Loading...
HomeMy WebLinkAboutKeystone Parkway #07-08C (116) Full Size Bridge PlansCLAY TOWNSHIP T. 18N. T. 17N. R. 3E. R. 4E. HAMILTON COUNTY END CONSTRUCTION STA. 26+00.00 "S-6-E" BEGIN PROJECT STA. 473+95.00 "E" BEGIN CONSTRUCTION STA. 15+00.00 "S-6-E" END PROJECT STA. 529+70.00 "E" 116TH STREET OVER KEYSTONE PARKWAY DESIGNATION NO. BRIDGE FILE SHEETS CONTRACT PROJECT NO. of CONTRACT BRIDGE FILE DESIGNATIONPROJECT PROJECT LOCATION SHOWN BY BRIDGE PLANS ACCESS CONTROL TERRAIN % DESIGN DATA RURAL/URBAN FUNCTIONAL CLASSIFICATION % D.H.V. M.P.H. V.P.H. V.P.D. V.P.D. TRUCKS PROJECT DESIGN CRITERIA DESIGN SPEED DIRECTIONAL DISTRIBUTION D.H.V. A.A.D.T. A.A.D.T. TRAFFIC DATA % Mile Mile Mile MAX. GRADE : TOTAL LENGTH : ROADWAY LENGTH : BRIDGE LENGTH : INDEX STRUCTURE TYPE SPAN AND SKEW OVER STATION PRESTRESSED CONCRETE SUBJECT LATITUDE LONGITUDE HYDRAULIC UNIT CODE INDIANA DEPARTMENT OF TRANSPORTATION STANDARD SPECIFICATIONS DATED 2008 TO BE USED WITH THESE PLANS CITY OF CARMEL BOARD OF PUBLIC WORKS AND SAFETY KEYSTONE PARKWAY AT THE 116TH STREET ROUNDABOUT CITY OF CARMEL PROJECT No. 07-08C 116TH STREET CONTINUOUS COMPOSITE KEYSTONE PARKWAY PHONE NUMBER PREPARED BY: PLANS CERTIFIED BY: APPROVED FOR LETTING: CHIEF, DIVISION OF DESIGN DATE DATE (317) 547-5580American Structurepoint, Inc. SHEET NO.DATE REVISIONS REVISED 116TH STREET 2 SPANS @ 50’-3" SKEW: SQUARE 20+00.00 "S-6-E" 07-08C 0.020 0.188 0.208 2.15 07-08C 1 INDEX AND TITLE SHEET TYPICAL SECTION - LINE "E" (FOR INFORMATION ONLY) TYPICAL SECTION - LINE "S-6-E" (FOR INFORMATION ONLY) 5 BRIDGE TIE-UP DIAGRAM LAYOUT GENERAL PLAN END BENT NO.1 DETAILS 13-18 PIER NO.2 DETAILS 19-22 END BENT NO.3 DETAILS 23-25 BEAM DETAILS 26-45 SUPERSTRUCTURE DETAILS 46-50 R.C. BRIDGE APPROACH DETAILS 51 BRIDGE SUMMARY 2-3 4 51 21,200 29,900 3,110 60/40 2 2007 2030 2030 35 SECONDARY ARTERIAL URBAN LEVEL PARTIAL 1 9-12 6-7 8 February 6, 2009 Scale: 1"=2,000’ This New Bridge Construction is on 116th Street over Keystone Parkway Located Approximately 0.39 Miles South of the Intersection of Carmel Drive & Keystone Parkway on Section Line Between Section 31, T-18-N, R-4-E and Section 6, T-17-N, R-4-E Clay Township, Hamilton County, Indiana. Co lle ge Ave E 106th St E 116th St E 126th St E Main St Me rid ia n St N Guilfo rd Ro a d N Me r id ia n S t N Meridian St S Gu ilfo r d R o a d S R a n g e lin e Ro a d US Hwy 31 W 106th St W 111th St W 116th St Bl u e W o o d s Cr e e k Carmel Creek Cool CreekHot Lick Creek La ke Wo o d la n d Little Cool Creek 1 36 31 32 5 6 25 30 29 Mo n o n Tra il Mo n o n Tr a il 26 35 2 Carmel Dr. Ke ys t o n e P a rkwa y Ke y s t o n e P a r kwa y afishburn 12:33:01 PM2/11/2009 P:\IN2003\0661\D. Drawings\IN20030661.BR.C5.116.BTS.01.dgn INDIANAPOLIS, IN 46256-3957 TEL 317.547.5580 FAX 317.543.0270 www.structurepoint.com 7260 SHADELAND STATION No. STATE OF INDIANA REGISTE RED P R OFE S SIONAL ENGIN EER 880305 DAVID A. D AY 51 HDP STA. 488+50.00 to 491+00.00 STA. 500+59.35 to 509+18.19 STA. 500+50.00 to 500+59.35 STA. 491+00.00 to 500+50.00 STA. 509+25.00 to 519+25.00 STA. 509+18.19 to 509+25.00 Sta. 482+55.00 to Sta. 486+90.00 Line "E" Sta. 486+90.00 to Sta. 487+20.00 Line "E" Sta. 476+55.00 to Sta. 482+55.00 Line "E" Sta. 486+90.00 to Sta. 488+50.00 Line "E" TYPICAL SECTION-LINE "E" NORTHBOUND TYPICAL SECTION-LINE "E" NORTHBOUND TYPICAL SECTION-LINE "E" NORTHBOUND TYPICAL SECTION-LINE "E" NORTHBOUND TYPICAL SECTION-LINE "E" NORTHBOUND TYPICAL SECTION-LINE "E" NORTHBOUND TYPICAL SECTION-LINE "E" NORTHBOUND STA. 519+25.00 to 522+50.00 HORIZONTAL SCALE DESIGNATION NO. BRIDGE FILE VERTICAL SCALE SURVEY BOOK SHEETS CONTRACT PROJECT NO. of DESIGNED:DRAWN: CHECKED:CHECKED: DESIGN ENGINEER RECOMMENDED FOR APPROVAL DATE TYPICAL CROSS SECTION 2 N/A CITY OF CARMEL JSB JSB ELS 07-08C 1"=5’ 2/12/09 2’-0" ShoulderTravel Lane Existing Pavement 2% Subgrade Treatment, Type I Sawcut 4% R K2 Line "E " Varies from 7’-6" at 476+55.00 to 10’-0" at 477+75.00 Varies from 12’-0" at 481+75.00 to 16’-0" at 483+75.00 Varies from 0’-0" at 476+55.00 to 12’-0" at 477+75.00 12’-0" Travel Lane 12’-0" Travel Lane 25’-6" Median R 12’-0" Travel Lane 10’-0" Shoulder 12’-0" Travel Lane 2’-0" 2’-0" 10’-0" Median Profile Grade Line "E" U 18 K J 26 2%2%2%4% 69 2% 2’-0" 12’-0" Travel Lane 10’-0" Shoulder 12’-0" Travel Lane 10’-0" Median Profile Grade Line "E" U 18 K J 26 2%2%2%4% 2% 2’-0" 12’-0" Travel Lane 10’-0" Shoulder 12’-0" Travel Lane 2’-0" 2’-0" 10’-0" Median Profile Grade Line "E" 18 K J 26 2%2%2%4% 69 2% 6" Compacted Aggregate No. 53 8" No. 8 Aggregate U1 U1 3 Line "E" 2%25 5:1 R2% Existing Pavement Sawcut K22%4% K2 Sawcut Varies from 25’-6" at 482+55.00 to 10’-0" at 487+20.00 Varies Varies Varies Median K2 12’-0" Travel Lane 12’-0" Travel Lane Varies Gore Area Varies Travel Lane 10’-0" Shoulder 4 5 4 5 Line "E" 5:1 25 2% Subgrade Treatment, Type I 4% 3’-0" 4:1 (max.) 69 2’-0"10’-0" Profile Grade Paved Side Ditch, Type "A" 12’-0" Travel Lane 12’-0" Travel Lane Varies Gore 16’-0" Travel Lane 5 27’-6" Varies from 4’-0" at 483+75.00 to 25’-3" at 487+20.00 Varies from 25’-3" at 487+20.00 to 30’-5" at 488+50.00 Varies from 0’-0" at 482+55.00 to 4’-0" at 483+75.00 Varies Median 4 Subgrade Treatment, Type I Line "E" 1826 Profile Grade Varies from 10’-0" at 488+00.00 to 8’-0" at 488+50.00 4% 3’-0" 4:1 (max.) 69 2’-0" Paved Side Ditch, Type "A" K2%2% 2% 12’-0" Travel Lane 12’-0" Travel Lane Varies Gore 16’-0" Travel Lane 5 6 6 Varies 1 2 1 2 25 25 1 Subgrade Treatment, Type I K2 K2 K U 4’-0" Shoulder U 2%2% 2%2% 49’-6" Is 10’-0" from 487+20.00 to 488+00.00 U 20 20 2’-0" Existing Ground Existing Ground 2’-0" Note: Wall Begins @ Sta. 489+00.00 See Sheet 21 for wall details Existing Shoulder 4 :1 25 4 :1 25 Note:Wall Begins @ Sta. 486+50 Paved Side Sitch Begins @ 486+50 K2K2 R1K2 Varies Median 4 Note:Curb Starts @ Sta. 487+20 Existing Pavement Exist.Exist. 2% afishburn 12:33:08 PM2/11/2009 P:\IN2003\0661\D. Drawings\IN20030661.BR.C5.116.TY.01.dgn No. STATE OF INDIAN A REGISTE RED P R OFE S SIONAL ENGIN EER 10505104 J. SAMUEL B ALO G K U 1 16 21 17 19 22 Curb and Gutter Type II Curb and Gutter Type III 18 Curb and Gutter, B, Modified 70 Moment Slab 6" Underdrain 20 Curb and Gutter, B 15 Concrete Roll Curb A R2 K2 2 K1 J O1 G R1 R 26 Sodding 69 Retaining Wall 12" PCCP B Subbase for PCCP Seeding25 Integral Concrete CurbF3 Variable Depth Compacted Aggregate Base, No. 53 Concrete Curb, Modified U1 O2 Coarse Aggregate, No. 8 6" A2000 PVC Pipe 3 F Concrete Sidewalk, 4" 110 #/Syd. HMA Surface, Type "A", on 330#/Syd. HMA Intermediate, Type "A" on 5" Compacted Aggregate Base No. 53 165 #/Syd. HMA Surface, Type "D" on 275 #/Syd. HMA Intermediate, Type "D" on 385 #/Syd. HMA Base, Type "D" on 350 #/Syd. HMA Intermediate, OG, Type "D" on 550 #/Syd. HMA Base , Type "D" 165 #/Syd. HMA Surface, Type "C" on 275 #/Syd. HMA Intermediate, Type "C" on 385 #/Syd. HMA Base, Type "C" on 250 #/Syd. HMA Intermediate, OG, Type "C" on 330 #/Syd. HMA Base , Type "C" on Subgrade Treatment, Type I 165 #/Syd. HMA Surface, Type "D" on 275 #/Syd. HMA Intermediate, Type "D" on 385 #/Syd. HMA Base, Type "D" on 385 #/Syd. HMA Base, Type "D" on 550 #/Syd. HMA Base, Type "D" on Subgrade Treatment, Type I 165 #/Syd. HMA Surface, Type "D", on 495 #/Syd. HMA Base, Type "D" on 10" Compacted Aggregate Base 165 #/Syd HMA Surface Type "D" on 1.5" Surface Milling 165 #/Syd HMA Surface Type "D" on Variable depth HMA Wedge & Level on 1.5" Surface Milling 165 #/Syd HMA Surface Type "C" on 1.5" Surface Milling Modified 33" Bridge Rail, Type I Integral Concrete Curb, Type B 24 Modified 33" Bridge Rail, Type II Straight concrete Curb F1 Decorative Concrete Sidewalk, 4" F2 Decorative PCCP, 7", Pattern 2 Modified Reinforced Conc. Barrier Wall Decorative Concrete 4" on 2" Blue Board 51 HDP STA. 488+00.00 to 491+00.00 STA. 501+53.19 to 509+25.00 STA. 519+25.00 to 522+50.00 STA. 491+00.00 to 500+50.00 STA. 509+86.97 to 519+25.00 STA. 500+50.00 to 501+53.19 STA. 509+25.00 to 509+86.97 STA. 527+85.00 to 528+50.00 STA. 522+50.00 to 527+85.00 STA. 529+70.00 to 536+50.00 TYPICAL SECTION-LINE "E" SOUTHBOUND TYPICAL SECTION-LINE "E" SOUTHBOUND TYPICAL SECTION-LINE "E" SOUTHBOUND TYPICAL SECTION-LINE "E" SOUTHBOUND TYPICAL SECTION-LINE "E" SOUTHBOUND TYPICAL SECTION-LINE "E" SOUTHBOUND TYPICAL SECTION-LINE "E" SOUTHBOUND STA. 528+50.00 to 529+70.00 TYPICAL SECTION-LINE "E" SOUTHBOUND HORIZONTAL SCALE DESIGNATION NO. BRIDGE FILE VERTICAL SCALE SURVEY BOOK SHEETS CONTRACT PROJECT NO. of DESIGNED:DRAWN: CHECKED:CHECKED: DESIGN ENGINEER RECOMMENDED FOR APPROVAL DATE TYPICAL CROSS SECTION 3 N/A CITY OF CARMEL JSB JSB ELS 07-08C 1"=5’ 2/12/09 12’-0" Travel Lane 10’-0" Shoulder 12’-0" Travel Lane 2’-0" 2’-0" Profile Grade 10’-0" Median 18 J 4%2%2%2% 69 K 2% 2’-0" 12’-0" Travel Lane 10’-0" Shoulder 12’-0" Travel Lane 2’-0" Profile Grade 10’-0" Median 18 J 4%2%2%2%2% 2’-0" Profile Grade 18 J 4%2%2%2% 69 K 2% U1 Line "E" Line "E" Line "E" 2’-0"10’-0" Shoulder 2’-0" 12’-0" Travel Lane 12’-0" Travel Lane 10’-0" Median Profile Grade 18 J 4%2%2%2%K 2% U1 Line "E" 10’-0" Shoulder 2’-0" 12’-0" Travel Lane 12’-0" Travel Lane 10’-0" Median 12’-0" Travel Lane 12’-0" Travel Lane 10’-0" Median Profile Grade Line "E" 10’-0" Shoulder U 26 18 2%2%2%K K 2% 2’-0" 2% 2’-0" K2 2:1 Existing Ground 2’-0" 4% 18 18 Varies from 16’-0" at 527+85.00 to 12’-0" at 529+70.00 O1 25 2’-0"3’-5" 12’-0" Travel Lane 12’-0" Travel Lane 10’-0" Median Profile Grade Line "E" UU K 26 18 2%2%2%K K 2% Varies Gore Area 2’-0" 2% 2’-0" **K2 Existing Ground 2’-0" 4% 16’-0" Travel Lane 16 16 17 Varies from 20’-5" at 522+50.00 to 0’-0" at 527+85.00 Varies from 8’-0" at 522+50.00 to 10’-0" at 523+50.00 O1 25 2’-0"3’-5" Varies Travel Lane Varies Shoulder 17 Line "E" Existing Ground Existing Shoulder 18 26 2% 10’-0"12’-0" Travel Lane 12’-0" Travel Lane 12’-0" Travel Lane Existing Shoulder Width Varies SawcutExisting Pavement 8" No. 8 Aggregate6" Compacted Aggregate No. 53 6" Compacted Aggregate No. 53 8" No. 8 Aggregate 26 26 26 26 U U1 U U1 12’-0" Travel Lane 12’-0" Travel Lane 10’-0" Median Profile Grade 26 18 2%2%2%K K 2% 2’-0" 18Varies Travel Lane Line "E" 10’-0" Shoulder U 2% 2’-0" K2 3:1 Existing Ground 2’-0" 4% O1 2’-0"3’-5" 2: 1 2:1 Max 6:1 3: 1 25 Note: Underdrain Ends @ Sta. 526+60.00 * See Spot Elevation Sheet for Gore Grading Mill 7 1 2" Existing Asphalt (See Misc. Details) K 3 3 See Sheet 21 for wall details See Sheet 21 for wall details Note: 4’ Bottom Ditch Begins @ Sta. 525+95.00 "E" 22’-0" Clear Zone R R Note:Guardrail Ends @ Sta. 529+55.00 "E" afishburn 12:33:12 PM2/11/2009 P:\IN2003\0661\D. Drawings\IN20030661.BR.C5.116.TY.02.dgn No. STATE OF INDIAN A REGISTE RED P R OFE S SIONAL ENGIN EER 10505104 J. SAMUEL B ALO G K U 1 16 21 17 19 22 Curb and Gutter Type II Curb and Gutter Type III 18 Curb and Gutter, B, Modified 70 Moment Slab 6" Underdrain 20 Curb and Gutter, B 15 Concrete Roll Curb A R2 K2 2 K1 J O1 G R1 R 26 Sodding 69 Retaining Wall 12" PCCP B Subbase for PCCP Seeding25 Integral Concrete CurbF3 Variable Depth Compacted Aggregate Base, No. 53 Concrete Curb, Modified U1 O2 Coarse Aggregate, No. 8 6" A2000 PVC Pipe 3 F Concrete Sidewalk, 4" 110 #/Syd. HMA Surface, Type "A", on 330#/Syd. HMA Intermediate, Type "A" on 5" Compacted Aggregate Base No. 53 165 #/Syd. HMA Surface, Type "D" on 275 #/Syd. HMA Intermediate, Type "D" on 385 #/Syd. HMA Base, Type "D" on 350 #/Syd. HMA Intermediate, OG, Type "D" on 550 #/Syd. HMA Base , Type "D" 165 #/Syd. HMA Surface, Type "C" on 275 #/Syd. HMA Intermediate, Type "C" on 385 #/Syd. HMA Base, Type "C" on 250 #/Syd. HMA Intermediate, OG, Type "C" on 330 #/Syd. HMA Base , Type "C" on Subgrade Treatment, Type I 165 #/Syd. HMA Surface, Type "D" on 275 #/Syd. HMA Intermediate, Type "D" on 385 #/Syd. HMA Base, Type "D" on 385 #/Syd. HMA Base, Type "D" on 550 #/Syd. HMA Base, Type "D" on Subgrade Treatment, Type I 165 #/Syd. HMA Surface, Type "D", on 495 #/Syd. HMA Base, Type "D" on 10" Compacted Aggregate Base 165 #/Syd HMA Surface Type "D" on 1.5" Surface Milling 165 #/Syd HMA Surface Type "D" on Variable depth HMA Wedge & Level on 1.5" Surface Milling 165 #/Syd HMA Surface Type "C" on 1.5" Surface Milling Modified 33" Bridge Rail, Type I Integral Concrete Curb, Type B 24 Modified 33" Bridge Rail, Type II Straight concrete Curb F1 Decorative Concrete Sidewalk, 4" F2 Decorative PCCP, 7", Pattern 2 Modified Reinforced Conc. Barrier Wall Decorative Concrete 4" on 2" Blue Board 51 HDP TYPICAL SECTION-LINE "S-6-E" STA. 14+75.00 to 15+75.00 TYPICAL SECTION-LINE "S-6-E" STA. 14+50.00 to 14+75.00 TYPICAL SECTION-LINE "S-6-E" STA. 15+75.00 to 18+07.50 See Spot Elevation Details for grading TYPICAL SECTION-LINE "S-6-E" STA. 21+83.74 to 23+20.43 See Spot Elevations Details for grading HORIZONTAL SCALE DESIGNATION NO. BRIDGE FILE VERTICAL SCALE SURVEY BOOK SHEETS CONTRACT PROJECT NO. of DESIGNED:DRAWN: CHECKED:CHECKED: DESIGN ENGINEER RECOMMENDED FOR APPROVAL DATE TYPICAL CROSS SECTION 4 N/A CITY OF CARMEL JSB JSB ELS 07-08C 1"=5’ 2/12/09 Width varies from 0’-0" @ Sta. 15+00.00 to 12’-0" @ Sta. 15+75.00 Profile Grade Line "S-6-E" K1K1 G17 17 26 26 2%2%2%2%2%2% 2’-0"2’-0" 3:1 3:12% U U 1’-0" 25 1’-0" 25 Existing Pavement Existing Ground Existing Ground R2 R2Exist.Exist. 12’-0" Travel Lane 12’-0" Travel Lane 12’-0" Travel Lane 12’-0" Travel Lane Existing Pavement 32 3331 Profile Grade 12’-0" 2% 34 2’-0"2’-0" 32 33 34 30 30 31 Width varies from 4’ 8" @ Sta. 15+00.00 to 5’ 0" @ Sta. 15+50.00 Width varies from 6’ 4" @ Sta. 15+00.00 to 5’ 0" @ Sta. 15+50.00 Line "S-6-E" K1K1 G17 17 26 26 2%2% 2’-0"2’-0" 3:1 3:12% U U 1’-0" 25 25 2% 2’-0"2’-0" 5’-0" Sidewalk 1’-6" Existing Median Width Varies K1 1’-0"Varies Median Varies Median ***Varies Travel Lane Varies Travel Lane ****************** *** See Geometric Tie Up Sheet for Actual Dimensions *** See Geometric Tie Up Sheet for Actual Dimensions Varies 10’-0" Multi-Use Path Line "S-6-E" K1 K1 G 17 1719 2% 10’-0" Multi-Use Path 19 Varies Median Varies Median 2’-0"2’-0" 2’-0"2’-0" Varies Travel Lane Varies Travel Lanes Varies Travel Lane Varies Travel Lane ****************** U U G26 2% 8’-0" Multi-Use Path 3:1 1’-0" 25 1’-0" 25 Varies *** Existing Sidewalk Existing Path 26 26 2%2% 1’-6" 2’-6" 26 2%2% 26 Varies 24 24 24 24 Width varies from 6’-5" @ Sta. 14+75.00 to 10’-0" @ Sta. 15+75.00 Width varies from 9’-6" @ Sta. 15+00.00 to 0’-0" @ Sta. 15+75.00 Varies Varies Varies Varies Varies Varies Varies Varies Varies (See Constr. Details) (See Construction Details) 2% Varies Width varies from 10’-7" @ Sta. 14+75.00 to 9’-6" @ Sta. 15+00.00 Line "S-6-E" Varies Sidewalk Varies Varies Multi-Use Path 37 37 Is 11’-0" from Sta. 14+75 to Sta. 15+00 Width varies from 11’-0" @ Sta. 15+00.00 to 12’-0" @ Sta. 15+75.00 Profile Grade Profile Grade Profile GradeProfile Grade 1’-6" Varies Travel Lane Varies Travel Lane Varies Travel Lane 12’-0" Travel Lane Varies Travel Lane Varies Turn Lane 11’-0" Travel Lane 12’-0" Travel Lane afishburn 12:33:17 PM2/11/2009 P:\IN2003\0661\D. Drawings\IN20030661.BR.C5.116.TY.03.dgn No. STATE OF INDIAN A REGISTE RED P R OFE S SIONAL ENGIN EER 10505104 J. SAMUEL B ALO G K U 1 16 21 17 19 22 Curb and Gutter Type II Curb and Gutter Type III 18 Curb and Gutter, B, Modified 70 Moment Slab 6" Underdrain 20 Curb and Gutter, B 15 Concrete Roll Curb A R2 K2 2 K1 J O1 G R1 R 26 Sodding 69 Retaining Wall 12" PCCP B Subbase for PCCP Seeding25 Integral Concrete CurbF3 Variable Depth Compacted Aggregate Base, No. 53 Concrete Curb, Modified U1 O2 Coarse Aggregate, No. 8 6" A2000 PVC Pipe 3 F Concrete Sidewalk, 4" 110 #/Syd. HMA Surface, Type "A", on 330#/Syd. HMA Intermediate, Type "A" on 5" Compacted Aggregate Base No. 53 165 #/Syd. HMA Surface, Type "D" on 275 #/Syd. HMA Intermediate, Type "D" on 385 #/Syd. HMA Base, Type "D" on 350 #/Syd. HMA Intermediate, OG, Type "D" on 550 #/Syd. HMA Base , Type "D" 165 #/Syd. HMA Surface, Type "C" on 275 #/Syd. HMA Intermediate, Type "C" on 385 #/Syd. HMA Base, Type "C" on 250 #/Syd. HMA Intermediate, OG, Type "C" on 330 #/Syd. HMA Base , Type "C" on Subgrade Treatment, Type I 165 #/Syd. HMA Surface, Type "D" on 275 #/Syd. HMA Intermediate, Type "D" on 385 #/Syd. HMA Base, Type "D" on 385 #/Syd. HMA Base, Type "D" on 550 #/Syd. HMA Base, Type "D" on Subgrade Treatment, Type I 165 #/Syd. HMA Surface, Type "D", on 495 #/Syd. HMA Base, Type "D" on 10" Compacted Aggregate Base 165 #/Syd HMA Surface Type "D" on 1.5" Surface Milling 165 #/Syd HMA Surface Type "D" on Variable depth HMA Wedge & Level on 1.5" Surface Milling 165 #/Syd HMA Surface Type "C" on 1.5" Surface Milling Modified 33" Bridge Rail, Type I Integral Concrete Curb, Type B 24 Modified 33" Bridge Rail, Type II Straight concrete Curb F1 Decorative Concrete Sidewalk, 4" F2 Decorative PCCP, 7", Pattern 2 Modified Reinforced Conc. Barrier Wall Decorative Concrete 4" on 2" Blue Board TELEPHONE UTILITIES ELECTRIC CABLE TV GAS WATER & SEWER EXISTING STRUCTURE (NONE) NOTES: 116t h Str eet W. B.L. 116t h St r eet E. B.L. +00 +00 +00 +00 +00 +00+00+00+00+00 18 19 20 21 22 18 19 20 21 22 Bush Developement Company SDMBR, LLC City of Carmel CONTINUOUS COMPOSITE 116th STREET OVER KEYSTONE PARKWAY 790 800 810 820 830 840 790 800 810 820 830 840 SEC. 31, T 18 N, R 4 E HAMILTON COUNTY SEC. 6, T 17 N, R 4 E HAMILTON COUNTY P.O.T. Sta. 20+00.00 "S-6-E" P.O.T. Sta. 495+35.04 "E" Merchants Pointe Association, LLC G & T Company RMC MSP BMP MSP AS NOTED AS NOTED Ke y s t o n e P a r k w a y S .B.L. Ke y s t o n e P a rk w a y N . B . L. P.V.I. STA. 20+00.00 P.V.I. ELEV. 825.90 360.00’ V.C. 2.00 %-2.15 % VC VCS VCS 18+00 8 16 .9 8 16 .7 8 1 6 .8 8 1 7 .8 8 1 8 . 