)
(Bit . Mat .)
(Gras s)
(Bit . Mat .)
(Gras s)
(Gras s)
(Gras s)
(Woode d)
(Gras s)
(Gras s)
Shou
l
d
e
r (
C
-
S
t
n .)
TR
RT
RT
RT
RT
RT
RT
TH
H
TR
RT
RT
XXXPPPPPPPP
835835
835
835835
835
835
835
835
835
835
835
835
835835835835
835
835
835
835
835
835
835
835
835835835
835835835
835
835
835
835
835
8
3
5
835
835835
835
835
835
835
835835
835
8
3
5
840
840
840
8
4
0
S
S
S
66
" C
MP
Ex. Conc
. Dit ch
18 " R CP
18 " R CP
12
" R
C
P
Ex. C
o
n
c
. Dit
ch
Ex . Conc. Dit ch
8" VCP (San.)
18"
C
M
P
10
"
C
M
P
PPPPPPPP
825825
82
5 82
5
830
830
830
830
830
830
830
830 83
0
835
835
835835
835
835
835
835
8
3
5
835
835
835
835
835
835
835
835
835
835 835
835
840
840
840
840
840
840
840
840
840
840
840
840
840
840
840
840
840
840
840
8
4
0
845
845
845
845
HORIZONTAL SCALE
DESIGNATION NO.
BRIDGE FILE
VERTICAL SCALE
SURVEY BOOK SHEETS
CONTRACT PROJECT NO.
of
DESIGNED:DRAWN:
CHECKED:CHECKED:
DESIGN ENGINEER
RECOMMENDED
FOR APPROVAL
DATE
aedwards 3:58:07 PM3/20/2008 P:\IN2003\0661\D. Drawings\IN20030661.RD.C2.EC02.dgn
CITY OF CARMEL
07-08D
No.
STATE OF
INDIANA
REGISTERED
P
R
OFE
S
SIONAL ENGIN
EER10505104
J. SAMUEL B
ALO
G
03/21/2008
173
PP
CKWCKW EROSION CONTROL PHASE I
KEYSTONE PARKWAYJSBJSB
74
15
" R
C
P
Ex . Conc . Dit ch
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
(Gras s)
(Gras s)
(Gras s)(Gras s)
(Woode d)
(Gras s)
(Gras s)
(Bit . Mat .)
(Bit . Mat .)
Sh ed
(Gras s)
(Woode d)
(Garde n)Sh ed
840 840 840
840
840
845
845
845
845
845
845
845
845
845
845
845
845
845
845
845
845
845
845
845
845
845
845
845
845845
845
18
" R
C
P
Ex . Conc
. Dit ch
12 " R CP
12
"
C
M
P
6" CM P
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
TR
W
II
(Gras s)
(Gras s)
(Gras s)
(Gras s)
(Gras s)
(Woode d)
Shoulde r (Bit . Mat .)
Ya rd
Ba rn
(Bit . Mat .)
(Bit . Mat .)
(Gras s)
(Gras s)
(Gras s)
(Gras s)
(Gras s)
(Gras s)
(Gras s)
(Gras s)
(Gras s)
84
5
845
84
5
845
845
HORIZONTAL SCALE
DESIGNATION NO.
BRIDGE FILE
VERTICAL SCALE
SURVEY BOOK SHEETS
CONTRACT PROJECT NO.
of
DESIGNED:DRAWN:
CHECKED:CHECKED:
DESIGN ENGINEER
RECOMMENDED
FOR APPROVAL
DATE
aedwards 3:58:25 PM3/20/2008 P:\IN2003\0661\D. Drawings\IN20030661.RD.C2.EC03.dgn
CITY OF CARMEL
07-08D
No.
STATE OF
INDIANA
REGISTERED
P
R
OFE
S
SIONAL ENGIN
EER10505104
J. SAMUEL B
ALO
G
03/21/2008
173
PP
CKW CKW EROSION CONTROL PHASE I
126TH STREET
1" = 30’
N/A
JSB JSB
75
SS
S
S
S
S
Lift Station
6" V
C
P
6" V
C P
12
" R
C
P
1
2
" R
CP
12 " R CP
Ex
. C
o
n
c
. D
i
t
ch
8" PVC (San .)
8 " PV
C (S
a
n
.)
8
" P
V
C
(
S
a
n
.
)
8" PV C (San .)
12 " R CP 12 " R CP
8"
V
C
P
(
S
a
n
.
)
18
"
C
M
P
10" CM P
Lift Statio n
8" CM P
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
P
XXXXXXXXXXXXXXX
FP
FP
FP
VCSAC
(Bit . Mat .)
(Bit . Mat .)
(Gras s)
(B
i
t
. M
a
t
.)
(B
i
t
. M
a
t
.)
(Gras s)(Bit . Mat .)
Sidewal k (Conc .)
Sidewal k (Conc .)
(Bit . Mat .)
(Gras s)
(Bit . Mat .)
Sidewal k (Conc .)
Sidewal k (Conc .)
(Gras s)
(B
i
t
. M
a
t
.)
(
G
r
a
s
s
)
(B
i
t
.
M
a
t
.
)(G
r
a
s
s
)
Sh
o
u
l
d
e
r (C
-
S
t
n
.)
(Gras s)
(Gras s)
(Gras s)
Sidewal k (Conc .)
Sidewal k (Conc .)
Sidewal k (Conc .)
1 Sty. Brick Bldg.
TR
RT
RT
RT
RT
RT
RT
THH
TR
RT
RT
XXXX
5
5
0
+
0
0
5
5
0
+
0
0
5
5
0
+
0
0
PPPPPPPP
8
3
0
83
5
8
3
5
83
5
8
3
5
8
3
5
83
5
83
5
84
0
840
840840
840
840
8
4
0
840
840
840
840
840
840
84
0
840
845
845
18
" C
MP
18
" R
C
P
4
" F
I
E
L
D T
I
LE
6 " F
I
E
L
D T
I
L E
3
" P
I
P
E
2
7
"
X
4
2
"
EL
L
.
C
MP
Ex . Conc . Dit ch
42" X 54" CM P
42" X 54" CM P
6
"
P
V
C
6" PV C
12
"
C
M
P
Shoulder (Bit. Mat.)
XXXXXXXXXXXXXXXXXXXXXX
(W
o
o
d
e
d
)
(Bit . Mat .)
(Ri p Ra p)
(Ri p Ra p)
Parkin g L ot
(Bit . Mat .)
Sidewal k (Conc .)
(Gras s)Comm . D r.
(Bit . Mat .)
(Gras s)
S
i
d
e
w
a
l
k
(
C
o
n
c
.
)
(B
i
t
.
M
a
t
.
)
S
i
d
e
w
a
l
k
(
C
o
n
c
.)
(Gras s)
(Gras s)
(Woode d)
S
i
d
e
w
a
l
k
(
C
o
n
c
.
)
(
B
i
t
.
M
a
t
.
)
S
i
d
e
w
a
l
k
(
C
o
n
c
.
)
(Woode d)
(Gras s)
Sh
o
u
l
d
e
r (C
-
S
t
n
.)
1 Sty. Brick Bldg.
2 Sty .
Ston e & Bric k Bld g.
PPPPPPPPPPPPPPPPPPPPPPPPPPPPPPPPPPPPPPPP
815
815
815
81
5
815
815
820
820
82
0
820
820
820
820
8
2
0
820
820820
820
820
8
2
0
8
2
0
820
825
825
825
825
825825
825
825
82
5
825
825
82
5
82
5
825
825
825
825
830
830
830
830
830
830
830
83
5
83
5
HORIZONTAL SCALE
DESIGNATION NO.
BRIDGE FILE
VERTICAL SCALE
SURVEY BOOK SHEETS
CONTRACT PROJECT NO.
of
DESIGNED:DRAWN:
CHECKED:CHECKED:
DESIGN ENGINEER
RECOMMENDED
FOR APPROVAL
DATE
aedwards 3:58:44 PM3/20/2008 P:\IN2003\0661\D. Drawings\IN20030661.RD.C2.EC04.dgn
CITY OF CARMEL
07-08D
No.
STATE OF
INDIAN A
REGISTERED
P
R
OFE
S
SIONAL ENGIN
EER10505104
J. SAMUEL B
ALO
G
03/21/2008
173
PP
CKW CKW EROSION CONTROL PHASE II
KEYSTONE PARKWAY
1" = 30’
N/A
JSB JSB
76
S
S
12
"
V
C
P
15 " V CP
15 " V CP
15 " V CP
15 " V CP
12
" V
CP
60
" C
MP
15 " V CP
12 " R CP
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
II
I
I
(Gras s)
(Gras s)
(Gras s)
Parkin g L ot
(Bit . Mat .)
(Woode d)
(Bit . Mat .)
(Bit . Mat .)
(Bit . Mat .)
(Woode d)
(Ri p Ra p)
(Woode d)
(Gras s)
(Gras s)
(Gras s)
Sh ed
820
825
825
825 825 825
825
825
825
825
825
825825
825825
825
830830830830830
830
830
830
830
830
830 830 830 830 830
830
830
830
830
830830830
830830
830
830
830
830
830
830
830 830 830 830
8
3
0
830
830
8
3
0
830
830
8
3
5
G
E
O
R
G
E
N
A
E
E
T
U
X
.
I
N
S
T
R
U
M
E
N
T
N
U
M
B
E
R
2
0
0
6
0
0
0
2
5
1
5
1
L
O
T
1
1
5
E
D
E
N
E
S
T
A
T
E
S
S
E
C
T
I
O
N
F
O
U
R
P
L
A
T
B
O
O
K
5
,
P
A
G
E
1
8
7
E
D
E
N
P
A
R
K
S
E
C
T
I
O
N
S
I
X
P
L
A
T
B
O
O
K
6
,
P
A
G
E
4
1
J
A
C
K
T
.
S
R
.
&
C
O
N
N
I
E
L
.
B
U
R
N
S
M
A
T
T
H
E
W
R
.
&
S
T
E
P
H
A
N
I
E
T
.
C
O
F
F
M
A
N
H
.
A
L
A
N
S
T
E
P
H
E
N
S
D
A
V
I
D
L
.
&
D
O
N
N
A
L
.
H
A
N
N
I
N
G
S S
S
15 " V CP 15 " V CP
12
" R
CP
15
" R
C
P
15
" R
C
P
15 " V CP
15 " V CP
12
" V
CP
12
" R
C
P
6
" C
MP
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
(Gras s)
(Gras s)
(Gras s)
(Bit . Mat .)
(Bit . Mat .)
(Gras s)
(Gras s)
(Gras s)
830
830 830
830
830 830
830830
830
830
830
830
830
830
830 830 830 830 830830
830
830830
8
3
0
830
830
830 830
835
835835835
835
835
835
835
835
835
835
8
3
5
83
5
L
O
T
1
7
3
L
O
T
1
7
4
E
D
E
N
E
S
T
A
T
E
S
S
E
C
T
I
O
N
E
I
G
H
T
P
L
A
T
B
O
O
K
6
,
P
A
G
E
4
5
L
O
T
1
4
9
R
O
N
A
L
D
&
K
A
R
E
N
L
.
P
E
A
R
S
O
N
R
I
C
H
A
R
D
K
E
I
T
H
&
S
H
E
L
L
Y
A
N
N
J
O
N
E
S
F
R
A
N
C
E
S
L
Y
N
N
K
A
I
S
E
R
H
A
R
O
L
D
A
.
M
A
R
L
E
Y
J
A
S
O
N
A
.
&
C
A
R
R
I
E
T
.
M
c
G
U
I
R
E
J
T
/
R
S
M
A
R
T
I
N
J
E
N
N
I
F
E
R
W
A
R
D
HORIZONTAL SCALE
DESIGNATION NO.
BRIDGE FILE
VERTICAL SCALE
SURVEY BOOK SHEETS
CONTRACT PROJECT NO.
of
DESIGNED:DRAWN:
CHECKED:CHECKED:
DESIGN ENGINEER
RECOMMENDED
FOR APPROVAL
DATE
aedwards 3:59:05 PM3/20/2008 P:\IN2003\0661\D. Drawings\IN20030661.RD.C2.EC05.dgn
CITY OF CARMEL
07-08D
No.
STATE OF
INDIANA
REGISTERED
P
R
OFE
S
SIONAL ENGIN
EER10505104
J. SAMUEL B
ALO
G
03/21/2008
173
PP
CKWCKW
1" = 30’
N/A
EROSION CONTROL PHASE II
KEYSTONE PARKWAYJSBJSB
77
S
S
S
S
12
" R
C
P
6" P VC
1
2"
R
CP
18 " R CP 18 " R CP
15 " V CP15" V CP
1
2
" R
C
P
12 " R CP
8" VCP (San.)
8" VCP (San.)
S
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
TR
(Gras s)
(Gras s)
(Gras s)
(Bit . Mat .)
(Bit . Mat .)
(Gras s)
(Woode d)
(Gras s)
(Gras s)
(Bit . Mat .)
835835
835
835835
835
835
835
835
835
835
835
835
835835835835
835
835
835
835
835
835
835
835
835835835
835835835
835
835
835
835
835
8
3
5
835
835835
835
835
835
835
835835
835
8
3
5
840
840
840
8
4
0
S
S
S
66
" C
MP
Ex. Conc
. Dit ch
18 " R CP
18 " R CP
12
" R
C
P
Ex. C
o
n
c
. Dit
ch
Ex . Conc. Dit ch
8" VCP (San.)
18"
C
M
P
10
"
C
M
P
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
TR
P
XXX
FP
FP
(Gras s)
(Gras s)
(Gras s)
(
B
i
t
.
M
a
t
.
)
(Bit . Mat .)
(Gras s)
(Bit . Mat .)
(Gras s)
(Gras s)
(Gras s)
(Woode d)
(Gras s)
(Gras s)
Shou
l
d
e
r (
C
-
S
t
n .)
TR
RT
RT
RT
RT
RT
RT
TH
H
TR
RT
RT
XXX
825825
82
5 82
5
830
830
830
830
830
830
830
830 83
0
835
835
835835
835
835
835
835
8
3
5
835
835
835
835
835
835
835
835
835
835 835
835
840
840
840
840
840
840
840
840
840
840
840
840
840
840
840
840
840
840
840
8
4
0
845
845
845
845
HORIZONTAL SCALE
DESIGNATION NO.
BRIDGE FILE
VERTICAL SCALE
SURVEY BOOK SHEETS
CONTRACT PROJECT NO.
of
DESIGNED:DRAWN:
CHECKED:CHECKED:
DESIGN ENGINEER
RECOMMENDED
FOR APPROVAL
DATE
aedwards 3:59:24 PM3/20/2008 P:\IN2003\0661\D. Drawings\IN20030661.RD.C2.EC06.dgn
CITY OF CARMEL
07-08D
No.
STATE OF
INDIANA
REGISTERED
P
R
OFE
S
SIONAL ENGIN
EER10505104
J. SAMUEL B
ALO
G
03/21/2008
173
PP
CKWCKW
1" = 30’
N/A
EROSION CONTROL PHASE II
KEYSTONE PARKWAYJSBJSB
78
15
" R
C
P
Ex . Conc . Dit ch
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
(Gras s)
(Gras s)
(Gras s)(Gras s)
(Woode d)
(Gras s)
(Gras s)
(Bit . Mat .)
(Bit . Mat .)
Sh ed
(Gras s)
(Woode d)
(Garde n)Sh ed
840 840 840
840
840
845
845
845
845
845
845
845
845
845
845
845
845
845
845
845
845
845
845
845
845
845
845
845
845845
845
18
" R
C
P
Ex . Conc
. Dit ch
12 " R CP
12
"
C
M
P
6" CM P
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
TR
W
II
(Gras s)
(Gras s)
(Gras s)
(Gras s)
(Gras s)
(Woode d)
Shoulde r (Bit . Mat .)
Ya rd
Ba rn
(Bit . Mat .)
(Bit . Mat .)
(Gras s)
(Gras s)
(Gras s)
(Gras s)
(Gras s)
(Gras s)
(Gras s)
(Gras s)
(Gras s)
84
5
845
84
5
845
845
HORIZONTAL SCALE
DESIGNATION NO.
BRIDGE FILE
VERTICAL SCALE
SURVEY BOOK SHEETS
CONTRACT PROJECT NO.
of
DESIGNED:DRAWN:
CHECKED:CHECKED:
DESIGN ENGINEER
RECOMMENDED
FOR APPROVAL
DATE
aedwards 3:59:43 PM3/20/2008 P:\IN2003\0661\D. Drawings\IN20030661.RD.C2.EC07.dgn
CITY OF CARMEL
07-08D
No.
STATE OF
INDIANA
REGISTERED
P
R
OFE
S
SIONAL ENGIN
EER10505104
J. SAMUEL B
ALO
G
03/21/2008
173
PP
CKW CKW
1" = 30’
N/A
EROSION CONTROL PHASE II
126TH STREETJSBJSB
79
SS
S
S
S
S
Lift Station
6" V
C
P
6" V
C P
12
" R
C
P
1
2
" R
CP
12 " R CP
Ex
. C
o
n
c
. D
i
t
ch
8" PVC (San .)
8 " PV
C (S
a
n
.)
8
" P
V
C
(
S
a
n
.
)
8" PV C (San .)
12 " R CP 12 " R CP
8"
V
C
P
(
S
a
n
.
)
18
"
C
M
P
10" CM P
Lift Statio n
8" CM P
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
P
XXXXXXXXXXXXXXX
FP
FP
FP
VCSAC
(Bit . Mat .)
(Bit . Mat .)
(Gras s)
(B
i
t
. M
a
t
.)
(B
i
t
. M
a
t
.)
(Gras s)(Bit . Mat .)
Sidewal k (Conc .)
Sidewal k (Conc .)
(Bit . Mat .)
(Gras s)
(Bit . Mat .)
Sidewal k (Conc .)
Sidewal k (Conc .)
(Gras s)
(B
i
t
. M
a
t
.)
(
G
r
a
s
s
)
(B
i
t
.
M
a
t
.
)(G
r
a
s
s
)
Sh
o
u
l
d
e
r (C
-
S
t
n
.)
(Gras s)
(Gras s)
(Gras s)
Sidewal k (Conc .)
Sidewal k (Conc .)
Sidewal k (Conc .)
1 Sty. Brick Bldg.
TR
RT
RT
RT
RT
RT
RT
THH
TR
RT
RT
XXXXTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTOH EOH EOH EOH EOH EOH EOH EOH EOH EOH EOH EOH EOH EOH EOH EOH EGGGGGGGGGGGGGGGGGGGGGGGOH TOH TTTTTTWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWOH EOH EOH EOH EOH EOH EOH EOH EOH EOH EOH EOH EOH EOH EOH EOH EGGGGGGGGGGGGGGGGGGGGGGGOH TOH TTTTTTWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWW
T
WV
WV
WV
WV
WE
E
W
TT
W
ETT
W
WV
E G
WV
WV
T
EE
W
WV
OH EOH EOH EOH EOH E
THH
OH EOH EOH EOH EOH EOH EOH E
THH
OH EOH E
5
5
0
+
0
0
5
5
0
+
0
0
5
5
0
+
0
0
PPPPPPPPPPPPPP
8
3
0
83
5
8
3
5
83
5
8
3
5
8
3
5
83
5
83
5
84
0
840
840840
840
840
8
4
0
840
840
840
840
840
840
84
0
840
845
845
18
" C
MP
18
" R
C
P
4
" F
I
E
L
D T
I
LE
6 " F
I
E
L
D T
I
L E
3
" P
I
P
E
2
7
"
X
4
2
"
EL
L
.
C
MP
Ex . Conc . Dit ch
42" X 54" CM P
42" X 54" CM P
6
"
P
V
C
6" PV C
12
"
C
M
P
Shoulder (Bit. Mat.)
XXXXXXXXXXXXXXXXXXXXXX
(W
o
o
d
e
d
)
(Bit . Mat .)
(Ri p Ra p)
(Ri p Ra p)
Parkin g L ot
(Bit . Mat .)
Sidewal k (Conc .)
(Gras s)Comm . D r.
(Bit . Mat .)
(Gras s)
S
i
d
e
w
a
l
k
(
C
o
n
c
.
)
(B
i
t
.
M
a
t
.
)
S
i
d
e
w
a
l
k
(
C
o
n
c
.)
(Gras s)
(Gras s)
(Woode d)
S
i
d
e
w
a
l
k
(
C
o
n
c
.
)
(
B
i
t
.
M
a
t
.
)
S
i
d
e
w
a
l
k
(
C
o
n
c
.
)
(Woode d)
(Gras s)
Sh
o
u
l
d
e
r (C
-
S
t
n
.)
1 Sty. Brick Bldg.
2 Sty .
Ston e & Bric k Bld g.
