HomeMy WebLinkAboutVS Engineering, Inc./ENG/$15,000/ 22-ENG-08 136th Street Trail Connections ASAVS Engineering, Inc.
Engineering Department - 2024
Appropriation #2200 0 44-628.71 2022 Bond Fund; P.O. #109780
Contract Not To Exceed $15,000.00
ADDITIONAL SERVICES AMENDMENT TO
AGREEMENT FOR PROFESSIONAL SERVICES
THIS AMENDMENT TO THE AGREEMENT FOR PROFESSIONAL SERVICES (“Agreement”) entered into by
and between the City of Carmel and VS Engineering, Inc. (the “Professional”), as City Contract dated June 21, 2023
shall amend the terms of the Agreement by adding the additional services to be provided by Professional consistent
with the Scope of Work attached hereto and incorporated herein as Exhibit “A”. The terms and conditions of the
Agreement shall not otherwise be affected by this Additional Services Amendment and shall remain in full force and
effect.
IN WITNESS WHEREOF, the parties hereto have made and executed this Amendment as follows:
CITY OF CARMEL, INDIANA VS Engineering, Inc.
By: By:
Bradley Pease, Director Authorized Signature
Engineering Department
Date: Printed Name:
Title
FID/TIN:
Date:
August 30, 2024
Mr. Chris Ogg
Assistant City Engineer
One Civic Square
Carmel, IN 46032
thRe:136Street Trail Connections
Amendment #1 – Geotechnical Evaluation
Dear Mr. Ogg:
thVSEngineering, Inc. (VS) appreciates the continued work with City ofCarmel onthe136Street Trail
Connections project. Please find attached our requested amendment tothe contract for theaddition of
Geotechnical Evaluation services associated with the installation oftwo prefabricated pedestrian bridges.
DESIGN
Project Administration
Amendment covers the additional Level of Effort associated with the management and review ofa
Geotechnical Evaluation services.
GEOTECHNICAL EVALUATION
Scope
VSshall provide thefollowing services associated with theanalysis ofthe existing soils inthe area ofthe
proposed bridges:
Drill four borings to30ft (one boring near each proposed abutment).
thoItappearsthatreadyaccessisavailableneartheproposedabutmentsatthe136St. bridge
and thesouth side ofthe Ditch Rd. bridge.
oAccess tothe proposed north abutment ofthe Ditch Rd. pedestrian bridge appears tobe
restricted duetoheavy timber/vegetation. VSunderstands that the City isamenable to
clearing apath approximately 15ftinwidth toprovide our drill crew access.
oVSassumesthatpermission toaccessprivateproperty willbeprovided byothers. VSwill
need landowner contactinformation sothatwecannotifythemofourintention toaccess
theirproperty.
Performlaboratory testingtoaidinsoilstrengthandproperty characterization.
Prepareabriefdata-stylereportthatsummarizes ourobservations, laboratory testingresults,
andboring logs. Helical piledesignisaperformance-baseddesignperformed byspecialty
contractor. General subsurface conditions andtestboringlogswillbeprovided inthedatareport
fortheproprietary designbythecontractor.
GEOTECHNICAL ON-SITE TRAFFIC CONTROL
Scope
VS shall provide traffic control and temporary lane closure for boring crews ifborings need tobedrilled from
theroadway inthe event thatthere are utility orother unforeseen conflicts.
FEE SUMMARY
Current New
LUMP SUM ITEMSContractAmendmentContract
Topographic Survey$28,000$28,000
Design$193,100$1,600$194,700
Permitting$36,200$36,200
Utility Coordination$16,900$16,900
Geotechnical Evaluation$10,900$10,900
GeotechnicalOn-Site Traffic Control$2,500$2,500
SUB-TOTAL$274,200$15,000$289,200
Current New
UNITITEMSUNITSUNIT COSTContractAmendmentContract
T&E Reports4$625$2,500$2,500
4R/WEngineering (Permanent)$2,950$11,800$11,800
4AdditionalDescription$725$2,900$2,900
4R/WStaking$750$3,000$3,000
SUB-TOTAL$20,200$20,200
Current New
HOURLY FEES ITEMContractAmendmentContract
Construction Administration$5,000
SUB-TOTAL$5,000$5,000
TOTAL$299,400$15,000$314,400
We look forward toproviding our professional services. Please contact usif youshould have any questions or
require additional information.
Respectfully,
Christopher L. Waidner, P.E.
Indiana Transportation Director
VSEngineering, Inc.
Fee Justification
136th St. and Ditch Rd. Pedestrian Bridges
Carmel, IN
EXPLORATORY FIELD ACTIVITIES
Mobilization and demobilization1LS$788.00/ LS 788.00
Test boring with SPT sampling, 0-50ft120ft$26.25/ ft 3,150.00
Test boring with SPT sampling, upto100 ftft$37.00/ ft
Shelby tube samplingea$131.00/ ea
ATV-mounted equipment1day$630.00/ day 630.00
Truck-mounted equipmentday$315.00/ day
Rock coringft$63.00/ ft
Rock core set-upsea$158.00/ ea
Soundingsft$16.00/ ft
Pavement coresea$184.00/ ea
Road closureday$210.00/ day
Trafficcontrol (flagmen)day$1,700.00/ day
Boring layout, permits and utility coordination8hr$121.00/ hr 968.00
Support truck1day$131.00/ day 131.00
Per diemday$95.00/ day
Overnight living expensenight$240.00/ night
Subtotal 5,667.00
LABORATORY
Visualsoil/rockclassification, moisture content and
hand penetrometer readings2hr$84.00/ hr 168.00
Atterberglimits 4ea$105.00/ ea 420.00
Grainsizeanalysis 4ea$168.00/ ea 672.00
Unconfined compression5ea$89.00/ ea 445.00
Standard Proctorea$168.00/ ea
California bearing ratio (CBR)ea$420.00/ ea
Unit Weight3ea$42.00/ ea 126.00
Loss on Ignitionea$53.00/ ea
Specific Gravityea$74.00/ ea
Topsoil Testingea$462.00/ ea
Pavement core logging, summaryea$84.00/ ea
Subtotal$1,831.00
ENGINEERING
Report ofresults, discussion, andrecommendations1LS$2,500.00/ LS 2,500.00
Project oversight and coordination1LS$920.00/ LS 920.00
Pavement Analysis and DesignLS$5,250.00/ LS
Subtotal$3,420.00
Estimated Total$ 10,918.00
TrafficControl andTemporary Lane Closure Allowance (pass-through)$2,500