1 8 1 7 . 9 8 1 7 . 4 8 16 .9 8 16 .8 SITUATION PLAN SCALE: 1" = 30’-0", CONTOUR INTERVAL 1’-0" SCALES: 1" = 30’-0" HORIZONTAL, 1" = 10’-0" VERTICAL HORIZONTAL SCALE DESIGNATION NO. BRIDGE FILE VERTICAL SCALE SURVEY BOOK SHEETS CONTRACT PROJECT NO. of DESIGNED:DRAWN: CHECKED:CHECKED: DESIGN ENGINEER RECOMMENDED FOR APPROVAL DATE LAYOUT CITY OF CARMEL 07-08C 515 2/06/2009 City of Carmel Water Utilities 3450 W. 131st Street Westfield, IN 46074 (317) 733-2855 Fax: (317)733-2053 ATTN: Steve Cook Clay Twp. Regional Waste District 10701 North College Avenue, Suite A Indianapolis, IN 46280-1098 (317)844-9200 Fax: (317)844-9203 www.ctrwd.org ATTN: Shawn Pabst Veolia Water Indianapolis LLC 1220 Waterway Boulevard Indianapolis, IN 46202 (317) 264-7715 Fax: (317) 263-6494 ATTN: Dale Koch AT&T Indiana Engineering Department 5858 North College Ave. (317)252-5134 ATTN: Greg Cammack Bright House 3030 Roosevelt Avenue Indianapolis, IN (317) 339-9075 ATTN: Joe Evans Vectren 16000 Allisonville Road P.O. BOX 1700 Noblesville, IN 46061 (317) 776-5534 ATTN: Don Perdue Duke Energy 16475 Southpark Drive Westfield, IN 46074 (317) 896-6711 ATTN: Cindy Rowland Indianapolis Power and Light Co. Morris Street Service Center 1230 W. Morris Street Indianapolis, IN 46221-1744 Office: (317) 261-5203 Fax: (317) 630-5625 www.IPLpower.com Attn: Bob Stephens 53’ R/W R /W R/W R/W R/W For R/W Information, see Road Plans. For Alignment References and Topo References, See Road Plans. For Additional Alignment Data, see Geometric Tie-In Details, located in the Road Plans. Line "S-6-E" Lin e "E " Constr. Limits 2 SPANS @ 50’-3"SKEW: SQUARE CLEAR ROADWAY: VARIES of 116th Street on East Side of Keystone Parkway, Sta. 502+20.13 "E", 68.13 Rt., Elev. 819.12 Constr. Limits Constr. Limits 1 5 " RCP 12" RCP6" CMP 2 4 " R C P 2 4 " R C P 2 4 " R C P 18" RCP18" RCP15" RCP18" RCP 18" RCP 18" RCP21" RCP 24" RCP 24" R C P D D D 815 82 0 820 820 820 820 820 825 8 2 5 825 1’-6"B Borrow (Est. Qty.= 49 Cys.) 1’-6" Structure Backfill Type 3 (See MSE Wall Plans For Quantities) Structure Backfill Type 3 (See MSE Wall Plans For Quantities) Profile Grade Approximate Existing Ground STRUCTURE LIMITS + 4 8 .7 5 + 5 1.2 5 14 ’- 9 Æ" Min . Ve rt ic a l Clr. 14 ’- 1 0 " Min . Ve rt ic a l Clr. 1:4 (Typ.) Aggregate For End Bent Backfill (Est. Qty. = 138 Cys.) Over Geotextiles (Est. Qty. = 294 Sys.) Aggregate For End Bent Backfill (Est. Qty. = 143 Cys.) Over Geotextiles (Est. Qty. = 305 Sys.) Dry Excavation (Est. Qty.= 148 Cys.) 2-Sty. Br. Comm Bldg P a r k in g Lo t . Ma t . )( Gr a s s ) (Grass) (Bit. Mat.) (Grass)( R ip R a p ) Parking Lot (Bit. Mat.) (Bit. Mat.) (Grass)(Conc.) (Grass) Canopy over Con & Pum ps ( Gr a s s ) (Grass) (Bit. Mat.) (Grass)( R ip R a p ) Parking Lot (Bit. Mat.) (Bit. Mat.) (Grass)(Conc.) (Grass) Canopy over Con & Pum ps ACACAC AC AC ACACAC FP RT RT RT RT E T GVGVGV E THH WV WV W E W T 8 2 1 . 7 7 8 2 2 . 8 5 8 2 3 . 5 4 8 2 3 . 9 3 8 2 4 . 0 4 8 2 3 . 8 6 8 2 3 . 3 9 8 2 2 . 6 3 8 2 1 .6 0 afishburn 12:33:34 PM2/11/2009 P:\IN2003\0661\D. Drawings\IN20030661.BR.C5.116.LAY.01.dgn No. STATE OF INDIAN A REGISTE RED P R OFE S SIONAL ENGIN EER 880305 DAVID A. D AY PLAN CONTINUOUS COMPOSITE 116th STREET OVER KEYSTONE PARKWAY Keystone Pkwy. S.B.L. Keystone Pkwy. N.B.L. ELEVATION Structure To Be Built To A 360’ Vertical Curve A A 19+00 21+00 GENERAL NOTES DESIGN DATA K E Y S T O N E P A R K WA Y S . B . L. K E Y S T O N E P A R K WA Y N . B . L . 4 9 5 + 0 0 P.C. 495+72.71 "E" 116t h St reet W.B.L. 116th Street E.B.L. 116th Street W.B.L. 116t h St r eet E.B. L. NOTES: HORIZONTAL SCALE DESIGNATION NO. BRIDGE FILE VERTICAL SCALE SURVEY BOOK SHEETS CONTRACT PROJECT NO. of DESIGNED:DRAWN: CHECKED:CHECKED: DESIGN ENGINEER RECOMMENDED FOR APPROVAL DATE CITY OF CARMEL 07-08C 516 2/06/2009 2 SPANS @ 50’-3"SKEW: SQUARE CLEAR ROADWAY: VARIES Line "S-6-E" 16’- 0" R.C.Br. A p pr. Sta. 20+50.25 "S-6-E" P.G. El.823.85 Sta. 19+49.75 "S-6-E" P.G. El.823.93 Min. Vert. Clr. Min. Vert. Clr. 16’-0" R.C. Br. Appr. 1 6’- 0" R. C.Br. A p pr. 16’-0" R.C. Br. Appr. 116TH STREET IntegralIntegral Semi-Fixed Bent No.1 Bent No.3Pier No.2 Span A Span B HP12x74 Steel "H" Piles Driven To 220 Tons Per Pile Ultimate Bearing (Typ.) Bridge Railing 102’-6" 0-0 Bridge Floor 50’-3"50’-3"1’-0"1’-0" 1" = 20’-0" , UNLESS NOTED GENERAL PLAN RMC BMP 0 - 0 C o p in g V a r ie s Va r ie s C le a r R d w y . Va r ie s Va r ie s V a r ie s C le a r R d w y . V a r ie s Va r ie s 1’- 4 " 1 ’- 4 " P.O.T. 20+00.00 "S-6-E" =P.O.T. 495+35.04 "E" MSP MSP Ve rt . C lr . Ve r t . C lr . Sta. 20+00.00 "S-6-E" P.G. El.824.03 Superstructure and substructure designed for HL-93 loading in accordance with the AASHTO LRFD Bridge Design Specifications, Fourth Edition, 2007. Substructure foundation designed for HS-25 loading in accordance with the AASHTO Standard Specifications For Highway Bridges, Seventeenth Edition, 2002. LIVE LOAD : of floor slabs, 3" in the footings except the bottom steel which shall be 4", and 2" in all other parts, unless noted. Actual weight plus 35 Lbs./Sft. for future wearing surface and 15 Lbs./Sft. for permanent metal deck forms. Designed with the AASHTO Strip Method Reinforcing Steel, Fy = 60,000 psi Concrete Class B, f’c = 3,000 psi Concrete Class A, f’c = 3,500 psi Concrete Class C, f’c = 4,000 psi UNIT STRESSES : FLOOR SLAB : DEAD LOAD : HP12x74 Steel "H" Piles Driven To 200 Tons Per Pile Ultimate Bearing (Typ.) Bott.Footing El. 797.74 L in e "E " N 0 0 ’3 6 "W Sidewalk was considered as additional Structure Depth for the Slab Overhang Design. afishburn 8:55:17 AM2/11/2009 P:\IN2003\0661\D. Drawings\IN20030661.BR.C5.116.GPL.01.dgn No. STATE OF INDIAN A REGISTE RED P R OFE S SIONAL ENGIN EER 880305 DAVID A. D AY 3/16" = 1’-0", U.N. RMC GENERAL PLAN MSP MSP BMP HORIZONTAL SCALE DESIGNATION NO. BRIDGE FILE VERTICAL SCALE SURVEY BOOK SHEETS CONTRACT PROJECT NO. of DESIGNED:DRAWN: CHECKED:CHECKED: DESIGN ENGINEER RECOMMENDED FOR APPROVAL DATE CITY OF CARMEL 07-08C 517 2/06/2009 1’-2"2" Coping 8 " Roughened Constr. Joint (Typ.) Profile Grade 1 ’- 9 " Slope 2.0%Slope 2.0%Slope Varies Slope Varies Conduit * SECTION A-A EASTBOUND SECTION A-A WESTBOUND Clear Roadway VariesVaries Varies 1’-4" 2 ’- 9 " 4 ’- 6 "1 ’- 9 " Slope Varies 2.0% Max. Slope Varies 6" (Typ.) Profile Grade Slope 2.0%Slope 2.0%Slope Varies Ø" Half-Round Drip Bead (Typ.) Varies 8 " C la s s "C " C o n c r e t e S la b 2" PVC Conduit 1 ’- 9 " 8 " 1 ’- 9 " 2 ’- 9 " 4 ’- 6 " 1’-4" 2" Coping 1’-2" O.-O. Coping Varies Varies Varies O.-O. Coping Varies 6 " C u r b 6 " C u r b Slope Varies 2.0% Max. CONTINUOUS COMPOSITE 116TH STREET OVER KEYSTONE PARKWAY 2 SPANS @ 50’-3"SKEW: SQUARE CLEAR ROADWAY: VARIES Line "S-6-E" Varies Clear Roadway Varies Varies Varies Multi-Use Path Varies Line "S-6-E" Varies Varies Multi-Use Path Varies 8 " C la s s "C " C o n c r e t e S la b 9’-0"8 Equal Spaces @ 9’-0" = 72’-0" 9’-0"8 Equal Spaces @ 9’-0" = 72’-0"Beam Spa. Varies See Framing Plan Beam Spa. Varies See Framing Plan NOTES: * -Indicates Quantity Included in Road Plans. afishburn 8:55:21 AM2/11/2009 P:\IN2003\0661\D. Drawings\IN20030661.BR.C5.116.GPL.02.dgn No. STATE OF INDIAN A REGISTE RED P R OFE S SIONAL ENGIN EER 880305 DAVID A. D AY P.O.C. 496+36.75 "E" = O.P.O.T. 19+99.63 "S-6-E", 101.70 Lt. P.O.T. 494+31.86 "E" = O.P.O.T. 20+00.48 "S-6-E", 103.18 Rt. P.O.T. 20+00.00 "S-6-E" = P.O.T. 495+35.04 "E" P.O.T. 20+50.25 "S-6-E" P.O.T. 19+49.75 "S-6-E" P.C. 495+72.71 "E" 4 9 5 + 0 0 18+00 1" = 40’-0" BRIDGE TIE-UP DIAGRAM RMC MSP ALF DAD CENTER POINT NORTH COPING O.P.O.T. 20+34.55 "S-6-E", 298.63 Lt. = O.P.O.C. 498+33.98 "E", 34.17 Rt.. CENTER POINT SOUTH COPING O.P.O.T. 19+62.72 "S-6-E", 299.58 Rt. = O.P.O.T. 492+35.64 "E", 38.68 Lt. HORIZONTAL SCALE DESIGNATION NO. BRIDGE FILE VERTICAL SCALE SURVEY BOOK SHEETS CONTRACT PROJECT NO. of DESIGNED:DRAWN: CHECKED:CHECKED: DESIGN ENGINEER RECOMMENDED FOR APPROVAL DATE CITY OF CARMEL 07-08C 518 2/06/2009 North Coping Line Radius = 200.00’ South Coping Line Radius = 200.00’ Line "S-6-E" Lin e "E" R . 19 , 0 9 8 . 5 9 ’ afishburn 8:55:25 AM2/11/2009 P:\IN2003\0661\D. Drawings\IN20030661.BR.C5.116.TIE.01.dgn No. STATE OF INDIAN A REGISTE RED P R OFE S SIONAL ENGIN EER 880305 DAVID A. D AY END BENT NO. 1 DETAILS RMC MSP ALF DAD HORIZONTAL SCALE DESIGNATION NO. BRIDGE FILE VERTICAL SCALE SURVEY BOOK SHEETS CONTRACT PROJECT NO. of DESIGNED:DRAWN: CHECKED:CHECKED: DESIGN ENGINEER RECOMMENDED FOR APPROVAL DATE CITY OF CARMEL 07-08C 519 2/06/2009 Line "PR-S-6-E" 13- #7x36’-0" (5 Top, 4 Mid., 4 Bott.) 13- #7x36’-0" (5 Top, 4 Mid., 4 Bott.) 13- #7x36’-0" (5 Top, 4 Mid., 4 Bott.) PARTIAL PLAN (E.B.L.) PARTIAL ELEVATION (E.B.L.) 3" 8’-41 2" 105’-11 2" 3 Spa. @ 5’-3" = 15’-9"8 Spa. @ 9’-0" = 72’-0"9’-0" =2’-0"=2’-0"=2’-0"=2’-0"=2’-0"=2’-0"=2’-0"=2’-0"=2’-0"=2’-0"=2’-0"=2’-0" 8 Spa. @ 1’-0" Max. =3’-3"=3’-3"=3’-3" 9’-0"9’-0"9’-0"9’-0"9’-0"9’-0"9’-0"9’-0"9’-0" Varies Varies Varies 2"x10" Keyway Constr. Joint (Typ.) Work Point 4 Spa. @ 6" 4 Spa. @ 1’-0" Max. 4 Spa. @ 6" 4 Spa. @ 1’-0" Max. 4 Spa. @ 6" 4 Spa. @ 1’-0" Max. 4 Spa. @ 6" 7 Spa. @ 1’-0" = 7’-0" 4 Spa. @ 6" 7 Spa. @ 1’-0" = 7’-0" 4 Spa. @ 6" 7 Spa. @ 1’-0" = 7’-0" 4 Spa. @ 6" 7 Spa. @ 1’-0" = 7’-0" 4 Spa. @ 6" 7 Spa. @ 1’-0" = 7’-0" 4 Spa. @ 6" 7 Spa. @ 1’-0" = 7’-0" 4 Spa. @ 6" 7 Spa. @ 1’-0" = 7’-0" 4 Spa. @ 6" 7 Spa. @ 1’-0" = 7’-0" 4 Spa. @ 6" 7 Spa. @ 1’-0" = 7’-0" 6"6" Spa. 401b, 402b 403b, 404b, 405b (Typ.) 25- Req’d. No. 23ANo. 24ANo. 25A 13A-22A (Typ.) 1 ’- 9 " 3 ’- 6 " 1 ’- 9 " 3" 6" 1’-6"1’-6"3 Spa. @ 1’-0"=3’-0" Spa. 601b (Typ.) 94- 601b 118- 401b (Spa. W/601b) 22- 401b (Spa. @ 5’-0" Max.) 23- 401b 20- 402b 33- 403b 3- #4x27’-0" 3- #4x25’-3"3- #4x38’-6" 3- #4x38’-6"3- #4x14’-0"3- #4x17’-0" El. 817.77 El. 817.87 El. 817.98 El. 818.09 El. 818.28 El. 818.46 El. 818.64 El. 818.82 El. 819.00 El. 819.18 El. 819.36 El. 819.54 El. 819.72 1’-6" 44- 404b 13- 405b Min. Lap #4 #7 4’-0" 2’-0" 19+49.75 "S-6-E" Line "S-6-E" 10- 403b (Spa. @ 5’-0" Max.) 3- 404b (Spa. @ 5’-0" Max.) 4" 6"5’-31 2" 2 Eq. Spa.=1’-3" =2’-3"=2’-3"=2’-3" 100 Spa. @ 1’-0" Max. = 99’-4" (101- 602b R.F.) 6 Spa. @ 1’-0" = 6’-0" 3’-0" 6 Spa. @ 1’-0" = 6’-0" 3’-0" 6 Spa. @ 1’-0" = 6’-0" 3’-0" 6 Spa. @ 1’-0" = 6’-0" 3’-0" 6 Spa. @ 1’-0" = 6’-0" 3’-0" 6 Spa. @ 1’-0" = 6’-0" 3’-0" 6 Spa. @ 1’-0" = 6’-0" 3’-0" 6 Spa. @ 1’-0" = 6’-0" 3’-0" 6 Spa. @ 1’-0" = 6’-0" 3’-0" 3 Eq. Spa. 3’-0" 3 Eq. Spa. 3’-0" 3 Eq. Spa. 3’-0" Bottom Cap El. 814.44 2’-0" (Typ.) 2’-0" (Typ.) A A B B NOTES : For reinforcing bar notes, see Standard Drawing E703-BRST-01. All reinforcing steel to be epoxy coated, unless otherwise noted. For Sections A-A and B-B, see Sheet No.12. Hatched areas to be poured with Superstructure. For Bearing Assembly Details, see Sheet No.12 Spa. #6 F.F. 78- #6x4’-3" afishburn 8:55:34 AM2/11/2009 P:\IN2003\0661\D. Drawings\IN20030661.BR.C5.116.EBD.01.dgn No. STATE OF INDIAN A REGISTE RED P R OFE S SIONAL ENGIN EER 880305 DAVID A. D AY END BENT NO. 1 DETAILS RMC MSP ALF DAD HORIZONTAL SCALE DESIGNATION NO. BRIDGE FILE VERTICAL SCALE SURVEY BOOK SHEETS CONTRACT PROJECT NO. of DESIGNED:DRAWN: CHECKED:CHECKED: DESIGN ENGINEER RECOMMENDED FOR APPROVAL DATE CITY OF CARMEL 07-08C 5110 2/06/2009 13- #7x36’-0" (5 Top, 4 Mid., 4 Bott.) 13- #7x36’-0" (5 Top, 4 Mid., 4 Bott.) 13- #7x36’-0" (5 Top, 4 Mid., 4 Bott.) 13- #7x36’-0" (5 Top, 4 Mid., 4 Bott.) 3" 10’-412" 122’-1012" 3 Spa. @ 10’-6" = 31’-6"8 Spa. @ 9’-0" = 72’-0"9’-0" 10 Spa. @ 1’-0" Max. = 9’-11 2" =2’-0"=2’-0"=2’-0"=2’-0"=2’-0"=2’-0"=2’-0"=2’-0"=2’-0"=2’-0"=2’-0"=2’-0" 3- #4x25’-3" 9’-0"9’-0"9’-0"9’-0"9’-0"9’-0"9’-0"9’-0"9’-0" Varies VariesVaries No. 4A-13A (Typ.) 2"x10" Keyway Constr. Joint (Typ.) Work Point 3"x8" Keyway Constr. Joint W/ 1" Open Joint Line "S-6-E" 36- 401b Min. Lap #4 #7 4’-0" 2’-0" 3" 6" 1’-6"1’-6"3 Spa. @ 1’-0"=3’-0" Spa. 601b (Typ.) Bottom Cap El. 814.44 Bridge Seat El. 817.44El. 817.67El. 817.88El. 818.10El. 818.28El. 818.46El. 818.64El. 818.82El. 819.00El. 819.18El. 819.36El. 819.54 El. 819.72 Line "S-6-E" 4’-11" 1’-5" 3’-0" 8 Spa. @ 1’-0" Max.=7’-6" 3’-0" 8 Spa. @ 1’-0" Max.=7’-6" 3’-0" 8 Spa. @ 1’-0" Max.=7’-6" 3’-0" 6 Spa. @ 1’-0" = 6’-0" 3’-0" 6 Spa. @ 1’-0" = 6’-0" 3’-0" 6 Spa. @ 1’-0" = 6’-0" 3’-0" 6 Spa. @ 1’-0" = 6’-0" 3’-0" 6 Spa. @ 1’-0" = 6’-0" 3’-0" 6 Spa. @ 1’-0" = 6’-0" 3’-0" 6 Spa. @ 1’-0" = 6’-0" 3’-0" 6 Spa. @ 1’-0" = 6’-0" 3’-0" 6 Spa. @ 1’-0" = 6’-0" 1’-6" 6" 118 Spa. @ 1’-0" Max. = 117’-51 2" (119- 602b R.F.) 3 Eq. Spa.= Spa. #6 F.F. 94- #6x4’-3" 3- #4x19’-6" 3- #4x38’-6" 3- #4x38’-6"3- #4x18’-0" 3- #4x21’-6" 2’-0" (Typ.) 2’-0" (Typ.) (Typ.) 25- Req’d. 24- 402b55- 403b 22- 404b12- 405b PARTIAL ELEVATION (W.B.L.) PARTIAL PLAN (W.B.L.) 26- 401b (Spa. @ 5’-0" Max.) 7- 403b (Spa. @ 5’-0" Max.) 110- 601b 1 ’- 9 " 3 ’- 6 " 1 ’- 9 " 19+49.75 "S-6-E" 4 Spa. @ 6" 9 Spa. @ 1’-0" Max. = 8’-6" 4 Spa. @ 6" 9 Spa. @ 1’-0" Max. = 8’-6" 4 Spa. @ 6" 9 Spa. @ 1’-0" Max. = 8’-6" 4 Spa. @ 6" 7 Spa. @ 1’-0" = 7’-0" 4 Spa. @ 6" 7 Spa. @ 1’-0" = 7’-0" 4 Spa. @ 6" 7 Spa. @ 1’-0" = 7’-0" 4 Spa. @ 6" 7 Spa. @ 1’-0" = 7’-0" 4 Spa. @ 6" 7 Spa. @ 1’-0" = 7’-0" 4 Spa. @ 6" 7 Spa. @ 1’-0" = 7’-0" 4 Spa. @ 6" 7 Spa. @ 1’-0" = 7’-0" 4 Spa. @ 6" 7 Spa. @ 1’-0" = 7’-0" 4 Spa. @ 6" 7 Spa. @ 1’-0" = 7’-0" 1’-0" A A B B 6’-0" 137- 401b (Spa. W/601b) For Bearing Assembly Details, see Sheet No.12 NOTES : For reinforcing bar notes, see Standard Drawing E703-BRST-01. All reinforcing steel to be epoxy coated, unless otherwise noted. For Sections A-A and B-B, see Sheet No.12. Hatched areas to be poured with Superstructure. afishburn 8:55:40 AM2/11/2009 P:\IN2003\0661\D. Drawings\IN20030661.BR.C5.116.EBD.02.dgn No. STATE OF INDIAN A REGISTE RED P R OFE S SIONAL ENGIN EER 880305 DAVID A. D AY END BENT NO. 1 DETAILS RMC MSP ALF DAD HORIZONTAL SCALE DESIGNATION NO. BRIDGE FILE VERTICAL SCALE SURVEY BOOK SHEETS CONTRACT PROJECT NO. of DESIGNED:DRAWN: CHECKED:CHECKED: DESIGN ENGINEER RECOMMENDED FOR APPROVAL DATE CITY OF CARMEL 07-08C 5111 2/06/2009 Work Point1 ’- 9 " 3 ’- 6 " 1 ’- 9 " 19+49.75 "S-6-E" Line "S-6-E" PARTIAL PILING PLAN PARTIAL PILING PLAN Work Point 3"x8" Keyway Constr. Joint W/ 1" Open Joint Line "S-6-E" 1’- 9 " 3 ’- 6 " 1 ’- 9 " 19+49.75 "S-6-E" HP 12x74 Bent Pile (Typ.) 11 2"6’-0" 11 Spa. @ 9’-0" = 99’-0" (12- Bent Piles) 105’-11 2" 8’-101 2" 122’-101 2" 12 Spa. @ 9’-0" = 108’-0" (13- Bent Piles) Bent Piles 3 " Bent Piles 6’-0" 6’-0" Wall Pile (Typ.) NOTES : 25- HP 12x74 Steel "H" Piles Required. For reinforcing bar notes, see Standard Drawing E703-BRST-01. All reinforcing steel to be epoxy coated, unless otherwise noted. For Retaining Wall Details, see Road Plans. HP 12x74 Bent Pile (Typ.) Wall Pile (Typ.) afishburn 8:55:45 AM2/11/2009 P:\IN2003\0661\D. Drawings\IN20030661.BR.C5.116.EBD.03.dgn No. STATE OF INDIAN A REGISTE RED P R OFE S SIONAL ENGIN EER 880305 DAVID A. D AY ALF END BENT NO.1 DETAILS RMC MSP DAD HORIZONTAL SCALE DESIGNATION NO. BRIDGE FILE VERTICAL SCALE SURVEY BOOK SHEETS CONTRACT PROJECT NO. of DESIGNED:DRAWN: CHECKED:CHECKED: DESIGN ENGINEER RECOMMENDED FOR APPROVAL DATE CITY OF CARMEL 07-08C 5112 2/06/2009 BENT NO.1 BILL OF MATERIALS Epoxy Coated Reinforcing Steel Size And Mark Bars No. Of Length (Feet) Weight (Lbs.) 4 ’- 3 " 3 ’- 0 " 3’-2" 1’-0"1’-0" B A 401b 402b 3’-2" 403b Mark 1’-0" 1’-6" A B 5’-2" 4’-6" 6’-2" Length 8" Bearing Assembly Bridge Seat Pile and Bearing SIDE VIEW END VIEW PLAN ELEVATION BEARING ASSEMBLY DETAILS Bridge Seat Bearing Assembly S3x7.5 S3x7.5 Bearing Prepare Ends for Full Penetration Weld (Weld in Shop)(Typ.) #8 Reinf. Bars or x 8" Auto Welded Anchor Studs (Headed) May Be Used. (No Paint) Bar 2"x1" (No Paint) Setting Tolerance of Anchor PLates, Level With NOTE: Scale: 1" = 1’-0" Type Prestressed Concrete m Type Prestressed Concrete m 2" 1"1" 3 " 1 " 1’-6" 4 12 " 4 1 2 "3 " 3 " 2"2"2"2" 3"1’-0"3" 1’-6" 1 " 1 ’- 0 " Bearing, Bent & Piles SECTION A-A 602b HP 12x74 Steel "H" Piles Constr. Joint 1 4 Geotextiles 1’-6" 401b 601b F.F.R.F. 9"1’-0" 1’- 2 " V a r ie s Va rie s 3 ’- 0 " M in . 