TTTTTTTTTTTTTTTTTTTTTT
W
TTTTTTTTTTTTTTTTTTTTTTOH EOH EOH EOH EOH EOH EOH EOH EOH EOH EOH EGGGGGGGGGGGGGGTTTWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWOH EOH EOH EOH EOH EOH EOH EOH EOH EOH EOH EGGGGGGGGGGGGGGTTTWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWW
WV WV
GV
WV
WV
G
OH E
G
OH EGGGG
815
815
815
81
5
815
815
820
820
82
0
820
820
820
820
8
2
0
820
820820
820
820
8
2
0
8
2
0
820
825
825
825
825
825825
825
825
82
5
825
825
82
5
82
5
825
825
825
825
830
830
830
830
830
830
830
83
5
83
5
HORIZONTAL SCALE
DESIGNATION NO.
BRIDGE FILE
VERTICAL SCALE
SURVEY BOOK SHEETS
CONTRACT PROJECT NO.
of
DESIGNED:DRAWN:
CHECKED:CHECKED:
DESIGN ENGINEER
RECOMMENDED
FOR APPROVAL
DATE
aedwards 4:00:06 PM3/20/2008 P:\IN2003\0661\D. Drawings\IN20030661.RD.C2.EC08.dgn
CITY OF CARMEL
07-08D
No.
STATE OF
INDIAN A
REGISTERED
P
R
OFE
S
SIONAL ENGIN
EER10505104
J. SAMUEL B
ALO
G
03/21/2008
173
PP
CKW CKW
JSB JSB
N/A
N/A
80
HORIZONTAL SCALE
DESIGNATION NO.
BRIDGE FILE
VERTICAL SCALE
SURVEY BOOK SHEETS
CONTRACT PROJECT NO.
of
DESIGNED:DRAWN:
CHECKED:CHECKED:
DESIGN ENGINEER
RECOMMENDED
FOR APPROVAL
DATE
EROSION CONTROL TABLE
aedwards 4:00:16 PM3/20/2008 P:\IN2003\0661\D. Drawings\IN20030661.RD.C2.EC09.dgn
LOCATION
STATION TO STATION
T
E
M
P
O
R
A
R
Y
S
I
L
T
F
E
N
C
E
(ft)
T
E
M
P
O
R
A
R
Y
C
H
E
C
K
D
A
M
S
S
T
R
A
W
B
A
L
E
S
(ft)
T
E
M
P
O
R
A
R
Y
C
H
E
C
K
D
A
M
R
E
V
E
T
M
E
N
T
R
I
P
R
A
P
(TON)
T
E
M
P
O
R
A
R
Y
S
E
D
I
M
E
N
T
T
R
A
P
(TON)
T
E
M
P
O
R
A
R
Y
S
L
O
P
E
D
R
A
I
N
(ft)
S
P
L
A
S
H
P
A
D
R
I
P
R
A
P
(TON)
S
E
E
D
M
I
X
T
U
R
E
,
T
F
E
R
T
I
L
I
Z
E
R
(TON)
T
E
M
P
O
R
A
R
Y
D
I
T
C
H
IN
L
E
T
P
R
O
T
E
C
T
I
O
N
EACH EACH
LOCATION
STATION TO STATION
T
E
M
P
O
R
A
R
Y
S
I
L
T
F
E
N
C
E
(ft)
T
E
M
P
O
R
A
R
Y
C
H
E
C
K
D
A
M
S
S
T
R
A
W
B
A
L
E
S
(ft)
T
E
M
P
O
R
A
R
Y
C
H
E
C
K
D
A
M
R
E
V
E
T
M
E
N
T
R
I
P
R
A
P
(TON)
T
E
M
P
O
R
A
R
Y
S
E
D
I
M
E
N
T
T
R
A
P
(TON)
T
E
M
P
O
R
A
R
Y
S
L
O
P
E
D
R
A
I
N
(ft)
S
P
L
A
S
H
P
A
D
R
I
P
R
A
P
(TON)
S
E
E
D
M
I
X
T
U
R
E
,
T
F
E
R
T
I
L
I
Z
E
R
(TON)
T
E
M
P
O
R
A
R
Y
D
I
T
C
H
IN
L
E
T
P
R
O
T
E
C
T
I
O
N
EACH
LOCATION
STATION TO STATION
T
E
M
P
O
R
A
R
Y
S
I
L
T
F
E
N
C
E
(ft)
T
E
M
P
O
R
A
R
Y
C
H
E
C
K
D
A
M
S
S
T
R
A
W
B
A
L
E
S
(ft)
T
E
M
P
O
R
A
R
Y
C
H
E
C
K
D
A
M
R
E
V
E
T
M
E
N
T
R
I
P
R
A
P
(TON)
T
E
M
P
O
R
A
R
Y
S
E
D
I
M
E
N
T
T
R
A
P
(TON)
T
E
M
P
O
R
A
R
Y
S
L
O
P
E
D
R
A
I
N
(ft)
S
P
L
A
S
H
P
A
D
R
I
P
R
A
P
(TON)
S
E
E
D
M
I
X
T
U
R
E
,
T
F
E
R
T
I
L
I
Z
E
R
(TON)
T
E
M
P
O
R
A
R
Y
D
I
T
C
H
IN
L
E
T
P
R
O
T
E
C
T
I
O
N
EACH
EROSION CONTROL TABLEEROSION CONTROL TABLEEROSION CONTROL TABLE
CITY OF CARMEL
T
E
M
P
O
R
A
R
Y
C
U
R
B
IN
L
E
T
P
R
O
T
E
C
T
I
O
N
T
E
M
P
O
R
A
R
Y
C
U
R
B
IN
L
E
T
P
R
O
T
E
C
T
I
O
N
EACH
T
E
M
P
O
R
A
R
Y
C
U
R
B
IN
L
E
T
P
R
O
T
E
C
T
I
O
N
EACH(SYS)(SYS)(SYS)
P
H
A
S
E
P
H
A
S
E
P
H
A
S
E
07-08D
No.
STATE OF
INDIAN A
REGISTERED
P
R
OFE
S
SIONAL ENGIN
EER10505104
J. SAMUEL B
ALO
G
03/21/2008
173
RETAINING WALL "B" DETAILS
MHW
EAKCKW
JSB
1" = 20’
81
No.
STATE OF
INDIANA
REGISTERED
P
R
OFE
S
SIONAL ENGIN
EER860409
M I CHAEL H. W
ENNI
N
G
HORIZONTAL SCALE
DESIGNATION NO.
BRIDGE FILE
VERTICAL SCALE
SURVEY BOOK SHEETS
CONTRACT PROJECT NO.
of
DESIGNED:DRAWN:
CHECKED:CHECKED:
DESIGN ENGINEER
RECOMMENDED
FOR APPROVAL
DATE
aedwards 4:00:26 PM3/20/2008 P:\IN2003\0661\D. Drawings\IN20030661.RD.C2.RETB.01.dgn
N/A
CITY OF CARMEL
07-08D
03/21/2008
173
RETAINING WALL "B" DETAILS
CKW
JSB
EAK
MHW
82
1" = 20’
No.
STATE OF
INDIAN A
REGISTERED
P
R
OFE
S
SIONAL ENGIN
EER860409
M I CHAEL H. W
ENNIN
G
HORIZONTAL SCALE
DESIGNATION NO.
BRIDGE FILE
VERTICAL SCALE
SURVEY BOOK SHEETS
CONTRACT PROJECT NO.
of
DESIGNED:DRAWN:
CHECKED:CHECKED:
DESIGN ENGINEER
RECOMMENDED
FOR APPROVAL
DATE
aedwards 4:00:35 PM3/20/2008 P:\IN2003\0661\D. Drawings\IN20030661.RD.C2.RETB.02.dgn
N/A
CITY OF CARMEL
07-08D
03/21/2008
173
RETAINING WALL "C" DETAILS
EAKCKW
JSB MHW
1" = 20’
83
No.
STATE OF
INDIA NA
REGISTE
RED
P
R
OFE
S
SIONAL ENGIN
EER860409
M I CHAEL H. W
ENNIN
G
HORIZONTAL SCALE
DESIGNATION NO.
BRIDGE FILE
VERTICAL SCALE
SURVEY BOOK SHEETS
CONTRACT PROJECT NO.
of
DESIGNED:DRAWN:
CHECKED:CHECKED:
DESIGN ENGINEER
RECOMMENDED
FOR APPROVAL
DATE
aedwards 4:00:43 PM3/20/2008 P:\IN2003\0661\D. Drawings\IN20030661.RD.C2.RETC.01.dgn
N/A
CITY OF CARMEL
07-08D
03/21/2008
173
RETAINING WALL "C" DETAILS
EAK
1" = 20’
84
CKW
JSB MHW
No.
STATE OF
INDIANA
REGISTE
RED
P
R
OFE
S
SIONAL ENGIN
EER
860409
M I CHAEL H. W
E
NNIN
G
HORIZONTAL SCALE
DESIGNATION NO.
BRIDGE FILE
VERTICAL SCALE
SURVEY BOOK SHEETS
CONTRACT PROJECT NO.
of
DESIGNED:DRAWN:
CHECKED:CHECKED:
DESIGN ENGINEER
RECOMMENDED
FOR APPROVAL
DATE
aedwards 4:00:53 PM3/20/2008 P:\IN2003\0661\D. Drawings\IN20030661.RD.C2.RETC.02.dgn
N/A
CITY OF CARMEL
07-08D
03/21/2008
173
RETAINING WALL "C" DETAILS
EAKCKW
JSB MHW
1" = 20’
85
No.
STATE OF
INDIANA
REGISTE
RED
P
R
OFE
S
SIONAL ENGIN
EER860409
M I CHAEL H. W
E
NNIN
G
HORIZONTAL SCALE
DESIGNATION NO.
BRIDGE FILE
VERTICAL SCALE
SURVEY BOOK SHEETS
CONTRACT PROJECT NO.
of
DESIGNED:DRAWN:
CHECKED:CHECKED:
DESIGN ENGINEER
RECOMMENDED
FOR APPROVAL
DATE
aedwards 4:01:01 PM3/20/2008 P:\IN2003\0661\D. Drawings\IN20030661.RD.C2.RETC.03.dgn
N/A
CITY OF CARMEL
07-08D
03/21/2008
173
RETAINING WALL "D" DETAILS
EAK
1" = 20’
86
MHWJSB
CKW
No.
STATE OF
INDIA N A
REGISTER
ED
P
R
OFE
S
S
IONAL EN GINEER860409
MIC HA EL H. W
E
N
NI
N
G
8
3
3
.
7
8
3
3
.
3
8
3
3
.
6
83
5
.
1
8
3
3
.
6
8
3
1
.
4
8
2
8
.
3
8
2
4
.
8
8
2
2
.
3
8
2
1
.
7
HORIZONTAL SCALE
DESIGNATION NO.
BRIDGE FILE
VERTICAL SCALE
SURVEY BOOK SHEETS
CONTRACT PROJECT NO.
of
DESIGNED:DRAWN:
CHECKED:CHECKED:
DESIGN ENGINEER
RECOMMENDED
FOR APPROVAL
DATE
aedwards 4:01:11 PM3/20/2008 P:\IN2003\0661\D. Drawings\IN20030661.RD.C2.RETD.01.dgn
N/A
CITY OF CARMEL
07-08D
03/21/2008
173
RETAINING WALL "D" DETAILS
EAK
87
1" = 20’
CKW
JSB MHW
No.
STATE OF
INDIA NA
REGISTE
RED
P
R
OFE
S
SIONAL ENGIN
EER
860409
M I CHAEL H. W
ENNIN
G
8
2
1
.
4
8
2
2
.
3
8
2
1
.
7
8
2
1
.
5
8
2
1
.
4
8
2
2
.
3
82
1
.
1
8
1
9
.
3
HORIZONTAL SCALE
DESIGNATION NO.
BRIDGE FILE
VERTICAL SCALE
SURVEY BOOK SHEETS
CONTRACT PROJECT NO.
of
DESIGNED:DRAWN:
CHECKED:CHECKED:
DESIGN ENGINEER
RECOMMENDED
FOR APPROVAL
DATE
aedwards 4:01:20 PM3/20/2008 P:\IN2003\0661\D. Drawings\IN20030661.RD.C2.RETD.02.dgn
N/A
CITY OF CARMEL
07-08D
03/21/2008
173
RETAINING WALL "E’" DETAILS
EAKCKW
JSB MHW
1" = 20’
88
No.
STATE OF
INDIANA
REGISTERED
P
R
OFE
S
SIONAL ENGINEER860409
MI CHAEL H. W
ENNIN
G
HORIZONTAL SCALE
DESIGNATION NO.
BRIDGE FILE
VERTICAL SCALE
SURVEY BOOK SHEETS
CONTRACT PROJECT NO.
of
DESIGNED:DRAWN:
CHECKED:CHECKED:
DESIGN ENGINEER
RECOMMENDED
FOR APPROVAL
DATE
aedwards 4:01:29 PM3/20/2008 P:\IN2003\0661\D. Drawings\IN20030661.RD.C2.RETE.01.dgn
N/A
CITY OF CARMEL
07-08D
03/21/2008
173
8
2
6
.
0
8
2
6
.
6
8
2
6
.
9
8
2
7
.
6
8
2
5
.
0
8
2
4
.
2
8
2
6
.
3
8
2
4
.
4
82
6
.
1
8
2
5
.
0
8
2
7
.
6
RETAINING WALL "F" DETAILS
EAKCKW
JSB MHW
1" = 20’
89
No.
STATE OF
INDIAN A
REGISTERED
P
R
OFE
S
SIONAL ENGIN
EER860409
M I CHAEL H. W
ENNIN
G
8
4
2
.
0
8
3
9
.
2
8
3
7
.
0
8
3
5
.
7
8
3
4
.
7
83
4
.
1
8
3
3
.
9
HORIZONTAL SCALE
DESIGNATION NO.
BRIDGE FILE
VERTICAL SCALE
SURVEY BOOK SHEETS
CONTRACT PROJECT NO.
of
DESIGNED:DRAWN:
CHECKED:CHECKED:
DESIGN ENGINEER
RECOMMENDED
FOR APPROVAL
DATE
aedwards 4:01:39 PM3/20/2008 P:\IN2003\0661\D. Drawings\IN20030661.RD.C2.RETF.01.dgn
N/A
CITY OF CARMEL
07-08D
03/21/2008
173
RETAINING WALL "G" DETAILS
EAK
90
CKW
MHWJSB
1" = 20’
No.
STATE OF
INDIAN A
REGISTE
RED
P
R
OFE
S
SIONAL ENGIN
EER860409
M I CHAEL H. W
E
NNIN
G
HORIZONTAL SCALE
DESIGNATION NO.
BRIDGE FILE
VERTICAL SCALE
SURVEY BOOK SHEETS
CONTRACT PROJECT NO.
of
DESIGNED:DRAWN:
CHECKED:CHECKED:
DESIGN ENGINEER
RECOMMENDED
FOR APPROVAL
DATE
aedwards 4:01:47 PM3/20/2008 P:\IN2003\0661\D. Drawings\IN20030661.RD.C2.RETG.01.dgn
N/A
CITY OF CARMEL
07-08D
03/21/2008
173
8
3
7
.
0
8
4
1
.
9
8
4
3
.
7
8
4
4
.
3
8
4
4
.
5
8
4
4
.
4
8
4
4
.
3
84
4
.
1
N/A
WRONG
WAY
1"=50’
CKW KRO
JSB JSB
EXISTING SIGNING
50
SPEED
LIMIT
WRONG
WAY
ONE
WAY
ONE
WAY
ONE
WAY ONE
WAY
50
SPEED
LIMIT
ONE
WAY
ONE
WAY
91
LINE "E"
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
II
I
I
(Bit . Mat .)
(Bit . Mat .)
(Bit . Mat .)
(Woode d)
(Ri p Ra p)
(Wooded)
(Grass)
(Gras s)
(Gras s)
(Gras s)
(Grass)
(Gras s)
(Bit . Mat .)
(Bit . Mat .)
(Gras s)
(Grass)
(Gras s)
Sh ed
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
P
XXXXXXXXXX
FP
FP
FP
(Grass)
(Grass)
(Grass)
(Bit . Mat .)
(Bit. Mat.)
(Gras s)
(Woode d)
(Gras s)
(Grass)
(Bit . Mat .)
(Wooded)
(B
i
t
.
M
a
t
.
)
(B
i
t
. M
a
t
.)
(Bit. Mat.)
(Grass)
(Bit. Mat.)
(Gras s)
(R
i
p R
a
p)
Parkin g Lot
(Bit . Mat .)
(Wooded)
(Gras s)
Shoulde
r (C-
S
t
n .)
(G
r
a
s
s)
XXXXX
HORIZONTAL SCALE
DESIGNATION NO.
BRIDGE FILE
VERTICAL SCALE
SURVEY BOOK SHEETS
CONTRACT PROJECT NO.
of
DESIGNED:DRAWN:
CHECKED:CHECKED:
DESIGN ENGINEER
RECOMMENDED
FOR APPROVAL
DATE
aedwards 4:02:05 PM3/20/2008 P:\IN2003\0661\D. Drawings\IN20030661.RD.C2.SN01.dgn
CITY OF CARMEL
07-08D
No.
STATE OF
INDIAN A
REGISTERED
P
R
OFE
S
SIONAL ENGIN
EER10505104
J. SAMUEL B
ALO
G
03/21/2008
173
N/A
1"=50’
CKW KRO
JSB JSB
EXISTING SIGNING
50
SPEED
LIMIT
50
SPEED
LIMIT
WRONG
WAY
H BUSINESS
DISTRICT
SOUTH
INDIANA
431
6CARMEL H.S.
92
LINE "E"
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
(Grass)
(Wooded)
(Grass)
(Grass)(Gras s)
(Gras s)
(Grass)(Gras s)
(Wooded)
(Grass)
(Gras s)
(Bit . Mat .)
(Bit. Mat.)
Sh ed
(Grass)
(Wooded)
(Gras s)
(Grass)
(Garden)Sh ed
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
W
II
I
(Grass)
(Gras s)
(Gras s)
(Woode d)
Shoulde r (Bit. Mat.)
Ya rd
Ba rn
1-St
y.Fr. Hs
e.
(Woode d)
(Bit. Mat.)
(Bit. Mat.)
(Gras s)
(Grass)
(Gras s)
(Gras s)
Pvt. D r.
(Conc.)Si
d
e
w
a
l
k (
C
o
n
c
.)
(G
r
a
s
s
)
(Rip Rap)
Si
d
e
w
a
l
k (
C
o
n
c
.)
Si
d
e
w
a
l
k
(
C
o
n
c
.)
(Grass)
Pvt . D r.
(Conc.)
(Lawn)
(Gras s)
(B
i
t
. M
a
t
.)
(Ri p Ra p)
(Grass)
(Grass)
(Grass)
(Bit . Mat .)
(Bit. Mat.)
Shed
Shoulder (Bit. Mat.)
Shoulder (Bit . Mat .)
Shoulde r (Bit. Mat.)
Shoulder (Bit. Mat.)
Sh ed
(Gras s)
(Rip Rap)
(Grass)
(Gras s)
Pvt. D r.
(Conc.)Si
d
e
w
a
l
k (
C
o
n
c
.)
(G
r
a
s
s
)
Si
d
e
w
a
l
k (
C
o
n
c
.)
Si
d
e
w
a
l
k
(
C
o
n
c
.)
(Grass)
Pvt . D r.
(Conc.)
(Lawn)
(Gras s)
(B
i
t
. M
a
t
.)
(Grass)
(Gras s)
Pvt. D r.
(Conc.)Si
d
e
w
a
l
k (
C
o
n
c
.)
(G
r
a
s
s
)
Si
d
e
w
a
l
k (
C
o
n
c
.)
Si
d
e
w
a
l
k
(
C
o
n
c
.)
(Grass)
Pvt . D r.
(Conc.)
(Lawn)
(Gras s)
(B
i
t
. M
a
t
.)
(Grass)
(Gras s)
Pvt. D r.
(Conc.)Si
d
e
w
a
l
k (
C
o
n
c
.)
(G
r
a
s
s
)
Si
d
e
w
a
l
k (
C
o
n
c
.)
Si
d
e
w
a
l
k
(
C
o
n
c
.)
(Grass)
Pvt . D r.
(Conc.)
(Lawn)
(Gras s)
(B
i
t
. M
a
t
.)
XXXX
RT
RT
HORIZONTAL SCALE
DESIGNATION NO.
BRIDGE FILE
VERTICAL SCALE
SURVEY BOOK SHEETS
CONTRACT PROJECT NO.
of
DESIGNED:DRAWN:
CHECKED:CHECKED:
DESIGN ENGINEER
RECOMMENDED
FOR APPROVAL
DATE
aedwards 4:02:20 PM3/20/2008 P:\IN2003\0661\D. Drawings\IN20030661.RD.C2.SN02.dgn
CITY OF CARMEL
07-08D
No.
