HomeMy WebLinkAbout16-110 4th Street Asbuilts-SanitaryPROPOSED
STORMWATER
EASEMENT
PROPOSED STORMWATER EASEMENT
0+75 1+00 1+50 2+00 2+50 3+00 3+50 3+69
SANITARY STR#202
RIM = 827.89
INV S = 821.48
SANITARY STR#201
RIM = 828.36
INV N = 820.85
INV E = 819.82
SANITARY STR#200
DOGHOUSE MH
RIM = 826.68
INV W = 818.50
INV N = 818.47
INV S = 818.47
315 LF OF 8" PVC @ 0.42%
149 LF OF 8" PVC @ 0.42%
826.90
818.49
818.38
818.47
828.48
820.68
819.84
820.59 INV SW
0.43%317
42 LF OF 6" SDR-35
@ 1.04% SLOPE
37
CANNOT VERIFY
SLOPE PIPE
BURIED
C/O TYPE 2
TC: 828.40
INV.: 820.43
828.28
ʽ
36 LF OF SANITARY
FOR SANITARY C/O
SANITARY STR#SS-1
FROM PROJECT 16-ENG-22
AND 16-ENG-32
RIM = 828.75
INV NE = 821.12
INV S = 821.22
828.80
821.15
55 LF OF 8" PVC
@ 0.46%
54
1.04%
**CANNOT VERIFY**
**CANNOT VERIFY**1" = 20'Prepared by:Survey Tech PC.7172 North Keystone Ave #JIndianapolis, IN 46240Prepared for:CRIDER & CRIDER4806 W. 86th STREETIndianapolis IN 46268DrawnCheckDateScalePAGERevisionDateNumberDescriptionJob # 16-1101 OF 1: BMF: LDB: 01-16-2018: 1" = 20'SANITARY POST CONSTRUCTION SURVEY4TH STREET SW MIDTOWN CARMELCITY OF CARMELLS9300007
STATE OF
-oN
E ERE
DI A NLYLE D A V I D BRA
N
SONL
A
ND SUR V E Y O RPOST CONSTRUCTION
SURVEY