7 " 1 ’- 9 " 4 " 1 ’- 6 " M in . Em b e d m e n t 1’-9" 3’-6" 8 " C la s s C C o n c r e t e S la b 1’-9" 3’-6" #7 (Typ.) Anchor Plate 1 SECTION B-B NOTES: 602b x 4’-11" All reinforcing bar notes, see Std. E703-BRST-01. All reinforcing to be Epoxy Coated, except as noted. For location of Sections A-A & B-B, see Sheets No. 9 & 10. Hatched area to be poured with superstructure. 6" 1’-9" 2 ’- 0 " M in . 404b 1’-9"6’-8" 405b 2’-0"7’-2" 9" 1 ’- 2 " Geotextiles 4 1 Constr. Joint 401b 602b 1’-6" 601b #6 403b (In Step) #7 #4 (In Step) F.F.R.F. 1’-0" Va r ie s ( S t e p ) V a r ie s 1’- 6 " M in . E m b e d m e n t 2 ’- 5 " M in . La p 8 " C la s s C C o n c r e t e S la b 4 " 1’-9" 3’-6" 1’-9" 3’-6" 402b (In Step) 2" Cl. (Typ.) V a r ie s Va r ie s #4 (In Step) 1’-9" Bearing, Bent & Bent Piles 1 ’- 3 " 3 ’- 0 " M in . 6 12 " 6 1 2 " 404b (In Step) Va r ie s #4 (In Step) 2"x10" Keyway Constr. Joint Between Beams Aggregate for End Bent Backfill Aggregate for End Bent Backfill 1" Expanded Polystyrene Wrap Around Flanges and Web Of Wall Piles (Typ.) 601b x 11’-2" 3’-2" 3’-2" 3’-2" 3’-2" #7 91 36’-0" Total No. 7 6697 601b 204 11’-2" 602b 220 4’-11" #6 172 4’-3" Total No. 6 6145 401b 362 4’-6" 402b 44 5’-2" 403b 105 6’-2" 404b 69 6’-8" 405b 25 7’-2" #4 12 38’-6" #4 3 27’-0" #4 6 25’-3" #4 3 21’-6" #4 3 19’-6" #4 3 18’-0" #4 3 17’-0" #4 3 14’-0" Total No. 4 2744 Total Epoxy Coated Reinforcing Steel 15586 Concrete Class "C" in Superstructure Pour No. 1 57.1 Cys. Pour No. 2 63.8 Cys. Total Class "C" in Superstructure 120.9 Cys. Miscellaneous Surface Seal 920 Sft. 25-Piles, Steel, "H", HP12x74 x 90’-0" Approximate 2250 Lft. Driving Tips, Steel "H"25 Each Anchor Plate MK - AP1 50 Each afishburn 8:55:49 AM2/11/2009 P:\IN2003\0661\D. Drawings\IN20030661.BR.C5.116.EBD.04.dgn No. STATE OF INDIAN A REGISTE RED P R OFE S SIONAL ENGIN EER 880305 DAVID A. D AY SECTION B-B Min. Lap SECTION A-A PARTIAL ELEVATION PARTIAL CAP PLANNOTES: RMC MSB MSB AJE PIER NO. 2 DETAILS NOTE: A A BB B CC NOTES: HORIZONTAL SCALE DESIGNATION NO. BRIDGE FILE VERTICAL SCALE SURVEY BOOK SHEETS CONTRACT PROJECT NO. of DESIGNED:DRAWN: CHECKED:CHECKED: DESIGN ENGINEER RECOMMENDED FOR APPROVAL DATE CITY OF CARMEL 07-08C 5113 2/06/2009 Bridge Seat 403c #10 (Typ.) #10 (Typ.) #5 (Typ.) #10 (Typ.) 3"x14" Keyway Constr. Jt. #4 (Typ.) Type "A" Constr. Jt. 3’-6" #6 2’-11" #5 2’-5" 8’-3"#10 #5 (Typ.) 601c (Typ.) 3"x10" Keyway Constr. Jt. Optional Type "A" Constr. Jt. A B 7 Spa. @ 9" Max. = 5’-0" (#6 Bars) 6 Spa. @ 10" Max. = 5’-0" (401c Bars) 11 Spa. @ 9" Max. = 7’-9" (#6 Bars) 10 Spa @ 10" Max. = 7’-9" (401c Bars) 401c (Typ.) Type "A" Constr. Jt. #6 (Typ.) Hatched areas indicate limits of 3" Expanded Polystyrene. Cross-Hatched areas indicate limits of " Expanded Polystyrene. HP 12x74 Steel "H" Pile (Typ.) Bridge Seat Elastomeric Bearing Pad (Typ.)(16 Req’d.) 3"x14" Keyway Constr. Jt. (Typ.) @ 6" =2’-0" @ 1’-0 Max. =3’-9" 22-404c 21-405c 403c-405c Spacing Bott. Cap El. 814.49 Bott. Footing El. 797.74 Top Of Crashwall El. 806.24 1-1004c 42-403c 4- #4 x 17’-9" (1 Ea. Line, 4 Lines) 4- #4 x 15’-3" (1 Ea. Line, 4 Lines) #5 (Typ.)3"x10" Keyway Constr. Jt. (Typ.) 601c (Typ.)HP 12x74 Steel "H" Pile (Typ.) 5-#6 x 7’-6" 4-#6 x 6’-3" 1-1004c2-1004c3-1005c 7-1001c (1 Cuts 2) (7 Lt.,7 Rt.) 7-1001c (1 Cuts 2) (7 Lt.,7 Rt.) 1001c, 1002c, 1004c, 1005c, or 1006c (Typ.) All Pier Stem Steel Shown for West Face of Pier Only, East Face of Pier Same by Opposite Hand. V a r ie s Va r ie s @ 1’-0 Max. =3’-9" @ 1’-0 Max. =3’-9" @ 6" =2’-0" @ 6" =2’-0" @ 6" =2’-0" @ 6" =2’-0" @ 6" =2’-0" Sta. 20+00.00 Line "S-6-E" 8- #5 x 32’-0" (2 Ea. Line, 4 Lines) Line "S-6-E" 8-403c (Spa. @ 5’-0" Max.) 403c, 404c, or 405c 603c or 605c 402c or 409c Masonry coat all exposed surfaces of piers. For masonry coating colors, see Special Provisions. For reinforcing bar notes, see Standard E703-BRST-01. For Footing Plan, see Sheet No. 18. For bar bending details and Bill Of Materials, see Sheet No. 18. Surface seal all exposed surfaces of pier. For elastomeric bearing pad details, see Sheet No. 23. For pier backfill limits, see Standard E211-BFIL-03. For Section C-C, see Sheet No. 16 . 217-401c (7 Lines, 31 Ea. Line) (In Crashwall) (Alternate Hooks Ea. Row) 198-401c (11 Lines, 6 Ea. Line) (Typ. Spa. Between Holes, 3 Spa.) (Alternate Hooks Ea. Row) @ 6" =2’-0" @ 6" =2’-0" 5-#6 x 7’-6"5-#6 x 7’-6"5-#6 x 7’-6"4-#6 x 6’-3" 1-604c 1-604c El. 818.02 El. 818.14 El. 818.26 El. 818.38 El. 818.57 El. 818.75 El. 818.93 El. 819.11 32- #10 x 35’-0" (2 Ea. Line, 8 Lines Top) (2 Ea. Line, 8 Lines Bott.) 1’-6"1’-9"1’-9"1’-6" 6’-6" 3’-3"3’-3" 2’-0"2’-6"2’-0" 4"4" 1’-9" 2" Cl. (Typ.) 1’-9" 3’-6" 3" 3’-6" 3" 3’-0" Varies (See Sheet No.26) 2" Cl. (Typ.) 2" Cl. (Typ.) 5" Cl. 61’-6" 203’-0" 203’-0" 3" 1" Open Joint6"(Typ.)3" 71 2"5’-214"(Typ.)5’-214"(Typ.)25-1006c25-1006c25-1006c6"(Typ.) 1001c 1001c 1001c 1002c 7 Eq. Spa. (Typ. #10 Spa.) 101’-6" 61’-6" 3 ’- 6 " 1 ’- 9 " 1 ’- 9 " 712" 9" V a r ie s 3 ’- 6 " 1 3 ’- 9 " 3 ’- 0 " 4 " C l. 1 ’- 0 " 3 " 3 " 3 " 3 " 2 ’- 0 " M in . E m b e d m e n t A B 5 ’- 6 " 3 ’- 0 " 5 1 2 " 5 12 " V a r ie s 3 ’- 6 " 2 ’- 0 " M in . E m b e d m e n t 8-#6 x 32’-3"8-#6 x 32’-3" 5 - 6 0 2 c ( 1 B a r C u t s 2 ) 5 - 6 0 2 c ( 1 B a r C u t s 2 ) 5 - 6 0 2 c ( 1 B a r C u t s 2 ) 3 78" 32-603c 8-402c 48-603c 8-402c 8-402c48-603c 24-603c 8 ’- 3 " ( T a p e r 1: 3 3 , E .F .) 5 ’- 6 " 3 ’- 0 " 2’-6"3 Spa. @ 5’-9" = 17’-3"4 Spa. @ 9’-0" = 36’-0"5’-9" 7 ’- 4 " 3 ’- 8 " 3 ’- 8 " 12 Spa. @ 6" = 6’-0"8 Spa. @ 1’-0" = 8’-0"24 Spa. @ 6" = 12’-0"8 Spa. @ 1’-0" = 8’-0"24 Spa. @ 6" = 12’-0"8 Spa. @ 1’-0" = 8’-0"15 Spa. @ 6" = 7’-6" 3 ’- 6 " Min . 11 8" 103 4"4 Spa.5 Spa.4 Spa.5 Spa.4 Spa.5 Spa.4 Spa.7 Spa. @ 1’-0 = 7’-0"4 Spa.7 Spa. @ 1’-0 = 7’-0"4 Spa.7 Spa. @ 1’-0 = 7’-0"4 Spa.7 Spa. @ 1’-0 = 7’-0"4 Spa. 4 Spa. @ 1’-0 Max. = 3’-101 4" 2’-0" (Typ.) 2’-0" (Typ.) 8 ’- 3 " 2- #6 x 31’-3" (2 Ea. Line, 1 Line) 2- #6 x 31’-3" (2 Ea. Line, 1 Line) afishburn 8:55:52 AM2/11/2009 P:\IN2003\0661\D. Drawings\IN20030661.BR.C5.116.PRD.01.dgn No. STATE OF INDIAN A REGISTE RED P R OFE S SIONAL ENGIN EER 880305 DAVID A. D AY Min. Lap PARTIAL ELEVATION PARTIAL CAP PLAN NOTES: RMC MSB MSB AJE PIER NO. 2 DETAILS NOTE: B BB A A DD NOTES: HORIZONTAL SCALE DESIGNATION NO. BRIDGE FILE VERTICAL SCALE SURVEY BOOK SHEETS CONTRACT PROJECT NO. of DESIGNED:DRAWN: CHECKED:CHECKED: DESIGN ENGINEER RECOMMENDED FOR APPROVAL DATE CITY OF CARMEL 07-08C 5114 2/06/2009 #6 2’-11" #5 2’-5" 8’-3"#10 Hatched areas indicate limits of 3" Expanded Polystyrene. Cross-Hatched areas indicate limits of " Expanded Polystyrene. All Pier Stem Steel Shown for West Face of Pier Only, East Face of Pier Same by Opposite Hand. 3 7 8" 8-409c 24-605c48-605c8-409c48-605c8-409c48-605c8-409c 3 7 8" 25-1006c 1-1004c 1001c 7-1001c (1 Cuts 2) (7 Lt.,7 Rt.) 7-1001c (1 Cuts 2) (7 Lt.,7 Rt.) 1001c 5 - 6 0 2 c ( 1 B a r C u t s 2 ) 1-1004c 7-1001c (1 Cuts 2) (7 Lt.,7 Rt.) 1001c 1-1004c 25-1006c 8-1002c (1 Cuts 2) (8 Lt.,8 Rt.) 6"(Typ.)6"(Typ.)25-1006c 8-#6 x 28’-6" 5 - 6 0 2 c ( 1 B a r C u t s 2 ) 5 - 6 0 2 c ( 1 B a r C u t s 2 ) 1002c 5 - 6 0 2 c ( 1 B a r C u t s 2 ) 25-1006c 8-#6 x 28’-6" 203’-0" 40’-0"40’-0" @ 6" =2’-0" @ 6" =2’-0" @ 6" =2’-0" @ 6" =2’-0" @ 6" =2’-0" @ 6" =2’-0" @ 6" =2’-0" @ 6" =2’-0" @ 6" =2’-0" Bott. Cap El. 814.49 Top Of Crashwall El. 806.24 5 ’- 6 " 3 ’- 0 " 6 " 6 " 7 ’- 3 " 3 ’- 7 12 " 3 ’- 7 1 2 " Bott. Footing El. 797.74 3 ’- 6 " 1 ’- 9 " 1 ’- 9 " V a r ie s Va r ie s Sta. 20+00.00 Line "S-6-E" 2 Spa. @ 1’-0 Max. = 1’-43 4" 4 Spa.7 Spa. @ 1’-0 = 7’-0"4 Spa.7 Spa. @ 1’-0 = 7’-0"4 Spa.7 Spa. @ 1’-0 = 7’-0"4 Spa.7 Spa. @ 1’-0 = 7’-0"4 Spa.7 Spa. @ 1’-0 = 7’-0"4 Spa.7 Spa. @ 1’-0 = 7’-0"4 Spa.7 Spa. @ 1’-0 = 7’-0"4 Spa.7 Spa. @ 1’-0 = 7’-0"4 Spa. 3 Spa. @ 1’-0 Max. = 2’-103 4" 10"10" 80’-0" 203’-0" 4’-9"8 Spa. @ 9’-0" = 72’-0"3’-3" Line "S-6-E" 9" 3"x14" Keyway Constr. Jt. (Typ.) Elastomeric Bearing Pad (Typ.)(18 Req’d.) 8-#6 x 28’-6" 3 ’- 6 " Min .5’-214"(Typ.)5’-214"(Typ.)601c (Typ.)HP 12x74 Steel "H" Pile (Typ.) 3"x10" Keyway Constr. Jt. (Typ.) #5 (Typ.) 1" Open Joint 1" Open Joint 280-401c (7 Lines, 40 Ea. Line) (In Crashwall) (Alternate Hooks Ea. Row) 264-401c (11 Lines, 6 Ea. Line) (Typ. Spa. Between Holes, 4 Spa.) (Alternate Hooks Ea. Row) 24-403c 403c-404c Spacing 24 Spa. @ 6" = 12’-0"8 Spa. @ 1’-0" = 8’-0"11 Spa. @ 6" = 5’-6" 18- #5 x 28’-0" (3 Ea. Line, 6 Lines) 24-605c 4- #4 x 39’-6" (1 Ea. Line, 4 Lines) 51-404c 24-403c 9-403c (Spa. @ 5’-0" Max.) 1002c 39’-3"40’-0" 12 Spa. @ 6" = 6’-0"8 Spa. @ 1’-0" = 8’-0"24 Spa. @ 6" = 12’-0"8 Spa. @ 1’-0" = 8’-0"24 Spa. @ 6" = 12’-0"8 Spa. @ 1’-0" = 8’-0" 4-#6 x 6’-3"5-#6 x 7’-6"5-#6 x 7’-6"5-#6 x 7’-6"5-#6 x 7’-6"5-#6 x 7’-6"5-#6 x 7’-6"4-#6 x 6’-3" 1-604c 1-604c 11 8"11 8" El. 819.11 El. 819.29 El. 819.47 El. 819.65 El. 819.83 El. 820.01 El. 819.83 El. 819.65 El. 819.47 El. 819.29 El. 819.11 2’-0" (Typ.) 2’-0" (Typ.) 3- #6 x 28’-6" (3 Ea. Line, 1 Line) 48- #10 x 32’-0" (3 Ea. Line, 8 Lines Top) (3 Ea. Line, 8 Lines Bott.) 3- #6 x 28’-6" (3 Ea. Line, 1 Line) Masonry coat all exposed surfaces of piers. For masonry coating colors, see Special Provisions. For reinforcing bar notes, see Standard E703-BRST-01. For Footing Plan, see Sheet No. 18. For bar bending details and Bill Of Materials, see Sheet No. 18. Surface seal all exposed surfaces of pier. For elastomeric bearing pad details, see Sheet No. 23. For pier backfill limits, see Standard E211-BFIL-03. For Section D-D, see Sheets No. 16 & 17 . afishburn 8:55:56 AM2/11/2009 P:\IN2003\0661\D. Drawings\IN20030661.BR.C5.116.PRD.02.dgn No. STATE OF INDIAN A REGISTE RED P R OFE S SIONAL ENGIN EER 880305 DAVID A. D AY NOTES: RMC MSB MSB AJE PIER NO. 2 DETAILS NOTE: A A BB B E E PARTIAL ELEVATION PARTIAL CAP PLAN NOTES: Min. Lap HORIZONTAL SCALE DESIGNATION NO. BRIDGE FILE VERTICAL SCALE SURVEY BOOK SHEETS CONTRACT PROJECT NO. of DESIGNED:DRAWN: CHECKED:CHECKED: DESIGN ENGINEER RECOMMENDED FOR APPROVAL DATE CITY OF CARMEL 07-08C 5115 2/06/2009 Hatched areas indicate limits of 3" Expanded Polystyrene. Cross-Hatched areas indicate limits of " Expanded Polystyrene. All Pier Stem Steel Shown for West Face of Pier Only, East Face of Pier Same by Opposite Hand. 22-404c21-405c 403c-405c Spacing 42-403c V a r ie s Va r ie s @ 1’-0 Max. =4’-3" @ 6" =2’-0" @ 6" =2’-0" @ 6" =2’-0" @ 6" =2’-0" @ 6" =2’-0" Sta. 20+00.00 Line "S-6-E" Line "S-6-E" 1-1004c 1-1004c 1-1004c 7-1001c (1 Cuts 2) (7 Lt.,7 Rt.) 7-1001c (1 Cuts 2) (7 Lt.,7 Rt.) 7-1001c (1 Cuts 2) (7 Lt.,7 Rt.) 2-1005c 4-#6 x 6’-3" 4- #6 x 31’-3" (2 Ea. Line, 2 Lines) 4- #6 x 31’-3" (2 Ea. Line, 2 Lines) 5-#6 x 7’-6"5-#6 x 7’-6"5-#6 x 7’-6"5-#6 x 7’-6" 8-1002c (1 Cuts 2) (8 Lt.,8 Rt.) 4-#6 x 6’-3" Bott. Cap El. 814.49 Top Of Crashwall El. 806.24 Bott. Footing El. 797.74 Elastomeric Bearing Pad (Typ.)(16 Req’d.) 3"x14" Keyway Constr. Jt. (Typ.) 4- #4 x 17’-9" (1 Ea. Line, 4 Lines) 8- #5 x 32’-0" (2 Ea. Line, 4 Lines) 4- #4 x 15’-3" (1 Ea. Line, 4 Lines) 8-403c (Spa. @ 5’-0" Max.) Bridge Seat El. 817.99 = 5’-0" @ 6" =2’-0" @ 6" =2’-0" @ 6" =2’-0" @ 1’-0 Max. =4’-3" @ 1’-0 Max. =4’-3" 217-401c (7 Lines, 31 Ea. Line) (In Crashwall) (Alternate Hooks Ea. Row) 198-401c (11 Lines, 6 Ea. Line) (Typ. Spa. Between Holes, 3 Spa.) (Alternate Hooks Ea. Row) Masonry coat all exposed surfaces of piers. For masonry coating colors, see Special Provisions. For reinforcing bar notes, see Standard E703-BRST-01. For Footing Plan, see Sheet No. 18. For bar bending details and Bill Of Materials, see Sheet No. 18. Surface seal all exposed surfaces of pier. For elastomeric bearing pad details, see Sheet No. 23. For pier backfill limits, see Standard E211-BFIL-03. For Section E-E, see Sheet No. 17 . #5 (Typ.)3"x10" Keyway Constr. Jt. (Typ.) 601c (Typ.)HP 12x74 Steel "H" Pile (Typ.) #6 2’-11" #5 2’-5" 8’-3"#10 1-604c1-604c El. 819.11 El. 818.93 El. 818.75 El. 818.57 El. 818.38 El. 818.25 El. 818.12 203’-0" 3" 3" 71 2" 101’-6" 61’-6" 3 ’- 6 " 1 ’- 9 " 1 ’- 9 " 712" 9" 5 ’- 6 " 3 ’- 0 " 5 12 " 5 12 " 3 7 8" 32-603c8-402c48-603c8-402c8-402c 48-603c 25-1006c 25-1006c 8-#6 x 32’-3" 1001c 1001c 5 - 6 0 2 c ( 1 B a r C u t s 2 ) 5 - 6 0 2 c ( 1 B a r C u t s 2 )5’-214"(Typ.)5’-214"(Typ.)5 - 6 0 2 c ( 1 B a r C u t s 2 )6"(Typ.)6"(Typ.) 1002c 25-1006c 8-#6 x 32’-3" 1" Open Joint 61’-6" 203’-0" 20-603c 2’-6"3 Spa. @ 6’-3" = 18’-9"4 Spa. @ 9’-0" = 36’-0"4’-3" 3 ’- 8 " 3 ’- 8 " 7 ’- 4 " 10 Spa. @ 6"8 Spa. @ 1’-0" = 8’-0"24 Spa. @ 6" = 12’-0"8 Spa. @ 1’-0" = 8’-0"24 Spa. @ 6" = 12’-0"8 Spa. @ 1’-0" = 8’-0"15 Spa. @ 6" = 7’-6" 3 ’- 6 " 11 8" 103 4"4 Spa.6 Spa.4 Spa.6 Spa.4 Spa.6 Spa.4 Spa.7 Spa. @ 1’-0 = 7’-0"4 Spa.7 Spa. @ 1’-0 = 7’-0"4 Spa.7 Spa. @ 1’-0 = 7’-0"4 Spa.7 Spa. @ 1’-0 = 7’-0"4 Spa. 3 Spa. @ 1’-0 Max. = 2’-41 4" 2’-0" (Typ.) 2’-0" (Typ.) 32- #10 x 35’-0" (2 Ea. Line, 8 Lines Top) (2 Ea. Line, 8 Lines Bott.) 8 ’- 3 " afishburn 8:55:59 AM2/11/2009 P:\IN2003\0661\D. Drawings\IN20030661.BR.C5.116.PRD.03.dgn No. STATE OF INDIAN A REGISTE RED P R OFE S SIONAL ENGIN EER 880305 DAVID A. D AY RMC MSB MSB AJE PIER NO. 2 DETAILS Min. Lap NOTE: NOTE: SECTION C-C NOTES: PARTIAL SECTION D-D HORIZONTAL SCALE DESIGNATION NO. BRIDGE FILE VERTICAL SCALE SURVEY BOOK SHEETS CONTRACT PROJECT NO. of DESIGNED:DRAWN: CHECKED:CHECKED: DESIGN ENGINEER RECOMMENDED FOR APPROVAL DATE CITY OF CARMEL 07-08C 5116 2/06/2009 6"6"6"6"6"6"3" 6"6"6"6"6"6" 6" 6" 2 Eq. Spaces @ 6" Max. = 101 4" 4 Eq. Spaces @ 6" Max. = 1’-71 2"7 Eq. Spaces @ 6" Max. = 3’-21116" 7 Eq. Spaces @ 6" Max. = 3’-211 16" #6 2’-11" 6"Dimensions Shown Dimensions Shown 3" 6" 3" 3" 6 Spa. @ 6"=3’-0" 24 Spa. @ 6" = 12’-0"24 Spa. @ 6" = 12’-0"24 Spa. @ 6" = 12’-0"14 Spa. @ 6" = 7’-0"14 Spa. @ 6" = 7’-0" 1" Open Joint 6 Spa. @ 6"=3’-0" 24 Spa. @ 6" = 12’-0"24 Spa. @ 6" = 12’-0"24 Spa. @ 6" = 12’-0"14 Spa. @ 6" = 7’-0"14 Spa. @ 6" = 7’-0" 1006c (Typ.) ( Between Diamonds) (1001c-1006c Spa.) 1005c 1002c (Typ.) 1001c (Typ.) (Each Diamond) 1004c (Typ.) 401c (Typ.)#6 (Typ.)Sta. 20+00.00 Line "S-6-E" Line "S-6-E" 9"39’-3"61’-6" 1’- 4 12 " 1 ’- 4 12 " V a r ie s ( 2 ’- 6 " M in . , 3 ’- 0 " M a x .) 3" 6"6"6"6"6"6"6" 7 Eq. Spaces @ 6" Max. = 3’-211 16" 24 Spa. @ 6" = 12’-0"24 Spa. @ 6" = 12’-0"24 Spa. @ 6" = 12’-0"24 Spa. @ 6" = 12’-0"14 Spa. @ 6" = 7’-0"14 Spa. @ 6" = 7’-0"14 Spa. @ 6" = 7’-0" 6" 6" 6"6"6"6"6"6"6"6" 7 Eq. Spaces @ 6" Max. = 3’-211 16" 6" 3"24 Spa. @ 6" = 12’-0"24 Spa. @ 6" = 12’-0"24 Spa. @ 6" = 12’-0"24 Spa. @ 6" = 12’-0"14 Spa. @ 6" = 7’-0"14 Spa. @ 6" = 7’-0"14 Spa. @ 6" = 7’-0" Dimensions Shown Dimensions Shown 1" Open Joint 401c (Typ.) 1006c (Typ.) ( Between Diamonds) 1004c (Typ.)1001c (Typ.) (Each Diamond) 1002c (Typ.) #6 (Typ.) 1 ’- 4 12 " 1’- 4 12 " Va r ie s ( 2 ’- 6 " M in ., 3 ’- 0 " M a x . ) 1002c (Typ.) 7 Eq. Spaces @ 6" Max. = 3’-211 16" 3" 7 Eq. Spaces @ 6" Max. = 3’-211 16" 3" Sta. 20+00.00 Line "S-6-E" 80’-0" 40’-0"40’-0" 9" 401c Bar Pattern this half, Represents Area from Top of Crashwall to Top of Footing Only. (1001c-1006c Spa.) (1001c-1006c Spa.) (1001c-1006c Spa.) For reinforcing bar notes, see Standard E703-BRST-01. For Footing Plan, see Sheet No. 18. For bar bending details and Bill Of Materials, see Sheet No. 18. Surface seal all exposed surfaces of pier. For elastomeric bearing pad details, see Sheet No. 23. For pier backfill limits, see Standard E211-BFIL-03. For Location of Section C-C & D-D, see Sheet No.’s 13 & 14. 3’-8"12’-8"3’-8"3’-8"12’-8"3’-8"3’-8"12’-8"3’-8"2’-0" 3’-8"12’-8"3’-8"3’-8"12’-8"3’-8"3’-8"12’-8"3’-8"1’-0" 3’-8"12’-8"3’-8"3’-8"12’-8"3’-8"3’-8"12’-8"3’-8"3’-8"12’-8"3’-8" 3’-8"12’-8"3’-8"3’-8"12’-8"3’-8"3’-8"12’-8"3’-8"3’-8"12’-8"3’-8" 401c Bar Pattern this half, Represents Area from Top of Crashwall to Top of Footing Only. See Section E-E for 401c Bar Pattern for Area from Top of Crashwall to Bottom of Cap. Same by Opposite hand. Line "S-6-E" afishburn 8:56:02 AM2/11/2009 P:\IN2003\0661\D. Drawings\IN20030661.BR.C5.116.PRD.04.dgn No. STATE OF INDIAN A REGISTE RED P R OFE S SIONAL ENGIN EER 880305 DAVID A. D AY RMC MSB MSB AJE PIER NO. 2 DETAILS Min. Lap NOTE: NOTES: NOTE: SECTION E-E PARTIAL SECTION D-D HORIZONTAL SCALE DESIGNATION NO. BRIDGE FILE VERTICAL SCALE SURVEY BOOK SHEETS CONTRACT PROJECT NO. of DESIGNED:DRAWN: CHECKED:CHECKED: DESIGN ENGINEER RECOMMENDED FOR APPROVAL DATE CITY OF CARMEL 07-08C 5117 2/06/2009 #6 2’-11" 3" 6"6"6"6"6"6"6" 7 Eq. Spaces @ 6" Max. = 3’-211 16" 24 Spa. @ 6" = 12’-0"24 Spa. @ 6" = 12’-0"24 Spa. @ 6" = 12’-0"24 Spa. @ 6" = 12’-0"14 Spa. @ 6" = 7’-0"14 Spa. @ 6" = 7’-0"14 Spa. @ 6" = 7’-0" 6" 6" 6"6"6"6"6"6"6"6" 7 Eq. Spaces @ 6" Max. = 3’-211 16" 6" 3"24 Spa. @ 6" = 12’-0"24 Spa. @ 6" = 12’-0"24 Spa. @ 6" = 12’-0"24 Spa. @ 6" = 12’-0"14 Spa. @ 6" = 7’-0"14 Spa. @ 6" = 7’-0"14 Spa. @ 6" = 7’-0" Dimensions Shown Dimensions Shown 1" Open Joint 401c (Typ.) 1006c (Typ.) ( Between Diamonds) 1004c (Typ.)1001c (Typ.) (Each Diamond) 1002c (Typ.) #6 (Typ.) 1’- 4 12 " 1 ’- 4 12 " V a r ie s ( 2 ’- 6 " M in . , 3 ’- 0 " M a x .) 