STATE OF
INDIAN A
REGISTERED
P
R
OFE
S
SIONAL ENGIN
EER10505104
J. SAMUEL B
ALO
G
03/21/2008
173
KRO
1"=30’
CKW
JSB JSB
EXISTING SIGNING
30
SPEED
LIMIT
BIKE ROUTE
SHARE
THE
ROAD
WEIGHT
LIMIT
5000
LBS
STOP
WHEN
SCHOOL BUS
STOPS
KEEP
RIGHT
SIGNAL
AHEAD
126th ST
MELARK DR
93
LINE "S-7-E"
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
FP
FP
FP
VCS
AC
(
G
r
a
s
s
)
(G
r
a
s
s
)
(B
i
t
.
M
a
t
.
)
(Bit . Mat .)
(Gras s)
(B
i
t
.
M
a
t
.
)
(
B
i
t
.
M
a
t
.
)
(Gras s)(Bit . Mat .)
Sidewal k (Conc .)
Sidewal k (Conc .)
(Bit . Mat .)
(Gras s)
(Bit . Mat .)
Sidewal k (Conc .)
Sidewal k (Conc .)
(Gras s)
(B
i
t
.
M
a
t
.)
(G
r
a
s
s
)
(B
i
t
. M
a
t
.)
(W
o
o
d
e
d
)
(G
r
a
s
s
)
(Gras s)
(Gras s)
(Gras s)
Sidewal k (Conc .)
Sidewal k (Conc .)
Sidewal k (Conc .)
1 Sty. Brick Bldg.
XXXXX
HORIZONTAL SCALE
DESIGNATION NO.
BRIDGE FILE
VERTICAL SCALE
SURVEY BOOK SHEETS
CONTRACT PROJECT NO.
of
DESIGNED:DRAWN:
CHECKED:CHECKED:
DESIGN ENGINEER
RECOMMENDED
FOR APPROVAL
DATE
aedwards 4:02:31 PM3/20/2008 P:\IN2003\0661\D. Drawings\IN20030661.RD.C2.SN03.dgn
N/A
CITY OF CARMEL
07-08D
No.
STATE OF
INDIAN A
REGISTERED
P
R
OFE
S
SIONAL ENGIN
EER10505104
J. SAMUEL B
ALO
G
03/21/2008
173
1"=30’
KROCKW
JSB JSB
EXISTING SIGNING
SIGNAL
AHEAD
94
LINE "S-7-E"
126th ST
HIGH DRIVE
30
SPEED
LIMIT
BIKE ROUTE
SHARE
THE
ROAD
126th ST
HIGH DRIVE
Shoulder (Bit. Mat.)
XXXXXXXXXXXXXXXXXXXXXX
P
(
G
r
a
s
s
)
(
W
o
o
d
e
d
)
(
G
r
a
s
s
)
(W
o
o
d
e
d
)
(Bit . Mat .)
(G
r
a
s
s
)
(B
i
t
. M
a
t
.)(
G
r
a
s
s
)
(Ri p Ra p)
(Ri p Ra p)
Parkin g L ot
(Bit . Mat .)
Sidewal k (Conc .)
(Gras s)Comm . D r.
(Bit . Mat .)
(Gras s)
S
i
d
e
w
a
l
k
(
C
o
n
c
.
)
(B
i
t
.
M
a
t
.
)
S
i
d
e
w
a
l
k
(
C
o
n
c
.)
(Gras s)
(Gras s)
(Woode d)
S
i
d
e
w
a
l
k
(
C
o
n
c
.
)
(
B
i
t
.
M
a
t
.
)
S
i
d
e
w
a
l
k
(
C
o
n
c
.
)
(Woode d)
(Gras s)
P
a
r
k
i
n
g
L
o
t
(B
i
t
.
M
a
t
.)
Sh
o
u
l
d
e
r (C
-
S
t
n
.)
1 Sty. Brick Bldg.
HORIZONTAL SCALE
DESIGNATION NO.
BRIDGE FILE
VERTICAL SCALE
SURVEY BOOK SHEETS
CONTRACT PROJECT NO.
of
DESIGNED:DRAWN:
CHECKED:CHECKED:
DESIGN ENGINEER
RECOMMENDED
FOR APPROVAL
DATE
aedwards 4:02:43 PM3/20/2008 P:\IN2003\0661\D. Drawings\IN20030661.RD.C2.SN04.dgn
N/A
CITY OF CARMEL
07-08D
No.
STATE OF
INDIAN A
REGISTERED
P
R
OFE
S
SIONAL ENGIN
EER10505104
J. SAMUEL B
ALO
G
03/21/2008
173
SIGNING & PAVEMENT MARKINGS
N/A
WRONG
WAY
ONLY
1"=50’
CKW CKW
95
JSB JSB
SPEED
LIM IT
50
RA M P
25
M . P. H .
126TH Street
EXIT M ILE …
126TH
St
126TH STREET
15
M . P . H .
LINE "E"
HORIZONTAL SCALE
DESIGNATION NO.
BRIDGE FILE
VERTICAL SCALE
SURVEY BOOK SHEETS
CONTRACT PROJECT NO.
of
DESIGNED:DRAWN:
CHECKED:CHECKED:
DESIGN ENGINEER
RECOMMENDED
FOR APPROVAL
DATE
aedwards 4:02:57 PM3/20/2008 P:\IN2003\0661\D. Drawings\IN20030661.RD.C2.PM01.dgn
CITY OF CARMEL
07-08D
No.
STATE OF
INDIAN A
REGISTERED
P
R
OFE
S
SIONAL ENGIN
EER10505104
J. SAMUEL B
ALO
G
03/21/2008
173
SIGNING & PAVEMENT MARKINGS
N/A
ONLY
1"=50’
WRONG
WAY
CKW CKW
96
JSB JSB
SPEED
LIM IT
50
RA MP
25
M . P. H .
126TH STREET
15
M . P . H .
126TH Street
EXIT M ILE …
126TH
St
LINE "E"
HORIZONTAL SCALE
DESIGNATION NO.
BRIDGE FILE
VERTICAL SCALE
SURVEY BOOK SHEETS
CONTRACT PROJECT NO.
of
DESIGNED:DRAWN:
CHECKED:CHECKED:
DESIGN ENGINEER
RECOMMENDED
FOR APPROVAL
DATE
aedwards 4:03:10 PM3/20/2008 P:\IN2003\0661\D. Drawings\IN20030661.RD.C2.PM02.dgn
CITY OF CARMEL
07-08D
No.
STATE OF
INDIAN A
REGISTERED
P
R
OFE
S
SIONAL ENGIN
EER10505104
J. SAMUEL B
ALO
G
03/21/2008
173
SIGNING & PAVEMENT MARKINGS
ONEWAY
YIELD
YIELD
YIELD
DO NOT
ENTER
YIELD
DO NOT
ENTER
ONEWAY
Keystone Pkwy.
126 th Street
CKW
1"=30’
CKW
MUST
RIGHT LANE
TURN RIGHT
97
JSB JSB
30
SPEED
LIMIT
KEYSTONE PARKWAY
15
M . P . H .
LINE "S-7-E"
126 th Street
Melark Dr.
HORIZONTAL SCALE
DESIGNATION NO.
BRIDGE FILE
VERTICAL SCALE
SURVEY BOOK SHEETS
CONTRACT PROJECT NO.
of
DESIGNED:DRAWN:
CHECKED:CHECKED:
DESIGN ENGINEER
RECOMMENDED
FOR APPROVAL
DATE
aedwards 4:03:20 PM3/20/2008 P:\IN2003\0661\D. Drawings\IN20030661.RD.C2.PM03.dgn
N/A
CITY OF CARMEL
07-08D
No.
STATE OF
INDIAN A
REGISTERED
P
R
OFE
S
SIONAL ENGIN
EER10505104
J. SAMUEL B
ALO
G
03/21/2008
173
SIGNING & PAVEMENT MARKINGS
ONE WAY
YIELD
YIELD
YIELD
DO NOT
ENTER
YIELD
DO NOT
ENTER
ONE WAY
Keystone Pkwy.
1"=30’
CKWCKW
98
JSB JSB
MUST
RIGHT LANE
TURN RIGHT
KEYSTONE PARKWAY
15
M.P.H.
30
SPEED
LIMIT
LINE "S-7-E"
126th Street
126 th Street
High Drive
HORIZONTAL SCALE
DESIGNATION NO.
BRIDGE FILE
VERTICAL SCALE
SURVEY BOOK SHEETS
CONTRACT PROJECT NO.
of
DESIGNED:DRAWN:
CHECKED:CHECKED:
DESIGN ENGINEER
RECOMMENDED
FOR APPROVAL
DATE
aedwards 4:03:31 PM3/20/2008 P:\IN2003\0661\D. Drawings\IN20030661.RD.C2.PM04.dgn
N/A
CITY OF CARMEL
07-08D
No.
STATE OF
INDIAN A
REGISTERED
P
R
OFE
S
SIONAL ENGIN
EER10505104
J. SAMUEL B
ALO
G
03/21/2008
173
CKW
XXX
N/A
CKW
JSB JSB
1" = 20’
SIGNING AND PAVEMENT MARKINGS
LINE "S-16-E"
99
HORIZONTAL SCALE
DESIGNATION NO.
BRIDGE FILE
VERTICAL SCALE
SURVEY BOOK SHEETS
CONTRACT PROJECT NO.
of
DESIGNED:DRAWN:
CHECKED:CHECKED:
DESIGN ENGINEER
RECOMMENDED
FOR APPROVAL
DATE
aedwards 4:03:40 PM3/20/2008 P:\IN2003\0661\D. Drawings\IN20030661.RD.C2.PM05.dgn
N/A
CITY OF CARMEL
07-08D
No.
STATE OF
INDIAN A
REGISTERED
P
R
OFE
S
SIONAL ENGIN
EER10505104
J. SAMUEL B
ALO
G
03/21/2008
173
XXXX
(B
i
t
. M
a
t
.)
(B
i
t
. M
a
t
.)
(
G
r
a
s
s
)
(
G
r
a
s
s
)
Parkin g L ot
(Bit . Mat .)
Media n (Conc .)
Media n (Conc .)
(Bit . Mat .)
Media n (Conc .)
Sidewal k (Conc .)
Parkin g L ot
(Bit . Mat .)
(
B
i
t
.
M
a
t
.
)
(
G
r
a
s
s
)
Comm . D r.
(Bit . Mat .)
(
B
i
t
.
M
a
t
.
)
Parkin g L ot
(Bit . Mat .)
(Gras s)
P
a
r
k
i
n
g
L
o
t
(
B
i
t
.
M
a
t
.
)
(
G
r
a
s
s
)
(
G
r
a
s
s
)
Parkin g L ot
(Bit . Mat .)
Media n (Conc .)
Media n (Conc .)
(Bit . Mat .)
Media n (Conc .)
Sidewal k (Conc .)
Parkin g L ot
(Bit . Mat .)
(
B
i
t
.
M
a
t
.
)
(
G
r
a
s
s
)
Comm . D r.
(Bit . Mat .)
(
B
i
t
.
M
a
t
.
)
Parkin g L ot
(Bit . Mat .)
(Gras s)VCSVCSVCSRT
RT
RT
CKWCKW
N/A
N/A
JSB JSB
PLAN
SHEET NO.
/ LINE
SIGN
LOCATION
SIGN
CODE
SIGN
SIZE
(in.x in.)
SIGN
ENCAPSULATED LENS
METAL THICKNESS
(in.)
0.080
SFT.
0.100
SFT.
0.125
SFT.
SHEET SIGN & POST SUMMARY
POST
SQUARE, QUIK - PUNCH
214" x 2 14" x 12 ga.
REINFORCED
POST LENGTH (FT.)
21 TOTAL
REMARKS
PLAN
SHEET NO.
/ LINE
SIGN
LOCATION
SIGN
CODE
SIGN
SIZE
(in.x in.)
SIGN
ENCAPSULATED LENS
METAL THICKNESS
(in.)
0.080
SFT.
0.100
SFT.
0.125
SFT.
POST
SQUARE, QUIK - PUNCH
214" x 2 14" x 12 ga.
REINFORCED
POST LENGTH (FT.)
21 TOTAL
REMARKS
SHEET SIGN & POST SUMMARY
SHEET SIGN & POST SUMMARY TABLE 100
HORIZONTAL SCALE
DESIGNATION NO.
BRIDGE FILE
VERTICAL SCALE
SURVEY BOOK SHEETS
CONTRACT PROJECT NO.
of
DESIGNED:DRAWN:
CHECKED:CHECKED:
DESIGN ENGINEER
RECOMMENDED
FOR APPROVAL
DATE
aedwards 4:03:48 PM3/20/2008 P:\IN2003\0661\D. Drawings\IN20030661.RD.C2.SN05.dgn
N/A
CITY OF CARMEL
07-08D
No.
STATE OF
INDIAN A
REGISTERED
P
R
OFE
S
SIONAL ENGIN
EER10505104
J. SAMUEL B
ALO
G
03/21/2008
173
CKWCKW
N/A
N/A
JSB JSB
SHEET SIGN & POST SUMMARY TABLE
PLAN
SHEET NO.
/ LINE
SIGN
LOCATION
SIGN
CODE
SIGN
SIZE
(in.x in.)
SIGN
ENCAPSULATED LENS
METAL THICKNESS
(in.)
0.080
SFT.
0.100
SFT.
0.125
SFT.
POST
SQUARE, QUIK - PUNCH
214" x 2 14" x 12 ga.
REINFORCED
POST LENGTH (FT.)
21 TOTAL
REMARKS
PLAN
SHEET NO.
/ LINE
SIGN
LOCATION
SIGN
CODE
SIGN
SIZE
(in.x in.)
SIGN
ENCAPSULATED LENS
METAL THICKNESS
(in.)
0.080
SFT.
0.100
SFT.
0.125
SFT.
POST
SQUARE, QUIK - PUNCH
214" x 2 14" x 12 ga.
REINFORCED
POST LENGTH (FT.)
21 TOTAL
REMARKS
101
HORIZONTAL SCALE
DESIGNATION NO.
BRIDGE FILE
VERTICAL SCALE
SURVEY BOOK SHEETS
CONTRACT PROJECT NO.
of
DESIGNED:DRAWN:
CHECKED:CHECKED:
DESIGN ENGINEER
RECOMMENDED
FOR APPROVAL
DATE
aedwards 4:03:53 PM3/20/2008 P:\IN2003\0661\D. Drawings\IN20030661.RD.C2.SN06.dgn
N/A
CITY OF CARMEL
07-08D
No.
STATE OF
INDIAN A
REGISTERED
P
R
OFE
S
SIONAL ENGIN
EER10505104
J. SAMUEL B
ALO
G
03/21/2008
173
AJECKW
JSBJSB
PANEL SIGN DETAILS
PANEL SIGN SUMMARY TABLE
SI
G
N
S
I
Z
E
S
I
G
N
C
O
D
E
ft.ft.sf
PA
N
E
L
S
I
G
N
A
R
E
A
SIGN SUMMARY
ME
D
I
A
N
RI
G
H
T
LE
F
T
STATION
LOCATION
PO
S
T
L
E
N
G
T
H
ST
U
B
L
E
N
G
T
H
POST LENGTH
POST 1 POST 2
ST
U
B
L
E
N
G
T
H
PO
S
T
L
E
N
G
T
H
ft.ft.
W6 X 9
lbs.
ST
E
E
L
(ft. x ft.)
FO
U
N
D
A
T
I
O
N
T
Y
P
E
1
0
.
3
1
3
.
4
10.5 29.8
1
0
.
3
8
1.7
13.5
7
1
3
.
3
10.5 19.4
10.5
36.1
1
0
35
.
7
5
4
66
6.8" Radius, 1.3" Border, 0.8" Indent, White on Green;
[126TH] E Mod 75} spacing; [St] E Mod 75} spacing;
Table of widths and spaces.
126TH
St
AS NOTED
14
1
3
11 30
14
8
2 13
14
1
3
6 59
9
1
0
24 29 6 13 6 30
11
24
1
4
3
8
3
3
6
0
132
8" Radius, 2" Border, 1" Indent, White on Green;
[126TH Street] E Mod 75} spacing; [EXIT … MILE] E Mod 60} spacing;
Table of widths and spaces.
126TH Street
EXIT … M ILE
102
HORIZONTAL SCALE
DESIGNATION NO.
BRIDGE FILE
VERTICAL SCALE
SURVEY BOOK SHEETS
CONTRACT PROJECT NO.
of
DESIGNED:DRAWN:
CHECKED:CHECKED:
DESIGN ENGINEER
RECOMMENDED
FOR APPROVAL
DATE
aedwards 4:03:57 PM3/20/2008 P:\IN2003\0661\D. Drawings\IN20030661.RD.C2.SN07.dgn
N/A
CITY OF CARMEL
07-08D
No.
STATE OF
INDIAN A
REGISTERED
P
R
OFE
S
SIONAL ENGIN
EER10505104
J. SAMUEL B
ALO
G
03/21/2008
173
SIGNING CROSS SECTION
LINE "E"
CKW AJE
10:1 2%2%
126TH
St
126TH Street
EXIT … MILE
103
20 30 40 50 60 70 80 90 100 110 120 130 140 150 1605060708090100110120130140150203040
0 10 20 30 40 50 60 70 80 90 100 110 120 130 140 150 160506070809011012013014015010203040
CUT FILLCROSS SECTIONS
Scale: 1 inch = 10 feet
100
HORIZONTAL SCALE
DESIGNATION NO.
BRIDGE FILE
VERTICAL SCALE
SURVEY BOOK SHEETS
CONTRACT PROJECT NO.
of
DESIGNED:DRAWN:
CHECKED:CHECKED:
DESIGN ENGINEER
RECOMMENDED
FOR APPROVAL
DATE
CROSS SECTION
1" = 10’
1" = 10’
aedwards 4:04:02 PM3/20/2008 P:\IN2003\0661\D. Drawings\IN20030661.RD.C2.SN08.dgn
CITY OF CARMEL
BCF BCF
JSB JSB
07-08D
No.
STATE OF
INDIAN A
REGISTERED
P
R
OFE
S
SIONAL ENGIN
EER10505104
J. SAMUEL B
ALO
G
03/21/2008
173
SIGNING CROSS SECTION
LINE "E"
CKW AJE
2%2%6:1
3:1
126TH
St
126TH Street
EXIT … MILE
104
20 30 40 50 60 70 80 90 100 110 120 130 140 150 1605060708090100110120130140150203040
0 10 20 30 40 50 60 70 80 90 100 110 120 130 140 150 160506070809011012013014015010203040
CUT FILLCROSS SECTIONS
Scale: 1 inch = 10 feet
100
HORIZONTAL SCALE
DESIGNATION NO.
BRIDGE FILE
VERTICAL SCALE
SURVEY BOOK SHEETS
CONTRACT PROJECT NO.
of
DESIGNED:DRAWN:
CHECKED:CHECKED:
DESIGN ENGINEER
RECOMMENDED
FOR APPROVAL
DATE
CROSS SECTION
1" = 10’
1" = 10’
aedwards 4:04:06 PM3/20/2008 P:\IN2003\0661\D. Drawings\IN20030661.RD.C2.SN09.dgn
CITY OF CARMEL
BCF BCF
JSB JSB
07-08D
No.
STATE OF
INDIAN A
REGISTERED
P
R
OFE
S
SIONAL ENGIN
EER10505104
J. SAMUEL B
ALO
G
03/21/2008
173
N/A
1"=50’
AJE LIGHTING DETAILNSP
CMP NSP LINE "E"
No.
STATE OF
INDIAN A
REGISTE
RED
P
R
OFE
S
SIONAL ENGIN
EER10403865
N ATALIE S. P
ARKS
107
HORIZONTAL SCALE
DESIGNATION NO.
BRIDGE FILE
VERTICAL SCALE
SURVEY BOOK SHEETS
CONTRACT PROJECT NO.
of
DESIGNED:DRAWN:
CHECKED:CHECKED:
DESIGN ENGINEER
RECOMMENDED
FOR APPROVAL
DATE
aedwards 4:04:23 PM3/20/2008 P:\IN2003\0661\D. Drawings\IN20030661.RD.C2.LT01.dgn
CITY OF CARMEL
07-08D
03/21/2008
173
N/A
1"=50’
NSP AJE LIGHTING DETAIL
CMP NSP LINE "E"
No.
STATE OF
INDIAN A
REGISTE
RED
P
R
OFE
S
SIONAL ENGIN
EER10403865
N ATALIE S. P
ARKS
108
HORIZONTAL SCALE
DESIGNATION NO.
