HomeMy WebLinkAbout07040085 Sq. Ft.
,~,
j
f. Minimum front building setback line, per approved development plan (include all front yard)
g. All roads, alleys, rights-of-way, etc...
h. Any applicable flood piain area (Certificate of Elevation, if necessary)
i. Building pad elevation and lot corner elevations
j, All accessory buildings / structures -- existing or proposed
k. All sidewalks and driveways
I. Sewer and water lines, septic system, (tanks & filed system) and/or well locations
m. Drainage flow arrows
n. Ail drainage swales and subsurface facilities (retention / detention areas, etc ,.)
o. Sump pump -- Show sump pump pitts) and discharge line locations
p. Geothermal heat pump discharge locations
*NOTE: If land is not within a platted subdivision, a legal description is required.
FURTHER NOTES / NOTICES:
'" CARMEL ZONING ORDINANCE Z-289, SECTION 29.04,02 (3): "The Director shali approve or deny the Improvement
Location Permit within five (5) working days of the receipt of the written application form and accompanying materials. The
Improvement Location Permit shall be issued when the proposed structure/ improvement/ or use and its location conform in
all respects to this ordinance."
'" IN ADDmON TO THE ABOVE-LISTED SUBMffiAL REQUIREMENTS, THE BUILDING INSPECTOR WILL BE PROVIDED WITH
ANY INFORMATION RELATIVE TO COMMITMENTS MADE IN THE ZONING PROCESS FOR THE PROPERTY INVOLVED. THIS
WOULD INCLUDE ANY PLAN COMMISION, BOARD OF ZONING APPEALS, AND/OR DEPT. OF COMMUNITY SERVICES
ADMINISTRATIVE APPROVALS REQUIRED,
'" ADDmONAL INFORMATION MAY BE REQUESTED BY, AND WILL BE PROVIDED TO THE BUILDING INSPECTOR, IF THE,
SUBMffiED PLANS ARE NOT OF SUFFICIENT IN CLARITY OR DETAIL, TO INDICATE THE NATURE AND EXTENT OF THE
WORK PROPOSED AND TO DETERMINE COMPLIANCE WITH ALL APPLICABLE CODES AND ORDINANCES. SUBMffiAL OF
ADDmONALLY REQUESTED/REQUIRED INFORMATION, AFTER THE INITIAL SUBMffiAL, WILL EXTEND THE TIME IT I
TAKES COMPLETE THE PERMIT REVIEW. . I
'" THE OFFICE OF BUILDING & CODE ENFORCEMENT RECOGNIZES ANY ROOM/AREA DESIGNATED ON CONSTRUCTION
PLANS AS A "BONUS ROOM" TO BEUNOCCUPIABLE. UNFINISHED SPACE, IF AN AREA SO LABELED IS TO BE A FINISHED
SPACE, CONSTRUCTION PLANS MUST BE LABELED ACCORDINGLY. IF IT IS DETERMINED THAT AN UNFINISHED, "BONUS
ROOM" AREA IS TO BECOME A FINISHED AREA AFTER THE ISSUANCE OF THE PERMIT, THE PLANS AND PERMIT
RECORDS MUST BE UPDATED AT THE OFFICE OF BUILDING & CODE ENFORCEMENT,
'" ALL CONSTRUCTION IS SUBJECT TO FIELD INSPECTION, AND SHOULD NOT BEGIN PRIOR TO THE ISSUANCE
'OF THE BUILDING PERMIT. ONCE THE PERMIT IS ISSUED, WORK SHOULD NOT BE POURED, INSULATED/COVERED,
~ AND/OR OCCUPIED PRIOR TO THE APPROPRIATE INSPECTION, Beginning prior to obtaining a building permit and/or
proceeding with construction beyond the stage of a required inspection without approval constitutes Late Fee penalties, per
Z-2B9 of the Carmel/Clay Zoning Ordinance; 29.06.07, and 29,06.08.
BVILDING /I{ CODE ENFORCEMENT; CITY OF CARMEL. One Civic Sq,; C~rrnel. IN 46032, ph. (317) 571-24441
_~, ,~~ ......~_~~~ ._ '!!!'!!!"!-_.~'._ _ ~_ ~___ __ 1!!!! Ji:!!! !! ,,_~ _ ~_J:i. .,!~
I, the undersigned, certify that all of the above listed information is shown completely and accurately on the attached plot or
site plan(s), construction plans, and any other submitted documentation, submitted with the building permit application to the
City of Carmel/Clay Township Department of Community Services. I further certify that the joining of water supply piping'
shali be made with lead-free solders and fluxes. Failure to comply wili result in a replacement of the system. (Plumbing Code
P-509-5) Under the penaities of Perjury (Indiana Code 35-44-2-1), I also hereby affirm, under oath, that ali of the Information
I have provided in the table below is true and accurate, to the best of my knowledge and belief, and that I have not
knowingly or intentionaliy provided or omitted any information that would tend to hide, obscure, or otherwise mislead the
Dept. of Community Services regarding the truth of the matters addressed therein.
BASEMENT
(Finished and
Unfinished)
1st Floor 2nd Floor
3'd
Floor
Front
Porch
Rear
Porch or
Sun room
Toted Sq.
Ft. of
Garages
gbtj
4-/(-P7
TOTAL
gt
DATE
APPLlCAN;n~L IUVf7~
NAM E PRINTED
S:Permits/FORMS/RESIDENTIAL PROCEDURES 2007
2of2