1002c (Typ.) 7 Eq. Spaces @ 6" Max. = 3’-21116" 3" 7 Eq. Spaces @ 6" Max. = 3’-211 16" 3" Sta. 20+00.00 Line "S-6-E" 80’-0" 40’-0"40’-0" 9" 401c Bar Pattern this half, Represents Area from Top of Crashwall to Bottom of Cap Only. (1001c-1006c Spa.) (1001c-1006c Spa.) For reinforcing bar notes, see Standard E703-BRST-01. For Footing Plan, see Sheet No. 18. For bar bending details and Bill Of Materials, see Sheet No. 18. Surface seal all exposed surfaces of pier. For elastomeric bearing pad details, see Sheet No. 23. For pier backfill limits, see Standard E211-BFIL-03. For Location of Section D-D & E-E, see Sheet No.’s 14 & 15. 3’-8"12’-8"3’-8"3’-8"12’-8"3’-8"3’-8"12’-8"3’-8"3’-8"12’-8"3’-8" 3’-8"12’-8"3’-8"3’-8"12’-8"3’-8"3’-8"12’-8"3’-8"3’-8"12’-8"3’-8" 3" 6"6"6"6"6" 7 Eq. Spaces @ 6" Max. = 3’-211 16" 24 Spa. @ 6" = 12’-0"24 Spa. @ 6" = 12’-0"24 Spa. @ 6" = 12’-0"14 Spa. @ 6" = 7’-0"14 Spa. @ 6" = 7’-0" 2 Eq. Spaces @ 6" Max. = 101 4" 6 Spa. @ 6"=3’-0"6" 3" (1001c-1006c Spa.) 6" 6" 6"6"6"6"6"6"3" 6" 4 Eq. Spaces @ 6" Max. = 1’-71 2" 7 Eq. Spaces @ 6" Max. = 3’-211 16" 6" 3" (1001c-1006c Spa.) 6 Spa. @ 6"=3’-0" 24 Spa. @ 6" = 12’-0"24 Spa. @ 6" = 12’-0"24 Spa. @ 6" = 12’-0"14 Spa. @ 6" = 7’-0"14 Spa. @ 6" = 7’-0" Dimensions Shown Dimensions Shown 1" Open Joint 401c (Typ.) 1006c (Typ.) ( Between Diamonds) 1004c (Typ.)1001c (Typ.) (Each Diamond) 1005c 1002c (Typ.) #6 (Typ.) 1 ’- 4 12 " 1’- 4 12 " Va r ie s ( 2 ’- 6 " Min ., 3 ’- 0 " M a x . ) Sta. 20+00.00 Line "S-6-E" Line "S-6-E" 9"40’-0"61’-6" 3’-8"12’-8"3’-8"3’-8"12’-8"3’-8"3’-8"12’-8"3’-8"2’-0" 3’-8"12’-8"3’-8"3’-8"12’-8"3’-8"3’-8"12’-8"3’-8"1’-0" 401c Bar Pattern this half, Represents Area from Top of Crashwall to Bottom of Cap Only. See Section C-C for 401c Bar Pattern for Area from Top of Crashwall to Top of Footing. Same by Opposite hand. Line "S-6-E" afishburn 8:56:06 AM2/11/2009 P:\IN2003\0661\D. Drawings\IN20030661.BR.C5.116.PRD.05.dgn No. STATE OF INDIAN A REGISTE RED P R OFE S SIONAL ENGIN EER 880305 DAVID A. D AY RMC MSB MSB AJE PIER NO. 2 DETAILS Min. Lap NOTES: 601c x 7’-6" 603c x 10’-6" 401c x 3’-4" 402c x 10’-10" 1 Bar Cuts 2 1 Bar Cuts 2Bending Diagragm 605c x 12’-6"409c x 12’-10" 604c x 7’-9" 1" OPEN JOINT DETAILS NOTES: PIER NO. 2 BILL OF MATERIALS NORTH HALF FOOTING PLAN (South Half Same By Opposite Hand) HORIZONTAL SCALE DESIGNATION NO. BRIDGE FILE VERTICAL SCALE SURVEY BOOK SHEETS CONTRACT PROJECT NO. of DESIGNED:DRAWN: CHECKED:CHECKED: DESIGN ENGINEER RECOMMENDED FOR APPROVAL DATE CITY OF CARMEL 07-08C 5118 2/06/2009 #5 2’-5" LengthMarkAB 7’-5"1’-10"9’-3"1004c 6’-11"1’-10"8’-9"1005c 1’-10"19’-6"1006c 3’-2" Length 4’-6" Mark A B 3’-2"1’-4"5’-10" 3’-2"1’-6"6’-2" 403c 404c 405c 8" B A N B L A A 6’-2" 3 ’- 2 " 3’-2" 8"8" 3 ’- 2 " 1’-0"1’-0" 8 " 2’-2" A B 2’-2" B 17’-8" 3" 3"x10" Keyway Constr. Jt. 204’-0" 6 ’- 6 " 1’- 6 " 1 ’- 9 " 1 ’- 9 " 1’- 6 " 3 ’- 3 " 3 ’- 3 " 3 " 3 " 12 S p a . @ 6 " = 6 ’- 0 " B A N B L A B NLAMark 18’-9"77’-11"1001c 5 13 16 Va rie s 1’-10" B NLAMark 31’-5"518’-6"12’-11"1’-4 3 4602c 85 11 1611’-0"7’-9"1002c 18’-9" 4 ’- 2 " 3’-2" 8"8" 4 ’- 2 " 1’-0"1’-0" 2’-2" 10’-10" Sta. 20+00.00 Line"S-6-E" Line "S-6-E" 102’-0" HP 12x74 Steel "H" Pile (Typ.) 9" 101 Spa. @ 12" Max. = 101’-0" (601c Spa.) 101’-3" 103- 601c 58- HP 12x74 Steel "H" Piles Required 39- #5x35’-6" (3 Ea. Line, 13 Lines) 14 Spa. @ 7’-2" = 100’-4" (Pile Spa.) 1’-8" 9" 6’-3" 1’-6" 1’-03 4" 1" Open Joint 75 8" 1 ’- 9 " 1 ’- 9 " 11 16" 12" 12" 9 16"9 16" 3 ’- 6 " C a p 75 8" 1 ’- 9 " 1 ’- 9 " 11 16" 9 16"9 16" 80’-0"61’-6" 3 ’- 6 " C a p 1" Open Joint 12" 12" 61’-6" 40’-0"40’-0" 9" Sta. 20+00.00 Line "S-6-E" Line "S-6-E" Not to Scale Masonry coat all exposed surfaces of piers. For masonry coating colors, see Special Provisions. For reinforcing bar notes, see Standard E703-BRST-01. Surface seal all exposed surfaces of pier. For elastomeric bearing pad details, see Sheet No. 26. For pier backfill limits, see Standard E211-BFIL-03. Plain Reinforcing Steel Size And Mark Bars No. of Length (Feet) Weight (Lbs.) 1001c 112 18’-9" 1002c 32 18’-9" 1004c 20 9’-3" 1005c 10 8’-9" 1006c 500 19’-6" #10 64 35’-0" #10 48 32’-0" Total No. 10 70994 601c 205 7’-6" 602c 100 31’-5" 603c 300 10’-6" 604c 12 7’-9" 605c 192 12’-6" #6 64 32’-3" #6 16 31’-3" #6 60 28’-6" #6 140 7’-6" #6 48 6’-3" Total No. 6 23952 #5 78 35’-6" #5 16 32’-0" #5 18 28’-0" Total No. 5 3948 401c 1374 3’-4" 402c 48 10’-10" 403c 157 4’-6" 404c 95 5’-10" 405c 42 6’-2" 409c 32 12’-10" #4 4 39’-6" #4 8 17’-9" #4 8 15’-3" Total No. 4 4979 Total Plain Reinforcing Steel 103873 Concrete Class "A" in Substructure Crashwall 103.4 Cys. Stem 140.6 Cys. Cap 117.3 Cys. Total Class "A" in Substructure 361.3 Cys. Class "B" in Footing 147.3 Cys. Miscellaneous Surface Seal 7140 Sft. Masonry Coating 5570 Sft. 58-Piles, Steel, "H", HP12x74 x 80’-0" Approximate 4640 Lft. Driving Tips, Steel "H"58 Each 1001c 112 18’-9" 1002c 32 18’-9" 1004c 20 9’-3" 1005c 10 8’-9" 1006c 500 19’-6" #10 64 35’-0" #10 48 32’-0" Total No. 10 70994 601c 205 7’-6" 602c 100 31’-5" 603c 300 10’-6" 604c 12 7’-9" 605c 192 12’-6" #6 64 32’-3" #6 16 31’-3" #6 60 28’-6" #6 140 7’-6" #6 48 6’-3" Total No. 6 23952 #5 78 35’-6" #5 16 32’-0" #5 18 28’-0" Total No. 5 3948 401c 1374 3’-4" 402c 48 10’-10" 403c 157 4’-6" 404c 95 5’-10" 405c 42 6’-2" 409c 32 12’-10" #4 4 39’-6" #4 8 17’-9" #4 8 15’-3" Total No. 4 4979 Total Plain Reinforcing Steel 103873 Concrete Class "A" in Substructure Crashwall 103.4 Cys. Stem 140.6 Cys. Cap 117.3 Cys. Total Class "A" in Substructure 361.3 Cys. Class "B" in Footing 147.3 Cys. Miscellaneous Surface Seal 7140 Sft. Masonry Coating 5570 Sft. 58-Piles, Steel, "H", HP12x74 x 80’-0" Approximate 4640 Lft. Driving Tips, Steel "H"58 Each afishburn 9:08:20 AM2/11/2009 P:\IN2003\0661\D. Drawings\IN20030661.BR.C5.116.PRD.06.dgn No. STATE OF INDIAN A REGISTE RED P R OFE S SIONAL ENGIN EER 880305 DAVID A. D AY END BENT NO. 3 DETAILS RMC MSP ALF DAD HORIZONTAL SCALE DESIGNATION NO. BRIDGE FILE VERTICAL SCALE SURVEY BOOK SHEETS CONTRACT PROJECT NO. of DESIGNED:DRAWN: CHECKED:CHECKED: DESIGN ENGINEER RECOMMENDED FOR APPROVAL DATE CITY OF CARMEL 07-08C 5119 2/06/2009 Work Point 1 ’- 9 " 3 ’- 6 " 1 ’- 9 " 9’-0"9’-0"9’-0"9’-0"9’-0"9’-0"9’-0"9’-0"9’-0"9’-0" VariesVaries Varies 2B 3B 4B 5B 6B 7B 8B 9B 10B 11B 12B 13B 14B 3 Spa. @ 5’-0" = 15’-0"9 Spa. @ 9’-0" = 81’-0" 9’-0" 3" 7’-61 2" 103’-61 2" 112’-61 2" 13- #7x36’-0" (5 Top, 4 Mid., 4 Bott.) 13- #7x36’-0" (5 Top, 4 Mid., 4 Bott.) 13- #7x36’-0" (5 Top, 4 Mid., 4 Bott.)13- #7x36’-0" (5 Top, 4 Mid., 4 Bott.) 3- #4x38’-6" 3- #4x38’-6" 3- #4x20’-6" 3- #4x9’-0" 3- #4x25’-6" 3- #4x18’-0" 3- #4x21’-6" 3" 6" 1’-6"1’-6"Spa. 601d (Typ.) =2’-0"=2’-0"=2’-0"=2’-0"=2’-0"=2’-0"=2’-0"=2’-0"=2’-0"=2’-0"=2’-0"=2’-0"=2’-0"=3’-0" 3 Spa. @ 1’-0" 4 Spa. @ 6" 3 Spa. @ 1’-0" 4 Spa. @ 6" 3 Spa. @ 1’-0" 4 Spa. @ 6" 7 Spa. @ 1’-0" Max. =3’-0"=3’-0" 4 Spa. @ 6" 7 Spa. @ 1’-0" = 7’-0" 4 Spa. @ 6" 7 Spa. @ 1’-0" = 7’-0" 4 Spa. @ 6" 7 Spa. @ 1’-0" = 7’-0" 4 Spa. @ 6" 7 Spa. @ 1’-0" = 7’-0" 4 Spa. @ 6" 7 Spa. @ 1’-0" = 7’-0" 4 Spa. @ 6" 7 Spa. @ 1’-0" = 7’-0" 4 Spa. @ 6" 7 Spa. @ 1’-0" = 7’-0" 4 Spa. @ 6" 7 Spa. @ 1’-0" = 7’-0" 4 Spa. @ 6" 7 Spa. @ 1’-0" = 7’-0" 4 Spa. @ 6" 7 Spa. @ 1’-0" = 7’-0" 3 Spa. @ 1’-0"=3’-0" 101- 601d 126- 401d (Spa. W/601d) El. 817.71 El. 817.81 El. 817.91 El. 818.01 El. 818.20 El. 818.38 El. 818.56 El. 818.74 El. 818.92 El. 819.10 El. 819.28 El. 819.46 El. 819.64 Line "S-6-E" 3- #4x38’-6" El. 819.46 Line "S-6-E" Min. Lap #4 #7 4’-0" 2’-0" PARTIAL ELEVATION (W.B.L.) PARTIAL PLAN (W.B.L.) 20+50.25 "S-6-E" 2 Spa. @ 6" = 1’-0" 4’-5" 3" 6" 3’-0"3’-0"3’-0"3’-0"3’-0"3’-0"3’-0"3’-0"3’-0"3’-0"3’-0"3’-0"1’-6"1’-6"1’-6"6 Spa. @ 1’-0" = 6’-0" 6 Spa. @ 1’-0" = 6’-0" 6 Spa. @ 1’-0" = 6’-0" 6 Spa. @ 1’-0" = 6’-0" 6 Spa. @ 1’-0" = 6’-0" 6 Spa. @ 1’-0" = 6’-0" 6 Spa. @ 1’-0" = 6’-0" 6 Spa. @ 1’-0" = 6’-0" 6 Spa. @ 1’-0" = 6’-0" 6 Spa. @ 1’-0" = 6’-0" 2 Eq. Spa. =2’-0"=2’-0"=2’-0" 2 Eq. Spa. 2 Eq. Spa. 2 Eq. Spa. =1’-41 2" Spa. #6 F.F. 82- #6x4’-3" 108 Spa. @ 1’-0" Max. = 107’-71 2" (109- 602d R.F.) Bottom Cap El. 814.32 47- 405d22- 404d44- 403d28- 402d 12- 403d (Spa. @ 5’-0" Max.) 23- 401d (Spa. @ 5’-0" Max.) 5- 405d (Spa. @ 5’-0" Max.) 2"x10" Keyway Constr. Joint (Typ.) 2’-0" (Typ.) 2’-0" (Typ.) For Bearing Assembly Details, see Sheet No. 23 (Typ.) 27- Req’d. A A B B NOTES : For reinforcing bar notes, see Standard Drawing E703-BRST-01. All reinforcing steel to be epoxy coated, unless otherwise noted. For Sectins A-A and B-B, see Sheet No. 22. Hatched area to be poured with Superstructure. afishburn 9:08:31 AM2/11/2009 P:\IN2003\0661\D. Drawings\IN20030661.BR.C5.116.EBD.05.dgn No. STATE OF INDIAN A REGISTE RED P R OFE S SIONAL ENGIN EER 880305 DAVID A. D AY END BENT NO. 3 DETAILS RMC MSP ALF DAD HORIZONTAL SCALE DESIGNATION NO. BRIDGE FILE VERTICAL SCALE SURVEY BOOK SHEETS CONTRACT PROJECT NO. of DESIGNED:DRAWN: CHECKED:CHECKED: DESIGN ENGINEER RECOMMENDED FOR APPROVAL DATE CITY OF CARMEL 07-08C 5120 2/06/2009 Work Point 3"x8" Keyway Constr. Joint W/ 1" Open Joint Varies Varies Varies 9’-0"9’-0"9’-0"9’-0"9’-0"9’-0"9’-0"9’-0" 14B 15B 16B 17B 18B 19B 20B 21B 22B 23B 24B 25B 9’-0" 3" 9’-81 2" 115’-51 2" 124’-51 2" 4’-0" 13- #7x36’-0" (5 Top, 4 Mid., 4 Bott.) 13- #7x36’-0" (5 Top, 4 Mid., 4 Bott.) 13- #7x36’-0" (5 Top, 4 Mid., 4 Bott.) 3- #4x38’-6" 3- #4x25’-6" 3- #4x27’-0" =2’-0"=2’-0"=2’-0"=2’-0"=2’-0"=2’-0"=2’-0"=2’-0"=2’-0"=2’-0"=2’-0" 4 Spa. @ 6" 10 Spa. @ 1’-0" Max. = 9’-3" 4 Spa. @ 6" 10 Spa. @ 1’-0" Max. = 9’-3" 4 Spa. @ 6" 10 Spa. @ 1’-0" Max. = 9’-3" 4 Spa. @ 6" 7 Spa. @ 1’-0" = 7’-0" 4 Spa. @ 6" 7 Spa. @ 1’-0" = 7’-0" 4 Spa. @ 6" 7 Spa. @ 1’-0" = 7’-0" 4 Spa. @ 6" 7 Spa. @ 1’-0" = 7’-0" 4 Spa. @ 6" 7 Spa. @ 1’-0" = 7’-0" 4 Spa. @ 6" 7 Spa. @ 1’-0" = 7’-0" 4 Spa. @ 6" 7 Spa. @ 1’-0" = 7’-0" 4 Spa. @ 6" 7 Spa. @ 1’-0" = 7’-0" 9 Spa. @ 1’-0" Max. = 8’-51 2" Line "S-6-E" Line "S-6-E" 3" 6" 1’-6"1’-6"3 Spa. @ 1’-0"=3’-0" Spa. 601d (Typ.) 103- 601d 129- 401d (Spa. W/601d) 3’-0"3’-0"3’-0"3’-0"3’-0"3’-0"3’-0"3’-0"3’-0"3’-0"3’-0"1’-6" 4’-3" 1’-51 2" 20+50.25 "S-6-E" 6 Spa. @ 1’-0" = 6’-0" 6 Spa. @ 1’-0" = 6’-0" 6 Spa. @ 1’-0" = 6’-0" 6 Spa. @ 1’-0" = 6’-0" 6 Spa. @ 1’-0" = 6’-0" 6 Spa. @ 1’-0" = 6’-0" 6 Spa. @ 1’-0" = 6’-0" 6 Spa. @ 1’-0" = 6’-0" 9 Spa. @ 1’-0" Max. = 8’-3"9 Spa. @ 1’-0" Max. = 8’-3"9 Spa. @ 1’-0" Max. = 8’-3"Spa. #6 F.F. 90- #6x4’-3" 3 Eq. Spa. = 2’-6" 9’-0"6"111 Spa. @ 1’-0" Max. = 110’-81 2" (112- 602d R.F.) 6" 6" 3- #4x19’-9" Bridge Seat El. 817.32El. 817.57El. 817.80El. 818.02El. 818.20El. 818.38El. 818.56El. 818.74El. 818.92El. 819.10El. 819.28 El. 819.46 37- 401d Bottom Cap El. 814.32 25- 402d 33- 403d33- 404d13- 405d 18- 401d (Spa. @ 5’-0" Max.) 8- 403d (Spa. @ 5’-0" Max.) PARTIAL ELEVATION (E.B.L.) PARTIAL PLAN (E.B.L.) A A B B 2"x10" Keyway Constr. Joint (Typ.) 2’-0" (Typ.) 2’-0" (Typ.) NOTES : For reinforcing bar notes, see Standard Drawing E703-BRST-01. All reinforcing steel to be epoxy coated, unless otherwise noted. For Sections A-A and B-B, see Sheet No.22. Hatched area to be poured with Superstructure. †-AP1 Anchor Plate (Typ.), 23- Req’d. For Bearing Assembly Details, see Sheet No.23 3 Spa. @ 11’-3" = 33’-9"8 Spa. @ 9’-0" = 72’-0" afishburn 9:08:37 AM2/11/2009 P:\IN2003\0661\D. Drawings\IN20030661.BR.C5.116.EBD.06.dgn No. STATE OF INDIAN A REGISTE RED P R OFE S SIONAL ENGIN EER 880305 DAVID A. D AY END BENT NO. 3 DETAILS RMC MSP ALF DAD HORIZONTAL SCALE DESIGNATION NO. BRIDGE FILE VERTICAL SCALE SURVEY BOOK SHEETS CONTRACT PROJECT NO. of DESIGNED:DRAWN: CHECKED:CHECKED: DESIGN ENGINEER RECOMMENDED FOR APPROVAL DATE CITY OF CARMEL 07-08C 5121 2/06/2009 Work Point 1 ’- 9 " 3 ’- 6 " 1 ’- 9 " 3"x8" Keyway Constr. Joint W/ 1" Open Joint 4’-0" Line "S-6-E" 3 " Bent Piles 9’-0" 7’-612"11 Spa. @ 9’-0" = 99’-0" (12- Bent Piles) 20+50.25 "S-6-E" 6’-0" 103’-61 2" 112’-61 2" 9’-0"9’-0" 124’-512" 1’-512" 115’-512" Line "S-6-E" 12 Spa. @ 9’-0" = 108’-0" (13- Bent Piles) 6’-0" Work Point PARTIAL PILING PLAN PARTIAL PILING PLAN 1 ’- 9 " 3 ’- 6 " 1 ’- 9 " 3 " 20+50.25 "S-6-E" HP 12x74 Bent Pile (Typ.) Wall Pile (Typ.) NOTES : 25- HP 12x74 Steel "H" Piles Required. For reinforcing bar notes, see Standard Drawing E703-BRST-01. All reinforcing steel to be epoxy coated, unless otherwise noted. For Retaining Wall Details, see Road Plans. Wall Pile (Typ.) HP 12x74 Bent Pile (Typ.) afishburn 9:08:42 AM2/11/2009 P:\IN2003\0661\D. Drawings\IN20030661.BR.C5.116.EBD.07.dgn No. STATE OF INDIAN A REGISTE RED P R OFE S SIONAL ENGIN EER 880305 DAVID A. D AY ALFRMC MSP DAD END BENT NO.3 DETAILS HORIZONTAL SCALE DESIGNATION NO. BRIDGE FILE VERTICAL SCALE SURVEY BOOK SHEETS CONTRACT PROJECT NO. of DESIGNED:DRAWN: CHECKED:CHECKED: DESIGN ENGINEER RECOMMENDED FOR APPROVAL DATE CITY OF CARMEL 07-08C 5122 2/06/2009 BENT NO.3 BILL OF MATERIALS Epoxy Coated Reinforcing Steel Size And Mark Bars No. Of Length (Feet) Weight (Lbs.) 4 ’- 3 " 3 ’- 0 " 3’-4" 1’-0"1’-0" B A 401d 402d 3’-4" 403d Mark 1’-0" 1’-6" A B 5’-2" 4’-6" 6’-2" Length 8" Bearing Assembly Bridge Seat Pile and Bearing SIDE VIEW END VIEW PLAN ELEVATION BEARING ASSEMBLY DETAILS Bridge Seat Bearing Assembly S3x7.5 S3x7.5 Bearing Prepare Ends for Full Penetration Weld (Weld in Shop)(Typ.) #8 Reinf. Bars or x 8" Auto Welded Anchor Studs (Headed) May Be Used. (No Paint) Bar 2"x1" (No Paint) Setting Tolerance of Anchor PLates, Level With NOTE: Scale: 1" = 1’-0" Type Prestressed Concrete m Type Prestressed Concrete m 2" 1"1" 3 " 1 " 1’-6" 4 12 " 4 1 2 "3 " 3 " 2"2"2"2" 3"1’-0"3" 1’-6" 1 " 1 ’- 0 " Bearing, Bent & Piles SECTION A-A 602d HP 12x74 Steel "H" Piles Constr. Joint 1 4 Geotextiles 1’-6" 401d 601d F.F.R.F. 9"1’-0" 1’- 2 " V a r ie s Va rie s 3 ’- 0 " M in . 7 " 1 ’- 9 " 4 " 1 ’- 6 " M in . Em b e d m e n t 1’-9" 3’-6" 8 " C la s s C C o n c r e t e S la b 1’-9" 3’-6" #7 (Typ.) Anchor Plate 1 SECTION B-B NOTES: 602d x 4’-11" 6" 1’-9" 2 ’- 0 " M in . 404d 1’-9"6’-8" 405d 2’-0"7’-2" 9" 1 ’- 2 " 4 1 602d 1’-6" 601d #6 403d (In Step) #7 #4 (In Step) F.F.R.F. 1’-0" V a r ie s ( S t e p ) Va r ie s 1 ’- 6 " M in . E m b e d m e n t 2 ’- 5 " M in . L a p 8 " C la s s C C o n c r e t e S la b 4 " 1’-9" 3’-6" 1’-9" 3’-6" 402d (In Step) 2" Cl. (Typ.) V a r ie s V a r ie s #4 (In Step) 1’-9" 1 ’- 3 " 3 ’- 0 " Min . 6 12 " 6 12 " 404d (In Step) V a r ie s #4 (In Step) 3’-4" 3’-4" 3’-4" 3’-4" 601d x 11’-2" Aggregate for End Bent Backfill Aggregate for End Bent Backfill All reinforcing bar notes, see Std. E703-BRST-01. All reinforcing to be Epoxy Coated, except as noted. For location of Sections A-A & B-B, see Sheets No. 19 & 20. Hatched area to be poured with superstructure. 1" Expanded Polystyrene Wrap Around Flanges and Web of Wall Piles (Typ.) #7 91 36’-0" Total No. 7 6697 601d 204 11’-2" 602d 221 4’-11" #6 172 4’-3" Total No. 6 6152 401d 333 4’-6" 402d 53 5’-2" 403d 97 6’-2" 404d 55 6’-8" 405d 65 7’-2" #4 12 38’-6" #4 3 27’-0" #4 6 25’-6" #4 3 21’-6" #4 3 20’-6" #4 3 19’-9" #4 3 18’-0" #4 3 9’-0" Total No. 4 2783 Total Epoxy Coated Reinforcing Steel 15632 Concrete Class "C" in Superstructure Pour No. 1 57.0 Cys. Pour No. 2 65.0 Cys. Total Class "C" in Superstructure 122.0 Cys. Miscellaneous Surface Seal 950 Sft. 25-Piles, Steel, "H", HP12x74 x 90’-0" Approximate 2250 Lft. Driving Tips, Steel "H"25 Each Anchor Plate MK - AP1 50 Each Geotextiles 401d Bearing, Bent & Bent Piles 2"x10" Keyway Constr. Joint Between Beams Constr. Joint afishburn 9:08:46 AM2/11/2009 P:\IN2003\0661\D. Drawings\IN20030661.BR.C5.116.EBD.08.dgn No. STATE OF INDIAN A REGISTE RED P R OFE S SIONAL ENGIN EER 880305 DAVID A. D AY PLAN ELASTOMERIC BEARING PAD DETAILS (50 Required) PLAN SECTION A-A NOTES: AA Showing Elastomeric Bearing Pad Locations BEAM PLACEMENT DETAILS FRAMING PLAN RMC MSP ALF MSB HORIZONTAL SCALE DESIGNATION NO. BRIDGE FILE VERTICAL SCALE SURVEY BOOK SHEETS CONTRACT PROJECT NO. of DESIGNED:DRAWN: CHECKED:CHECKED: DESIGN ENGINEER RECOMMENDED FOR APPROVAL DATE CITY OF CARMEL 07-08C 5123 2/06/2009 11 2 ’- 6 " 9 ’- 0 " 8 S p a . @ 9 ’- 0 " = 7 2 ’- 0 " 9 ’- 0 " 8 S p a . @ 9 ’- 0 " = 7 2 ’- 0 " 3 S p a . @ 10 ’- 6 " = 3 1 ’- 6 " 3 S p a . @ 5 ’- 3 "= 15 ’- 9 " 9 6 ’- 9 " 2 0 9 ’- 3 " 9 6 ’- 0 " 8 S p a . @ 9 ’- 0 " = 7 2 ’- 0 " 9 ’- 0 " 9 ’- 0 " 8 S p a . @ 9 ’- 0 " = 7 2 ’- 0 " 3 S p a . @ 1 1 ’- 3 " = 3 3 ’- 9 " 1 14 ’- 9 " 2 1 0 ’- 9 " 3 S p a . @ 5 ’- 0 "= 15 ’- 0 " Line "PR-S-6-E" Lin e "E" 50’-3"50’-3" 1 7 ’- 3 " 1 8 ’- 9 " Beams No. 4-22 Beams No. 4-22 No. 4-22 912" 91 2" Elastomeric Bearing Pad (Typ.) 91 2" 9 1 2" 10" 10" 10 1 2" 101 2" 10 1 2" 101 2" 10" 10" 91 2" Elastomeric Bearing Pad (Typ.) Elastomeric Bearing Pad (Typ.) Elastomeric Bearing Pad (Typ.) Elastomeric Bearing Pad (Typ.) Elastomeric Bearing Pad (Typ.) Elastomeric Bearing Pad (Typ.) 18 " ( Ty p .) 316" (Typ.) 1 4 " 2 3 13 2 " 14 " 12 " ( T y p .) 