BRIDGE FILE
VERTICAL SCALE
SURVEY BOOK SHEETS
CONTRACT PROJECT NO.
of
DESIGNED:DRAWN:
CHECKED:CHECKED:
DESIGN ENGINEER
RECOMMENDED
FOR APPROVAL
DATE
aedwards 4:04:35 PM3/20/2008 P:\IN2003\0661\D. Drawings\IN20030661.RD.C2.LT02.dgn
CITY OF CARMEL
07-08D
03/21/2008
173
AJE
1"=30’
NSP LIGHTING DETAIL
CMP NSP LINE "S-7-E"
109
No.
STATE OF
INDIAN A
REGISTE
RED
P
R
OFE
S
SIONAL ENGIN
EER10403865
N ATALIE S. P
ARKS
49+41.00 "S-7-E"
47.00 LT
HORIZONTAL SCALE
DESIGNATION NO.
BRIDGE FILE
VERTICAL SCALE
SURVEY BOOK SHEETS
CONTRACT PROJECT NO.
of
DESIGNED:DRAWN:
CHECKED:CHECKED:
DESIGN ENGINEER
RECOMMENDED
FOR APPROVAL
DATE
aedwards 4:04:45 PM3/20/2008 P:\IN2003\0661\D. Drawings\IN20030661.RD.C2.LT03.dgn
N/A
CITY OF CARMEL
07-08D
03/21/2008
173
1"=30’
AJENSP LIGHTING DETAIL
CMP NSP LINE "S-7-E"
110
No.
STATE OF
INDIAN A
REGISTE
RED
P
R
OFE
S
SIONAL ENGIN
EER10403865
N ATALIE S. P
ARKS
KEYSTONE PARKWAY
15
M.P.H.
50+65.00 "S-7-E"
47.00 RT
HORIZONTAL SCALE
DESIGNATION NO.
BRIDGE FILE
VERTICAL SCALE
SURVEY BOOK SHEETS
CONTRACT PROJECT NO.
of
DESIGNED:DRAWN:
CHECKED:CHECKED:
DESIGN ENGINEER
RECOMMENDED
FOR APPROVAL
DATE
aedwards 4:04:56 PM3/20/2008 P:\IN2003\0661\D. Drawings\IN20030661.RD.C2.LT04.dgn
N/A
CITY OF CARMEL
07-08D
03/21/2008
173
CMP NSP
NSP AJE
N/A
N/A
111
No.
STATE OF
INDIAN A
REGISTE
RED
P
R
OFE
S
SIONAL ENGIN
EER10403865
N ATALIE S. P
ARKS
HORIZONTAL SCALE
DESIGNATION NO.
BRIDGE FILE
VERTICAL SCALE
SURVEY BOOK SHEETS
CONTRACT PROJECT NO.
of
DESIGNED:DRAWN:
CHECKED:CHECKED:
DESIGN ENGINEER
RECOMMENDED
FOR APPROVAL
DATE
LUMINAIRE TABLE
LUMINAIRE TABLE
LUMINAIRE NO.
FOUNDATION TYPE
CIRCUIT CONNECTION
CONNECTION TYPE
MAST ARM LENGTH (FT)
ELEVATION
POLE SET BACK (FT)
SHOULDER WIDTH (FT)
LUMINAIRE E.M.H. (FT)
FACE OF CURB
LINE
RAMP
SET BACK
FROM
SEE NOTES
LUMINAIRE NO.
FOUNDATION TYPE
LUMINAIRE E.M.H. (FT)
SIGN STRUCTURE TABLE
SIGN STRUCTURE NO.
NUMBER OF LIGHTS
CIRCUIT CONNECTION
NUMBER OF "R"
NUMBER OF "B"
CONNECTION TYPE
FOR STRUCTURE TYPE
SEE NOTES
LUMINAIRE TABLE
LUMINAIRE NO.
FOUNDATION TYPE
CIRCUIT CONNECTION
CONNECTION TYPE
MAST ARM LENGTH (FT)
ELEVATION
POLE SET BACK (FT)
SHOULDER WIDTH (FT)
LUMINAIRE E.M.H. (FT)
FACE OF CURB
LINE
RAMP
SET BACK
FROM
SEE NOTES
LUMINAIRE TABLE
LUMINAIRE NO.
FOUNDATION TYPE
CIRCUIT CONNECTION
CONNECTION TYPE
MAST ARM LENGTH (FT)
ELEVATION
POLE SET BACK (FT)
SHOULDER WIDTH (FT)
LUMINAIRE E.M.H. (FT)
FACE OF CURB
LINE
RAMP
SET BACK
FROM
SEE NOTES
LUMINAIRE TABLE
LUMINAIRE NO.
FOUNDATION TYPE
CIRCUIT CONNECTION
CONNECTION TYPE
MAST ARM LENGTH (FT)
ELEVATION
POLE SET BACK (FT)
SHOULDER WIDTH (FT)
LUMINAIRE E.M.H. (FT)
FACE OF CURB
LINE
RAMP
SET BACK
FROM
SEE NOTES
LUMINAIRE NO.
FOUNDATION TYPE
LUMINAIRE E.M.H. (FT)
SIGN STRUCTURE TABLE
SIGN STRUCTURE NO.
NUMBER OF LIGHTS
CIRCUIT CONNECTION
NUMBER OF "R"
NUMBER OF "B"
CONNECTION TYPE
FOR STRUCTURE TYPE
SEE NOTES
LUMINAIRE NO.
FOUNDATION TYPE
LUMINAIRE E.M.H. (FT)
SIGN STRUCTURE TABLE
SIGN STRUCTURE NO.
NUMBER OF LIGHTS
CIRCUIT CONNECTION
NUMBER OF "R"
NUMBER OF "B"
CONNECTION TYPE
FOR STRUCTURE TYPE
SEE NOTES
LUMINAIRE NO.
FOUNDATION TYPE
LUMINAIRE E.M.H. (FT)
SIGN STRUCTURE TABLE
SIGN STRUCTURE NO.
NUMBER OF LIGHTS
CIRCUIT CONNECTION
NUMBER OF "R"
NUMBER OF "B"
CONNECTION TYPE
FOR STRUCTURE TYPE
SEE NOTES
LUMINAIRE NO.
FOUNDATION TYPE
LUMINAIRE E.M.H. (FT)
SIGN STRUCTURE TABLE
SIGN STRUCTURE NO.
NUMBER OF LIGHTS
CIRCUIT CONNECTION
NUMBER OF "R"
NUMBER OF "B"
CONNECTION TYPE
FOR STRUCTURE TYPE
SEE NOTES
aedwards 4:05:02 PM3/20/2008 P:\IN2003\0661\D. Drawings\IN20030661.RD.C2.LT05.dgn
CITY OF CARMEL
07-08D
03/21/2008
173
RT
KEYSTONE PARKWAY &
CARMEL DRIVE
VMS 2008
1" = 20’
105
JE FFREY R. SW
ENS
O
N
60900360
No.
STATE OF
INDIANA
REGISTE
RED
P
R
OFE
S
SIONAL ENGIN
EER
01-029-023
RT
RT
RT
RT
RT
TTT
WV
T
T
SCALE:
DES. NO PROJECT NO.
CONTRACT NO.
COMM. NO.
DRAWN BY YEAR SHEET TOTAL
DATEDESIGN ENGINEER
TRAFFIC SIGNAL DETAIL
XXX
XXX
XXX
XXX
XXX
XXX XXX XXX
XXX
aedwards 4:05:17 PM3/20/2008 P:\IN2003\0661\D. Drawings\IN20030661.RD.C2.SG01.dgn
07-08D
CITY OF CARMEL
03/21/2008
173
RT
RT
RT
RT
RT
126TH STREET
GRAY ROAD &
1" = 20’
VMS 2008
JE FFREY R. SW
ENS
O
N
60900360
No.
STATE OF
INDIANA
REGISTE
RED
P
R
OFE
S
SIONAL ENGIN
EER
106 173
SCALE:
DES. NO PROJECT NO.
CONTRACT NO.
COMM. NO.
DRAWN BY YEAR SHEET TOTAL
DATEDESIGN ENGINEER
TRAFFIC SIGNAL DETAIL
XXX
XXX
XXX
XXX
XXX
XXX XXX XXX
XXX
aedwards 4:05:27 PM3/20/2008 P:\IN2003\0661\D. Drawings\IN20030661.RD.C2.SG02.dgn
07-08D
CITY OF CARMEL
03/21/2008
173
MISCELLANEOUS QUANTITIES TABLE
N/A
N/A
JSB JSB
STATION RIGHTLEFTOFFSET (FT.)
RIGHT - OF - WAY FENCE TABLE
FENCE LENGTH (FT.)STATION RIGHTLEFT
CURB RAMP TABLE
TYPE RAMP AREA (SYS)
KDS KDS
112
FROM
STATION
TO
STATI ON L
O
C
A
T
I
O
N
R
I
G
H
T
M
E
D
I
A
N
LE
F
T
AC
T
U
A
L
LE
N
G
T
H
TOTAL EQUIVAL ENT
PAY LENG THS
PAVED SIDE DITCH
PAVED SIDE DITCH & SODDING SUMMARY TABLE
RIPRAP SODDING
S
E
E
S
H
E
E
T
N
O
.
FO
R
G
R
E
EN
SP
A
C
E
F
O
R
O
U
T
S
ID
E
S
T
R
IP
F
O
R
U
T
I
L
I
T
Y S
T
R
IP
F
O
R
ME
D
IA
N
F
O
R
DI
T
C
H
E
S
F
O
R
P
A
VE
D
S
IDE
DI
TC
H
SYD SYD SYD SYD SYD SYDTONSFTFTFTFTFTEACH
L
U
GS
(
8
f
t
E
Q
U
I
V
LE
N
G
TH
E
A
)
C
U
T
-
O
F
F
WA
LL
S
(
8
f
t
E
Q
U
IV
LE
N
G
T
H
E
A
)
EACHFT
R
I
P
R
A
P
F
O
R
DI
T
C
H
E
S
G
E
O
T
E
X
TI
LE
S
IM
P
A
C
T
A
T
T
E
N
U
A
T
O
R
R
1
-
W
1
,
T
L
-
2
TYPETYPE ft.ft.EACHEACHEACHEACH
REMARKS
RE
S
E
T
GU
A
R
D
R
A
I
L
GU
A
R
D
R
A
I
L
RE
M
O
V
E
CONNECTOR
SYSTEMSYSTEM
TERMINAL
CURVED W-BEAM GUARDRAIL SYSTEM
GUARDRAIL SUMMARY TABLE
CU
R
V
E
D
EACH
TE
R
M
I
N
A
L
E
N
D
A
T
3
’
-
1
.
5
"
S
P
A
.
ft.
A
T
6
’
-
3
"
S
P
A
.
ft.ft.ft.EACHEACHEACHEACH
GU
A
R
D
R
A
I
L
E
N
D
T
R
E
A
T
M
E
N
T
O
S
TR
E
A
T
M
E
N
T
M
S
GU
A
R
D
R
A
I
L
E
N
D
GU
A
R
D
R
A
I
L
TR
A
N
S
I
T
I
O
N
T
Y
P
E
G
P
GU
A
R
D
R
A
I
L
TR
A
N
S
I
T
I
O
N
TY
P
E
T
G
B
D
O
U
B
L
E
F
A
C
E
D
D
O
U
B
L
E
F
A
C
E
D
A
T
1
’
-
6
.
7
5
"
S
P
A
.
ft.
W-BEAM GUARDRAIL LENGTH
ME
D
I
A
N
RI
G
H
T
LE
F
T
A
T
6
’
-
3
"
S
P
A
.
A
T
3
’
-
1
.
5
"
S
P
A
.
FL
A
R
E
R
A
T
E
GU
A
R
D
R
A
I
L
STATION
LOCATION
BOX TRUSS SIGN STRUCTURE
FOUNDATION QUANTITIES
BOX TRUSS SIGN STRUCTURE
FOUNDATION QUANTITIES FOUNDATION QUANTITIES
CANTILEVER SIGN STRUCTURE
HORIZONTAL SCALE
DESIGNATION NO.
BRIDGE FILE
VERTICAL SCALE
SURVEY BOOK SHEETS
CONTRACT PROJECT NO.
of
DESIGNED:DRAWN:
CHECKED:CHECKED:
DESIGN ENGINEER
RECOMMENDED
FOR APPROVAL
DATE
GUARDRAIL & SIGN
FOUNDATION SUMMARY TABLE
aedwards 4:05:32 PM3/20/2008 P:\IN2003\0661\D. Drawings\IN20030661.RD.C2.MT01.dgn
CITY OF CARMEL
07-08D
No.
STATE OF
INDIAN A
REGISTERED
P
R
OFE
S
SIONAL ENGIN
EER10505104
J. SAMUEL B
ALO
G
03/21/2008
173
CO
N
C
R
E
T
E
B
R
I
D
G
E
R
A
I
L
I
N
G
TR
A
N
S
I
T
I
O
N
,
T
Y
P
E
2
BCF BCF
N/A
N/A
JSB JSB
113
07-08D
173
HORIZONTAL SCALE
DESIGNATION NO.
BRIDGE FILE
VERTICAL SCALE
SURVEY BOOK SHEETS
CONTRACT PROJECT NO.
of
DESIGNED:DRAWN:
CHECKED:CHECKED:
DESIGN ENGINEER
RECOMMENDED
FOR APPROVAL
DATE
SUMMARY OF QUANTITIES
AND APPROACH TABLE
aedwards 4:05:37 PM3/20/2008 P:\IN2003\0661\D. Drawings\IN20030661.RD.C2.AP01.dgn
CITY OF CARMEL
07-08B
SUMMARY OF QUANTITIES AND APPROACH TABLE
LOCATION
(STATION)
DESCRIPTION
(APPROACH
TYPE OR
CLASS)
REMARKS
HMA
Wedge and
Level
#/SYS
TONS TONS
HMA for
Approaches
Type A
TONS
SURFACE
110/SYS
HMA TYPE A
TONS
165/SYS
SURFACE
TONS
330/SYS
TONS
825/SYS
INTER-
MEDIATE
BASE
TONS
SURFACE
HMA TYPE C
165/SYS
TONS
275/SYS
TONS
385/SYS
INTER-
MEDIATE
BASE
250/SYS
TONS
INTER-
MEDIATE
OG
TONS
330/SYS
BASE
HMA TYPE D
SURFACE
165/SYS
TONS
INTER-
MEDIATE
275/SYS
TONS
BASE
385/SYS
TONS TONS
350/SYS
INTER-
MEDIATE
OG
BASE
550/SYS
TONS
495/SYS
TONS
BASE
TONS
ASPHALT
FOR TACK
COAT
WIDTH LENGTH RADII
ft.ft.ft.
"W""L""R"
No.
STATE OF
INDIAN A
REGISTE
RED
P
R
OFE
S
SIONAL ENGIN
EER
10505104
J. SAMUEL B
ALO
G
03/21/2008
SURFACE
165/SYS
TONS
HMA TYPE B
BASE
825/SYS
TONS
825/SYS
218
BCF BCF
N/A
N/A
JSB JSB
114 173
07-08D
HORIZONTAL SCALE
DESIGNATION NO.
BRIDGE FILE
VERTICAL SCALE
SURVEY BOOK SHEETS
CONTRACT PROJECT NO.
of
DESIGNED:DRAWN:
CHECKED:CHECKED:
DESIGN ENGINEER
RECOMMENDED
FOR APPROVAL
DATE
SUMMARY OF QUANTITIES
AND APPROACH TABLE
SUMMARY OF QUANTITIES AND APPROACH TABLE
LOCATION
(STATION)
DESCRIPTION
(APPROACH
TYPE OR
CLASS)
REMARKS
aedwards 4:05:41 PM3/20/2008 P:\IN2003\0661\D. Drawings\IN20030661.RD.C2.AP02.dgn
CITY OF CARMEL
SYS CYS TONS
WIDTH LENGTH RADII
ft.ft.ft.
"W""L""R"
12" PCCP SUBBASE
FOR PCCP
6" PCCP
for
APPROACHES
SYS SYS
REINFORCED
CONCRETE
MOMENT
SLAB
COMPACTED AGGREGATE
No. 53
5"
TONS
No. 53
6"
TONS
No. 53
TONS
No. 53
TONS
No. 8
10"VARIABLE
DEPTH
8"
TONS
No. 8
9"
SYS
4"
CONCRETE
SIDEWALK
SYS
7" PCCP
TRUCK
APRON
SYS
No.
STATE OF
INDIANA
REGISTE
RED
P
R
OFE
S
SIONAL ENGIN
EER10505104
J. SAMUEL B
ALO
G
CONCRETE
IMPRINTING
SFTSYS
4" PCCP
PCCP
PATCHING,
FULL DEPTH
KDS KDS
JSB JSB
N/A
N/A
UNDERDRAIN TABLE 115
HORIZONTAL SCALE
DESIGNATION NO.
BRIDGE FILE
VERTICAL SCALE
SURVEY BOOK SHEETS
CONTRACT PROJECT NO.
of
DESIGNED:DRAWN:
CHECKED:CHECKED:
DESIGN ENGINEER
RECOMMENDED
FOR APPROVAL
DATE
UNDERDRAIN TABLE
U
N
D
E
R
D
R
A
I
N
P
I
P
E
L
I
M
I
T
S
TYPE 4 PIPE
4
I
N
.
6
I
N
.
FT.SYS.CYS.TON
SP
E
C
I
A
L
G
R
A
D
E
(%)(Y/N)
UNDERDRAIN PIPE
6
I
N
O
U
T
L
E
T
P
I
P
E
FT.
O
U
T
L
E
T
S
T
A
T
I
O
N
OU
T
L
E
T
E
L
E
V
A
T
I
O
N
CYS.TON
OUTLET PIPE
O
U
T
L
E
T
P
R
O
T
E
C
T
O
R
T
Y
P
E
LOCATION
O
U
T
S
I
D
E
L
E
F
T
M
E
D
I
A
N
L
E
F
T
ME
D
I
A
N
R
I
G
H
T
OU
T
S
I
D
E
R
I
G
H
T
OUTLET PROTECTORS
REMARKS
OU
T
L
E
T
P
R
O
T
E
C
T
O
R
N
O
.
_
_
_
G
E
O
T
E
X
T
I
L
E
S
F
O
R
UN
D
E
R
D
R
A
I
N
S
AG
G
R
E
G
A
T
E
F
O
R
UN
D
E
R
D
R
A
I
N
S
HM
A
F
O
R
UN
D
E
R
D
R
A
I
N
S
FL
O
W
L
I
N
E
E
L
E
V
A
T
I
O
N
@
UN
D
E
R
D
R
A
I
N
P
I
P
E
L
I
M
I
T
OU
T
L
E
T
P
I
P
E
RE
Q
U
I
R
E
D
CO
N
N
E
C
T
U
N
D
E
R
D
R
A
I
N
PI
P
E
T
O
S
T
R
U
C
T
U
R
E
N
O
.
_
_
_
_
_
ST
R
U
C
T
U
R
E
I
N
V
E
R
T
EL
E
V
A
T
I
O
N
45
D
E
G
R
E
E
E
L
B
O
W
S
R
E
Q
U
I
R
E
D
(
1
O
R
2
)
OU
T
L
E
T
A
T
O
U
T
L
E
T
P
R
O
T
E
C
T
O
R
N
O
.
_
_
_
DI
T
C
H
F
L
O
W
L
I
N
E
EL
E
V
A
T
I
O
N
A
T
O
U
T
L
E
T
P
R
O
T
E
C
T
O
R
C
O
N
N
E
C
T
O
U
T
L
E
T
P
I
P
E
T
O
S
T
R
U
C
T
U
R
E
N
O
.
_
_
_
ST
R
U
C
T
U
R
E
I
N
V
E
R
T
EL
E
V
A
T
I
O
N
B
B
O
R
R
O
W
F
O
R
ST
R
U
C
T
U
R
E
B
A
C
K
F
I
L
L
HM
A
F
O
R
UN
D
E
R
D
R
A
I
N
S
FT.
aedwards 4:05:46 PM3/20/2008 P:\IN2003\0661\D. Drawings\IN20030661.RD.C2.UD01.dgn
CITY OF CARMEL
07-08D
UNDERDRAIN TABLE
N/A
N/ANo.
STATE OF
INDIAN A
REGISTERED
P
R
OFE
S
SIONAL ENGIN
EER10505104
J. SAMUEL B
ALO
G
03/21/2008
173
UNDERDRAIN TABLE
KDS
JSBJSB
KDS
N/A
N/A
116
HORIZONTAL SCALE
DESIGNATION NO.
