Loading...
HomeMy WebLinkAbout16-110 4th Street Asbuilts-SanitaryPROPOSED STORMWATER EASEMENT PROPOSED STORMWATER EASEMENT 0+75 1+00 1+50 2+00 2+50 3+00 3+50 3+69 SANITARY STR#202 RIM = 827.89 INV S = 821.48 SANITARY STR#201 RIM = 828.36 INV N = 820.85 INV E = 819.82 SANITARY STR#200 DOGHOUSE MH RIM = 826.68 INV W = 818.50 INV N = 818.47 INV S = 818.47 315 LF OF 8" PVC @ 0.42% 149 LF OF 8" PVC @ 0.42% 826.90 818.49 818.38 818.47 828.48 820.68 819.84 820.59 INV SW 0.43%317 42 LF OF 6" SDR-35 @ 1.04% SLOPE 37 CANNOT VERIFY SLOPE PIPE BURIED C/O TYPE 2 TC: 828.40 INV.: 820.43 828.28 ʽ 36 LF OF SANITARY FOR SANITARY C/O SANITARY STR#SS-1 FROM PROJECT 16-ENG-22 AND 16-ENG-32 RIM = 828.75 INV NE = 821.12 INV S = 821.22 828.80 821.15 55 LF OF 8" PVC @ 0.46% 54 1.04% **CANNOT VERIFY** **CANNOT VERIFY**1" = 20'Prepared by:Survey Tech PC.7172 North Keystone Ave #JIndianapolis, IN 46240Prepared for:CRIDER & CRIDER4806 W. 86th STREETIndianapolis IN 46268DrawnCheckDateScalePAGERevisionDateNumberDescriptionJob # 16-1101 OF 1: BMF: LDB: 01-16-2018: 1" = 20'SANITARY POST CONSTRUCTION SURVEY4TH STREET SW MIDTOWN CARMELCITY OF CARMELLS9300007 STATE OF -oN E ERE DI A NLYLE D A V I D BRA N SONL A ND SUR V E Y O RPOST CONSTRUCTION SURVEY