5- 3 32 1 ’- 4 " 10" Scale: 1" = 1’-0" Scale: As Noted Sealing Rib, All Sides Top and Bottom Scale: 3" = 1’-0" 9 1 2" afishburn 9:08:52 AM2/11/2009 P:\IN2003\0661\D. Drawings\IN20030661.BR.C5.116.BMD.01.dgn No. STATE OF INDIAN A REGISTE RED P R OFE S SIONAL ENGIN EER 880305 DAVID A. D AY ALF MSP BEAM DETAILS 3/4" = 1’-0", U.N. TYPICAL SECTION SECTION SHOWING REINFORCING 501 401End View Side View 502E (Epoxy Coated) BEAM END DETAILS Residual Camber Table Legend Table Of Beam Dimensions RMC MSB PLAN - BEAMS NO.1A SPAN A & 25B SPAN B PLAN - BEAMS NO.1A SPAN A & 25B SPAN B HORIZONTAL SCALE DESIGNATION NO. BRIDGE FILE VERTICAL SCALE SURVEY BOOK SHEETS CONTRACT PROJECT NO. of DESIGNED:DRAWN: CHECKED:CHECKED: DESIGN ENGINEER RECOMMENDED FOR APPROVAL DATE CITY OF CARMEL 07-08C 5124 2/06/2009 6 Strands To Be Bent Up By Manufacturer Without The Use Of Heat 6 Strands To Be Bent Up By Manufacturer Without The Use Of Heat 2" Radius 2-#6x2’-8" (1 E.F.) 4-#6x1’-11" (2 E.F.) 401 Spa. 501 & 502E Spa. 401 Spa. 2 Strands 8 Strands 8 Strands 501 502E 401 Prestressed Concrete 1 1 No Scale No Scale 2- #6 Bar Full Length #6 Bar Full Length 4-#6x2’-8" (2 E.F.) prestressing force minus deflection from dead load of beam in inches. Superimposed Dead Load Deflection Residual Camber 1.447" 0.630" 0.817" Debond Strands 0’ To 6’ From End Of Beam Pier No.2 Pier No.2 Beam No. 1A Dimension "A"Dimension "B"Dimension "C"Dimension "D"Dimension "E"Dimension "F"Dimension "G" 5 5 "H" 52’-6" 52’-8" 9’-8" Beam Number 1A 1.454" 0.640" 0.814" 25B 25B 6" 1 ’- 6 " 3 " 3 " 3 " 9 " 3 ’- 0 " 6 " 6 " 1 ’- 3 " 3 " 6 " 1’-0" 1’-6" 3"6"6" 2 ’- 6 " 2 " 2 " 2"2"7 Spa. @ 2" = 1’-2" 5 " ( Ty p .) 4"4" & Piles Welded Studs 6 " 10" 10" 1 0 " 1’-4" 1’-2" 3 " 3"4" 3 ’- 2 " 2" 8" 12 Spa. @ 6" = 6’-0" 2" 12 Spa. @ 6" = 6’-0" Dimension "A" 3"3"6" Dim. "B" Dim. "C" Dim. "E" Dim. "D" Dim. "F" Dim. "G" 41 2" (To Be Cast In Beams 1 Each Beam, 2 Total) (To Be Cast In Beams) 6 Each Beam, 12 Total Bent No.1 or Bent No. 3 Bent No.1 or Bent No. 3 20 Spa. @ 6" = 10’-0"11 Spa. @ 1’-0" = 11’-0"11 Spa. @ 1’-0" = 11’-0"20 Spa. @ 6" = 10’-0" 9’-10" 1’-11" 16- " Special Lo-Lax Strands NOTES : See Standard Drawing E707-BPBF-02 for tolerances for fabrication of prestressed beams. See Standard Drawing E703-BRST-01 for reinforcing bar notes. The prestressed beams shall be cast a minimum of 15 days before the deck is poured. Several lifting devices are satisfactory. The type used must be guaranteed by the manufacturer and approved by the engineer on the shop drawings. Beams are to be lifted at bearing points only. Top of beams are to be scored transversely at 3" centers with pointed tool. The concrete strength shall be 6,000 psi mimnimum at release and 7,000 psi minimum at 28 days. " (270 ksi) Special Lo-Lax Strands to be pulled to 33,820 lbs. each. Ø" x 3’-0" Threaded Dowels shall be provided with inserts. 10" afishburn 9:08:55 AM2/11/2009 P:\IN2003\0661\D. Drawings\IN20030661.BR.C5.116.BMD.02.dgn No. STATE OF INDIAN A REGISTE RED P R OFE S SIONAL ENGIN EER 880305 DAVID A. D AY ALF MSP BEAM DETAILS 3/4" = 1’-0", U.N. TYPICAL SECTION SECTION SHOWING REINFORCING 501 401End View Side View 502E (Epoxy Coated) BEAM END DETAILS Residual Camber Table Legend Table Of Beam Dimensions RMC MSB PLAN - BEAMS NO.2A-19A SPAN A AND BEAMS NO.1B-20B SPAN B ELEVATION - BEAMS NO.2A-19A SPAN A AND BEAMS NO.1B-20B SPAN B Residual Camber Table HORIZONTAL SCALE DESIGNATION NO. BRIDGE FILE VERTICAL SCALE SURVEY BOOK SHEETS CONTRACT PROJECT NO. of DESIGNED:DRAWN: CHECKED:CHECKED: DESIGN ENGINEER RECOMMENDED FOR APPROVAL DATE CITY OF CARMEL 07-08C 5125 2/06/2009 Bent No.1 Or Bent No.3 6 Strands To Be Bent Up By Manufacturer Without The Use Of Heat 6 Strands To Be Bent Up By Manufacturer Without The Use Of Heat 2" Radius 2-#6x2’-8" (1 E.F.) 4-#6x1’-11" (2 E.F.) Bent No.1 Or Bent No.3 401 Spa. 501 & 502E Spa. 401 Spa. 2 Strands 6 Strands 8 Strands 501 502E 401 Prestressed Concrete 1 1 End Welded Studs No Scale No Scale 2- #6 Bar Full Length #6 Bar Full Length 4-#6x2’-8" (2 E.F.) prestressing force minus deflection from dead load of beam in inches. Superimposed Dead Load Deflection Residual Camber 1.163" 0.587" 0.576" Debond Strands 0’ To 6’ From End Of Beam Pier No.2 Pier No.2 Beam No. 2A 3A Dimension "A"Dimension "B"Dimension "C"Dimension "D"Dimension "E"Dimension "F"Dimension "G" 5 4 "H" 50’-6"4 7’-8" 7’-10" Beam Number 2A 1.144" 0.568" 0.576" 3A 1.136" 0.580" 0.556" 4A 1.138" 0.426" 0.712" 1.139" 0.453" 0.686" 1.136" 0.597" 0.539" 6" 1 ’- 6 " 3 " 3 " 3 " 9 " 3"6"6" 2 " 2 " 2 " 2"2" 10" 3 " 2" 8" 12 Spa. @ 6" = 6’-0" 2" 12 Spa. @ 6" = 6’-0" Dimension "A" 3"3"6" Dim. "B" Dim. "C" Dim. "E" Dim. "D" Dim. "F" Dim. "G" 3- "x4" End Welded Studs (To Be Cast In Beams) 6 Each Beam, 288 Total & Piles 1 0 " 10" 1’-4" 1’-2" 6 " 3 ’- 2 " 4"3" ( T y p .) 5 " 2 ’- 6 " 6 " 6 " 1 ’- 3 " 3 " 6 " 3 ’- 0 " 1’-6" 7 Spa. @ 2" = 1’-2" 1’-0" 41 2" 4"4" 50’-6" 50’-6" 4 4 7’-8" 7’-8" 4 7’-11"23B 5 8’-8"24B 8’-6" 16 Spa. @ 6" = 8’-0"11 Spa. @ 1’-0" = 11’-0"11 Spa. @ 1’-0" = 11’-0"16 Spa. @ 6" = 8’-0" 4A-22A 4B-22B 4 7’-8"1’-1"23A 2B 3B 50’-6" 50’-6" 50’-9" 51’-6" 1.136" 0.512" 0.624" 22A 23A-24A NOTES : See Standard Drawing E707-BPBF-02 for tolerances for fabrication of prestressed beams. See Standard Drawing E703-BRST-01 for reinforcing bar notes. The prestressed beams shall be cast a minimum of 15 days before the deck is poured. Several lifting devices are satisfactory. The type used must be guaranteed by the manufacturer and approved by the engineer on the shop drawings. Beams are to be lifted at bearing points only. Top of beams are to be scored transversely at 3" centers with pointed tool. The concrete strength shall be 6,000 psi mimnimum at release and 7,000 psi minimum at 28 days. " (270 ksi) Special Lo-Lax Strands to be pulled to 33,820 lbs. each. Ø" x 3’-0" Threaded Dowels shall be provided with inserts. 24A 25A 1B 51’-4" 50’-8" 50’-6" 50’-6" 50’-6" 1’-10" 1’-9Ø" 1’-10"1’-1"1’-1"1’-1"1’-1" 1’-0Œ" 1’-10"1’-10" 1’-9Œ" 1’-10" 1’-2" 1’-1"1’-1"1’-1" 11" 1’-1" 4 7’-8" 4 7’-8" 4 7’-8" 4 7’-8" (To Be Cast In Beams 1 Each Beam, 48 Total) 1’-9Œ"1’-9" 1’-9"1’-10" 1’-10" 1’-10ª" 1’-9º" 1’-10"1’-10" 1’-10Æ"1’-10" Superimposed Dead Load Deflection Residual Camber Beam Number 1.139" 0.443" 0.696" 1.137" 0.410" 0.727" 1B 1.136" 0.503" 0.633" 2B-3B 4B 1.136" 0.585" 0.551" 22B 1.144" 0.581" 0.563" 23B 1.165" 0.608" 0.557" 24B 25A5A-21A 1.136" 0.585" 0.551" 5B-21B afishburn 9:08:59 AM2/11/2009 P:\IN2003\0661\D. Drawings\IN20030661.BR.C5.116.BMD.03.dgn No. STATE OF INDIAN A REGISTE RED P R OFE S SIONAL ENGIN EER 880305 DAVID A. D AY Showing Concrete Dimensions PARTIAL PLAN SUPERSTRUCTURE DETAILS RMC MSP ALF MSB HORIZONTAL SCALE DESIGNATION NO. BRIDGE FILE VERTICAL SCALE SURVEY BOOK SHEETS CONTRACT PROJECT NO. of DESIGNED:DRAWN: CHECKED:CHECKED: DESIGN ENGINEER RECOMMENDED FOR APPROVAL DATE CITY OF CARMEL 07-08C 5126 2/06/2009 X 1’-0"1’-0" 102’-6" O.-O. Bridge Floor 2’-6"2’-6" 16’-8"85’-10" R 2 0 0 ’- 0 " R76’-6" 6 3 ’- 0 " 4 0 ’- 0 5 8 " 2 2 ’- 2 12 " 4 1 ’- 1116 " 2 3 ’- 2 3 1 6 " 6 3 ’- 0 " P.C. P.C.C. R 8 2’- 6" 3’-75 16" Required Keyway Constr. Joint Optional Keyway Constr. Joint Optional Keyway Constr. Joint 1 23 4 5 6 13 14 Sidewalk Pour Median Pour10 ’- 1 1 1 16 " 3 5 ’- 0 " 1 7 ’- 0 15 16 " 3 5 ’- 7 9 1 6 " 8’-55 8"41’-93 8"48’-711 16" 52’-3"50’-3" R 1 1 7 ’- 6 " 5 5 ’- 8 12 " 5 4 ’- 1 1 5 8 " 1 1 7 ’- 1 15 8 " 3 5 ’- 0 3 4 " 3 6 ’- 4 " 9 9 ’- 4 " NOTES : For reinforcing bar notes, see Standard Drawing E703-BRST-01. All reinforcing steel to be epoxy coated, unless otherwise noted. Indicates concrete pour number. Pour numbers indicate sequence of pours. Pours over interior supports to be made last to reduce the effect of the slab dead load in the negative moment area. Pours No.3, 6, 9 and 12 will include the diaphragm at the support, and will be held to a 5’-0" length. Suitable restraint shall be provided to prevent the rotation of the outside beams under construction loads, such as finishing machines, forms, etc. After the beams have been erected, concrete forms shall not be blocked against the expansion end of the beams in making any pours adjacent to the beam spans. The contractor may use permanent metal deck forms in this contract. For bar bending diagrams, Bill of Materials and additional details, see Sheet No. 45. afishburn 9:09:03 AM2/11/2009 P:\IN2003\0661\D. Drawings\IN20030661.BR.C5.116.SST.01.dgn No. STATE OF INDIAN A REGISTE RED P R OFE S SIONAL ENGIN EER 880305 DAVID A. D AY Showing Concrete Dimensions PARTIAL PLAN SUPERSTRUCTURE DETAILS RMC MSP ALF MSB HORIZONTAL SCALE DESIGNATION NO. BRIDGE FILE VERTICAL SCALE SURVEY BOOK SHEETS CONTRACT PROJECT NO. of DESIGNED:DRAWN: CHECKED:CHECKED: DESIGN ENGINEER RECOMMENDED FOR APPROVAL DATE CITY OF CARMEL 07-08C 5127 2/06/2009 X Optional Keyway Constr. Joint 14 Median Pour R 1 1 7 ’- 6 " R 8 2 ’- 6 " R 2 0 0 ’- 0 " 3 9 ’- 4 3 4 " 6 3 ’- 0 " 19 ’- 1 0 5 8 " 6 3 ’- 0 " 4 0 ’- 3 5 8 " 2 6 ’- 2 5 8 " 5 3 ’- 8 5 8 " 5 7 ’- 2 7 8 " 1 2 0 ’- 2 7 8 " 3 5 ’- 0 " 1 7 ’- 0 15 1 6 " 1 0 ’- 1 1 116 " 3 6 ’- 6 15 1 6 " 1’-0"1’-0" 102’-6" O.-O. Bridge Floor 88’-63 8"13’-115 8" 44’-1115 16"41’-93 8"15’-811 16" 44’-1115 16"52’-1"5’-51 16" Optional Keyway Constr. Joint Required Keyway Constr. Joint 7 8 9 10 11 12 15 Sidewalk Pour P.T. P.T. 2’-6"2’-6" 4 0 ’- 9 12 " NOTES : For reinforcing bar notes, see Standard Drawing E703-BRST-01. All reinforcing steel to be epoxy coated, unless otherwise noted. Indicates concrete pour number. Pour numbers indicate sequence of pours. Pours over interior supports to be made last to reduce the effect of the slab dead load in the negative moment area. Pours No.3, 6, 9 and 12 will include the diaphragm at the support, and will be held to a 5’-0" length. Suitable restraint shall be provided to prevent the rotation of the outside beams under construction loads, such as finishing machines, forms, etc. After the beams have been erected, concrete forms shall not be blocked against the expansion end of the beams in making any pours adjacent to the beam spans. The contractor may use permanent metal deck forms in this contract. For bar bending diagrams, Bill of Materials and additional details, see Sheet No. 45. afishburn 9:09:07 AM2/11/2009 P:\IN2003\0661\D. Drawings\IN20030661.BR.C5.116.SST.02.dgn No. STATE OF INDIAN A REGISTE RED P R OFE S SIONAL ENGIN EER 880305 DAVID A. D AY PARTIAL PLAN SUPERSTRUCTURE DETAILS RMC MSP ALF Showing Top And Bottom Transverse Reinforcing And Top Longitudinal Reinforcing A A Min. Lap MSB HORIZONTAL SCALE DESIGNATION NO. BRIDGE FILE VERTICAL SCALE SURVEY BOOK SHEETS CONTRACT PROJECT NO. of DESIGNED:DRAWN: CHECKED:CHECKED: DESIGN ENGINEER RECOMMENDED FOR APPROVAL DATE CITY OF CARMEL 07-08C 5128 2/06/2009 X 1 23 4 5 6 13 14 Sidewalk Pour Median Pour 1’-0"1’-0" 102’-6" O.-O. Bridge Floor 2’-6"2’-6" 6 3 ’- 0 " 4 0 ’- 0 5 8 " 2 2 ’- 2 12 " 4 1 ’- 1116 " 2 3 ’- 2 3 1 6 " 6 3 ’- 0 " Required Keyway Constr. Joint Optional Keyway Constr. Joint Optional Keyway Constr. Joint 3" 1- #4x2’-3" (Top) 1- #4x4’-6" (Top) 1- #4x6’-9" (Top) 1- #4x9’-3" (Top) 34- 601a (17 Top, 17 Bott.) (1 Bar Cuts 2) 10- #4x9’-0" 5- 401a (1 Bar Cuts 2) 1- #4x36’-6" (Top Coping) 90- 501a (45 Top, 45 Bott.) (1 Bar Cuts 2) 1-#7x4’-3" 1- #7x9’-9" 1-#6x6’-9" 1- #6x12’-9" 1- #4x36’-6" (Top Coping) 1- #4x36’-6" (Top Coping) 74- #6x32’-6" (37 Top, 37 Bott.) 74- #5x17’-9" (37 Top, 37 Bott.) 4 1 - # 4 x 2 3 ’- 3 " 3 6 - # 4 x 2 3 ’- 3 " 3 6 - # 4 x 2 3 ’- 3 " 448- #5x35’-3" (224 Top, 224 Bott.) 448- #5x35’-3" (224 Top, 224 Bott.) 1 2 8 - # 4 x 2 3 ’- 3 " ( 6 4 Lin e s , 2 E a . Lin e ) 1 2 8 - # 4 x 2 3 ’- 3 " ( 6 4 Lin e s , 2 E a . Lin e ) 6 3 - # 7 x 1 7 ’- 0 " 6 4 - # 6 x 1 7 ’- 0 " 3 8 - # 6 x 17 ’- 0 " 3 8 - # 7 x 17 ’- 0 " 4 1 - # 4 x 2 3 ’- 3 " 3" (Transverse Reinforcing Steel Spa. Top and Bottom) 6 " 6 " 6 " 3 " 6 " 6 " 6 " 6 2 S p a . @ 1 ’- 0 " = 6 2 ’- 0 " ( 6 3 - 5 9 9 a ) 6 2 S p a . @ 1 ’- 0 " = 6 2 ’- 0 " ( 6 3 - 5 9 9 a ) 374- #5x35’-3" (187 Top, 187 Bott.) 3 6 S p a . @ 1’- 0 " M a x . = 3 5 ’- 7 " ( 3 7 - 5 9 9 a ) 1- #4x16’-3" #4 #5 2’-7" 2’-1" #6 3’-1" #7 3’-11" 3 " 5 5 S p a . @ 1 ’- 0 " Ma x . = 5 4 ’- 2 1116 " ( 5 6 - 5 9 9 a ) 5 5 ’- 8 12 " 5 4 ’- 1 1 5 8 " 1 1 7 ’- 1 15 8 " 3 5 ’- 0 3 4 " 3 6 ’- 4 " 9 9 ’- 4 " NOTES : For reinforcing bar notes, see Standard Drawing E703-BRST-01. All reinforcing steel to be epoxy coated, unless otherwise noted. Indicates concrete pour number. Pour numbers indicate sequence of pours. Pours over interior supports to be made last to reduce the effect of the slab dead load in the negative moment area. Pours No.3, 6, 9 and 12 will include the diaphragm at the support, and will be held to a 5’-0" length. Suitable restraint shall be provided to prevent the rotation of the outside beams under construction loads, such as finishing machines, forms, etc. After the beams have been erected, concrete forms shall not be blocked against the expansion end of the beams in making any pours adjacent to the beam spans. The contractor may use permanent metal deck forms in this contract. For Section A-A, see Sheets No.34 & 35. For bar bending diagrams, Bill of Materials and additional details, see Sheet No. 45. afishburn 9:09:11 AM2/11/2009 P:\IN2003\0661\D. Drawings\IN20030661.BR.C5.116.SST.03.dgn No. STATE OF INDIAN A REGISTE RED P R OFE S SIONAL ENGIN EER 880305 DAVID A. D AY PARTIAL PLAN SUPERSTRUCTURE DETAILS RMC MSP ALF Showing Top And Bottom Transverse Reinforcing And Top Longitudinal Reinforcing Min. Lap A A MSB HORIZONTAL SCALE DESIGNATION NO. BRIDGE FILE VERTICAL SCALE SURVEY BOOK SHEETS CONTRACT PROJECT NO. of DESIGNED:DRAWN: CHECKED:CHECKED: DESIGN ENGINEER RECOMMENDED FOR APPROVAL DATE CITY OF CARMEL 07-08C 5129 2/06/2009 X 14 Median Pour 7 8 9 10 11 12 15 Sidewalk Pour Optional Keyway Constr. Joint 3 9 ’- 4 3 4 " 6 3 ’- 0 " 19 ’- 1 0 5 8 " 6 3 ’- 0 " 4 0 ’- 3 5 8 " 2 6 ’- 2 5 8 " 5 3 ’- 8 5 8 " 5 7 ’- 2 7 8 " 1 2 0 ’- 2 7 8 " 1’-0"1’-0" 102’-6" O.-O. Bridge Floor Optional Keyway Constr. Joint Required Keyway Constr. Joint 2’-6"2’-6" 12 8 - # 4 x 2 3 ’- 3 " ( 6 4 L in e s , 2 E a . L in e ) 12 8 - # 4 x 2 3 ’- 3 " ( 6 4 L in e s , 2 E a . L in e ) 448- #5x35’-3" (224 Top, 224 Bott.) 448- #5x35’-3" (224 Top, 224 Bott.) 6 4 - # 6 x 1 7 ’- 0 " 6 3 - # 7 x 1 7 ’- 0 " 344- #5x35’-3" (172 Top, 172 Bott.) 104- #5x16’-6" (52 Top, 52 Bott.) 104- #6x32’-6" (52 Top, 52 Bott.) 10- #4x9’-0" 48- 602a (24 Top, 24 Bott.) (1 Bar Cuts 2) 1- #4x2’-3" (Top) 1- #4x4’-3" (Top) 1- #4x6’-6" (Top) 1- #4x8’-6" (Top) 1- #4x11’-0" (Top) 5- 402a (1 Bar Cuts 2) 1- #4x36’-6" (Top Coping) 1- #4x36’-6" (Top Coping) 1- #4x36’-6" (Top Coping)1- #4x6’-6" 1- #4x15’-0" 1- #6x13’-6" 1- #6x8’-0" 1- #7x10’-9" 1- #7x5’-6" 4 2 - # 4 x 2 3 ’- 3 " 4 2 - # 4 x 2 3 ’- 3 " 3 9 - # 7 x 1 7 ’- 0 " 3 9 - # 6 x 1 7 ’- 0 " 3 7 - # 4 x 2 3 ’- 3 " 3 7 - # 4 x 2 3 ’- 3 " 3"3" 6 " 6 " 6 " 3 " 5 7 S p a . @ 1’- 0 " M a x . = 5 6 ’- 5 7 8 " ( 5 8 - 5 9 9 a ) 6 2 S p a . @ 1 ’- 0 " = 6 2 ’- 0 " ( 6 3 - 5 9 9 a ) 3 " 6 " 6 " 6 " 6 2 S p a . @ 1 ’- 0 " = 6 2 ’- 0 " ( 6 3 - 5 9 9 a ) 3 7 S p a . @ 1’- 0 " M a x . = 3 6 ’- 3 13 16 " ( 3 8 - 5 9 9 a ) 100- 502a (50 Top, 50 Bott.) (1 Bar Cuts 2) #4 #5 2’-7" 2’-1" #6 3’-1" #7 3’-11" 4 0 ’- 9 12 " NOTES : For reinforcing bar notes, see Standard Drawing E703-BRST-01. All reinforcing steel to be epoxy coated, unless otherwise noted. Indicates concrete pour number. Pour numbers indicate sequence of pours. Pours over interior supports to be made last to reduce the effect of the slab dead load in the negative moment area. Pours No.3, 6, 9 and 12 will include the diaphragm at the support, and will be held to a 5’-0" length. Suitable restraint shall be provided to prevent the rotation of the outside beams under construction loads, such as finishing machines, forms, etc. After the beams have been erected, concrete forms shall not be blocked against the expansion end of the beams in making any pours adjacent to the beam spans. The contractor may use permanent metal deck forms in this contract. For Section A-A, see Sheets No.34 & 35. For bar bending diagrams, Bill of Materials and additional details, see Sheet No. 45. afishburn 9:09:15 AM2/11/2009 P:\IN2003\0661\D. Drawings\IN20030661.BR.C5.116.SST.04.dgn No. STATE OF INDIAN A REGISTE RED P R OFE S SIONAL ENGIN EER 880305 DAVID A. D AY PARTIAL PLAN SUPERSTRUCTURE DETAILS RMC MSP ALF Showing Bottom Longitudinal Reinforcing EE DD A A Min. Lap MSB HORIZONTAL SCALE DESIGNATION NO. BRIDGE FILE VERTICAL SCALE SURVEY BOOK SHEETS CONTRACT PROJECT NO. of DESIGNED:DRAWN: CHECKED:CHECKED: DESIGN ENGINEER RECOMMENDED FOR APPROVAL DATE CITY OF CARMEL 07-08C 5130 2/06/2009 X 1 2 3 4 5 6 13 14 Sidewalk Pour Median Pour 1’-0"1’-0" 102’-6" O.-O. Bridge Floor 2’-6"2’-6" 6 3 ’- 0 " 4 0 ’- 0 5 8 " 2 2 ’- 2 12 " 4 1 ’- 1116 " 2 3 ’- 2 3 1 6 " 6 3 ’- 0 " Required Keyway Constr. Joint Optional Keyway Constr. Joint 3"3" (Transverse Reinforcing Steel Spa. Top and Bottom) 12- #5x20’-0" 25- #5x20’-0" 25- #5x20’-0" 25- #5x20’-0" 21- #5x36’-0" 21- #5x36’-0" 21- #5x36’-0" 9- #5x36’-0" 9- #5x36’-0" 8- #5x19’-0" 14- #5x36’-0" 14- #5x36’-0" 14- #5x36’-0" 12- #5x19’-0" 12- #5x19’-0" 12- #5x19’-0" 5 5 5 - # 4 x 3 5 ’- 6 " ( 1 8 5 Lin e s , 3 E a . Lin e ) Optional Keyway Constr. Joint 5- 503a (Pier Diaph.) 