BRIDGE FILE
VERTICAL SCALE
SURVEY BOOK SHEETS
CONTRACT PROJECT NO.
of
DESIGNED:DRAWN:
CHECKED:CHECKED:
DESIGN ENGINEER
RECOMMENDED
FOR APPROVAL
DATE
UNDERDRAIN TABLE
U
N
D
E
R
D
R
A
I
N
P
I
P
E
L
I
M
I
T
S
TYPE 4 PIPE
4
I
N
.
6
I
N
.
FT.SYS.CYS.TON
SP
E
C
I
A
L
G
R
A
D
E
(%)(Y/N)
UNDERDRAIN PIPE
6
I
N
O
U
T
L
E
T
P
I
P
E
FT.
O
U
T
L
E
T
S
T
A
T
I
O
N
OU
T
L
E
T
E
L
E
V
A
T
I
O
N
CYS.TON
OUTLET PIPE
O
U
T
L
E
T
P
R
O
T
E
C
T
O
R
T
Y
P
E
LOCATION
O
U
T
S
I
D
E
L
E
F
T
M
E
D
I
A
N
L
E
F
T
ME
D
I
A
N
R
I
G
H
T
OU
T
S
I
D
E
R
I
G
H
T
OUTLET PROTECTORS
REMARKS
OU
T
L
E
T
P
R
O
T
E
C
T
O
R
N
O
.
_
_
_
G
E
O
T
E
X
T
I
L
E
S
F
O
R
UN
D
E
R
D
R
A
I
N
S
AG
G
R
E
G
A
T
E
F
O
R
UN
D
E
R
D
R
A
I
N
S
HM
A
F
O
R
UN
D
E
R
D
R
A
I
N
S
FL
O
W
L
I
N
E
E
L
E
V
A
T
I
O
N
@
UN
D
E
R
D
R
A
I
N
P
I
P
E
L
I
M
I
T
OU
T
L
E
T
P
I
P
E
RE
Q
U
I
R
E
D
CO
N
N
E
C
T
U
N
D
E
R
D
R
A
I
N
PI
P
E
T
O
S
T
R
U
C
T
U
R
E
N
O
.
_
_
_
_
_
ST
R
U
C
T
U
R
E
I
N
V
E
R
T
EL
E
V
A
T
I
O
N
45
D
E
G
R
E
E
E
L
B
O
W
S
R
E
Q
U
I
R
E
D
(
1
O
R
2
)
OU
T
L
E
T
A
T
O
U
T
L
E
T
P
R
O
T
E
C
T
O
R
N
O
.
_
_
_
DI
T
C
H
F
L
O
W
L
I
N
E
EL
E
V
A
T
I
O
N
A
T
O
U
T
L
E
T
P
R
O
T
E
C
T
O
R
C
O
N
N
E
C
T
O
U
T
L
E
T
P
I
P
E
T
O
S
T
R
U
C
T
U
R
E
N
O
.
_
_
_
ST
R
U
C
T
U
R
E
I
N
V
E
R
T
EL
E
V
A
T
I
O
N
B
B
O
R
R
O
W
F
O
R
ST
R
U
C
T
U
R
E
B
A
C
K
F
I
L
L
HM
A
F
O
R
UN
D
E
R
D
R
A
I
N
S
FT.
aedwards 4:05:51 PM3/20/2008 P:\IN2003\0661\D. Drawings\IN20030661.RD.C2.UD02.dgn
CITY OF CARMEL
07-08D
UNDERDRAIN TABLE
N/A
N/ANo.
STATE OF
INDIAN A
REGISTERED
P
R
OFE
S
SIONAL ENGIN
EER10505104
J. SAMUEL B
ALO
G
03/21/2008
173
KDS
JSB JSB
KDS
UNDERDRAIN TABLE
N/A
N/A
117
HORIZONTAL SCALE
DESIGNATION NO.
BRIDGE FILE
VERTICAL SCALE
SURVEY BOOK SHEETS
CONTRACT PROJECT NO.
of
DESIGNED:DRAWN:
CHECKED:CHECKED:
DESIGN ENGINEER
RECOMMENDED
FOR APPROVAL
DATE
UNDERDRAIN TABLE
U
N
D
E
R
D
R
A
I
N
P
I
P
E
L
I
M
I
T
S
TYPE 4 PIPE
4
I
N
.
6
I
N
.
FT.SYS.CYS.TON
SP
E
C
I
A
L
G
R
A
D
E
(%)(Y/N)
UNDERDRAIN PIPE
6
I
N
O
U
T
L
E
T
P
I
P
E
FT.
O
U
T
L
E
T
S
T
A
T
I
O
N
OU
T
L
E
T
E
L
E
V
A
T
I
O
N
CYS.TON
OUTLET PIPE
O
U
T
L
E
T
P
R
O
T
E
C
T
O
R
T
Y
P
E
LOCATION
O
U
T
S
I
D
E
L
E
F
T
M
E
D
I
A
N
L
E
F
T
ME
D
I
A
N
R
I
G
H
T
OU
T
S
I
D
E
R
I
G
H
T
OUTLET PROTECTORS
REMARKS
OU
T
L
E
T
P
R
O
T
E
C
T
O
R
N
O
.
_
_
_
G
E
O
T
E
X
T
I
L
E
S
F
O
R
UN
D
E
R
D
R
A
I
N
S
AG
G
R
E
G
A
T
E
F
O
R
UN
D
E
R
D
R
A
I
N
S
HM
A
F
O
R
UN
D
E
R
D
R
A
I
N
S
FL
O
W
L
I
N
E
E
L
E
V
A
T
I
O
N
@
UN
D
E
R
D
R
A
I
N
P
I
P
E
L
I
M
I
T
OU
T
L
E
T
P
I
P
E
RE
Q
U
I
R
E
D
CO
N
N
E
C
T
U
N
D
E
R
D
R
A
I
N
PI
P
E
T
O
S
T
R
U
C
T
U
R
E
N
O
.
_
_
_
_
_
ST
R
U
C
T
U
R
E
I
N
V
E
R
T
EL
E
V
A
T
I
O
N
45
D
E
G
R
E
E
E
L
B
O
W
S
R
E
Q
U
I
R
E
D
(
1
O
R
2
)
OU
T
L
E
T
A
T
O
U
T
L
E
T
P
R
O
T
E
C
T
O
R
N
O
.
_
_
_
DI
T
C
H
F
L
O
W
L
I
N
E
EL
E
V
A
T
I
O
N
A
T
O
U
T
L
E
T
P
R
O
T
E
C
T
O
R
C
O
N
N
E
C
T
O
U
T
L
E
T
P
I
P
E
T
O
S
T
R
U
C
T
U
R
E
N
O
.
_
_
_
ST
R
U
C
T
U
R
E
I
N
V
E
R
T
EL
E
V
A
T
I
O
N
B
B
O
R
R
O
W
F
O
R
ST
R
U
C
T
U
R
E
B
A
C
K
F
I
L
L
HM
A
F
O
R
UN
D
E
R
D
R
A
I
N
S
FT.
aedwards 4:05:56 PM3/20/2008 P:\IN2003\0661\D. Drawings\IN20030661.RD.C2.UD03.dgn
CITY OF CARMEL
07-08D
UNDERDRAIN TABLE
N/A
N/ANo.
STATE OF
INDIAN A
REGISTERED
P
R
OFE
S
SIONAL ENGIN
EER10505104
J. SAMUEL B
ALO
G
03/21/2008
173
CKWKDS
N/A
N/A
JSB KDS
118
HORIZONTAL SCALE
DESIGNATION NO.
BRIDGE FILE
VERTICAL SCALE
SURVEY BOOK SHEETS
CONTRACT PROJECT NO.
of
DESIGNED:DRAWN:
CHECKED:CHECKED:
DESIGN ENGINEER
RECOMMENDED
FOR APPROVAL
DATE
STRUCTURE DATA TABLE
STRUCTURE DATA
S
T
R
U
C
T
U
R
E
N
U
M
B
E
R
L
E
F
T
R
I
G
H
T
C
R
O
S
S
LOCATION
SIZE
in.
P
I
P
E
T
Y
P
E
MANHOLE, INLET,
CATCH BASIN, OR
SPECIALTY
STRUCTURE
ft.
L
E
N
G
T
H
S
K
E
W
ft.
C
O
V
E
R
ELEV.
UP
STREAM
ELEV.
DOWN
STREAM
FLOW LINE
YR.
S
E
R
V
I
C
E
L
I
F
E
S
I
T
E
D
E
S
I
G
N
A
T
I
O
N
p
H
B
A
C
K
F
I
L
L
M
E
T
H
O
D
CYS.
B
B
O
R
R
O
W
F
O
R
S
T
R
.
B
A
C
K
F
I
L
L
TON
R
E
V
E
T
M
E
N
T
R
I
P
R
A
P
CYS.
C
O
N
C
R
E
T
E
,
C
L
A
S
S
A
,
F
O
R
S
T
R
U
C
T
U
R
E
S
EACH
P
I
P
E
E
N
D
S
E
C
T
I
O
N
TYPE EACH
GRATED
BOX END
SECTION
SLOPE SLOPE EACH
SAFETY
METAL
END
SECTION
C
O
N
N
E
C
T
T
O
S
T
R
.
N
O
.
REMARKS
SYS.TON
G
E
O
T
E
X
T
I
L
E
S
C
L
A
S
S
I
R
I
P
R
A
P
STATION
TON
C
L
A
S
S
I
I
R
I
P
R
A
P
aedwards 4:06:00 PM3/20/2008 P:\IN2003\0661\D. Drawings\IN20030661.RD.C2.SD01.dgn
CITY OF CARMEL
07-08D
No.
STATE OF
INDIAN A
REGISTERED
P
R
OFE
S
SIONAL ENGIN
EER10505104
J. SAMUEL B
ALO
G
03/21/2008
173
CKWKDS
N/A
N/A
JSB KDS
119
HORIZONTAL SCALE
DESIGNATION NO.
BRIDGE FILE
VERTICAL SCALE
SURVEY BOOK SHEETS
CONTRACT PROJECT NO.
of
DESIGNED:DRAWN:
CHECKED:CHECKED:
DESIGN ENGINEER
RECOMMENDED
FOR APPROVAL
DATE
STRUCTURE DATA TABLE
STRUCTURE DATA
S
T
R
U
C
T
U
R
E
N
U
M
B
E
R
L
E
F
T
R
I
G
H
T
C
R
O
S
S
LOCATION
SIZE
in.
P
I
P
E
T
Y
P
E
MANHOLE, INLET,
CATCH BASIN, OR
SPECIALTY
STRUCTURE
ft.
L
E
N
G
T
H
S
K
E
W
ft.
C
O
V
E
R
ELEV.
UP
STREAM
ELEV.
DOWN
STREAM
FLOW LINE
YR.
S
E
R
V
I
C
E
L
I
F
E
S
I
T
E
D
E
S
I
G
N
A
T
I
O
N
p
H
B
A
C
K
F
I
L
L
M
E
T
H
O
D
CYS.
B
B
O
R
R
O
W
F
O
R
S
T
R
.
B
A
C
K
F
I
L
L
TON
R
E
V
E
T
M
E
N
T
R
I
P
R
A
P
CYS.
C
O
N
C
R
E
T
E
,
C
L
A
S
S
A
,
F
O
R
S
T
R
U
C
T
U
R
E
S
EACH
P
I
P
E
E
N
D
S
E
C
T
I
O
N
TYPE EACH
GRATED
BOX END
SECTION
SLOPE SLOPE EACH
SAFETY
METAL
END
SECTION
C
O
N
N
E
C
T
T
O
S
T
R
.
N
O
.
REMARKS
SYS.TON
G
E
O
T
E
X
T
I
L
E
S
C
L
A
S
S
I
R
I
P
R
A
P
STATION
TON
C
L
A
S
S
I
I
R
I
P
R
A
P
aedwards 4:06:05 PM3/20/2008 P:\IN2003\0661\D. Drawings\IN20030661.RD.C2.SD02.dgn
CITY OF CARMEL
07-08D
No.
STATE OF
INDIAN A
REGISTERED
P
R
OFE
S
SIONAL ENGIN
EER10505104
J. SAMUEL B
ALO
G
03/21/2008
173
CKWKDS
N/A
N/A
JSB KDS
120
HORIZONTAL SCALE
DESIGNATION NO.
BRIDGE FILE
VERTICAL SCALE
SURVEY BOOK SHEETS
CONTRACT PROJECT NO.
of
DESIGNED:DRAWN:
CHECKED:CHECKED:
DESIGN ENGINEER
RECOMMENDED
FOR APPROVAL
DATE
STRUCTURE DATA TABLE
STRUCTURE DATA
S
T
R
U
C
T
U
R
E
N
U
M
B
E
R
L
E
F
T
R
I
G
H
T
C
R
O
S
S
LOCATION
SIZE
in.
P
I
P
E
T
Y
P
E
MANHOLE, INLET,
CATCH BASIN, OR
SPECIALTY
STRUCTURE
ft.
L
E
N
G
T
H
S
K
E
W
ft.
C
O
V
E
R
ELEV.
UP
STREAM
ELEV.
DOWN
STREAM
FLOW LINE
YR.
S
E
R
V
I
C
E
L
I
F
E
S
I
T
E
D
E
S
I
G
N
A
T
I
O
N
p
H
B
A
C
K
F
I
L
L
M
E
T
H
O
D
CYS.
B
B
O
R
R
O
W
F
O
R
S
T
R
.
B
A
C
K
F
I
L
L
TON
R
E
V
E
T
M
E
N
T
R
I
P
R
A
P
CYS.
C
O
N
C
R
E
T
E
,
C
L
A
S
S
A
,
F
O
R
S
T
R
U
C
T
U
R
E
S
EACH
P
I
P
E
E
N
D
S
E
C
T
I
O
N
TYPE EACH
GRATED
BOX END
SECTION
SLOPE SLOPE EACH
SAFETY
METAL
END
SECTION
C
O
N
N
E
C
T
T
O
S
T
R
.
N
O
.
REMARKS
SYS.TON
G
E
O
T
E
X
T
I
L
E
S
C
L
A
S
S
I
R
I
P
R
A
P
STATION
TON
C
L
A
S
S
I
I
R
I
P
R
A
P
aedwards 4:06:10 PM3/20/2008 P:\IN2003\0661\D. Drawings\IN20030661.RD.C2.SD03.dgn
CITY OF CARMEL
07-08D
No.
STATE OF
INDIAN A
REGISTERED
P
R
OFE
S
SIONAL ENGIN
EER10505104
J. SAMUEL B
ALO
G
03/21/2008
173
CKWKDS
N/A
N/A
07-08B
JSB KDS
121
HORIZONTAL SCALE
DESIGNATION NO.
BRIDGE FILE
VERTICAL SCALE
SURVEY BOOK SHEETS
CONTRACT PROJECT NO.
of
DESIGNED:DRAWN:
CHECKED:CHECKED:
DESIGN ENGINEER
RECOMMENDED
FOR APPROVAL
DATE
STRUCTURE DATA TABLE
STRUCTURE DATA
S
T
R
U
C
T
U
R
E
N
U
M
B
E
R
L
E
F
T
R
I
G
H
T
C
R
O
S
S
LOCATION
SIZE
in.
P
I
P
E
T
Y
P
E
MANHOLE, INLET,
CATCH BASIN, OR
SPECIALTY
STRUCTURE
ft.
L
E
N
G
T
H
S
K
E
W
ft.
C
O
V
E
R
ELEV.
UP
STREAM
ELEV.
DOWN
STREAM
FLOW LINE
YR.
S
E
R
V
I
C
E
L
I
F
E
S
I
T
E
D
E
S
I
G
N
A
T
I
O
N
p
H
B
A
C
K
F
I
L
L
M
E
T
H
O
D
CYS.
B
B
O
R
R
O
W
F
O
R
S
T
R
.
B
A
C
K
F
I
L
L
TON
R
E
V
E
T
M
E
N
T
R
I
P
R
A
P
CYS.
C
O
N
C
R
E
T
E
,
C
L
A
S
S
A
,
F
O
R
S
T
R
U
C
T
U
R
E
S
EACH
P
I
P
E
E
N
D
S
E
C
T
I
O
N
TYPE EACH
GRATED
BOX END
SECTION
SLOPE SLOPE EACH
SAFETY
METAL
END
SECTION
C
O
N
N
E
C
T
T
O
S
T
R
.
N
O
.
REMARKS
SYS.TON
G
E
O
T
E
X
T
I
L
E
S
C
L
A
S
S
I
R
I
P
R
A
P
STATION
TON
C
L
A
S
S
I
I
R
I
P
R
A
P
aedwards 4:06:15 PM3/20/2008 P:\IN2003\0661\D. Drawings\IN20030661.RD.C2.SD04.dgn
CITY OF CARMEL
07-08D
No.
STATE OF
INDIAN A
REGISTERED
P
R
OFE
S
SIONAL ENGIN
EER10505104
J. SAMUEL B
ALO
G
03/21/2008
173
LINE "E"
122 173
07-08D
20 30 40 50 60 70 80 90 100 110 120 130 140 150 1605060708090100110120130140150203040
0 10 20 30 40 50 60 70 80 90 100 110 120 130 140 150 160506070809011012013014015010203040
CUT FILLCROSS SECTIONS
Scale: 1 inch = 10 feet
100
HORIZONTAL SCALE
DESIGNATION NO.
BRIDGE FILE
VERTICAL SCALE
SURVEY BOOK SHEETS
CONTRACT PROJECT NO.
of
DESIGNED:DRAWN:
CHECKED:CHECKED:
DESIGN ENGINEER
RECOMMENDED
FOR APPROVAL
DATE
CROSS SECTION
1" = 10’
1" = 10’
aedwards 4:06:47 PM3/20/2008 P:\IN2003\0661\D. Drawings\IN20030661.RD.C2.CS.E.DGN
CITY OF CARMEL
BCF BCF
JSB JSB
LINE "E"
123 173
07-08D
20 30 40 50 60 70 80 90 100 110 120 130 140 150 1605060708090100110120130140150203040
0 10 20 30 40 50 60 70 80 90 100 110 120 130 140 150 160506070809011012013014015010203040
CUT FILLCROSS SECTIONS
Scale: 1 inch = 10 feet
100
HORIZONTAL SCALE
DESIGNATION NO.
BRIDGE FILE
VERTICAL SCALE
SURVEY BOOK SHEETS
CONTRACT PROJECT NO.
of
DESIGNED:DRAWN:
CHECKED:CHECKED:
DESIGN ENGINEER
RECOMMENDED
FOR APPROVAL
DATE
CROSS SECTION
1" = 10’
1" = 10’
aedwards 4:06:48 PM3/20/2008 P:\IN2003\0661\D. Drawings\IN20030661.RD.C2.CS.E.DGN
CITY OF CARMEL
BCF BCF
JSB JSB
83
1
.
0
83
1
.
0
83
0
.
9
83
0
.
9
83
0
.
9
83
0
.
9
83
1
.
2
83
1
.
2
83
1
.
1
83
1
.
1
83
1
.
1
83
1
.
1
8
3
1
.
3
8
3
1
.
3
8
3
1
.
3
8
3
1
.
3
8
3
1
.
3
8
3
1
.
3
8
3
0
.
8
8
3
0
.
8
8
3
0
.
7
8
3
0
.
7
8
3
0
.
7
8
3
0
.
7
LINE "E"
124 173
07-08D
20 30 40 50 60 70 80 90 100 110 120 130 140 150 1605060708090100110120130140150203040
0 10 20 30 40 50 60 70 80 90 100 110 120 130 140 150 160506070809011012013014015010203040
CUT FILLCROSS SECTIONS
Scale: 1 inch = 10 feet
100
HORIZONTAL SCALE
DESIGNATION NO.
BRIDGE FILE
VERTICAL SCALE
SURVEY BOOK SHEETS
CONTRACT PROJECT NO.
of
DESIGNED:DRAWN:
CHECKED:CHECKED:
DESIGN ENGINEER
RECOMMENDED
FOR APPROVAL
DATE
CROSS SECTION
1" = 10’
1" = 10’
aedwards 4:06:49 PM3/20/2008 P:\IN2003\0661\D. Drawings\IN20030661.RD.C2.CS.E.DGN
CITY OF CARMEL
BCF BCF
JSB JSB
8
3
1
.
5
8
3
1
.
5
8
3
1
.
3
8
3
1
.
3
8
3
1
.
3
8
3
1
.
3
8
3
1
.
6
8
3
1
.
6
8
3
1
.
4
8
3
1
.
4
8
3
1
.
4
8
3
1
.
4
8
3
1
.
8
8
3
1
.
8
8
3
1
.
6
8
3
1
.
6
8
3
1
.
6
8
3
1
.
6
8
3
1
.
8
8
3
1
.
