HomeMy WebLinkAboutDepartment Report 09-23-242 of 14
CARMEL BOARD OF ZONING APPEALS HEARING OFFICER
DEPARTMENT REPORT
MONDAY, SEPTEMBER 23, 2024
(V) Beck Residence Variances.
The applicant seeks the following development standards variance approvals:
2. Docket No. PZ-2024-00134 V UDO Section 2.12 35% Maximum lot cover allowed,
38.3% requested.
3. Docket No. PZ-2024-00135 V UDO Section 5.02(C)(7) Sideyard Setback - a
swimming pool, hot tub, or its deck or equipment shall be set back a minimum of the greater of the
following: 10-ft from the side lot line and rear lot line, or be 3-ft from any easement (5.7-ft side
setback from lot line requested).
4. Docket No. PZ-2024-00136 V UDO section 5.79(J) Window wells cannot project
more than 24” into a required yard, 60” projection proposed.
The site is located at 430 1st Ave SE (Foster’s Addition, Lot 1). It is zoned R3/Residence. Filed by
Michael & Julie Beck, owners.
General Info:
• The Petitioner seeks approval for a new swimming pool in the side yard.
• Variances are requested for lot cover, side setback, and window well setback (related to the existing house).
• The site is in Foster’s Addition subdivision; however, an HOA (Homeowner’s Association) does not exist.
• Surrounding this site are single family residential homes to the north, south, and east, and a commercial use
to the west across the alley.
• Please see the Petitioner’s info packet for more detail on the variance request s.
Variances Requested:
Lot Coverage -
• The UDO allows a maximum 35% lot coverage, and 38.3% is requested. This is a 3.3% increase.
• The pool and its decking will add to the total lot coverage of the lot.
• Since the site will be exceeding the allowed lot cover percentage, the Carmel Engineering Dept. is also going
to require on-site stormwater detention OR payment into the Stormwater Fund/Fee. (Petitioner has opted to
pay into the fund.)
Pool Side Setback -
• The UDO requires Swimming Pools, Decking, & Equipment be located a minimum of 10-ft from the
side/rear property lines, and a 5’7” side yard setback is requested. This is a variance of 4’3”.
• There are no easements on the lot.
• The in-ground swimming pool spa will be 8’ by 15’, and a patio area will surround three sides of it.
• The Pool Pump Equipment should be of a quiet design with low noise/vibrations.
Window Well Setback -
• The UDO allows window wells in the R2 zone to encroach up to 2-ft into a building setback. A 3-ft
encroachment is requested in this instance. This is a variance of 1 foot more than is allowed.
• The window well will still have a 2-ft setback from the north property line.
Remaining Review Comments:
• All Planning/Zoning review comments have been addressed.
• The Carmel Engineering Dept. will require on-site stormwater detention OR payment into the Stormwater
Fund/Fee. The Petitioner has agreed to provide payment for the Stormwater Fund/Fee.
• The Petitioner did provide Staff the specs/design details of the Pool Pump equipment and it will be of a quiet
design with low noise/vibrations.
3 of 14
Final Comments:
• The Planning Dept. supports the variance requests, as long as the Petitioner addresses the
concerns/comments of the Carmel Engineering Dept, such as paying into the Stormwater Fund.
Findings of Fact:
• Please refer to the Petitioner’s Findings of Facts included in their BZA Info Packet.
Recommendation:
• The Dept. of Community Services (DOCS) recommends positive consideration of these variance requests,
with the condition of paying into the Stormwater Fund/fee, and with adoption of the Findings of Facts
submitted by the Petitioner.