5- 503a (Pier Diaph.) 5- 503a (Pier Diaph.) #4 #5 2’-7" 2’-1" #6 3’-1" #7 3’-11" 5 5 ’- 8 12 " 5 4 ’- 1 1 5 8 " 1 1 7 ’- 1 15 8 " 3 5 ’- 0 3 4 " 3 6 ’- 4 " 9 9 ’- 4 " 144- 503a (8 Ea. Diaph., 18 Pier Diaph.) 25- #8x3’-0" (1 Ea. Beam Line At Pier Diaph.) 138- #6x6’-0" (3 Ea. Interior Beam End At Pier Diaph.) 108- #5x7’-0" (6 Ea. Pier Diaph., 3 E.F., 18 Interior Pier Diaph.) 6- #5x3’-9" (3 E.F., Pier Diaph.) 6- #5x3’-9" (3 E.F., Pier Diaph.) 6- #5x3’-9" (3 E.F., Pier Diaph.) NOTES : For reinforcing bar notes, see Standard Drawing E703-BRST-01. All reinforcing steel to be epoxy coated, unless otherwise noted. Indicates concrete pour number. Pour numbers indicate sequence of pours. Pours over interior supports to be made last to reduce the effect of the slab dead load in the negative moment area. Pours No.3, 6, 9 and 12 will include the diaphragm at the support, and will be held to a 5’-0" length. Suitable restraint shall be provided to prevent the rotation of the outside beams under construction loads, such as finishing machines, forms, etc. After the beams have been erected, concrete forms shall not be blocked against the expansion end of the beams in making any pours adjacent to the beam spans. The contractor may use permanent metal deck forms in this contract. For Section A-A, see Sheets No.34 & 35. For bar bending diagrams, Bill of Materials and additional details, see Sheet No. 45. afishburn 9:09:19 AM2/11/2009 P:\IN2003\0661\D. Drawings\IN20030661.BR.C5.116.SST.05.dgn No. STATE OF INDIAN A REGISTE RED P R OFE S SIONAL ENGIN EER 880305 DAVID A. D AY PARTIAL PLAN SUPERSTRUCTURE DETAILS RMC MSP ALF Showing Bottom Longitudinal Reinforcing Min. Lap A A MSB HORIZONTAL SCALE DESIGNATION NO. BRIDGE FILE VERTICAL SCALE SURVEY BOOK SHEETS CONTRACT PROJECT NO. of DESIGNED:DRAWN: CHECKED:CHECKED: DESIGN ENGINEER RECOMMENDED FOR APPROVAL DATE CITY OF CARMEL 07-08C 5131 2/06/2009 X 14 Median Pour 7 8 9 10 11 12 15 Optional Keyway Constr. Joint 3 9 ’- 4 3 4 " 6 3 ’- 0 " 19 ’- 1 0 5 8 " 6 3 ’- 0 " 4 0 ’- 3 5 8 " 2 6 ’- 2 5 8 " 5 3 ’- 8 5 8 " 5 7 ’- 2 7 8 " 1 2 0 ’- 2 7 8 " 1’-0"1’-0" 102’-6" O.-O. Bridge Floor Required Keyway Constr. Joint 2’-6"2’-6" 3"3" Sidewalk Pour 5 5 5 - # 4 x 3 5 ’- 6 " ( 1 8 5 Lin e s , 3 E a . Lin e ) 12- #5x19’-0" 12- #5x19’-0" 12- #5x19’-0" 8- #5x19’-0" 15- #5x36’-0" 15- #5x36’-0" 15- #5x36’-0" 8- #5x36’-0" 22- #5x36’-0" 22- #5x36’-0" 22- #5x36’-0" 26- #5x20’-0" 26- #5x20’-0" 26- #5x20’-0" 8- #5x36’-0" 12- #5x21’-0" Optional Keyway Constr. Joint #4 #5 2’-7" 2’-1" #6 3’-1" #7 3’-11" 4 0 ’- 9 12 " 6- 503a 6- 503a 6- 503a 6- #5x4’-3" 6- #5x4’-3" 6- #5x4’-3"NOTES : For reinforcing bar notes, see Standard Drawing E703-BRST-01. All reinforcing steel to be epoxy coated, unless otherwise noted. Indicates concrete pour number. Pour numbers indicate sequence of pours. Pours over interior supports to be made last to reduce the effect of the slab dead load in the negative moment area. Pours No.3, 6, 9 and 12 will include the diaphragm at the support, and will be held to a 5’-0" length. Suitable restraint shall be provided to prevent the rotation of the outside beams under construction loads, such as finishing machines, forms, etc. After the beams have been erected, concrete forms shall not be blocked against the expansion end of the beams in making any pours adjacent to the beam spans. The contractor may use permanent metal deck forms in this contract. For Section A-A, see Sheets No.34 & 35. For bar bending diagrams, Bill of Materials and additional details, see Sheet No. 45. afishburn 9:09:23 AM2/11/2009 P:\IN2003\0661\D. Drawings\IN20030661.BR.C5.116.SST.06.dgn No. STATE OF INDIAN A REGISTE RED P R OFE S SIONAL ENGIN EER 880305 DAVID A. D AY PARTIAL PLAN SUPERSTRUCTURE DETAILS RMC MSP ALF Showing Sidewalk And Median Reinforcing A A Min. Lap MSB HORIZONTAL SCALE DESIGNATION NO. BRIDGE FILE VERTICAL SCALE SURVEY BOOK SHEETS CONTRACT PROJECT NO. of DESIGNED:DRAWN: CHECKED:CHECKED: DESIGN ENGINEER RECOMMENDED FOR APPROVAL DATE CITY OF CARMEL 07-08C 5132 2/06/2009 X 1 2 3 4 5 6 13 14 Sidewalk Pour Median Pour 2’-6"2’-6" 6 3 ’- 0 " 4 0 ’- 0 5 8 " 2 2 ’- 2 12 " 4 1 ’- 1 1 1 6 " 2 3 ’- 2 3 16 " 6 3 ’- 0 " Required Keyway Constr. Joint Optional Keyway Constr. Joint 3" 88- #4x38’-0" 88- #4x38’-0" 77- #4x38’-0" 155- 405a 155- 404a 155- 403a 62- #4x21’-6" 62- #4x21’-6" 2 0 - # 4 x 4 0 ’- 0 " 1 1 - # 4 x 3 8 ’- 0 " 1 2 - # 4 x 3 6 ’- 0 " 1 0 - # 4 x 3 4 ’- 0 " 8 - # 4 x 3 1 ’- 6 " 8 - # 4 x 2 9 ’- 6 " 8 - # 4 x 2 7 ’- 0 " 8 - # 4 x 2 4 ’- 6 " 8 - # 4 x 2 1 ’- 0 " 10- 406a (1 Bar Cuts 2) 10- 407a (1 Bar Cuts 2) 3" 154 Spa. @ 8" Max. = 102’-0" (Transverse Reinforcing Spa., Sidewalk) 102 Spa. @ 1’-0" = 102’-0" (Transverse Reinforcing Spa., Median) 1’-0"1’-0" 102’-6" O.-O. Bridge Floor 10- 408a (1 Bar Cuts 2) 14- 409a (1 Bar Cuts 2) 26- #4x36’-6" 50- #4x36’-6" 43- #4x36’-6" 103- #4x21’-6" 103- 403a 103- 403a #4 #5 2’-7" 2’-1" #6 3’-1" #7 3’-11" 5 5 ’- 8 12 " 5 4 ’- 1 15 8 " 1 17 ’- 1 1 5 8 " 3 5 ’- 0 3 4 " 3 6 ’- 4 " 9 9 ’- 4 " NOTES : For reinforcing bar notes, see Standard Drawing E703-BRST-01. All reinforcing steel to be epoxy coated, unless otherwise noted. Indicates concrete pour number. Pour numbers indicate sequence of pours. Pours over interior supports to be made last to reduce the effect of the slab dead load in the negative moment area. Pours No.3, 6, 9 and 12 will include the diaphragm at the support, and will be held to a 5’-0" length. Suitable restraint shall be provided to prevent the rotation of the outside beams under construction loads, such as finishing machines, forms, etc. After the beams have been erected, concrete forms shall not be blocked against the expansion end of the beams in making any pours adjacent to the beam spans. The contractor may use permanent metal deck forms in this contract. For Section A-A, see Sheets No.34 & 35. For bar bending diagrams, Bill of Materials and additional details, see Sheet No. 45. afishburn 9:09:26 AM2/11/2009 P:\IN2003\0661\D. Drawings\IN20030661.BR.C5.116.SST.07.dgn No. STATE OF INDIAN A REGISTE RED P R OFE S SIONAL ENGIN EER 880305 DAVID A. D AY PARTIAL PLAN SUPERSTRUCTURE DETAILS RMC MSP ALF Showing Sidewalk Reinforcing A A Min. Lap MSB HORIZONTAL SCALE DESIGNATION NO. BRIDGE FILE VERTICAL SCALE SURVEY BOOK SHEETS CONTRACT PROJECT NO. of DESIGNED:DRAWN: CHECKED:CHECKED: DESIGN ENGINEER RECOMMENDED FOR APPROVAL DATE CITY OF CARMEL 07-08C 5133 2/06/2009 X 14 Median Pour 7 8 9 10 11 12 15 3 9 ’- 4 3 4 " 6 3 ’- 0 " 19 ’- 1 0 5 8 " 6 3 ’- 0 " 4 0 ’- 3 5 8 " 2 6 ’- 2 5 8 " 5 3 ’- 8 5 8 " 5 7 ’- 2 7 8 " 1 2 0 ’- 2 7 8 " 1’-0"1’-0" 102’-6" O.-O. Bridge Floor Required Keyway Constr. Joint 2’-6"2’-6" 3" Sidewalk Pour Optional Keyway Constr. Joint 5- #4x25’-6" 8 - # 4 x 2 8 ’- 3 " 8 - # 4 x 3 0 ’- 6 " 8 - # 4 x 3 2 ’- 6 " 1 2 - # 4 x 3 5 ’- 0 " 2 0 - # 4 x 3 8 ’- 0 " 2 0 - # 4 x 4 0 ’- 0 " 38- #4x21’-6" 38- #4x21’-6" 2 0 - # 4 x 4 0 ’- 0 " 1 5 - # 4 x 3 7 ’- 6 " 82- #4x38’-0" 87- #4x38’-0" 87- #4x38’-0" 155- 405a 155- 404a 155- 403a 3" 154 Spa. @ 8" Max. = 102’-0" (Transverse Reinforcing Spa., Sidewalk) Optional Keyway Constr. Joint #4 #5 2’-7" 2’-1" #6 3’-1" #7 3’-11" 4 0 ’- 9 12 " NOTES : For reinforcing bar notes, see Standard Drawing E703-BRST-01. All reinforcing steel to be epoxy coated, unless otherwise noted. Indicates concrete pour number. Pour numbers indicate sequence of pours. Pours over interior supports to be made last to reduce the effect of the slab dead load in the negative moment area. Pours No.3, 6, 9 and 12 will include the diaphragm at the support, and will be held to a 5’-0" length. Suitable restraint shall be provided to prevent the rotation of the outside beams under construction loads, such as finishing machines, forms, etc. After the beams have been erected, concrete forms shall not be blocked against the expansion end of the beams in making any pours adjacent to the beam spans. The contractor may use permanent metal deck forms in this contract. For Section A-A, see Sheets No.34 & 35. For bar bending diagrams, Bill of Materials and additional details, see Sheet No. 45. afishburn 9:09:30 AM2/11/2009 P:\IN2003\0661\D. Drawings\IN20030661.BR.C5.116.SST.08.dgn No. STATE OF INDIAN A REGISTE RED P R OFE S SIONAL ENGIN EER 880305 DAVID A. D AY SUPERSTRUCTURE DETAILS 3/8" = 1’-0", U.N. RMC MSP ALF MSB HORIZONTAL SCALE DESIGNATION NO. BRIDGE FILE VERTICAL SCALE SURVEY BOOK SHEETS CONTRACT PROJECT NO. of DESIGNED:DRAWN: CHECKED:CHECKED: DESIGN ENGINEER RECOMMENDED FOR APPROVAL DATE CITY OF CARMEL 07-08C 5134 2/06/2009 SECTION A-A - W.B.L. Roughened Construction Joint (Typ.) 405a 404a 403a Drip Bead (Typ.) Optional Keyway Construction Joint #4 Slope Varies 482a 481a #4 Conduit #4403a #4 403a Profile Grade Line "CAR-BR-CL" SECTION A-A - MEDIAN 8 " C la s s C C o n c r e t e S la b 1" C l. C l. 3" 27’-0" Limits of Surface Seal Varies 3"3"125 Spa. @ 6" = 62’-6" (Spa. #6 and #7 Alternating Over Support) 63 Spa. @ 1’-0" = 62’-6" (Spa. #4 In Span) Spa. @ 6" Max. (Spa. #6 and #7 Alternating Over Support) Spa. @ 1’-0" Max. (Spa. #4 In Span) 3"Spa. @ 8" Max. (Spa. #4 In Sidewalk) 10’-0" Multi-Use Path Varies - 6’-6" Min. To 1" C l. 6 " C u r b 8 " C la s s C C o n c r e t e S la b 6 " C u r b Limits of Surface Seal 125 Spa. @ 6" = 62’-6" (Spa. #6 and #7 Alternating Over Support) 63 Spa. @ 1’-0" = 62’-6" (Spa. #4 In Span) Spa. @ 1’-0" Max. 3"3" 3"3" C l. 36’-0" 125 Spa. @ 6" = 62’-6" (Spa. #6 and #7 Alternating Over Support) 63 Spa. @ 1’-0" = 62’-6" (Spa. #4 In Span) Limits Of Surface Seal Varies - 35’-0" Min. To 40’-3" O - O Coping Varies - 202’-6" Min. To 219’-6º" Max. Varies - 73’-4Æ" Min. To 101’-8" Max.Varies - 99’-7" Min. To 120’-2º" Max. 6 " C u r b 6" (Typ.) 3" 8 Spa. @ 9’-0" = 72’-0" 3"3" 3"3" #5 #5 36’-0" Varies - 10’-11" Min. Spa. @ 1’-0" Max. (Spa. #4 In Median) Varies - 10’-11" Min. 26’-2" Max. Slope Varies Varies - 35’-0" Min. To 41’-1" Max. Varies - 35’-0" Min. To 41’-1" Max. 3" 1’-4" Varies - 99’-7" Min. To 120’-2º" Max. O - O Coping Varies - 202’-6" Min. To 219’-6º" Max. 143 Spa. @ 5Æ" Max. = 62’-6" (Spa. #4 Bottom Continuous)143 Spa. @ 5Æ" Max. = 62’-6" (Spa. #4 Bottom Continuous) 143 Spa. @ 5Æ" Max. = 62’-6" (Spa. #4 Bottom Continuous)Spa. @ 5Æ" Max. (Spa. #4 Bottom) Spa. @ 5Æ" Max. (Spa. #5 Bottom, Between All Flared Beams) 5 Spa. @ 9’-0" = 45’-0" Slope Varies 2.0% Max. 2.0% Slope 2.0% Slope 2.0% Slope 2.0% Slope 2.0% Slope Varies Varies - See Framing Plan 1’- 1 0 1 2 " 2 ’- 9 " Limits Of Surface Seal And Masonry Coating #5 or #6 #4 or #5 #6 And #7 Over Support or #4 In Span #6 And #7 Over Support or #4 In Span #4 or #5 afishburn 9:09:34 AM2/11/2009 P:\IN2003\0661\D. Drawings\IN20030661.BR.C5.116.SST.09.dgn No. STATE OF INDIAN A REGISTE RED P R OFE S SIONAL ENGIN EER 880305 DAVID A. D AY SUPERSTRUCTURE DETAILS 3/8" = 1’-0", U.N. RMC MSP ALF MSB HORIZONTAL SCALE DESIGNATION NO. BRIDGE FILE VERTICAL SCALE SURVEY BOOK SHEETS CONTRACT PROJECT NO. of DESIGNED:DRAWN: CHECKED:CHECKED: DESIGN ENGINEER RECOMMENDED FOR APPROVAL DATE CITY OF CARMEL 07-08C 5135 2/06/2009 SECTION A-A - E.B.L. 405a404a403a#4 Slope Varies 482a 481a #4 Conduit Limits Of Surface Seal And Masonry Coating Slope Varies Roughened Construction Joint (Typ.) Optional Keyway Construction Joint Conduit Drip Bead (Typ.) 1’- 10 1 2 " 2 ’- 9 " 1 " C l. 3"Limits Of Surface Seal 10’-0" Multi-Use Path Varies - 6’-6" Min. To 27’-0" Varies3"3"Spa. @ 6" Max. (Spa. #6 and #7 Alternating Over Support) Spa. @ 1’-0" Max. (Spa. #4 In Span) 125 Spa. @ 6" = 62’-6" (Spa. #6 and #7 Alternating Over Support) 63 Spa. @ 1’-0" = 62’-6" (Spa. #4 In Span) 3"Spa. @ 8" Max. (Spa. #4 In Sidewalk) 5 Spa. @ 9’-0" = 45’-0" 6" (Typ.) 3"3" 3" Varies - See Framing Plan Varies 6 " C u r b C l. 8 " C la s s C C o n c r e t e S la b #5 3" 1’-4" Spa. @ 5Æ" Max. (Spa. #4 Bottom)143 Spa. @ 5Æ" Max. = 62’-6" (Spa. #4 Bottom Continuous) 2.0% Slope Slope Varies 2.0% Max. #6 And #7 Over Support Or #4 In Span #4 Or #5 #5 Or #6 afishburn 9:09:37 AM2/11/2009 P:\IN2003\0661\D. Drawings\IN20030661.BR.C5.116.SST.10.dgn No. STATE OF INDIAN A REGISTE RED P R OFE S SIONAL ENGIN EER 880305 DAVID A. D AY SUPERSTRUCTURE DETAILS RMC MSP ALF MSB HORIZONTAL SCALE DESIGNATION NO. BRIDGE FILE VERTICAL SCALE SURVEY BOOK SHEETS CONTRACT PROJECT NO. of DESIGNED:DRAWN: CHECKED:CHECKED: DESIGN ENGINEER RECOMMENDED FOR APPROVAL DATE CITY OF CARMEL 07-08C 5136 2/06/2009 27- #7x7’-0" F.F. (3 Ea. Beam Spa., 9 Beam Spa.) Carmel Drive E.B.L. 26- #6x6’-0" (Thru Beam Ends, 2 Ea. Beam, 13 Beams) B B C C 4" 5- #7x34’-9" (1 F.F., 4 R.F.) ELEVATION - BENT NO.1 E.B.L. ELEVATION - BENT NO.1 W.B.L. Optional Keyway Constr. Joint Optional Keyway Constr. JointRoughened Constr. Joint (Typ.) Line "PR-S-6-E" Profile Grade 18- #6x7’-0" (Between Beams, 2 Ea. Beam Spa., 9 Beam Spa.) 9- #7x3’-3" F.F. (3 Ea. Beam Spa., 3 Beam Spa.) 3- #7x2’-0" F.F. 5- #7x34’-9" (1 F.F., 4 R.F.) 5- #7x34’-9" (1 F.F., 4 R.F.) 3- 603a F.F. 5- 603a F.F.5- 603a F.F.5- 603a F.F. 8- 603a F.F.8- 603a F.F.8- 603a F.F.8- 603a F.F.8- 603a F.F.8- 603a F.F.8- 603a F.F.8- 603a F.F.8- 603a F.F. 3"100 Spa. @ 1’-0" Max. = 99’-67 8" (101- 604a R.F.) 5- #7x34’-9" (1 F.F., 4 R.F.) 27- #7x7’-0" F.F. (3 Ea. Beam Spa., 9 Beam Spa.) Optional Keyway Constr. Joint Carmel Drive W.B.L. 5" 118 Spa. @ 1’-0" Max. = 117’-71 4" (119- 604a R.F.) Line "PR-S-6-E" 5- #7x34’-9" (1 F.F., 4 R.F.) 5- #7x34’-9" (1 F.F., 4 R.F.) Roughened Constr. Joint (Typ.) Profile Grade 24- #6x6’-0" (Thru Beam Ends, 2 Ea. Beam, 12 Beams) 5- #7x34’-9" (1 F.F., 4 R.F.) 8- 603a F.F.8- 603a F.F.8- 603a F.F.8- 603a F.F.8- 603a F.F.8- 603a F.F.8- 603a F.F.8- 603a F.F.10- 603a F.F. 10- 603a F.F. 5- 603a F.F. 18- #6x7’-0" (Between Beams, 2 Ea. Beam Spa., 9 Beam Spa.) 9- #7x8’-3" F.F. (3 Ea. Beam Spa., 3 Beam Spa.) 10- 603a F.F.8- 603a F.F. 6- #6x8’-0" (Between Beams, 2 Ea. Beam Spa., 3 Beam Spa.) 3" 3- #7x3’-3" F.F. NOTES : For reinforcing bar notes, see Standard Drawing E703-BRST-01. All reinforcing steel to be epoxy coated. For Sections B-B and C-C, see Sheet No.38. afishburn 9:09:41 AM2/11/2009 P:\IN2003\0661\D. Drawings\IN20030661.BR.C5.116.SST.11.dgn No. STATE OF INDIAN A REGISTE RED P R OFE S SIONAL ENGIN EER 880305 DAVID A. D AY SUPERSTRUCTURE DETAILS RMC MSP ALF MSB HORIZONTAL SCALE DESIGNATION NO. BRIDGE FILE VERTICAL SCALE SURVEY BOOK SHEETS CONTRACT PROJECT NO. of DESIGNED:DRAWN: CHECKED:CHECKED: DESIGN ENGINEER RECOMMENDED FOR APPROVAL DATE CITY OF CARMEL 07-08C 5137 2/06/2009 27- #7x7’-0" F.F. (3 Ea. Beam Spa., 9 Beam Spa.) 26- #6x6’-0" (Thru Beam Ends, 2 Ea. Beam, 13 Beams) B B C C 4" 5- #7x34’-9" (1 F.F., 4 R.F.) ELEVATION - BENT NO.3 W.B.L. ELEVATION - BENT NO.3 E.B.L. Optional Keyway Constr. Joint Optional Keyway Constr. JointRoughened Constr. Joint (Typ.) Line "PR-S-6-E" 18- #6x7’-0" (Between Beams, 2 Ea. Beam Spa., 9 Beam Spa.) 9- #7x3’-3" F.F. (3 Ea. Beam Spa., 3 Beam Spa.) 3- #7x2’-0" F.F. 5- #7x34’-9" (1 F.F., 4 R.F.) 5- #7x34’-9" (1 F.F., 4 R.F.) 3- 603a F.F. 5- 603a F.F.5- 603a F.F.5- 603a F.F. 8- 603a F.F.8- 603a F.F.8- 603a F.F.8- 603a F.F.8- 603a F.F.8- 603a F.F.8- 603a F.F.8- 603a F.F. 3" Line "PR-S-6-E" Profile Grade116th Street W.B.L. Line "PR-S-6-E" Profile Grade 5- #7x34’-9" (1 F.F., 4 R.F.) 27- #7x7’-0" F.F. (3 Ea. Beam Spa., 9 Beam Spa.) Optional Keyway Constr. Joint 5" 120 Spa. @ 1’-0" Max. = 119’-113 8" (121- 604a R.F.) Line "PR-S-6-E" 5- #7x34’-9" (1 F.F., 4 R.F.) 5- #7x34’-9" (1 F.F., 4 R.F.) Roughened Constr. Joint (Typ.) 24- #6x6’-0" (Thru Beam Ends, 2 Ea. Beam, 12 Beams) 5- #7x34’-9" (1 F.F., 4 R.F.) 8- 603a F.F.8- 603a F.F.8- 603a F.F.8- 603a F.F.8- 603a F.F.8- 603a F.F.8- 603a F.F.8- 603a F.F.10- 603a F.F. 10- 603a F.F. 5- 603a F.F. 18- #6x7’-0" (Between Beams, 2 Ea. Beam Spa., 9 Beam Spa.) 9- #7x8’-9" F.F. (3 Ea. Beam Spa., 3 Beam Spa.) 10- 603a F.F.8- 603a F.F. 6- #6x8’-0" (Between Beams, 2 Ea. Beam Spa., 3 Beam Spa.) 116th Street E.B.L. 3" 8- 603a F.F. 99 Spa. @ 1’-0" Max. = 98’-93 4" (100- 604a R.F.) 3- #7x3’-3" F.F. NOTES : For reinforcing bar notes, see Standard Drawing E703-BRST-01. All reinforcing steel to be epoxy coated. For Sections B-B and C-C, see Sheet No.38. afishburn 9:09:45 AM2/11/2009 P:\IN2003\0661\D. Drawings\IN20030661.BR.C5.116.SST.12.dgn No. STATE OF INDIAN A REGISTE RED P R OFE S SIONAL ENGIN EER 880305 DAVID A. D AY SUPERSTRUCTURE DETAILS 3/4" = 1’-0", U.N. RMC MSP ALF MSB HORIZONTAL SCALE DESIGNATION NO. BRIDGE FILE VERTICAL SCALE SURVEY BOOK SHEETS CONTRACT PROJECT NO. of DESIGNED:DRAWN: CHECKED:CHECKED: DESIGN ENGINEER RECOMMENDED FOR APPROVAL DATE CITY OF CARMEL 07-08C 5138 2/06/2009 3 E q u a l S p a . @ 1 ’- 0 " Ma x . ( S p a . # 7 C o n t in u o u s , R .F .) 