8
8
3
1
.
6
8
3
1
.
6
8
3
1
.
6
8
3
1
.
6
LINE "E"
125 173
07-08D
20 30 40 50 60 70 80 90 100 110 120 130 140 150 1605060708090100110120130140150203040
0 10 20 30 40 50 60 70 80 90 100 110 120 130 140 150 160506070809011012013014015010203040
CUT FILLCROSS SECTIONS
Scale: 1 inch = 10 feet
100
HORIZONTAL SCALE
DESIGNATION NO.
BRIDGE FILE
VERTICAL SCALE
SURVEY BOOK SHEETS
CONTRACT PROJECT NO.
of
DESIGNED:DRAWN:
CHECKED:CHECKED:
DESIGN ENGINEER
RECOMMENDED
FOR APPROVAL
DATE
CROSS SECTION
1" = 10’
1" = 10’
aedwards 4:06:50 PM3/20/2008 P:\IN2003\0661\D. Drawings\IN20030661.RD.C2.CS.E.DGN
CITY OF CARMEL
BCF BCF
JSB JSB
8
3
1
.
9
8
3
1
.
9
8
3
1
.
7
8
3
1
.
7
8
3
1
.
7
8
3
1
.
7
83
2
.
1
83
2
.
1
8
3
1
.
9
8
3
1
.
9
8
3
1
.
9
8
3
1
.
9
8
3
2
.
2
8
3
2
.
2
8
3
2
.
0
8
3
2
.
0
8
3
2
.
0
8
3
2
.
0
8
3
2
.
3
8
3
2
.
3
8
3
2
.
0
8
3
2
.
0
8
3
2
.
0
8
3
2
.
0
LINE "E"
126 173
07-08D
20 30 40 50 60 70 80 90 100 110 120 130 140 150 1605060708090100110120130140150203040
0 10 20 30 40 50 60 70 80 90 100 110 120 130 140 150 160506070809011012013014015010203040
CUT FILLCROSS SECTIONS
Scale: 1 inch = 10 feet
100
HORIZONTAL SCALE
DESIGNATION NO.
BRIDGE FILE
VERTICAL SCALE
SURVEY BOOK SHEETS
CONTRACT PROJECT NO.
of
DESIGNED:DRAWN:
CHECKED:CHECKED:
DESIGN ENGINEER
RECOMMENDED
FOR APPROVAL
DATE
CROSS SECTION
1" = 10’
1" = 10’
aedwards 4:06:52 PM3/20/2008 P:\IN2003\0661\D. Drawings\IN20030661.RD.C2.CS.E.DGN
CITY OF CARMEL
BCF BCF
JSB JSB
8
3
2
.
4
8
3
2
.
4
83
2
.
1
83
2
.
1
83
2
.
1
83
2
.
1
8
3
2
.
4
8
3
2
.
4
83
2
.
1
83
2
.
1
83
2
.
1
83
2
.
1
8
3
2
.
6
8
3
2
.
6
8
3
2
.
3
8
3
2
.
3
8
3
2
.
3
8
3
2
.
3
8
3
2
.
7
8
3
2
.
7
8
3
2
.
4
8
3
2
.
4
8
3
2
.
4
8
3
2
.
4
LINE "E"
127 173
07-08D
20 30 40 50 60 70 80 90 100 110 120 130 140 150 1605060708090100110120130140150203040
0 10 20 30 40 50 60 70 80 90 100 110 120 130 140 150 160506070809011012013014015010203040
CUT FILLCROSS SECTIONS
Scale: 1 inch = 10 feet
100
HORIZONTAL SCALE
DESIGNATION NO.
BRIDGE FILE
VERTICAL SCALE
SURVEY BOOK SHEETS
CONTRACT PROJECT NO.
of
DESIGNED:DRAWN:
CHECKED:CHECKED:
DESIGN ENGINEER
RECOMMENDED
FOR APPROVAL
DATE
CROSS SECTION
1" = 10’
1" = 10’
aedwards 4:06:53 PM3/20/2008 P:\IN2003\0661\D. Drawings\IN20030661.RD.C2.CS.E.DGN
CITY OF CARMEL
BCF BCF
JSB JSB
8
3
2
.
8
8
3
2
.
8
8
3
2
.
5
8
3
2
.
5
8
3
2
.
5
8
3
2
.
5
8
3
3
.
0
8
3
3
.
0
8
3
2
.
6
8
3
2
.
6
8
3
2
.
6
8
3
2
.
6
83
3
.
1
83
3
.
1
8
3
2
.
7
8
3
2
.
7
8
3
2
.
7
8
3
2
.
7
8
3
3
.
2
8
3
3
.
2
8
3
2
.
9
8
3
2
.
9
8
3
2
.
9
8
3
2
.
9
LINE "E"
128 173
07-08D
20 30 40 50 60 70 80 90 100 110 120 130 140 150 1605060708090100110120130140150203040
0 10 20 30 40 50 60 70 80 90 100 110 120 130 140 150 160506070809011012013014015010203040
CUT FILLCROSS SECTIONS
Scale: 1 inch = 10 feet
100
HORIZONTAL SCALE
DESIGNATION NO.
BRIDGE FILE
VERTICAL SCALE
SURVEY BOOK SHEETS
CONTRACT PROJECT NO.
of
DESIGNED:DRAWN:
CHECKED:CHECKED:
DESIGN ENGINEER
RECOMMENDED
FOR APPROVAL
DATE
CROSS SECTION
1" = 10’
1" = 10’
aedwards 4:06:55 PM3/20/2008 P:\IN2003\0661\D. Drawings\IN20030661.RD.C2.CS.E.DGN
CITY OF CARMEL
BCF BCF
JSB JSB
8
3
3
.
3
8
3
3
.
3
83
3
.
1
83
3
.
1
83
3
.
1
83
3
.
1
8
3
3
.
3
8
3
3
.
3
8
3
3
.
2
8
3
3
.
2
8
3
3
.
2
8
3
3
.
2
8
3
3
.
5
8
3
3
.
5
8
3
3
.
3
8
3
3
.
3
8
3
3
.
3
8
3
3
.
3
8
3
3
.
6
8
3
3
.
6
8
3
3
.
4
8
3
3
.
4
8
3
3
.
4
8
3
3
.
4
LINE "E"
129 173
07-08D
20 30 40 50 60 70 80 90 100 110 120 130 140 150 1605060708090100110120130140150203040
0 10 20 30 40 50 60 70 80 90 100 110 120 130 140 150 160506070809011012013014015010203040
CUT FILLCROSS SECTIONS
Scale: 1 inch = 10 feet
100
HORIZONTAL SCALE
DESIGNATION NO.
BRIDGE FILE
VERTICAL SCALE
SURVEY BOOK SHEETS
CONTRACT PROJECT NO.
of
DESIGNED:DRAWN:
CHECKED:CHECKED:
DESIGN ENGINEER
RECOMMENDED
FOR APPROVAL
DATE
CROSS SECTION
1" = 10’
1" = 10’
aedwards 4:06:56 PM3/20/2008 P:\IN2003\0661\D. Drawings\IN20030661.RD.C2.CS.E.DGN
CITY OF CARMEL
BCF BCF
JSB JSB
8
3
3
.
8
8
3
3
.
8
8
3
3
.
6
8
3
3
.
6
8
3
3
.
6
8
3
3
.
6
8
3
3
.
9
8
3
3
.
9
8
3
3
.
7
8
3
3
.
7
8
3
3
.
7
8
3
3
.
7
8
3
3
.
9
8
3
3
.
9
8
3
3
.
7
8
3
3
.
7
8
3
3
.
7
8
3
3
.
7
8
3
5
.
2
8
3
5
.
2
8
3
5
.
2
8
3
5
.
2
8
3
4
.
5
8
3
4
.
5
LINE "E"
130 173
07-08D
20 30 40 50 60 70 80 90 100 110 120 130 140 150 1605060708090100110120130140150203040
0 10 20 30 40 50 60 70 80 90 100 110 120 130 140 150 160506070809011012013014015010203040
CUT FILLCROSS SECTIONS
Scale: 1 inch = 10 feet
100
HORIZONTAL SCALE
DESIGNATION NO.
BRIDGE FILE
VERTICAL SCALE
SURVEY BOOK SHEETS
CONTRACT PROJECT NO.
of
DESIGNED:DRAWN:
CHECKED:CHECKED:
DESIGN ENGINEER
RECOMMENDED
FOR APPROVAL
DATE
CROSS SECTION
1" = 10’
1" = 10’
aedwards 4:06:57 PM3/20/2008 P:\IN2003\0661\D. Drawings\IN20030661.RD.C2.CS.E.DGN
CITY OF CARMEL
BCF BCF
JSB JSB
8
3
3
.
9
8
3
3
.
9
8
3
3
.
7
8
3
3
.
7
8
3
3
.
7
8
3
3
.
7
8
3
5
.
2
8
3
5
.
2
8
3
5
.
2
8
3
5
.
2
8
3
4
.
6
8
3
4
.
6
8
3
4
.
0
8
3
4
.
0
8
3
3
.
9
8
3
3
.
9
8
3
3
.
9
8
3
3
.
9
8
3
5
.
3
8
3
5
.
3
8
3
5
.
3
8
3
5
.
3
8
3
4
.
7
8
3
4
.
7
83
4
.
1
83
4
.
1
8
3
4
.
0
8
3
4
.
0
8
3
4
.
0
8
3
4
.
0
83
5
.
3
83
5
.
3
83
5
.
3
83
5
.
3
83
4
.
7
83
4
.
7
LINE "E"
131 173
07-08D
20 30 40 50 60 70 80 90 100 110 120 130 140 150 1605060708090100110120130140150203040
0 10 20 30 40 50 60 70 80 90 100 110 120 130 140 150 160506070809011012013014015010203040
CUT FILLCROSS SECTIONS
Scale: 1 inch = 10 feet
100
HORIZONTAL SCALE
DESIGNATION NO.
BRIDGE FILE
VERTICAL SCALE
SURVEY BOOK SHEETS
CONTRACT PROJECT NO.
of
DESIGNED:DRAWN:
CHECKED:CHECKED:
DESIGN ENGINEER
RECOMMENDED
FOR APPROVAL
DATE
CROSS SECTION
1" = 10’
1" = 10’
aedwards 4:06:58 PM3/20/2008 P:\IN2003\0661\D. Drawings\IN20030661.RD.C2.CS.E.DGN
CITY OF CARMEL
BCF BCF
JSB JSB
8
3
4
.
1
8
3
4
.
1
8
3
4
.
1
8
3
4
.
1
8
3
4
.
1
8
3
4
.
1
8
3
5
.
3
8
3
5
.
3
8
3
5
.
3
8
3
5
.
3
8
3
4
.
8
8
3
4
.
8
8
3
4
.
2
8
3
4
.
2
8
3
4
.
4
8
3
4
.
4
8
3
4
.
4
8
3
4
.
4
8
3
5
.
5
8
3
5
.
5
8
3
5
.
5
8
3
5
.
5
8
3
4
.
9
8
3
4
.
9
83
4
.
3
83
4
.
3
83
4
.
5
83
4
.
5
83
4
.
5
83
4
.
5
8
3
5
.
5
8
3
5
.
5
8
3
5
.
5
8
3
5
.
5
83
4
.
9
83
4
.
9
LINE "E"
132 173
07-08D
20 30 40 50 60 70 80 90 100 110 120 130 140 150 1605060708090100110120130140150203040
0 10 20 30 40 50 60 70 80 90 100 110 120 130 140 150 160506070809011012013014015010203040
CUT FILLCROSS SECTIONS
Scale: 1 inch = 10 feet
100
HORIZONTAL SCALE
DESIGNATION NO.
BRIDGE FILE
VERTICAL SCALE
SURVEY BOOK SHEETS
CONTRACT PROJECT NO.
of
DESIGNED:DRAWN:
CHECKED:CHECKED:
DESIGN ENGINEER
RECOMMENDED
FOR APPROVAL
DATE
CROSS SECTION
1" = 10’
1" = 10’
aedwards 4:06:59 PM3/20/2008 P:\IN2003\0661\D. Drawings\IN20030661.RD.C2.CS.E.DGN
CITY OF CARMEL
BCF BCF
JSB JSB
8
3
4
.
4
8
3
4
.
4
83
4
.
9
83
4
.
9
83
4
.
9
83
4
.
9
8
3
5
.
6
8
3
5
.
6
8
3
5
.
6
8
3
5
.
6
8
3
5
.
0
8
3
5
.
0
8
3
4
.
5
8
3
4
.
5
8
3
5
.
3
8
3
5
.
3
8
3
5
.
3
8
3
5
.
3
8
3
5
.
9
8
3
5
.
9
8
3
5
.
9
8
3
5
.
9
83
5
.
1
83
5
.
1
LINE "E"
133 173
07-08D
20 30 40 50 60 70 80 90 100 110 120 130 140 150 1605060708090100110120130140150203040
0 10 20 30 40 50 60 70 80 90 100 110 120 130 140 150 160506070809011012013014015010203040
CUT FILLCROSS SECTIONS
Scale: 1 inch = 10 feet
100
HORIZONTAL SCALE
DESIGNATION NO.
BRIDGE FILE
VERTICAL SCALE
SURVEY BOOK SHEETS
CONTRACT PROJECT NO.
of
DESIGNED:DRAWN:
CHECKED:CHECKED:
DESIGN ENGINEER
RECOMMENDED
FOR APPROVAL
DATE
CROSS SECTION
1" = 10’
1" = 10’
aedwards 4:07:00 PM3/20/2008 P:\IN2003\0661\D. Drawings\IN20030661.RD.C2.CS.E.DGN
CITY OF CARMEL
BCF BCF
JSB JSB
8
3
4
.
6
8
3
4
.
6
8
3
5
.
4
8
3
5
.
4
8
3
5
.
4
8
3
5
.
4
8
3
6
.
0
8
3
6
.
0
8
3
6
.
0
8
3
6
.
0
8
3
5
.
2
8
3
5
.
2
8
3
4
.
8
8
3
4
.
8
8
3
5
.
6
8
3
5
.
6
8
3
5
.
6
8
3
5
.
6
8
3
6
.
2
8
3
6
.
2
8
3
6
.
2
8
3
6
.
2
8
3
5
.
3
8
3
5
.
3
LINE "E"
134 173
07-08D
20 30 40 50 60 70 80 90 100 110 120 130 140 150 1605060708090100110120130140150203040
0 10 20 30 40 50 60 70 80 90 100 110 120 130 140 150 160506070809011012013014015010203040
CUT FILLCROSS SECTIONS
Scale: 1 inch = 10 feet
100
HORIZONTAL SCALE
DESIGNATION NO.
BRIDGE FILE
VERTICAL SCALE
SURVEY BOOK SHEETS
CONTRACT PROJECT NO.
of
DESIGNED:DRAWN:
CHECKED:CHECKED:
DESIGN ENGINEER
RECOMMENDED
FOR APPROVAL
DATE
CROSS SECTION
1" = 10’
1" = 10’
aedwards 4:07:01 PM3/20/2008 P:\IN2003\0661\D. Drawings\IN20030661.RD.C2.CS.E.DGN
CITY OF CARMEL
BCF BCF
JSB JSB
8
3
5
.
0
8
3
5
.
0
8
3
5
.
8
8
3
5
.
8
8
3
5
.
8
8
3
5
.
8
8
3
6
.
4
8
3
6
.
4
8
3
6
.
4
8
3
6
.
4
8
3
5
.
6
8
3
5
.
6
8
3
5
.
3
8
3
5
.
3
8
3
6
.
0
8
3
6
.
0
8
3
6
.
0
8
3
6
.
0
8
3
6
.
5
8
3
6
.
5
8
3
6
.
5
8
3
6
.
5
8
3
5
.
5
8
3
5
.
5
8
3
5
.
8
8
3
5
.
8
8
3
6
.
3
8
3
6
.
3
8
3
6
.
3
8
3
6
.
3
83
6
.
7
83
6
.
7
83
6
.
7
83
6
.
7
8
3
6
.
2
8
3
6
.
2
LINE "E"
135 173
07-08D
20 30 40 50 60 70 80 90 100 110 120 130 140 150 1605060708090100110120130140150203040
0 10 20 30 40 50 60 70 80 90 100 110 120 130 140 150 160506070809011012013014015010203040
CUT FILLCROSS SECTIONS
Scale: 1 inch = 10 feet
100
HORIZONTAL SCALE
DESIGNATION NO.
BRIDGE FILE
VERTICAL SCALE
SURVEY BOOK SHEETS
CONTRACT PROJECT NO.
of
DESIGNED:DRAWN:
CHECKED:CHECKED:
DESIGN ENGINEER
RECOMMENDED
FOR APPROVAL
DATE
CROSS SECTION
1" = 10’
1" = 10’
aedwards 4:07:02 PM3/20/2008 P:\IN2003\0661\D. Drawings\IN20030661.RD.C2.CS.E.DGN
CITY OF CARMEL
BCF BCF
JSB JSB
83
6
.
2
83
6
.
2
83
6
.
6
83
6
.
6
83
6
.
6
83
6
.
6
8
3
7
.
0
8
3
7
.
0
8
3
7
.
0
8
3
7
.
0
8
3
7
.
0
8
3
7
.
0
8
3
7
.
2
8
3
7
.
2
83
7
.
1
83
7
.
1
83
7
.
1
83
7
.
1
LINE "E"
136 173
07-08D
20 30 40 50 60 70 80 90 100 110 120 130 140 150 1605060708090100110120130140150203040
0 10 20 30 40 50 60 70 80 90 100 110 120 130 140 150 160506070809011012013014015010203040
CUT FILLCROSS SECTIONS
Scale: 1 inch = 10 feet
100
HORIZONTAL SCALE
DESIGNATION NO.
BRIDGE FILE
VERTICAL SCALE
SURVEY BOOK SHEETS
CONTRACT PROJECT NO.
of
DESIGNED:DRAWN:
CHECKED:CHECKED:
DESIGN ENGINEER
RECOMMENDED
FOR APPROVAL
DATE
CROSS SECTION
1" = 10’
1" = 10’
aedwards 4:07:04 PM3/20/2008 P:\IN2003\0661\D. Drawings\IN20030661.RD.C2.CS.E.DGN
CITY OF CARMEL
BCF BCF
JSB JSB
8
3
7
.
2
8
3
7
.
2
8
3
7
.
0
8
3
7
.
0
8
3
7
.
0
8
3
7
.
0
8
3
7
.
5
8
3
7
.
5
8
3
5
.
9
8
3
5
.
9
8
3
5
.
9
8
3
5
.
9
8
3
6
.
1
8
3
6
.
1
8
3
7
.
5
8
3
7
.
5
8
3
6
.
0
8
3
6
.
0
8
3
6
.
0
8
3
6
.
0
8
2
4
.
9
8
2
4
.
9
8
2
4
.
9
8
2
4
.
9
83
5
.
0
83
5
.
0
LINE "E"
137 173
07-08D
20 30 40 50 60 70 80 90 100 110 120 130 140 150 1605060708090100110120130140150203040
0 10 20 30 40 50 60 70 80 90 100 110 120 130 140 150 160506070809011012013014015010203040
CUT FILLCROSS SECTIONS
Scale: 1 inch = 10 feet
100
HORIZONTAL SCALE
DESIGNATION NO.
BRIDGE FILE
VERTICAL SCALE
SURVEY BOOK SHEETS
CONTRACT PROJECT NO.
of
DESIGNED:DRAWN:
CHECKED:CHECKED:
DESIGN ENGINEER
RECOMMENDED
FOR APPROVAL
DATE
CROSS SECTION
1" = 10’
1" = 10’
aedwards 4:07:05 PM3/20/2008 P:\IN2003\0661\D. Drawings\IN20030661.RD.C2.CS.E.DGN
CITY OF CARMEL
BCF BCF
JSB JSB
8
3
7
.
7
8
3
7
.
7
8
3
6
.
3
8
3
6
.
3
8
3
6
.
3
8
3
6
.
3
8
3
3
.
3
8
3
3
.
3
8
3
3
.
3
8
3
3
.
3
8
3
7
.
3
8
3
7
.
3
83
7
.
8
83
7
.
8
83
6
.
3
83
6
.
3
83
6
.
3
83
6
.
3
8
3
6
.
6
8
3
6
.
6
8
3
6
.
6
8
3
6
.
6
8
3
7
.
4
8
3
7
.
4
8
3
7
.
5
8
3
7
.
5
8
3
6
.
3
8
3
6
.
3
8
3
7
.
3
8
3
7
.
3
8
3
7
.
3
8
3
7
.