4 " 1’- 2 " Va r ie s - 3 ’- 0 " M in . V a r ie s 3 " 3’-6" 1’-9"1’-9" 3’-6" 1’-9"1’-9" 9"1’-0" 1’-4" 2" Cl. (Typ.) R.F. F.F. #6 Through BeamsPrestressing Strand #7x2’-0" 599a 604a #7 Bent And Piles Optional Type A Construction Joint 8 " C la s s C C o n c r e t e S la b SECTION C-C 3 E q u a l S p a . @ 1 ’- 0 " Ma x . ( S p a . # 7 C o n t in u o u s , R .F .) 4 " 1’- 2 " Va r ie s - 3 ’- 0 " M in . V a r ie s 3 " 3’-6" 1’-9"1’-9" 3’-6" 1’-9"1’-9" 9"1’-0" 2" Cl. (Typ.) R.F.F.F. #6 Between Beams 599a 604a #7 Bent And Piles Optional Type A Construction Joint 8 " C la s s C C o n c r e t e S la b SECTION B-B 2"x10" Keyway Construction Joint Between Beams #7 Between Beams 603a 2 ’- 6 " M in . La p 2’-6"2’-6" 3’-6" 1’-9"1’-9" 3" Expanded Polystyrene 8 " C la s s C C o n c r e t e S la b 3 ’- 0 " Va r ie s SECTION D-D 2’-6"2’-6" 3’-6" 1’-9"1’-9" 3" Expanded Polystyrene Elastomeric Bearing Pad 5" (Typ.) 8 " C la s s C C o n c r e t e S la b 3 ’- 0 " Va r ie s SECTION E-E 503a 2" Cl. (Typ.) 1’-2"1’-2"1’-2" 3"x14" Keyway. On Sides And Bottom. Bond With Suitable Adhesive. #4 #4 Varies Varies Varies Varies 1’-4" #5 Or #6 #4 Or #5 #5 Or #6 #4 Or #5 #6 And #7 #5 Or #6 #4 Or #5 #5 Or #6 #4 Or #5 #6 Through Beams #5 Between Beams #6 Through Beams #8x3’-0" NOTES : For reinforcing bar notes, see Standard Drawing E703-BRST-01. All reinforcing steel to be epoxy coated. For location of Sections B-B and C-C, see Sheets No.36 and 37. For location of Sections D-D and E-E, see Sheet No.30 Hatched areas indicate portion of bent poured with substructure, see Sheets Nos.8-11 and Nos.16-19. #6 And #7 afishburn 9:09:48 AM2/11/2009 P:\IN2003\0661\D. Drawings\IN20030661.BR.C5.116.SST.13.dgn No. STATE OF INDIAN A REGISTE RED P R OFE S SIONAL ENGIN EER 880305 DAVID A. D AY Showing Concrete Dimensions PARTIAL PLAN SUPERSTRUCTURE DETAILS RMC MSP ALF LEGEND MSB HORIZONTAL SCALE DESIGNATION NO. BRIDGE FILE VERTICAL SCALE SURVEY BOOK SHEETS CONTRACT PROJECT NO. of DESIGNED:DRAWN: CHECKED:CHECKED: DESIGN ENGINEER RECOMMENDED FOR APPROVAL DATE CITY OF CARMEL 07-08C 5139 2/06/2009 1’-0"1’-0" 102’-6" O.-O. Bridge Floor R 2 0 0 ’- 0 " R76’-6" 4 0 ’- 0 5 8 " 2 2 ’- 2 12 " 4 1 ’- 1116 " 2 3 ’- 2 3 1 6 " P.C. P.C.C. R 8 2’- 6" R 1 1 7 ’- 6 " P.C.C. P.C.C. P.C.C. P.C.C. P.C.C. P.C.C. P.C.C. R 40’-0" R30’-0" R 30’-0" R 20’-0" R 6 6 ’ - 0 " R20’-0"R 4 0’- 0" R 3 0’- 0" R 7 6 ’- 0 " 1’-0" 8’-0" 1’-0" 10’- 0 " 3 ’- 1 13 16 " 2 0 ’- 1 0 5 1 6 " 1 1’- 0 5 8 " 1 6 ’- 3 1 2 " 1 4 ’- 7 9 16 " 2 4 ’- 9 7 16 " 3 7 ’- 3 3 4 " 2 ’- 6 5 8 " 1 0 ’- 1 0 9 16 " 9 ’- 3 14 " 8 " 13’-81 4" 25’-67 16" 21’-91 2" 8’-55 8" 15 ’- 1 1 116 " 9 ’- 7 18 " 8 ’- 17 8 " 4 ’- 7 13 16 " 6’-91 2" 14’-011 16" 8’-314" 3’-7516" Q Q Q Q Q Q Q S P P P R R R R R O P Q R S NOTE : For more information on Architectural Finishes on sidewalks and curbs, see the Special Provisions. 1’-0" 5 5 ’- 8 12 " 1 1 7 ’- 1 15 8 " 3 5 ’- 0 3 4 " 9 9 ’- 4 " NOTES : For reinforcing bar notes, see Standard Drawing E703-BRST-01. All reinforcing steel to be epoxy coated, unless otherwise noted. afishburn 9:09:52 AM2/11/2009 P:\IN2003\0661\D. Drawings\IN20030661.BR.C5.116.SST.14.dgn No. STATE OF INDIAN A REGISTE RED P R OFE S SIONAL ENGIN EER 880305 DAVID A. D AY Showing Concrete Dimensions PARTIAL PLAN SUPERSTRUCTURE DETAILS RMC MSP ALF LEGEND MSB HORIZONTAL SCALE DESIGNATION NO. BRIDGE FILE VERTICAL SCALE SURVEY BOOK SHEETS CONTRACT PROJECT NO. of DESIGNED:DRAWN: CHECKED:CHECKED: DESIGN ENGINEER RECOMMENDED FOR APPROVAL DATE CITY OF CARMEL 07-08C 5140 2/06/2009 R 1 1 7 ’- 6 " R 8 2 ’- 6 " R 2 0 0 ’- 0 " 3 9 ’- 4 3 4 " 4 0 ’- 3 5 8 " 2 6 ’- 2 5 8 " 1’-0"1’-0" 102’-6" O.-O. Bridge Floor P.T. P.T. 5 3 ’- 8 5 8 " 1 2 0 ’- 2 7 8 " 1 2 ’- 7 5 8 " 1 2 ’- 7 11 1 6 " 2 8 ’- 5 5 1 6 " R30’-0" R 20’-0" R 40’- 0" R20’-0" R 6 6 ’- 0 " R40’-0" R30’-0" R30’-0" R 76 ’-0 " P.C.C. P.C.C. P.C.C. P.C.C. P.C.C. P.C.C. P.C.C. 1 6 ’- 1 11116 " 10 ’- 7 3 1 6 " 8 ’- 5 1 116 " 3 7 ’- 8 3 16 " 2 ’- 2 7 8 " 11 ’- 3 1 4 " 8 ’- 11 15 16 " 2 ’- 9 3 16 "15’-811 16" 24’-37 8" 28’-81 4" 17’-113 16" 8’-23 16" 1’-71 4" 9’-113 8" 4’-711 16" O P Q R S NOTE : For more information on Architectural Finishes on sidewalks and curbs, see the Special Provisions.1’-0" 8’-0 " 1’-0" 10’-0" 1’-0 " Q Q Q Q Q Q Q S S O P P P P P P P P 19 ’- 1 0 5 8 " 1 2 ’- 1 1 18 " 1 9 ’- 6 3 8 " 8 ’- 4 " 4 0 ’- 9 12 " NOTES : For reinforcing bar notes, see Standard Drawing E703-BRST-01. All reinforcing steel to be epoxy coated, unless otherwise noted. afishburn 9:09:56 AM2/11/2009 P:\IN2003\0661\D. Drawings\IN20030661.BR.C5.116.SST.15.dgn No. STATE OF INDIAN A REGISTE RED P R OFE S SIONAL ENGIN EER 880305 DAVID A. D AY SUPERSTRUCTURE DETAILS RMC ALF MSBMSP HORIZONTAL SCALE DESIGNATION NO. BRIDGE FILE VERTICAL SCALE SURVEY BOOK SHEETS CONTRACT PROJECT NO. of DESIGNED:DRAWN: CHECKED:CHECKED: DESIGN ENGINEER RECOMMENDED FOR APPROVAL DATE CITY OF CARMEL 07-08C 5141 2/06/2009 1’-1"1’-1" 61 2" 1’-1"1’-1" 61 2"61 2"61 2"1" Square Spindle (Typ.) 2"x3" Steel Tubing (Typ.) 8 " 1 ’- 1 0 12 " 4 ’- 6 " 2 ’- 9 " 1’- 9 " 1’- 7 " 3 " 2 " 3"3" 9"9"9"9" Pattern (Typ.) 36-#4x34’-6" (6 Lines E.F., 3 Each Line, 1’-11" Min. Lap) 300-481a (150 E.F.)Top Of Deck Slab Top Of Sidewalk Bottom Of Deck Slab PARTIAL ELEVATION - NORTH COPING F.F. RAILING Bent No.1 End 6 " A AA 150-482a C3x5 Channel (Typ.) 314"31 4" SECTION F-F 1 ’- 1 0 14 " 2 ’- 9 " 2 ’- 3 " 1’- 7 " 1’- 5 " 1 " 2 " 3 " 1 " 6 " 1 ’- 6 3 8 " 5 5 8 " 3 " 1’-4" 1’-2" 7"7" 2" 2" 1 2" 4" Cl. 4" Cl. 481a 482a 2"x3" Steel Tubing 1" Square Spindle 2" 2"x3" Steel Tubing 1 ’- 1 0 14 " 2 ’- 9 " 2 ’- 3 " 1’- 7 " 1’- 5 " 1 " 2 " 3 " 1 " 482a 4" Cl. 481a 3 " 1" Square Spindle SECTION G-G 6" Cl. 1’-4" 7"9" 1’-6" Scale - 3/4" = 1’-0" Scale - 3/4" = 1’-0" 4 " 2 " 2 " 4 " 4 7 1 6 " 1 ’- 0 " 1 ’- 0 " 4 9 16 " F.F.R.F. R.F.F.F. ORNAMENTAL HANDRAIL BASE PLATE DETAILS Anchor Top Of Concrete Rail Elevation Plan 1’-3" 41 2"6"41 2" 11"2"2" 7 " 3 12 " 3 12 " 2"x3" Steel Tubing (Typ.) Typ. Scale : 1" = 1’-0" NOTES : For Architectural Finishes on concrete and metal railing, see the Special Provisions. Denotes Architectural Finish.A C3x5 Channel C3x5 Channel 20 Spa. @ 5" = 8’-4" Bent No.1 End Bent No.3 End PARTIAL PLAN - NORTH COPING RAILING 6 " 1 ’- 6 3 8 " 5 5 8 " F F G G Bent No.3 End 9’-11" Typ. Interior Panel (8 Req’d.) 17 Spa. @ 5" = 7’-1"17 Spa. @ 5" = 7’-1" 1’-6"1’-6" 1’-4116"1’-59 16" 1’- 7 1 3 1 6 " 1’- 6 116 "R.F. Concrete Railing F.F. Concrete Railing North Coping Line Steel Railing 2 " (Ty p .) R 2 0 0 ’- 0 " R 2 0 0 ’- 2 " R 2 0 1’- 4 " 1’- 2 " 2 " 7 " 7 " 10’-0" Typ. Interior Panel (8 Req’d.) 149 Spa. @ 8" Max. = 98’-11" (Spa. Vertical Railing Reinforcing) R 2 0 0 ’- 9 " 1’-6"41 2"41 2"1’-6"613 16" 7’-43 8"613 16"1’-6"41 2"41 2"1’-6" 1 ’- 1 0 1 2 " 2 ’- 9 " 3 " 1 ’- 10 1 2 " 1’- 4 7 16 " 1 ’- 4 9 16 " 3 " 5 S p a . @ 10 " M a x . = 4 ’- 1 12 " 5 S p a . @ 10 " M a x . = 4 ’- 1 12 " 8 " 4 ’- 7 12 " 5 ’- 3 12 " 1 ’- 9 " 6 " 5 ’- 3 12 " 1 ’- 9 " 6 " 8 " 4 ’- 7 12 " Air Vent For Galvanizing To Be Located On Rear Face Of Tube afishburn 9:10:00 AM2/11/2009 P:\IN2003\0661\D. Drawings\IN20030661.BR.C5.116.SST.16.dgn No. STATE OF INDIAN A REGISTE RED P R OFE S SIONAL ENGIN EER 880305 DAVID A. D AY SUPERSTRUCTURE DETAILS RMC ALF MSBMSP HORIZONTAL SCALE DESIGNATION NO. BRIDGE FILE VERTICAL SCALE SURVEY BOOK SHEETS CONTRACT PROJECT NO. of DESIGNED:DRAWN: CHECKED:CHECKED: DESIGN ENGINEER RECOMMENDED FOR APPROVAL DATE CITY OF CARMEL 07-08C 5142 2/06/2009 PARTIAL ELEVATION - SOUTH COPING F.F. RAILING ORNAMENTAL HANDRAIL BASE PLATE DETAILS Anchor Top Of Concrete Rail Elevation Plan 1’-3" 41 2"6"41 2" 11"2"2" 7 " 3 12 " 3 12 " 2"x3" Steel Tubing (Typ.) Typ. Scale : 1" = 1’-0" NOTES : For Architectural Finishes on concrete and metal railing, see the Special Provisions. Denotes Architectural Finish.A Bent No.3 End Bent No.1 End PARTIAL PLAN - SOUTH COPING RAILING 1’-4" 1’-53 4" 1’-6" 1’-6" Steel Railing South Coping LineR.F. Concrete Railing F.F. Concrete Railing R 2 0 1’- 4 " R 2 0 0 ’- 2 " R 2 0 0 ’- 0 " 2 " ( Typ.) 1’- 2 " 2 " R 2 0 0 ’- 9 " 7 " 7 " 1’- 8 "1’- 6 " 1’-1"1’-1" 61 2" 1’-1" 61 2"61 2"61 2" 1" Square Spindle (Typ.) 2"x3" Steel Tubing (Typ.) 8 " 1’- 1 0 1 2 " 4 ’- 6 " 2 ’- 9 " 1 ’- 9 " 1 ’- 7 " 3 " 2 " 3"3" 9"9"9"9" Pattern (Typ.) 36-#4x34’-9" (6 Lines E.F., 3 Each Line, 1’-11" Min. Lap) 300-481a (150 E.F.)Top Of Deck Slab Top Of Sidewalk Bottom Of Deck Slab Bent No.3 End 6 " A AA 150-482a C3x5 Channel (Typ.) 18 Spa. @ 5" = 7’-6"31 4"314"18 Spa. @ 5" = 7’-6"20 Spa. @ 5" = 8’-4" 6 " 1 ’- 6 3 8 " 5 5 8 " Bent No.1 End 1’-1"3"3"3"3" 9’-11Æ" End Panel @ Bent No.3 10’-0" Typ. Interior Panel (8 Req’d.) 9’-7" End Panel @ Bent No.3 9’-11" Typ. Interior Panel (8 Req’d.)9’-7" End Panel @ Bent No.1 149 Spa. @ 8" Max. = 99’-3Ø" (Spa. Vertical Railing Reinforcing) 1’-6"41 2"41 2"1’-6"613 16" 7’-43 8"613 16"1’-6"41 2"6’-10"41 2"1’-6" SECTION H-H 1 ’- 1 0 14 " 2 ’- 9 " 2 ’- 3 " 1’- 7 " 1’- 5 " 1 " 2 " 3 " 1" 6 " 1 ’- 6 3 8 " 5 5 8 " 3 " 1’-4" 1’-2" 7"7"2" 2" 1 2" 4" Cl. 4" Cl. 481a 482a 2"x3" Steel Tubing 1" Square Spindle 2" 2"x3" Steel Tubing 1 ’- 1 0 14 " 2 ’- 9 " 2 ’- 3 " 1 ’- 7 " 1 ’- 5 " 1 " 2 " 3 " 1" 482a 4" Cl. 481a 3 " 1" Square Spindle SECTION I-I 6" Cl. 1’-4" 7"9" 1’-6" Scale - 3/4" = 1’-0" Scale - 3/4" = 1’-0" 4 " 2 " 2 " 4 " 4 7 1 6 " 1 ’- 0 " 1 ’- 0 " 4 9 16 " F.F.R.F. R.F.F.F. C3x5 Channel C3x5 Channel 1’- 10 1 2 " 2 ’- 9 " 3 " 1 ’- 10 1 2 " 1’- 4 7 16 " 1 ’- 4 9 16 " 3 " 5 S p a . @ 10 " M a x . = 4 ’- 1 12 " 5 S p a . @ 1 0 " M a x . = 4 ’- 1 1 2 " 8 " 4 ’- 7 12 " 5 ’- 3 12 " 1 ’- 9 " 6 " 5 ’- 3 12 " 1 ’- 9 " 6 " 8 " 4 ’- 7 12 " H H I I Air Vent For Galvanizing To Be Located On Rear Face Of Tube afishburn 9:10:04 AM2/11/2009 P:\IN2003\0661\D. Drawings\IN20030661.BR.C5.116.SST.17.dgn No. STATE OF INDIAN A REGISTE RED P R OFE S SIONAL ENGIN EER 880305 DAVID A. D AY F F G G H H SUPERSTRUCTURE DETAILS RMC MSP ALF MSB HORIZONTAL SCALE DESIGNATION NO. BRIDGE FILE VERTICAL SCALE SURVEY BOOK SHEETS CONTRACT PROJECT NO. of DESIGNED:DRAWN: CHECKED:CHECKED: DESIGN ENGINEER RECOMMENDED FOR APPROVAL DATE CITY OF CARMEL 07-08C 5143 2/06/2009 116TH STREET ELEVATION - NORTH COPING R.F. RAILING Bent No.3 North Bent No.1 North Pier No.2 North ELEVATION - SOUTH COPING R.F. RAILING Bent No.1 South Bent No.3 South Pier No.2 South Seal Of The City Of Carmel (2’-0" Dia.) Axis Of Rotation (Typ.) (Typ.) 4 ’- 7 1 2 " 1 ’- 10 1 2 " 2 ’- 9 " 1 ’- 4 12 " 1 ’- 4 12 " 8 " D e c k NOTES : For Sections F-F and G-G, see Sheet No.41. For Architectural Finishes on concrete and metal railings, see the Special Provisions. Concrete Railng Pilaster Spa. (Along R.F. Railing) 116TH STREET Seal Of The City Of Carmel (2’-0" Dia.) Axis Of Rotation (Typ.) (Typ.) 4 ’- 7 12 " 1’- 10 1 2 " 2 ’- 9 " 1 ’- 4 12 " 1 ’- 4 12 " 8 " D e c k Concrete Railng Pilaster Spa. (Along R.F. Railing) 2’-278"4’-534"2’-278" 21’-112" 96’-81 8" (Along R.F. Railing) 18’-478"21’-438"2’-15 8" 4’-31 4" 2’-15 8" 2’-53 4" (Typ.) 4’-111 2" (Typ.) 2’-53 4" (Typ.) 8’-612"58"14"58"8’-1112" 2’-1" 4’-21 4" 2’-1" 2’-61 8" (Typ.) 4’-111 2" (Typ.) 2’-61 8" (Typ.) 97’-0" (Along R.F. Railing) 2’-0"x2’-0" Diamond (Typ.) 2’-0"x2’-0" Diamond (Typ.) 2’-214"2’-214" 8’-414"58"14"58" afishburn 9:10:08 AM2/11/2009 P:\IN2003\0661\D. Drawings\IN20030661.BR.C5.116.SST.18.dgn No. STATE OF INDIAN A REGISTE RED P R OFE S SIONAL ENGIN EER 880305 DAVID A. D AY COPING OFFSETS - NORTH COPING LINE COPING OFFSETS - SOUTH COPING LINE SUPERSTRUCTURE DETAILS ALFRMC MSP RMC HORIZONTAL SCALE DESIGNATION NO. BRIDGE FILE VERTICAL SCALE SURVEY BOOK SHEETS CONTRACT PROJECT NO. of DESIGNED:DRAWN: CHECKED:CHECKED: DESIGN ENGINEER RECOMMENDED FOR APPROVAL DATE CITY OF CARMEL 07-08C 5144 2/06/2009 2 ’-6 " 9 Spa. @ 5 ’-0 " = 45 ’-0 " 4 ’-8 3 4" 4’- 2 58" 3’- 6 1316" 3’-0 916" 2’-7 1316" 2’-4 916" 2 ’-2 1316" 2’-2 916" 2 ’-3 1316" 2’-6 58" 2’-10 78" 2 ’- 115 8" 2 ’- 5 1116" 2 ’- 114 " 1’- 10 516 " 1’- 8 7 8" 1’- 8 15 16" 1’- 10 916 " 2 ’- 158 " 2 ’- 6 316 " 3 ’- 0 516" 3 ’- 3 316 " 4’-7 18" 3’-4 516" 3 ’- 4 3 8" 50’-35 8" 52 ’-2 3 4 " 2’-101 16" 52 ’-5 5 16" 50’-41 16" 2 ’- 1158" 2 ’- 5 916" 2 ’- 1116" 1’- 10 116 " 1’- 8 916" 1’- 8 12 " 1’- 10 " 2 ’- 1" 2 ’- 5 12 " 2 ’- 11916 " 3 ’- 3 5 8" 3 ’-3 916" 3 ’- 3 14" 4’-6 34"4’-2 316"3’-6 38" 3’-0"2’-7 316"2’-3 78"2’-2 116"2’-134"2’-3"2’- 5 1116" 2’-9 78" 2’-6" 9 Spa. @ 5’-0" = 45’-0" 2’-6 " 9 S pa. @ 5’-0" = 4 5 ’-0 " 4’-11 5 16" 2’-6" 9 Spa. @ 5’-0" = 45’-0" 2’-95 8" R 200’-0" R 2 0 0’- 0 " afishburn 9:10:12 AM2/11/2009 P:\IN2003\0661\D. Drawings\IN20030661.BR.C5.116.SST.19.dgn No. STATE OF INDIAN A REGISTE RED P R OFE S SIONAL ENGIN EER 880305 DAVID A. D AY SUPERSTRUCTURE DETAILS NONE RMC MSP ALF MSB/DAD HORIZONTAL SCALE DESIGNATION NO. BRIDGE FILE VERTICAL SCALE SURVEY BOOK SHEETS CONTRACT PROJECT NO. of DESIGNED:DRAWN: CHECKED:CHECKED: DESIGN ENGINEER RECOMMENDED FOR APPROVAL DATE CITY OF CARMEL 07-08C 5145 2/06/2009 V a r ie s X X F ille t ELEVATION SECTION X-X No Scale No Scale Bottom Of Slab Top Of Beam And Bottom Of Fillet 599a x 2’-0" 1 ’- 1 12 " 1 0 " 1 0 1 2 " 404a x 3’-6" 10"10" 3’-2" 3 ’- 3 " 503a x 11’-4" 2 ’- 8 " 1’-6" 6" 4 ’- 5 " 3 ’- 9 " 1’-0" 603a x 4’-9" 1’- 6 " 2 ’- 0 " 1’-4"6’-0" 2’-3 " 604a x 9’-9" NOTES : For reinforcing bar notes, see Standard Drawing E703-BRST-01. All reinforcing steel to be epoxy coated, unless otherwise noted. No Scale B e n t N o .1 0 . 0 0 0 ’ P ie r N o . 2 0 . 0 0 0 ’ B e n t N o . 3 0 . 0 0 0 ’ Span A Span B 0 .0 1 0 ’ 0 . 0 2 6 ’ 0 . 0 0 8 ’ 0 . 0 0 8 ’ 0 .0 1 0 ’ 51’-3"51’-3" 6" 403a x 2’-2" 8 " 6" 405a x 19’-6" 19’-0" 481a x 4’-2" 482a x 9’-4" 1 ’- 4 " NOTE : Bridge Seat Elevations were calculated using design camber and dead load deflection bottom of slab elevation at centerline of span. 31 2" 3’-9"9 Spa. @ 5’-0" = 45’-0"2’-6"2’-6"9 Spa. @ 5’-0" = 45’-0"3’-9" 0 . 0 3 9 ’ 0 . 0 4 9 ’ 0 . 0 5 3 ’ 0 . 0 5 2 ’ 0 . 0 4 7 ’ 0 . 0 3 7 ’ 0 . 0 2 3 ’ 0 . 0 2 3 ’ 0 . 0 3 7 ’ 0 . 0 4 7 ’ 0 . 0 5 2 ’ 0 . 0 5 3 ’ 0 . 0 4 9 ’ 0 . 0 3 9 ’ 0 . 0 2 6 ’ SUPERSTRUCTURE BILL OF MATERIALS Epoxy Coated Reinforcing Steel Size And Mark Bars No. of Length (Feet) Weight (Lbs.) SUPERSTRUCTURE BILL OF MATERIALS Epoxy Coated Reinforcing Steel Size And Mark Bars No. of Length (Feet) Weight (Lbs.) B C N D L A 1 Bar Cuts 2 B NLACDMark 401a 37’-3"54’-6"32’-9" 402a 41’-0"56’-6"34’-6" 601a 13’-6"173’-6"10’-0" 501a 19’-9"454’-9"15’-0" 502a 15’-9"503’-0"12’-9"7’-10"7’-11" 602a 16’-6"243’-9"12’-9" 406a 31’-0"109’-0"22’-0" 407a 11’-3"102’-9"8’-6" 408a 102’-9"8’-3"11’-0" 409a 148’-9"30’-6"39’-3" #8 25 3’-0" Total No. 8 201 #7 70 34’-9" #7 203 17’-0" #7 1 10’-9" #7 1 9’-9" #7 9 8’-9" #7 9 8’-3" #7 108 7’-0" #7 1 5’-6" #7 1 4’-3" #7 24 3’-3" #7 6 2’-0" Total No. 7 14130 601a 34 13’-6" 602a 48 16’-6" 603a 394 4’-9" 604a 441 9’-9" #6 178 32’-6" #6 205 17’-0" #6 1 13’-6" #6 1 12’-9" #6 13 8’-0" #6 72 7’-0" #6 1 6’-9" #6 238 6’-0" Total No. 6 28180 501a 90 19’-9" 502a 100 15’-9" 503a 177 11’-4" 599a 441 2’-0" #5 250 36’-0" #5 2510 35’-3" #5 12 21’-0" #5 165 20’-0" #5 88 19’-0" #5 74 17’-9" #5 104 16’-6" #5 108 7’-0" #5 18 4’-3" #5 18 3’-9" Total No. 5 117725 401a 5 37’-3" 402a 5 41’-0" 403a 516 2’-2" 404a 310 3’-6" 405a 310 19’-6" 406a 10 31’-0" 407a 10 11’-3" 408a 10 11’-0" 409a 14 39’-3" 481a 600 4’-2" 482a 300 9’-4" #4 60 40’-0" #4 540 38’-0" #4 15 37’-6" #4 125 36’-6" #4 12 36’-0" #4 1110 35’-6" #4 12 35’-0" #4 36 34’-9" #4 36 34’-6" #4 10 34’-0" #4 8 32’-6" #4 8 31’-6" #4 8 30’-6" #4 8 29’-6" #4 8 28’-3" #4 8 27’-0" #4 5 25’-6" #4 8 24’-6" #4 824 23’-3" #4 303 21’-6" #4 8 21’-0" #4 1 16’-3" #4 1 15’-0" #4 1 11’-0" #4 1 9’-3" #4 20 9’-0" #4 1 8’-6" #4 1 6’-9" #4 2 6’-6" #4 1 4’-6" #4 1 4’-3" #4 2 2’-3" Total No. 4 76170 Total Epoxy Coated Reinforcing Steel 236406 Concrete Class "C" in Superstructure Pour No. 1 78.6 Cys. Pour No. 2 59.0 Cys. Pour No. 3 19.1 Cys. Pour No. 4 102.6 Cys. Pour No. 5 102.6 Cys. Pour No. 6 30.8 Cys. Pour No. 7 102.6 Cys. Pour No. 8 102.6 Cys. Pour No. 9 30.8 Cys. Pour No. 10 60.6 Cys. Pour No. 11 81.8 Cys. Pour No. 12 19.9 Cys. Pour No. 13 230.2 Cys. Pour No. 14 56.4 Cys. Pour No. 15 235.9 Cys. Total Class "C" in Superstructure 1313.5 Cys. Concrete Railing Class "C"40.9 Cys. Miscellaneous Surface Seal 9350 Sft. Masonry Coating 1510 Sft. Ornamental Handrail 198 Lft. Concrete Structural Members 2532 Lft. 2" PVC Pipe Conduit 208 Lft. Concrete Imprinting 13646 Sft. Concrete Staining 220 Sft. Formliner, Bridge Rail, Front Face 200 Lft. Formliner, Bridge Rail, Rear Face 200 Lft. afishburn 9:10:17 AM2/11/2009 P:\IN2003\0661\D. Drawings\IN20030661.BR.C5.116.SST.20.dgn No. STATE OF INDIAN A REGISTE RED P R OFE S SIONAL ENGIN EER 880305 DAVID A. D AY PLAN AT BENT NO.1 E.B.L. DSH DSH R.C. BRIDGE APPROACH DETAILS 1/4" = 1’-0", U.N. B B B B AA Min. Lap MSP MSB HORIZONTAL SCALE DESIGNATION NO. BRIDGE FILE VERTICAL SCALE SURVEY BOOK SHEETS CONTRACT PROJECT NO. of DESIGNED:DRAWN: CHECKED:CHECKED: DESIGN ENGINEER RECOMMENDED FOR APPROVAL DATE CITY OF CARMEL 07-08C 5146 2/06/2009 6 " 3 " 3 " 6 " 3 5 S p a . @ 1 ’- 0 " M a x . = 3 4 ’- 6 " ( S p a . # 4 , T o p ) 7 0 S p a . @ 6 " M a x . = 3 4 ’- 6 " ( S p a . # 5 , B o t t o m ) 25-#4x22’-0" (Top) 13-#5x22’-0" (Bottom) 15-#4x22’-0" (Top) 8-#5x22’-0" (Bottom) 36-49 0 (Top) 71-5 90 (Bottom ) 1-#4x2’-3" (Top) 1-#5x2’-3" (Bottom) 1-#4x6’-9" (Top) 1-#5x6’-9" (Bottom) 1-#4x4’-6" (Top) 1-#4x9’-0" (Top) 1-#4x11’-6" (Top) 1-#5x11’-6" (Bottom) 1-#4x13’-9" (Top) 1-#4x18’-6" (Top) 1-#4x16’-0" (Top) 1-#5x16’-0" (Bottom) 1-#4x21’-3" (Top) 1-#4x16’-9" (Top) 1-#4x12’-3" (Top) 1-#4x10’-0" (Top) 1-#5x10’-0" (Bottom) 1-#4x14’-6" (Top) 1-#5x14’-6" (Bottom) 1-#4x19’-0" (Top) 1-#5x19’-0" (Bottom) 1-#4x3’-3" (Top) 1-#4x5’-6" (Top) 1-#5x5’-6" (Bottom) 1-#4x7’-9" (Top) 4 0’-6 38" 3 9’-4 34" 7 316" 6 12" 18-401 (Top, 1 Bar Cuts 2) 35-50 1 (Bottom , 1 Bar Cuts 2) 32 Spa. @ 1’-0" = 32’-0" (Spa. #4, Top) 16 Spa. @ 2’-0" = 32’-0" (Spa. #5, Bottom) 3" 16’-0" (Along F.F. Curb) 27’-11" (Along F.F. Curb) 3 6 ’- 0 " ( R a d ia l) P.O.T. 19+00.00 "S-6-E" Line " S- 6- E" Line " S- 6- E" P.O.T. 19+48.75 "S-6-E" Concrete Curb Concrete Curb P.R.C. 30+52.56 "116-OCL-2" Line "116-OCL-2" 9" Pvm’t.Le dge #4 #5 2’-0" 1’-7" 1-#4x35’-6" (Top) 1-#5x35’-6" (Bottom) R 4 1. 