3
LINE "E"
138 173
07-08D
20 30 40 50 60 70 80 90 100 110 120 130 140 150 1605060708090100110120130140150203040
0 10 20 30 40 50 60 70 80 90 100 110 120 130 140 150 160506070809011012013014015010203040
CUT FILLCROSS SECTIONS
Scale: 1 inch = 10 feet
100
HORIZONTAL SCALE
DESIGNATION NO.
BRIDGE FILE
VERTICAL SCALE
SURVEY BOOK SHEETS
CONTRACT PROJECT NO.
of
DESIGNED:DRAWN:
CHECKED:CHECKED:
DESIGN ENGINEER
RECOMMENDED
FOR APPROVAL
DATE
CROSS SECTION
1" = 10’
1" = 10’
aedwards 4:07:06 PM3/20/2008 P:\IN2003\0661\D. Drawings\IN20030661.RD.C2.CS.E.DGN
CITY OF CARMEL
BCF BCF
JSB JSB
8
3
7
.
9
8
3
7
.
9
8
3
6
.
7
8
3
6
.
7
8
3
6
.
7
8
3
6
.
7
8
3
7
.
8
8
3
7
.
8
8
3
7
.
8
8
3
7
.
8
8
3
7
.
7
8
3
7
.
7
8
3
8
.
3
8
3
8
.
3
83
7
.
1
83
7
.
1
83
7
.
1
83
7
.
1
8
3
8
.
1
8
3
8
.
1
8
3
8
.
1
8
3
8
.
1
8
3
8
.
0
8
3
8
.
0
8
3
8
.
6
8
3
8
.
6
8
3
7
.
4
8
3
7
.
4
8
3
7
.
4
8
3
7
.
4
8
3
8
.
4
8
3
8
.
4
8
3
8
.
4
8
3
8
.
4
8
3
8
.
3
8
3
8
.
3
LINE "E"
139 173
07-08D
20 30 40 50 60 70 80 90 100 110 120 130 140 150 1605060708090100110120130140150203040
0 10 20 30 40 50 60 70 80 90 100 110 120 130 140 150 160506070809011012013014015010203040
CUT FILLCROSS SECTIONS
Scale: 1 inch = 10 feet
100
HORIZONTAL SCALE
DESIGNATION NO.
BRIDGE FILE
VERTICAL SCALE
SURVEY BOOK SHEETS
CONTRACT PROJECT NO.
of
DESIGNED:DRAWN:
CHECKED:CHECKED:
DESIGN ENGINEER
RECOMMENDED
FOR APPROVAL
DATE
CROSS SECTION
1" = 10’
1" = 10’
aedwards 4:07:07 PM3/20/2008 P:\IN2003\0661\D. Drawings\IN20030661.RD.C2.CS.E.DGN
CITY OF CARMEL
BCF BCF
JSB JSB
8
3
8
.
7
8
3
8
.
7
8
3
7
.
5
8
3
7
.
5
8
3
7
.
5
8
3
7
.
5
8
3
8
.
5
8
3
8
.
5
8
3
8
.
5
8
3
8
.
5
83
8
.
4
83
8
.
4
8
3
9
.
1
8
3
9
.
1
8
3
7
.
8
8
3
7
.
8
8
3
7
.
8
8
3
7
.
8
8
3
8
.
7
8
3
8
.
7
8
3
8
.
7
8
3
8
.
7
8
3
8
.
7
8
3
8
.
7
8
3
9
.
5
8
3
9
.
5
8
3
8
.
2
8
3
8
.
2
8
3
8
.
2
8
3
8
.
2
8
3
9
.
2
8
3
9
.
2
8
3
9
.
2
8
3
9
.
2
8
3
9
.
2
8
3
9
.
2
LINE "E"
140 173
07-08D
20 30 40 50 60 70 80 90 100 110 120 130 140 150 1605060708090100110120130140150203040
0 10 20 30 40 50 60 70 80 90 100 110 120 130 140 150 160506070809011012013014015010203040
CUT FILLCROSS SECTIONS
Scale: 1 inch = 10 feet
100
HORIZONTAL SCALE
DESIGNATION NO.
BRIDGE FILE
VERTICAL SCALE
SURVEY BOOK SHEETS
CONTRACT PROJECT NO.
of
DESIGNED:DRAWN:
CHECKED:CHECKED:
DESIGN ENGINEER
RECOMMENDED
FOR APPROVAL
DATE
CROSS SECTION
1" = 10’
1" = 10’
aedwards 4:07:09 PM3/20/2008 P:\IN2003\0661\D. Drawings\IN20030661.RD.C2.CS.E.DGN
CITY OF CARMEL
BCF BCF
JSB JSB
8
3
9
.
7
8
3
9
.
7
8
3
8
.
9
8
3
8
.
9
8
3
8
.
9
8
3
8
.
9
8
3
9
.
7
8
3
9
.
7
8
3
9
.
7
8
3
9
.
7
83
9
.
7
83
9
.
7
8
3
9
.
8
8
3
9
.
8
83
9
.
1
83
9
.
1
83
9
.
1
83
9
.
1
8
3
9
.
8
8
3
9
.
8
8
3
9
.
8
8
3
9
.
8
8
3
9
.
8
8
3
9
.
8
LINE "E"
141 173
07-08D
20 30 40 50 60 70 80 90 100 110 120 130 140 150 1605060708090100110120130140150203040
0 10 20 30 40 50 60 70 80 90 100 110 120 130 140 150 160506070809011012013014015010203040
CUT FILLCROSS SECTIONS
Scale: 1 inch = 10 feet
100
HORIZONTAL SCALE
DESIGNATION NO.
BRIDGE FILE
VERTICAL SCALE
SURVEY BOOK SHEETS
CONTRACT PROJECT NO.
of
DESIGNED:DRAWN:
CHECKED:CHECKED:
DESIGN ENGINEER
RECOMMENDED
FOR APPROVAL
DATE
CROSS SECTION
1" = 10’
1" = 10’
aedwards 4:07:10 PM3/20/2008 P:\IN2003\0661\D. Drawings\IN20030661.RD.C2.CS.E.DGN
CITY OF CARMEL
BCF BCF
JSB JSB
8
4
0
.
0
8
4
0
.
0
8
3
9
.
6
8
3
9
.
6
8
3
9
.
6
8
3
9
.
6
8
4
0
.
2
8
4
0
.
2
8
4
0
.
2
8
4
0
.
2
8
4
0
.
2
8
4
0
.
2
8
4
0
.
2
8
4
0
.
2
84
0
.
1
84
0
.
1
84
0
.
1
84
0
.
1
8
4
0
.
7
8
4
0
.
7
8
4
0
.
7
8
4
0
.
7
8
4
0
.
7
8
4
0
.
7
LINE "E"
142 173
07-08D
20 30 40 50 60 70 80 90 100 110 120 130 140 150 1605060708090100110120130140150203040
0 10 20 30 40 50 60 70 80 90 100 110 120 130 140 150 160506070809011012013014015010203040
CUT FILLCROSS SECTIONS
Scale: 1 inch = 10 feet
100
HORIZONTAL SCALE
DESIGNATION NO.
BRIDGE FILE
VERTICAL SCALE
SURVEY BOOK SHEETS
CONTRACT PROJECT NO.
of
DESIGNED:DRAWN:
CHECKED:CHECKED:
DESIGN ENGINEER
RECOMMENDED
FOR APPROVAL
DATE
CROSS SECTION
1" = 10’
1" = 10’
aedwards 4:07:11 PM3/20/2008 P:\IN2003\0661\D. Drawings\IN20030661.RD.C2.CS.E.DGN
CITY OF CARMEL
BCF BCF
JSB JSB
84
0
.
6
84
0
.
6
84
0
.
6
84
0
.
6
84
0
.
6
84
0
.
6
8
4
1
.
2
8
4
1
.
2
8
4
1
.
2
8
4
1
.
2
8
4
1
.
2
8
4
1
.
2
8
4
1
.
0
8
4
1
.
0
84
1
.
1
84
1
.
1
84
1
.
1
84
1
.
1
8
4
1
.
7
8
4
1
.
7
8
4
1
.
7
8
4
1
.
7
84
1
.
7
84
1
.
7
LINE "E"
143 173
07-08D
20 30 40 50 60 70 80 90 100 110 120 130 140 150 1605060708090100110120130140150203040
0 10 20 30 40 50 60 70 80 90 100 110 120 130 140 150 160506070809011012013014015010203040
CUT FILLCROSS SECTIONS
Scale: 1 inch = 10 feet
100
HORIZONTAL SCALE
DESIGNATION NO.
BRIDGE FILE
VERTICAL SCALE
SURVEY BOOK SHEETS
CONTRACT PROJECT NO.
of
DESIGNED:DRAWN:
CHECKED:CHECKED:
DESIGN ENGINEER
RECOMMENDED
FOR APPROVAL
DATE
CROSS SECTION
1" = 10’
1" = 10’
aedwards 4:07:12 PM3/20/2008 P:\IN2003\0661\D. Drawings\IN20030661.RD.C2.CS.E.DGN
CITY OF CARMEL
BCF BCF
JSB JSB
8
4
1
.
7
8
4
1
.
7
8
4
1
.
8
8
4
1
.
8
8
4
1
.
8
8
4
1
.
8
8
4
2
.
3
8
4
2
.
3
8
4
2
.
3
8
4
2
.
3
8
4
2
.
3
8
4
2
.
3
8
4
2
.
2
8
4
2
.
2
8
4
2
.
3
8
4
2
.
3
8
4
2
.
3
8
4
2
.
3
8
4
2
.
8
8
4
2
.
8
LINE "E"
144 173
07-08D
20 30 40 50 60 70 80 90 100 110 120 130 140 150 1605060708090100110120130140150203040
0 10 20 30 40 50 60 70 80 90 100 110 120 130 140 150 160506070809011012013014015010203040
CUT FILLCROSS SECTIONS
Scale: 1 inch = 10 feet
100
HORIZONTAL SCALE
DESIGNATION NO.
BRIDGE FILE
VERTICAL SCALE
SURVEY BOOK SHEETS
CONTRACT PROJECT NO.
of
DESIGNED:DRAWN:
CHECKED:CHECKED:
DESIGN ENGINEER
RECOMMENDED
FOR APPROVAL
DATE
CROSS SECTION
1" = 10’
1" = 10’
aedwards 4:07:12 PM3/20/2008 P:\IN2003\0661\D. Drawings\IN20030661.RD.C2.CS.E.DGN
CITY OF CARMEL
BCF BCF
JSB JSB
8
4
2
.
7
8
4
2
.
7
8
4
2
.
8
8
4
2
.
8
8
4
2
.
8
8
4
2
.
8
84
3
.
3
84
3
.
3
8
4
2
.
7
8
4
2
.
7
8
4
2
.
8
8
4
2
.
8
8
4
2
.
8
8
4
2
.
8
8
4
3
.
3
8
4
3
.
3
LINE "E"LINE "E"
145 173
07-08D
20 30 40 50 60 70 80 90 100 110 120 130 140 150 1605060708090100110120130140150203040
0 10 20 30 40 50 60 70 80 90 100 110 120 130 140 150 160506070809011012013014015010203040
CUT FILLCROSS SECTIONS
Scale: 1 inch = 10 feet
100
HORIZONTAL SCALE
DESIGNATION NO.
BRIDGE FILE
VERTICAL SCALE
SURVEY BOOK SHEETS
CONTRACT PROJECT NO.
of
DESIGNED:DRAWN:
CHECKED:CHECKED:
DESIGN ENGINEER
RECOMMENDED
FOR APPROVAL
DATE
CROSS SECTION
1" = 10’
1" = 10’
aedwards 4:07:13 PM3/20/2008 P:\IN2003\0661\D. Drawings\IN20030661.RD.C2.CS.E.DGN
CITY OF CARMEL
BCF BCF
JSB JSB
84
2
.
8
84
2
.
8
84
2
.
9
84
2
.
9
84
2
.
9
84
2
.
9
8
4
3
.
3
8
4
3
.
3
8
4
3
.
3
8
4
3
.
3
8
4
3
.
3
8
4
3
.
3
8
4
3
.
8
8
4
3
.
8
8
4
3
.
8
8
4
3
.
8
8
4
3
.
8
8
4
3
.
8
LINE "E"LINE "E"
146 173
07-08D
20 30 40 50 60 70 80 90 100 110 120 130 140 150 1605060708090100110120130140150203040
0 10 20 30 40 50 60 70 80 90 100 110 120 130 140 150 160506070809011012013014015010203040
CUT FILLCROSS SECTIONS
Scale: 1 inch = 10 feet
100
HORIZONTAL SCALE
DESIGNATION NO.
BRIDGE FILE
VERTICAL SCALE
SURVEY BOOK SHEETS
CONTRACT PROJECT NO.
of
DESIGNED:DRAWN:
CHECKED:CHECKED:
DESIGN ENGINEER
RECOMMENDED
FOR APPROVAL
DATE
CROSS SECTION
1" = 10’
1" = 10’
aedwards 4:07:14 PM3/20/2008 P:\IN2003\0661\D. Drawings\IN20030661.RD.C2.CS.E.DGN
CITY OF CARMEL
BCF BCF
JSB JSB
8
4
4
.
2
8
4
4
.
2
8
4
4
.
3
8
4
4
.
3
8
4
4
.
3
8
4
4
.
3
8
4
4
.
8
8
4
4
.
8
8
4
4
.
8
8
4
4
.
8
8
4
4
.
8
8
4
4
.
8
8
4
5
.
3
8
4
5
.
3
8
4
5
.
3
8
4
5
.
3
8
4
5
.
3
8
4
5
.
3
8
4
5
.
8
8
4
5
.
8
8
4
5
.
8
8
4
5
.
8
8
4
5
.
8
8
4
5
.
8
LINE "E"LINE "E"
147 173
07-08D
20 30 40 50 60 70 80 90 100 110 120 130 140 150 1605060708090100110120130140150203040
0 10 20 30 40 50 60 70 80 90 100 110 120 130 140 150 160506070809011012013014015010203040
CUT FILLCROSS SECTIONS
Scale: 1 inch = 10 feet
100
HORIZONTAL SCALE
DESIGNATION NO.
BRIDGE FILE
VERTICAL SCALE
SURVEY BOOK SHEETS
CONTRACT PROJECT NO.
of
DESIGNED:DRAWN:
CHECKED:CHECKED:
DESIGN ENGINEER
RECOMMENDED
FOR APPROVAL
DATE
CROSS SECTION
1" = 10’
1" = 10’
aedwards 4:07:15 PM3/20/2008 P:\IN2003\0661\D. Drawings\IN20030661.RD.C2.CS.E.DGN
CITY OF CARMEL
BCF BCF
JSB JSB
8
4
6
.
3
8
4
6
.
3
8
4
6
.
2
8
4
6
.
2
8
4
6
.
2
8
4
6
.
2
84
6
.
7
84
6
.
7
84
6
.
6
84
6
.
6
84
6
.
6
84
6
.
6
84
6
.
8
84
6
.
8
84
6
.
8
84
6
.
8
84
6
.
8
84
6
.
8
8
4
7
.
4
8
4
7
.
4
8
4
7
.
5
8
4
7
.
5
8
4
7
.
5
8
4
7
.
5
LINE "E"
148 173
07-08D
20 30 40 50 60 70 80 90 100 110 120 130 140 150 1605060708090100110120130140150203040
0 10 20 30 40 50 60 70 80 90 100 110 120 130 140 150 160506070809011012013014015010203040
CUT FILLCROSS SECTIONS
Scale: 1 inch = 10 feet
100
HORIZONTAL SCALE
DESIGNATION NO.
BRIDGE FILE
VERTICAL SCALE
SURVEY BOOK SHEETS
CONTRACT PROJECT NO.
of
DESIGNED:DRAWN:
CHECKED:CHECKED:
DESIGN ENGINEER
RECOMMENDED
FOR APPROVAL
DATE
CROSS SECTION
1" = 10’
1" = 10’
aedwards 4:07:17 PM3/20/2008 P:\IN2003\0661\D. Drawings\IN20030661.RD.C2.CS.E.DGN
CITY OF CARMEL
BCF BCF
JSB JSB
8
4
7
.
9
8
4
7
.
9
8
4
7
.
8
8
4
7
.
8
8
4
7
.
8
8
4
7
.
8
8
4
8
.
3
8
4
8
.
3
8
4
8
.
2
8
4
8
.
2
8
4
8
.
2
8
4
8
.
2
LINE "E"
149 173
07-08D
20 30 40 50 60 70 80 90 100 110 120 130 140 150 1605060708090100110120130140150203040
0 10 20 30 40 50 60 70 80 90 100 110 120 130 140 150 160506070809011012013014015010203040
CUT FILLCROSS SECTIONS
Scale: 1 inch = 10 feet
100
HORIZONTAL SCALE
DESIGNATION NO.
BRIDGE FILE
VERTICAL SCALE
SURVEY BOOK SHEETS
CONTRACT PROJECT NO.
of
DESIGNED:DRAWN:
CHECKED:CHECKED:
DESIGN ENGINEER
RECOMMENDED
FOR APPROVAL
DATE
CROSS SECTION
1" = 10’
1" = 10’
aedwards 4:07:18 PM3/20/2008 P:\IN2003\0661\D. Drawings\IN20030661.RD.C2.CS.E.DGN
CITY OF CARMEL
BCF BCF
JSB JSB
LINE "E"
150 173
07-08D
20 30 40 50 60 70 80 90 100 110 120 130 140 150 1605060708090100110120130140150203040
0 10 20 30 40 50 60 70 80 90 100 110 120 130 140 150 160506070809011012013014015010203040
CUT FILLCROSS SECTIONS
Scale: 1 inch = 10 feet
100
HORIZONTAL SCALE
DESIGNATION NO.
BRIDGE FILE
VERTICAL SCALE
SURVEY BOOK SHEETS
CONTRACT PROJECT NO.
of
DESIGNED:DRAWN:
CHECKED:CHECKED:
DESIGN ENGINEER
RECOMMENDED
FOR APPROVAL
DATE
CROSS SECTION
1" = 10’
1" = 10’
aedwards 4:07:18 PM3/20/2008 P:\IN2003\0661\D. Drawings\IN20030661.RD.C2.CS.E.DGN
CITY OF CARMEL
BCF BCF
JSB JSB
LINE "E"
151 173
07-08D
20 30 40 50 60 70 80 90 100 110 120 130 140 150 1605060708090100110120130140150203040
0 10 20 30 40 50 60 70 80 90 100 110 120 130 140 150 160506070809011012013014015010203040
CUT FILLCROSS SECTIONS
Scale: 1 inch = 10 feet
100
HORIZONTAL SCALE
DESIGNATION NO.
BRIDGE FILE
VERTICAL SCALE
SURVEY BOOK SHEETS
CONTRACT PROJECT NO.
of
DESIGNED:DRAWN:
CHECKED:CHECKED:
DESIGN ENGINEER
RECOMMENDED
FOR APPROVAL
DATE
CROSS SECTION
1" = 10’
1" = 10’
aedwards 4:07:19 PM3/20/2008 P:\IN2003\0661\D. Drawings\IN20030661.RD.C2.CS.E.DGN
CITY OF CARMEL
BCF BCF
JSB JSB
LINE "S-7-E"
152
07-08D
173
20 30 40 50 60 70 80 90 100 110 120 130 140 150 1605060708090100110120130140150203040
0 10 20 30 40 50 60 70 80 90 100 110 120 130 140 150 160506070809011012013014015010203040
CUT FILLCROSS SECTIONS
Scale: 1 inch = 10 feet
100
HORIZONTAL SCALE
DESIGNATION NO.
BRIDGE FILE
VERTICAL SCALE
SURVEY BOOK SHEETS
CONTRACT PROJECT NO.
of
DESIGNED:DRAWN:
CHECKED:CHECKED:
DESIGN ENGINEER
RECOMMENDED
FOR APPROVAL
DATE
CROSS SECTION
1" = 10’
1" = 10’
aedwards 4:07:42 PM3/20/2008 P:\IN2003\0661\D. Drawings\IN20030661.RD.C2.CS.S7E.DGN
CITY OF CARMEL
BCF BCF
JSB JSB
LINE "S-7-E"07-08D
153 173
20 30 40 50 60 70 80 90 100 110 120 130 140 150 1605060708090100110120130140150203040
0 10 20 30 40 50 60 70 80 90 100 110 120 130 140 150 160506070809011012013014015010203040
CUT FILLCROSS SECTIONS
Scale: 1 inch = 10 feet
100
HORIZONTAL SCALE
DESIGNATION NO.
BRIDGE FILE
VERTICAL SCALE
SURVEY BOOK SHEETS
CONTRACT PROJECT NO.
of
DESIGNED:DRAWN:
CHECKED:CHECKED:
DESIGN ENGINEER
RECOMMENDED
FOR APPROVAL
DATE
CROSS SECTION
1" = 10’
1" = 10’
aedwards 4:07:43 PM3/20/2008 P:\IN2003\0661\D. Drawings\IN20030661.RD.C2.CS.S7E.DGN
CITY OF CARMEL
BCF BCF
JSB JSB
8
4
2
.