0 0 ’ R 118 . 0 0 ’ R 7 7 . 0 0 ’ R 8 5 . 0 0 ’ 4 1 ’- 0 " NOTES : For reinforcing bar notes, see Standard Drawing E703-BRST-01. All reinforcing steel to be epoxy coated. Surface Seal all exposed surfaces of the approaches. For Sections A-A and B-B, see Sheet No.50. For Type IA Joint Installation Details, see Standard Drawing E724-BJTS-01. afishburn 9:10:21 AM2/11/2009 P:\IN2003\0661\D. Drawings\IN20030661.BR.C5.116.APR.01.dgn No. STATE OF INDIAN A REGISTE RED P R OFE S SIONAL ENGIN EER 880305 DAVID A. D AY B B DSH DSH R.C. BRIDGE APPROACH DETAILS 1/4" = 1’-0", U.N. Min. LapAA B B PLAN AT BENT NO.3 E.B.L. MSP MSB HORIZONTAL SCALE DESIGNATION NO. BRIDGE FILE VERTICAL SCALE SURVEY BOOK SHEETS CONTRACT PROJECT NO. of DESIGNED:DRAWN: CHECKED:CHECKED: DESIGN ENGINEER RECOMMENDED FOR APPROVAL DATE CITY OF CARMEL 07-08C 5147 2/06/2009 24-#4x21’-9" (Top) 12-#5x21’-9" (Bottom) 16-#4x21’-9" (Top) 8-#5x21’-9" (Bottom) 32 Spa. @ 1’-0" = 32’-0" (Spa. #4, Top)16 Spa. @ 2’-0" = 32’-0" (Spa. #5, Bottom) 3" 16’-0" (Along F.F. Curb) 1-#4x21’-3" (Top) 1-#5x21’-3" (Bottom) 1-#4x16’-9" (Top) 1-#5x16’-9" (Bottom) 1-#4x12’-3" (Top)1-#5x12’-3" (Bottom) 1-#4x7’-6" (Top) 1-#5x7’-6" (Bottom) 1-#4x3’-3" (Top) 1-#5x3’-3" (Bottom) 1-#4x19’-0" (Top) 1-#4x14’-6" (Top) 1-#4x10’-0" (Top) 1-#4x5’-3" (Top) 1-#4x20’-0" (Top) 1-#5x20’-0" (Bottom) 1-#4x15’-6" (Top)1-#5x15’-6" (Bottom) 1-#4x10’-9" (Top) 1-#5x10’-9" (Bottom) 1-#4x6’-3" (Top) 1-#5x6’-3" (Bottom) 1-#4x13’-3" (Top) 1-#4x17’-9" (Top) 1-#4x8’-6" (Top) 1-#4x4’-0" (Top) 1-#4x35’-6" (Top)1-#5x35’-6" (Bottom) 3 6 ’- 0 " 6 " 3 " 6 " 3 " 3 5 S p a . @ 1 ’- 0 " M a x . = 3 4 ’- 6 " ( S p a . # 4 , T o p ) 7 0 S p a . @ 6 " M a x . = 3 4 ’- 6 " ( S p a . # 5 , B o t t o m ) 2 5’- 7Ł " 4 1’- 5 1 2" 4 0’- 35 8" 6 1 5 1 6" 6 15 1 6" 3 6- 4 9 0 ( T o p) 7 1- 5 9 0 ( B ott o m) 1 8- 4 0 2 ( 1 B ar C uts 2, T o p) 3 5- 5 0 2 ( 1 Bar C uts 2, B ott o m) P.O.T. 20+51.25 "S-6-E" P.O.T. 21+01.26 "S-6-E" P.C. 31+77.59 "116-OCL-2" Line "S-6-E" Line "S-6-E" 9" Pvm’t. Ledge #4 #5 2’-0" 1’-7" Concrete Curb Concrete Curb Line "116-OCL-2" R 4 9 .8 0 ’ R 8 6 .0 0 ’ NOTES : For reinforcing bar notes, see Standard Drawing E703-BRST-01. All reinforcing steel to be epoxy coated. Surface Seal all exposed surfaces of the approaches. For Sections A-A and B-B, see Sheet No.50. For Type IA Joint Installation Details, see Standard Drawing E724-BJTS-01. afishburn 9:10:25 AM2/11/2009 P:\IN2003\0661\D. Drawings\IN20030661.BR.C5.116.APR.02.dgn No. STATE OF INDIAN A REGISTE RED P R OFE S SIONAL ENGIN EER 880305 DAVID A. D AY B B B B AA Min. Lap PLAN AT BENT NO.1 W.B.L. DSH DSH R.C. BRIDGE APPROACH DETAILS 1/4" = 1’-0", U.N. MSP MSB HORIZONTAL SCALE DESIGNATION NO. BRIDGE FILE VERTICAL SCALE SURVEY BOOK SHEETS CONTRACT PROJECT NO. of DESIGNED:DRAWN: CHECKED:CHECKED: DESIGN ENGINEER RECOMMENDED FOR APPROVAL DATE CITY OF CARMEL 07-08C 5148 2/06/2009 Line "S-6-E" Line "S-6-E" 16-#4x21’-9" (Top) 8-#5x21’-9" (Bottom) 26-#4x21’-9" (Top) 13-#5x21’-9" (Bottom) 1-#4x20’-6" (Top) 1-#5x20’-6" (Bottom) 1-#4x18’-6" (Top) 1-#4x16’-6" (Top) 1-#5x16’-6" (Bottom) 1-#4x14’-6" (Top) 1-#4x12’-6" (Top) 1-#5x12’-6" (Bottom) 1-#4x10’-6" (Top) 1-#4x8’-9" (Top) 1-#5x8’-9" (Bottom) 1-#4x6’-9" (Top) 1-#4x4’-9" (Top) 1-#5x4’-9" (Bottom) 1-#4x35’-6" (Top) 1-#5x35’-6" (Bottom) 1-#4x8’-6" (Top) 1-#5x8’-6" (Bottom) 1-#4x6’-6" (Top) 1-#4x4’-6" (Top) 1-#5x4’-6" (Bottom) 1-#4x2’-6" (Top) 1-#4x10’-6" (Top) 1-#4x12’-3" (Top) 1-#5x12’-3" (Bottom) 1-#4x14’-3" (Top) 1-#4x16’-3" (Top) 1-#5x16’-3" (Bottom) 1-#4x18’-3" (Top) 1-#4x20’-3" (Top) 1-#5x20’-3" (Bottom) 36-490 ( Top) 71-590 ( Botto m)18-403 ( Top, 1 Bar Cuts 2) 35-503 ( Botto m, 1 Bar Cuts 2) 9" Pvm’t. Ledge 16’-0" (Along F.F. Curb) 15’-81 2" (Along R.F. Curb) P.T. 30+43.60 "116-OCL-5" 1’-0"34 Spa. @ 1’-0" = 34’-0" (Spa. #4, Top) 17 Spa. @ 2’-0" = 34’-0" (Spa. #5, Bottom) 3" R 1 1 6 . 0 0 ’ 30’-011 16"4’-258" (F.F.)2’-0716" (F.F.) 2’-338" (R.F.) N 59 18’ 53" W P.C. 30+71.06 "116-OCL-5" P.O.T. 19+48.75 "S-6-E" P.O.T. 18+93.63 "S-6-E" 3 5 S p a . @ 1 ’- 0 " Ma x . = 3 4 ’- 6 " ( S p a . # 4 , T o p ) 7 0 S p a . @ 6 " M a x . = 3 4 ’- 6 " ( S p a . # 5 , B o t t o m ) 3 6 ’- 0 " 6 " 3 " 6 " 3 " 40’-09 16" 615 16" 65 8" 41’-23 16" #4 #5 2’-0" 1’-7" Integral Concrete Curb Integral Concrete Curb Line "116-OCL-5" NOTES : For reinforcing bar notes, see Standard Drawing E703-BRST-01. All reinforcing steel to be epoxy coated. Surface Seal all exposed surfaces of the approaches. For Sections A-A and B-B, see Sheet No.50. For Type IA Joint Installation Details, see Standard Drawing E724-BJTS-01. afishburn 9:10:28 AM2/11/2009 P:\IN2003\0661\D. Drawings\IN20030661.BR.C5.116.APR.03.dgn No. STATE OF INDIAN A REGISTE RED P R OFE S SIONAL ENGIN EER 880305 DAVID A. D AY B B AA B B PLAN AT BENT NO.3 W.B.L. Min. Lap DSH DSH R.C. BRIDGE APPROACH DETAILS 1/4" = 1’-0", U.N. MSP MSB HORIZONTAL SCALE DESIGNATION NO. BRIDGE FILE VERTICAL SCALE SURVEY BOOK SHEETS CONTRACT PROJECT NO. of DESIGNED:DRAWN: CHECKED:CHECKED: DESIGN ENGINEER RECOMMENDED FOR APPROVAL DATE CITY OF CARMEL 07-08C 5149 2/06/2009 Line "S - 6- E " Line "S- 6- E " 36-490 (Top) 7 1-590 (Bottom ) 18-4 0 4 (1 Bar Cuts 2, Top) 35-504 (1 Ba r Cuts 2, Bottom ) R 1 1 8 . 0 0 ’ R 4 1 . 0 0 ’ 3"1’-0"26 Spa. @ 1’-0" = 26’-0" (Spa. #4, Top) 13 Spa. @ 2’-0" = 26’-0" (Spa. #5, Bottom) P.R.C. 31+68.63 "116-OCL-5" 16’-0" (Along F.F. Curb) R 7 7 . 0 0 ’ Concrete Curb Concrete Curb 1-#4x20’-0" (Top) 15-#4x22’-0" (Top) 8-#5x22’-0" (Bottom) 1-#4x16’-9" (Top) 1-#5x16’-9" (Bottom) 1-#4x13’-9" (Top) 1-#4x10’-6" (Top) 1-#5x10’-6" (Bottom) 1-#4x21’-3" (Top) 1-#4x18’-3" (Top) 1-#5x18’-3" (Bottom) 1-#4x7’-6" (Top) 1-#4x4’-6" (Top) 1-#5x4’-6" (Bottom) 21-#4x22’-0" (Top) 11-#5x22’-0" (Bottom) 1-#4x15’-3" (Top) 1-#4x12’-3" (Top) 1-#5x12’-3" (Bottom) 1-#4x9’-3" (Top) 1-#4x6’-6" (Top) 1-#5x6’-6" (Bottom) 1-#4x3’-6" (Top) 1-#4x35’-6" (Top) 1-#5x35’-6" (Bottom) 3 6 ’- 0 " 6 " 3 " 6 " 3 " P.O.T. 20+92.74 "S-6-E" 22’-7 12" 42’-2 78" 4 1’-1 116" 6 1116" 7 18" P.O.T. 20+51.25 "S-6-E" 9" Pvm ’t. L edge #4 #5 2’-0" 1’-7" Line "116-OCL-5" 3 4 ’- 6 " 4 1’- 0 " NOTES : For reinforcing bar notes, see Standard Drawing E703-BRST-01. All reinforcing steel to be epoxy coated. Surface Seal all exposed surfaces of the approaches. For Sections A-A and B-B, see Sheet No.50. For Type IA Joint Installation Details, see Standard Drawing E724-BJTS-01. afishburn 9:10:32 AM2/11/2009 P:\IN2003\0661\D. Drawings\IN20030661.BR.C5.116.APR.04.dgn No. STATE OF INDIAN A REGISTE RED P R OFE S SIONAL ENGIN EER 880305 DAVID A. D AY Min. Lap SECTION A-A R.C. BRIDGE APPROACH DETAILS R.C. BRIDGE APPROACH BENT NO.3 W.B.L. BILL OF MATERIALS R.C. BRIDGE APPROACH BENT NO.1 W.B.L. BILL OF MATERIALS R.C. BRIDGE APPROACH BENT NO.3 E.B.L. BILL OF MATERIALS R.C. BRIDGE APPROACH BENT NO.1 E.B.L. BILL OF MATERIALS SECTION B-B 1 Bar Cuts 2 DSH DSH 1/4" = 1’-0", U.N. MSB MSB HORIZONTAL SCALE DESIGNATION NO. BRIDGE FILE VERTICAL SCALE SURVEY BOOK SHEETS CONTRACT PROJECT NO. of DESIGNED:DRAWN: CHECKED:CHECKED: DESIGN ENGINEER RECOMMENDED FOR APPROVAL DATE CITY OF CARMEL 07-08C 5150 2/06/2009 #4 #5 2’-0" 1’-7" 6 " 2 " C l. 1 ’- 0 " AMark Length A 490 15’-8" 15’-8"590 16’-2" 16’-3" Epoxy Coated Reinforcing Steel Size And Mark Bars No. Of Length (Feet) Weight (Lbs.) Epoxy Coated Reinforcing Steel Size And Mark Bars No. Of Length (Feet) Weight (Lbs.) Epoxy Coated Reinforcing Steel Size And Mark Bars No. Of Length (Feet) Weight (Lbs.) Epoxy Coated Reinforcing Steel Size And Mark Bars No. Of Length (Feet) Weight (Lbs.) 35 71 Total No.5 Total Epoxy Coated Reinforcing Steel Concrete Sys. Miscellaneous Surface Seal Sft. 23’-4" 16’-3" 23’-9"18 51 Lft. 6" 1’- 6 " 6 " #4 #5 4" Min. Embedment Reinforced Concrete Bridge Approach Scale: 1" = 1’-0" 1’- 0 " 501 590 1 16’-0" 1 19’-0" 1 11’-6" #5 #5 #5 #5 1 10’-0" #5 1 6’-9" 14’-6"1#5 401 490 36 16’-2" 1 21’-3" 1 19’-0" 1 18’-6" 1 16’-9" 1 16’-0" #4 #4 #4 #4 #4 Total No.4 2 " F ille t ( M in . ) R.C. Bridge Approach, 12" Cys.Dense Graded Subbase 16 B C D L A 99 2,663 4,078 590 490 2 1 2 " C l. 9" Pvm’t. Ledge 1’-6" 2 " C l. 2 1 2 " C l. 1’-6" 490 (Top) (Spa. @ 1’-0" Max.) 590 (Bottom) (Spa. @ 6" Max.) Or Line "116-OCL-2" Or Line "116-OCL-5" End Of R.C. Bridge Approach 2- Layers Polyethylene (Min. Thickness 6 Mils) #5 (Bottom) (Spa. @ 2’-0") #4 (Top) (Spa. @ 1’-0") 6" Dense Graded Subbase Polystyrene Varies #5 Bar (Billed With Superstructure) L A B C D N 18 18 7"18 5"18 35 35 35 35 Mark 401 402 403 404 501 502 503 504 N = No. Of Bars 23’-9"2’-9"21’-0" 22’-9"2’-3"20’-6" 24’-11"2’-3"12’-2"12’-9"22’-8" 19’-1"2’-3"9’-4"9’-9"16’-10" 23’-4"2’-4"21’-0" 24’-10"2’-4"12’-3"12’-7"22’-6" 19’-1"2’-4"9’-5"9’-8"16’-9" 23’-4"2’-4"21’-0" 21 22’-0" 1 35’-6" #5 #5 #5 1 5’-6" #5 1 2’-3" #4 #4 1 35’-6" 40 22’-0" 1 14’-6" 1 13’-9" 1 12’-3" 1 11’-6" 1 10’-0" #4 #4 #4 #4 #4 1 9’-0" 1 7’-9" 1 6’-9" 1 5’-6" 1 4’-6" #4 #4 #4 #4 #4 1 3’-3" 1 2’-3" #4 #4 1,415 35 71 Total No.5 23’-4" 16’-3" 502 590 1 20’-0" 1 21’-3" 1 15’-6" #5 #5 #5 #5 1 12’-3" #5 1 10’-9" 16’-9"1#5 2,664 20 21’-9" 1 35’-6" #5 #5 #5 1 7’-6" #5 1 6’-3" #5 1 3’-3" 22’-9"18402 490 36 16’-2" 1 21’-3" 1 20’-0" 1 19’-0" 1 17’-9" 1 16’-9" #4 #4 #4 #4 #4 #4 #4 1 35’-6" 40 21’-9" 1 15’-6" 1 14’-6" 1 13’-3" 1 12’-3" 1 10’-9" #4 #4 #4 #4 #4 1 10’-0" 1 8’-6" 1 7’-6" 1 6’-3" 1 5’-3" #4 #4 #4 #4 #4 1 4’-0" 1 3’-3" #4 #4 Total Epoxy Coated Reinforcing Steel Concrete Sys. Miscellaneous Surface Seal Sft. 50 Lft. Total No.4 R.C. Bridge Approach, 12" Cys.Dense Graded Subbase 16 97 4,069 1,405 35 71 16’-3" 503 590 1 20’-3" 1 20’-6" 1 16’-3" #5 #5 #5 #5 1 12’-6" #5 1 12’-3" 16’-6"1#5 21 21’-9" 1 35’-6" #5 #5 #5 1 8’-9" #5 1 8’-6" #5 1 4’-9" Total No.5 2,753 #5 1 4’-6" 24’-10" 18403 490 36 16’-2" 1 20’-6" 1 20’-3" 1 18’-6" 1 18’-3" 1 16’-6" #4 #4 #4 #4 #4 #4 #4 1 35’-6" 42 21’-9" 1 16’-3" 1 14’-6" 1 14’-3" 1 12’-6" 1 12’-3" #4 #4 #4 #4 #4 2 10’-6" 1 8’-9" 1 8’-6" 1 6’-9" 1 6’-6" #4 #4 #4 #4 #4 1 4’-9" 1 4’-6" #4 #4 Total Epoxy Coated Reinforcing Steel Concrete Sys. Miscellaneous Surface Seal Sft. 53 Lft. R.C. Bridge Approach, 12" Cys.Dense Graded Subbase 16 4,227 Total No.4 1,474 1 2’-6"#4 24’-11" 35 71 16’-3" 504 590 1 16’-9" 1 18’-3" 1 10’-6" #5 #5 #5 #5 1 6’-6" #5 1 4’-6" 12’-3"1#5 19 22’-0" 1 35’-6" #5 #5 Total No.5 2,445 19’-1" 18404 490 36 16’-2" 1 21’-3" 1 20’-0" 1 18’-3" 1 16’-9" 1 15’-3" #4 #4 #4 #4 #4 #4 #4 1 35’-6" 36 22’-0" 1 13’-9" 1 12’-3" 1 10’-6" 1 9’-3" 1 7’-6" #4 #4 #4 #4 #4 1 6’-6" 1 4’-6" 1 3’-6" #4 #4 #4 Total Epoxy Coated Reinforcing Steel 3,722 Total No.4 1,277 19’-1" Concrete Sys. Miscellaneous Surface Seal Sft. 47 Lft. R.C. Bridge Approach, 12" Cys.Dense Graded Subbase 15 93 103 2" Clear NOTES : For reinforcing bar notes, see Standard Drawing E703-BRST-01. All reinforcing steel to be epoxy coated. Surface Seal all exposed surfaces of the approaches. For location of Sections A-A and B-B, see Sheet No.’s 46-49. For Type IA Joint Installation Details, see Standard Drawing E724-BJTS-01. 940 920 970 880 afishburn 9:10:35 AM2/11/2009 P:\IN2003\0661\D. Drawings\IN20030661.BR.C5.116.APR.05.dgn No. STATE OF INDIAN A REGISTE RED P R OFE S SIONAL ENGIN EER 880305 DAVID A. D AY 07-08C ALF DAD RMC DAD HORIZONTAL SCALE DESIGNATION NO. BRIDGE FILE VERTICAL SCALE SURVEY BOOK SHEETS CONTRACT PROJECT NO. of DESIGNED:DRAWN: CHECKED:CHECKED: DESIGN ENGINEER RECOMMENDED FOR APPROVAL DATE NONE NONE BRIDGE SUMMARY CITY OF CARMEL 07-08C 5151 REVISIONS Total Of Reinf. Steel Carried To "Structure Quantities" LOCATION TO W-BEAM GUARDRAIL LENGTH STATION FROM STATION TOTALS S TA N D A R D P O S T A T 6 ’- 3 S P A . RT. OR LT. LIN. FT. S TA N D A R D P O S T A T _ _ _ _ S P A . LIN. FT. S TA N D A R D P O S T A T _ _ _ _ S P A . LIN. FT. NE S TED G U A R DR A IL LIN. FT. G U A R DR A IL F LA R E R A TE REMARKS TYPE TR A N S ITION G U A R DR A IL EACH TYPE EACH G U A R DR A IL END TR EATM E N T CURVED W-BEAM GUARDRAIL SYSTEM TERMINAL SYSTEM TYPE EACH CONNECTOR SYSTEM EACHTYPE LIN. FT.LIN. FT. R EMO VE G U A R DR A IL G U A R DR A IL R E S E T RIGHTLOCATIONLEFT SINGLE DOUBLE B AC K F IL L CU. YDS. ** THICKNESS A LU M . S T E E L VE LO C IT Y SYS. R IP R A P B A C K F ILL M E T H O D O F CU. YDS. S T R U C TU R E DOWN STREAM ELEV. STREAM UP ELEV. FLOW LINE FT. C O V E R S KE W T YP ES IZ E C R O S S R IG H T DISTANCE BEYOND DESCRIPTION TONS TACK COATMAINLINE FILL EXCAVATION (CYS.) CUTR/W FT.FT. LENGTH % GRADE FT. RADIIWIDTH FT. LOCATION STATIONLT/RT SODDING (SQ. YDS.)PAVED SIDE DITCH (LIN. FT.) SOD TOTAL OTHERSHOULDERS DITCHES FOR PSD FOR LENGTH TOTAL PAY LENGTH PAY WALLS CUT OFF LENGTH PAY LUGS NO. OF LENGTH PAY TYPE LT. OR RT.STATION TO STATION LE F T INCHES N U M B E R S TR U C TU R E LOCATION REMARKS DESCRIPTION P IP E E N D S E C T IO N EACH R EIN F. S TE E L LBS. LEN G TH FT. IN S TR S . C O NC . C L . A CU. YDS.CU. YDS.RT. OR LT. EACHEACHLIN. FT.EACHLIN. FT.LIN. FT.LIN. FT.LIN. FT. TOTALS STATION TO STATION CULVERT PIPE PROTECTIONPROTECTIONPROTECTIONDITCH CHK INTERCEPTORDRAINAGE BARRIER DITCH STRAW BALE DITCH CHK RIPRAP SEDIMENT TRAP SEDIMENT BASINPROTECTION PERIMETER DROP INLET CURB INLETSLOPE DRAIN LIN. FT. GEOTEXTILES SQ. YD. RIPRAP TONS REVETMENT ? LBS./SYD. 19.0 mm, MAINLINE ? LBS./SYD. MAINLINE ? LBS./SYD.TONS FOR ASPHALT ASPHALT FOR PRIME COAT SIDEWALK CONCRETECONCRETE SYS. CURB SYS. DATE ITEM TOTAL LINE HMA BASEHMA SURFACE 9.5 mm,INTERMEDIATE HMA 25.0 mm, NOTES : * Estimated Quantity, to be paid for as "LSUM". ** If the Contractor elects to use metal pipe, the thickness shall be as shown in the Approach Quantity Table. *** The weight of structural steel is approximate only, and it shall be the Contractor’s responsibility to determine the weight on which he bases his bid. For Test Bar Samples, see Bridge Standard 703-BRST-01. GUARDRAIL SUMMARY TABLE RESET MAILBOX TABLE PAVEMENT QUANTITIES AND APPROACH TABLE PAVED SIDE DITCH, RIPRAP DITCH AND SODDING SUMMARY STRUCTURE SUMMARY TEMPORARY EROSION AND SEDIMENT CONTROL SUMMARY CATCH BASIN, OR MANHOLE, INLET, SPECIALTY STRUCTURE BRIDGE RAIL, R.F.* LIN. FT. CURB CONC. INTEG. SQ FT. * COAT MASONRYDENSE LFT. ITEM CONCRETE CLASS C IN SUPERSTR.SUBSTR. CLASS A IN CU. YDS.CU. YDS.CU. YDS. CLASS B IN FOOTING CU. YDS. CONCRETE RAILING CLASS C LIN. FT. REINF. TOTAL STEEL LBS.LBS. STEEL *** STRUCT. LBS. EPOXY SYS. BRIDGE APPR., 12" REINF.CONC. COATED REINF. STEEL PILES LIN. FT. SHELLS EPOXY COATED NO. TIMBER TREATED BEARING STEEL HSTEEL ENCASED CONCRETE FITTINGS BASINS & GRATES, CAST IRON, LBS.CYS. GRADED SUBBASE LIN. FT.LIN. FT. JOINT EXPANSION LIN. FT. CLASS SS JOINT EXPANSION TYPE BOX BEAMS SQ. FT. CONC. STR. MEMBERS LIN. FT. SEAL SURFACE SQ. FT. CONCRETE STAINING TOTALS ANCHOR PLATES EACH EXPANSION JOINT TYPE BS9 ANCHOR BOLT AB-1 EACH LFT.LIN. FT. CONDUIT EACH CONCRETE HOLES IN FIELD DRILLED MK -AP1 TIPS, B R I D GE F I L E 116 T H S T R E E T I BEAM QUANTITIESSTRUCTURE DRIVING STEEL "H" EACH NO.LIN. FT.NO.LIN. FT.NO.LIN. FT.LFT. TYPE M 2/06/2009 FORMLINER BRIDGE RAIL, F.F. FORMLINER ORNAMENTAL RAILING IMPRINTING CONCRETE SQ. FT.SQ. FT. 2" PVC PIPE SUPERSTRUCTURE 1313.5 40.9 200 200 236406 2532 198 208 9350 13646 220 1510 SUBSTRUCTURE Bent No. 1 120.9 15586 50 25 25 2250 920 Pier No. 2 361.3 147.3 103873 58 58 4640 7140 5570 Bent No. 3 122.0 15632 50 25 25 2250 950 R.C. BRIDGE APPROACHES Bent No. 1 E.B.L.99 16 4078 940 51 Bent No. 1 W.B.L.103 16 4227 970 53 Bent No. 3 E.B.L.97 16 4069 920 50 Bent No. 3 W.B.L.93 15 3722 880 47 TOTALS 1556.4 361.3 147.3 40.9 200 200 392 63 103873 283720 100 108 9140 2532 198 208 22070 13646 220 7080 201108 afishburn 9:10:39 AM2/11/2009 P:\IN2003\0661\D. Drawings\IN20030661.BR.C5.116.SUM.01.dgn No. STATE OF INDIAN A REGISTE RED P R OFE S SIONAL ENGIN EER 880305 DAVID A. D AY