9
8
4
2
.
9
LINE "S-7-E"07-08D
154 173
20 30 40 50 60 70 80 90 100 110 120 130 140 150 1605060708090100110120130140150203040
0 10 20 30 40 50 60 70 80 90 100 110 120 130 140 150 160506070809011012013014015010203040
CUT FILLCROSS SECTIONS
Scale: 1 inch = 10 feet
100
HORIZONTAL SCALE
DESIGNATION NO.
BRIDGE FILE
VERTICAL SCALE
SURVEY BOOK SHEETS
CONTRACT PROJECT NO.
of
DESIGNED:DRAWN:
CHECKED:CHECKED:
DESIGN ENGINEER
RECOMMENDED
FOR APPROVAL
DATE
CROSS SECTION
1" = 10’
1" = 10’
aedwards 4:07:44 PM3/20/2008 P:\IN2003\0661\D. Drawings\IN20030661.RD.C2.CS.S7E.DGN
CITY OF CARMEL
BCF BCF
JSB JSB
8
4
2
.
6
8
4
2
.
6
8
4
2
.
3
8
4
2
.
3
84
1
.
6
84
1
.
6
LINE "S-7-E"07-08D
155 173
20 30 40 50 60 70 80 90 100 110 120 130 140 150 1605060708090100110120130140150203040
0 10 20 30 40 50 60 70 80 90 100 110 120 130 140 150 160506070809011012013014015010203040
CUT FILLCROSS SECTIONS
Scale: 1 inch = 10 feet
100
HORIZONTAL SCALE
DESIGNATION NO.
BRIDGE FILE
VERTICAL SCALE
SURVEY BOOK SHEETS
CONTRACT PROJECT NO.
of
DESIGNED:DRAWN:
CHECKED:CHECKED:
DESIGN ENGINEER
RECOMMENDED
FOR APPROVAL
DATE
CROSS SECTION
1" = 10’
1" = 10’
aedwards 4:07:45 PM3/20/2008 P:\IN2003\0661\D. Drawings\IN20030661.RD.C2.CS.S7E.DGN
CITY OF CARMEL
BCF BCF
JSB JSB
8
4
1
.
3
8
4
1
.
3
8
4
0
.
9
8
4
0
.
9
8
4
0
.
3
8
4
0
.
3
LINE "S-7-E"07-08D
156 173
20 30 40 50 60 70 80 90 100 110 120 130 140 150 1605060708090100110120130140150203040
0 10 20 30 40 50 60 70 80 90 100 110 120 130 140 150 160506070809011012013014015010203040
CUT FILLCROSS SECTIONS
Scale: 1 inch = 10 feet
100
HORIZONTAL SCALE
DESIGNATION NO.
BRIDGE FILE
VERTICAL SCALE
SURVEY BOOK SHEETS
CONTRACT PROJECT NO.
of
DESIGNED:DRAWN:
CHECKED:CHECKED:
DESIGN ENGINEER
RECOMMENDED
FOR APPROVAL
DATE
CROSS SECTION
1" = 10’
1" = 10’
aedwards 4:07:46 PM3/20/2008 P:\IN2003\0661\D. Drawings\IN20030661.RD.C2.CS.S7E.DGN
CITY OF CARMEL
BCF BCF
JSB JSB
8
3
9
.
7
8
3
9
.
7
83
9
.
2
83
9
.
2
83
9
.
1
83
9
.
1
LINE "S-7-E"07-08D
157 173
20 30 40 50 60 70 80 90 100 110 120 130 140 150 1605060708090100110120130140150203040
0 10 20 30 40 50 60 70 80 90 100 110 120 130 140 150 160506070809011012013014015010203040
CUT FILLCROSS SECTIONS
Scale: 1 inch = 10 feet
100
HORIZONTAL SCALE
DESIGNATION NO.
BRIDGE FILE
VERTICAL SCALE
SURVEY BOOK SHEETS
CONTRACT PROJECT NO.
of
DESIGNED:DRAWN:
CHECKED:CHECKED:
DESIGN ENGINEER
RECOMMENDED
FOR APPROVAL
DATE
CROSS SECTION
1" = 10’
1" = 10’
aedwards 4:07:47 PM3/20/2008 P:\IN2003\0661\D. Drawings\IN20030661.RD.C2.CS.S7E.DGN
CITY OF CARMEL
BCF BCF
JSB JSB
8
3
8
.
3
8
3
8
.
3
83
8
.
3
83
8
.
3
8
3
8
.
2
LINE "S-7-E"07-08D
158 173
20 30 40 50 60 70 80 90 100 110 120 130 140 150 1605060708090100110120130140150203040
0 10 20 30 40 50 60 70 80 90 100 110 120 130 140 150 160506070809011012013014015010203040
CUT FILLCROSS SECTIONS
Scale: 1 inch = 10 feet
100
HORIZONTAL SCALE
DESIGNATION NO.
BRIDGE FILE
VERTICAL SCALE
SURVEY BOOK SHEETS
CONTRACT PROJECT NO.
of
DESIGNED:DRAWN:
CHECKED:CHECKED:
DESIGN ENGINEER
RECOMMENDED
FOR APPROVAL
DATE
CROSS SECTION
1" = 10’
1" = 10’
aedwards 4:07:48 PM3/20/2008 P:\IN2003\0661\D. Drawings\IN20030661.RD.C2.CS.S7E.DGN
CITY OF CARMEL
BCF BCF
JSB JSB
LINE "S-7-E"07-08D
159 173
20 30 40 50 60 70 80 90 100 110 120 130 140 150 1605060708090100110120130140150203040
0 10 20 30 40 50 60 70 80 90 100 110 120 130 140 150 160506070809011012013014015010203040
CUT FILLCROSS SECTIONS
Scale: 1 inch = 10 feet
100
HORIZONTAL SCALE
DESIGNATION NO.
BRIDGE FILE
VERTICAL SCALE
SURVEY BOOK SHEETS
CONTRACT PROJECT NO.
of
DESIGNED:DRAWN:
CHECKED:CHECKED:
DESIGN ENGINEER
RECOMMENDED
FOR APPROVAL
DATE
CROSS SECTION
1" = 10’
1" = 10’
aedwards 4:07:49 PM3/20/2008 P:\IN2003\0661\D. Drawings\IN20030661.RD.C2.CS.S7E.DGN
CITY OF CARMEL
BCF BCF
JSB JSB
LINE "S-7-E"07-08D
160 173
20 30 40 50 60 70 80 90 100 110 120 130 140 150 1605060708090100110120130140150203040
0 10 20 30 40 50 60 70 80 90 100 110 120 130 140 150 160506070809011012013014015010203040
CUT FILLCROSS SECTIONS
Scale: 1 inch = 10 feet
100
HORIZONTAL SCALE
DESIGNATION NO.
BRIDGE FILE
VERTICAL SCALE
SURVEY BOOK SHEETS
CONTRACT PROJECT NO.
of
DESIGNED:DRAWN:
CHECKED:CHECKED:
DESIGN ENGINEER
RECOMMENDED
FOR APPROVAL
DATE
CROSS SECTION
1" = 10’
1" = 10’
aedwards 4:07:50 PM3/20/2008 P:\IN2003\0661\D. Drawings\IN20030661.RD.C2.CS.S7E.DGN
CITY OF CARMEL
BCF BCF
JSB JSB
LINE "S-7-E"07-08D
161 173
20 30 40 50 60 70 80 90 100 110 120 130 140 150 1605060708090100110120130140150203040
0 10 20 30 40 50 60 70 80 90 100 110 120 130 140 150 160506070809011012013014015010203040
CUT FILLCROSS SECTIONS
Scale: 1 inch = 10 feet
100
HORIZONTAL SCALE
DESIGNATION NO.
BRIDGE FILE
VERTICAL SCALE
SURVEY BOOK SHEETS
CONTRACT PROJECT NO.
of
DESIGNED:DRAWN:
CHECKED:CHECKED:
DESIGN ENGINEER
RECOMMENDED
FOR APPROVAL
DATE
CROSS SECTION
1" = 10’
1" = 10’
aedwards 4:07:51 PM3/20/2008 P:\IN2003\0661\D. Drawings\IN20030661.RD.C2.CS.S7E.DGN
CITY OF CARMEL
BCF BCF
JSB JSB
LINE "S-7-E"07-08D
162 173
20 30 40 50 60 70 80 90 100 110 120 130 140 150 1605060708090100110120130140150203040
0 10 20 30 40 50 60 70 80 90 100 110 120 130 140 150 160506070809011012013014015010203040
CUT FILLCROSS SECTIONS
Scale: 1 inch = 10 feet
100
HORIZONTAL SCALE
DESIGNATION NO.
BRIDGE FILE
VERTICAL SCALE
SURVEY BOOK SHEETS
CONTRACT PROJECT NO.
of
DESIGNED:DRAWN:
CHECKED:CHECKED:
DESIGN ENGINEER
RECOMMENDED
FOR APPROVAL
DATE
CROSS SECTION
1" = 10’
1" = 10’
aedwards 4:07:51 PM3/20/2008 P:\IN2003\0661\D. Drawings\IN20030661.RD.C2.CS.S7E.DGN
CITY OF CARMEL
BCF BCF
JSB JSB
LINE "S-7-E"07-08D
163 173
20 30 40 50 60 70 80 90 100 110 120 130 140 150 1605060708090100110120130140150203040
0 10 20 30 40 50 60 70 80 90 100 110 120 130 140 150 160506070809011012013014015010203040
CUT FILLCROSS SECTIONS
Scale: 1 inch = 10 feet
100
HORIZONTAL SCALE
DESIGNATION NO.
BRIDGE FILE
VERTICAL SCALE
SURVEY BOOK SHEETS
CONTRACT PROJECT NO.
of
DESIGNED:DRAWN:
CHECKED:CHECKED:
DESIGN ENGINEER
RECOMMENDED
FOR APPROVAL
DATE
CROSS SECTION
1" = 10’
1" = 10’
aedwards 4:07:52 PM3/20/2008 P:\IN2003\0661\D. Drawings\IN20030661.RD.C2.CS.S7E.DGN
CITY OF CARMEL
BCF BCF
JSB JSB
8
2
8
.
6
8
2
8
.
6
8
2
7
.
9
8
2
7
.
9
LINE "S-7-E"07-08D
164 173
20 30 40 50 60 70 80 90 100 110 120 130 140 150 1605060708090100110120130140150203040
0 10 20 30 40 50 60 70 80 90 100 110 120 130 140 150 160506070809011012013014015010203040
CUT FILLCROSS SECTIONS
Scale: 1 inch = 10 feet
100
HORIZONTAL SCALE
DESIGNATION NO.
BRIDGE FILE
VERTICAL SCALE
SURVEY BOOK SHEETS
CONTRACT PROJECT NO.
of
DESIGNED:DRAWN:
CHECKED:CHECKED:
DESIGN ENGINEER
RECOMMENDED
FOR APPROVAL
DATE
CROSS SECTION
1" = 10’
1" = 10’
aedwards 4:07:53 PM3/20/2008 P:\IN2003\0661\D. Drawings\IN20030661.RD.C2.CS.S7E.DGN
CITY OF CARMEL
BCF BCF
JSB JSB
8
2
7
.
7
8
2
7
.
7
82
6
.
8
82
6
.
8
LINE "S-7-E"07-08D
165 173
20 30 40 50 60 70 80 90 100 110 120 130 140 150 1605060708090100110120130140150203040
0 10 20 30 40 50 60 70 80 90 100 110 120 130 140 150 160506070809011012013014015010203040
CUT FILLCROSS SECTIONS
Scale: 1 inch = 10 feet
100
HORIZONTAL SCALE
DESIGNATION NO.
BRIDGE FILE
VERTICAL SCALE
SURVEY BOOK SHEETS
CONTRACT PROJECT NO.
of
DESIGNED:DRAWN:
CHECKED:CHECKED:
DESIGN ENGINEER
RECOMMENDED
FOR APPROVAL
DATE
CROSS SECTION
1" = 10’
1" = 10’
aedwards 4:07:54 PM3/20/2008 P:\IN2003\0661\D. Drawings\IN20030661.RD.C2.CS.S7E.DGN
CITY OF CARMEL
BCF BCF
JSB JSB
8
2
6
.
6
8
2
6
.
6
8
2
5
.
7
8
2
5
.
7
LINE "S-7-E"07-08D
166 173
20 30 40 50 60 70 80 90 100 110 120 130 140 150 1605060708090100110120130140150203040
0 10 20 30 40 50 60 70 80 90 100 110 120 130 140 150 160506070809011012013014015010203040
CUT FILLCROSS SECTIONS
Scale: 1 inch = 10 feet
100
HORIZONTAL SCALE
DESIGNATION NO.
BRIDGE FILE
VERTICAL SCALE
SURVEY BOOK SHEETS
CONTRACT PROJECT NO.
of
DESIGNED:DRAWN:
CHECKED:CHECKED:
DESIGN ENGINEER
RECOMMENDED
FOR APPROVAL
DATE
CROSS SECTION
1" = 10’
1" = 10’
aedwards 4:07:55 PM3/20/2008 P:\IN2003\0661\D. Drawings\IN20030661.RD.C2.CS.S7E.DGN
CITY OF CARMEL
BCF BCF
JSB JSB
8
2
4
.
8
8
2
4
.
8
8
2
4
.
8
8
2
4
.
8
LINE "S-7-E"07-08D
167 173
20 30 40 50 60 70 80 90 100 110 120 130 140 150 1605060708090100110120130140150203040
0 10 20 30 40 50 60 70 80 90 100 110 120 130 140 150 160506070809011012013014015010203040
CUT FILLCROSS SECTIONS
Scale: 1 inch = 10 feet
100
HORIZONTAL SCALE
DESIGNATION NO.
BRIDGE FILE
VERTICAL SCALE
SURVEY BOOK SHEETS
CONTRACT PROJECT NO.
of
DESIGNED:DRAWN:
CHECKED:CHECKED:
DESIGN ENGINEER
RECOMMENDED
FOR APPROVAL
DATE
CROSS SECTION
1" = 10’
1" = 10’
aedwards 4:07:56 PM3/20/2008 P:\IN2003\0661\D. Drawings\IN20030661.RD.C2.CS.S7E.DGN
CITY OF CARMEL
BCF BCF
JSB JSB
82
4
.
3
82
4
.
3
8
2
4
.
3
8
2
4
.
3
LINE "S-7-E"07-08D
168 173
20 30 40 50 60 70 80 90 100 110 120 130 140 150 1605060708090100110120130140150203040
0 10 20 30 40 50 60 70 80 90 100 110 120 130 140 150 160506070809011012013014015010203040
CUT FILLCROSS SECTIONS
Scale: 1 inch = 10 feet
100
HORIZONTAL SCALE
DESIGNATION NO.
BRIDGE FILE
VERTICAL SCALE
SURVEY BOOK SHEETS
CONTRACT PROJECT NO.
of
DESIGNED:DRAWN:
CHECKED:CHECKED:
DESIGN ENGINEER
RECOMMENDED
FOR APPROVAL
DATE
CROSS SECTION
1" = 10’
1" = 10’
aedwards 4:07:57 PM3/20/2008 P:\IN2003\0661\D. Drawings\IN20030661.RD.C2.CS.S7E.DGN
CITY OF CARMEL
BCF BCF
JSB JSB
8
2
4
.
3
8
2
4
.
2
8
2
4
.
2
LINE "S-7-E"07-08D
169 173
20 30 40 50 60 70 80 90 100 110 120 130 140 150 1605060708090100110120130140150203040
0 10 20 30 40 50 60 70 80 90 100 110 120 130 140 150 160506070809011012013014015010203040
CUT FILLCROSS SECTIONS
Scale: 1 inch = 10 feet
100
HORIZONTAL SCALE
DESIGNATION NO.
BRIDGE FILE
VERTICAL SCALE
SURVEY BOOK SHEETS
CONTRACT PROJECT NO.
of
DESIGNED:DRAWN:
CHECKED:CHECKED:
DESIGN ENGINEER
RECOMMENDED
FOR APPROVAL
DATE
CROSS SECTION
1" = 10’
1" = 10’
aedwards 4:07:58 PM3/20/2008 P:\IN2003\0661\D. Drawings\IN20030661.RD.C2.CS.S7E.DGN
CITY OF CARMEL
BCF BCF
JSB JSB
82
4
.
1
82
4
.
1
82
4
.
1
82
4
.
1
8
2
3
.
7
8
2
3
.
7
LINE "S-7-E"07-08D
170 173
20 30 40 50 60 70 80 90 100 110 120 130 140 150 1605060708090100110120130140150203040
0 10 20 30 40 50 60 70 80 90 100 110 120 130 140 150 160506070809011012013014015010203040
CUT FILLCROSS SECTIONS
Scale: 1 inch = 10 feet
100
HORIZONTAL SCALE
DESIGNATION NO.
BRIDGE FILE
VERTICAL SCALE
SURVEY BOOK SHEETS
CONTRACT PROJECT NO.
of
DESIGNED:DRAWN:
CHECKED:CHECKED:
DESIGN ENGINEER
RECOMMENDED
FOR APPROVAL
DATE
CROSS SECTION
1" = 10’
1" = 10’
aedwards 4:07:59 PM3/20/2008 P:\IN2003\0661\D. Drawings\IN20030661.RD.C2.CS.S7E.DGN
CITY OF CARMEL
BCF BCF
JSB JSB
8
2
3
.
7
8
2
3
.
7
8
2
3
.
7
8
2
3
.
7
LINE "S-7-E"07-08D
171 173
20 30 40 50 60 70 80 90 100 110 120 130 140 150 1605060708090100110120130140150203040
0 10 20 30 40 50 60 70 80 90 100 110 120 130 140 150 160506070809011012013014015010203040
CUT FILLCROSS SECTIONS
Scale: 1 inch = 10 feet
100
HORIZONTAL SCALE
DESIGNATION NO.
BRIDGE FILE
VERTICAL SCALE
SURVEY BOOK SHEETS
CONTRACT PROJECT NO.
of
DESIGNED:DRAWN:
CHECKED:CHECKED:
DESIGN ENGINEER
RECOMMENDED
FOR APPROVAL
DATE
CROSS SECTION
1" = 10’
1" = 10’
aedwards 4:08:00 PM3/20/2008 P:\IN2003\0661\D. Drawings\IN20030661.RD.C2.CS.S7E.DGN
CITY OF CARMEL
BCF BCF
JSB JSB
8
2
2
.
9
8
2
2
.
9
82
2
.
1
82
2
.
1
LINE "S-7-E"07-08D
172 173
20 30 40 50 60 70 80 90 100 110 120 130 140 150 1605060708090100110120130140150203040
0 10 20 30 40 50 60 70 80 90 100 110 120 130 140 150 160506070809011012013014015010203040
CUT FILLCROSS SECTIONS
Scale: 1 inch = 10 feet
100
HORIZONTAL SCALE
DESIGNATION NO.
BRIDGE FILE
VERTICAL SCALE
SURVEY BOOK SHEETS
CONTRACT PROJECT NO.
of
DESIGNED:DRAWN:
CHECKED:CHECKED:
DESIGN ENGINEER
RECOMMENDED
FOR APPROVAL
DATE
CROSS SECTION
1" = 10’
1" = 10’
aedwards 4:08:01 PM3/20/2008 P:\IN2003\0661\D. Drawings\IN20030661.RD.C2.CS.S7E.DGN
CITY OF CARMEL
BCF BCF
JSB JSB
82
1
.
1
82
1
.
1
8
2
0
.
5
8
2
0
.
5
8
1
9
.
5
8
1
9
.
5
LINE "S-7-E"07-08D
173 173
20 30 40 50 60 70 80 90 100 110 120 130 140 150 1605060708090100110120130140150203040
0 10 20 30 40 50 60 70 80 90 100 110 120 130 140 150 160506070809011012013014015010203040
CUT FILLCROSS SECTIONS
Scale: 1 inch = 10 feet
100
HORIZONTAL SCALE
DESIGNATION NO.
BRIDGE FILE
VERTICAL SCALE
SURVEY BOOK SHEETS
CONTRACT PROJECT NO.
of
DESIGNED:DRAWN:
CHECKED:CHECKED:
DESIGN ENGINEER
RECOMMENDED
FOR APPROVAL
DATE
CROSS SECTION
1" = 10’
1" = 10’
aedwards 4:08:02 PM3/20/2008 P:\IN2003\0661\D. Drawings\IN20030661.RD.C2.CS.S7E.DGN
CITY OF CARMEL
BCF BCF