Loading...
HomeMy WebLinkAboutPress Box Elev. Height - Elevations & SectionsFIRST FLOOR EL 100'-0" A B NEW ELEVATOR SHAFT PRESS BOX LEVEL 1 (NEW) EL 143'-0" PRESS BOX LEVEL 2 (NEW) EL 155'-0" PRESS BOX TOP OF STEEL EL 167'-4" ADAB PRESS BOX LOWER LEVEL EL 139'-8" 3 A5.01 A A4.01 5 A10.05 3 A5.04 2 A5.03 CAST STONE WALL CAP MODULAR SIZE FACE BRICK REFER TO ENLARGED PRESSBOX ELEVATIONS CLEAN AND PREPARE EXISTING CONCRETE WALL SURFACES AND APPLY NEW ELASTOMERIC COATING SYSTEM ALUMINUM RAMP ASSEMBLY CLEAN EXISTING EXPOSED BRICK MASONRY FULL HEIGHT AND LENGTH FOR ENTIRE BUILDING, REFER TO MASONRY CLEANING SPECIFICATION FOR ADDITIONAL INFORMATION CAST STONE WALL CAP FIXED LOUVER -REFER TO MECHANICAL DRAWINGS FOR SIZE MODULAR SIZE FACE BRICKMETAL ROOF SCREEN ON STEEL FRAMING CONCRETE SITE WALL WITH RUBBED CONCRETE FINISH STRUCTURAL STEEL FRAMING (PAINT) AA AC EL. 110'-0"EL. 110'-8" EJ EJ EJ EJ EJ EJ ALUMINUM CLOSURE PANELS A B PRESS BOX LEVEL 1 (NEW) EL 143'-0" PRESS BOX LEVEL 2 (NEW) EL 155'-0" PRESS BOX TOP OF STEEL EL 167'-4" AD AB PRESS BOX LOWER LEVEL EL 139'-8" 3 A5.01 2 A5.01 A A4.01 2 A5.04 2 A5.03 REFER TO ENLARGED PRESSBOX ELEVATIONS CLEAN AND PREPARE EXISTING CONCRETE WALL SURFACES AND APPLY NEW ELASTOMERIC COATING SYSTEM ALUMINUM RAMP ASSEMBLY CLEAN EXISTING EXPOSED BRICK MASONRY FULL HEIGHT AND LENGTH FOR ENTIRE BUILDING, REFER TO MASONRY CLEANING SPECIFICATION FOR ADDITIONAL INFORMATION SITE FENCING AND GATES, REFER TO SITE DRAWINGS METAL ROOF SCREEN ON STEEL FRAMING STRUCTURAL STEEL FRAMING (PAINT) MODULAR SIZE FACE BRICK CAST STONE WALL CAP CONCRETE SITE WALL WITH RUBBED CONCRETE FINISH EJEJEJ EJ EJ AA AC FIXED LOUVER -REFER TO MECHANICAL DRAWINGS FOR SIZE EL. 110'-0" FIXED LOUVER -REFER TO MECHANICAL DRAWINGS FOR SIZE FIXED LOUVER -REFER TO MECHANICAL DRAWINGS FOR SIZE (BEHIND FENCING) ALUMINUM CLOSURE PANELS 123456789101112137.3 6.7 3 A4.03 4 A4.03 1 A4.02 2 A4.02 5 A4.04 6 A4.04 7 A4.05 8 A4.05 9 A4.05 5.18.9 4 A5.02 3 A5.03 CAST STONE WALL CAPMODULAR SIZE FACE BRICK ALUMINUM PIPE AND TUBE RAILING CONCRETE SITE WALL WITH RUBBED CONCRETE FINISH AND REVEALS APPROXIMATE FINISH GRADE CONCRETE SITE WALL WITH RUBBED CONCRETE FINISH AND REVEALS EJEJEJEJ 10'-0" 18'-8" 18'-8" 18'-8" 18'-10" 10'-0" EJ 10'-0" 18'-0" 17'-4" 18'-0" 10'-0" EJ EJ EJ EJ EJ EJ EJEJEJ CONCRETE SITE WALL WITH RUBBED CONCRETE FINISH AND REVEALSALUMINUM PIPE AND TUBE RAILING CAST STONE WALL CAP MODULAR SIZE FACE BRICK CONCRETE SITE WALL WITH RUBBED CONCRETE FINISH 12.9 12.1 1.11.9 BRICK PIER WITH CAST STONE CAP, REFER TO SITE DRAWINGS FOR LOCATIONSBRICK PIER WITH CAST STONE CAP, REFER TO SITE DRAWINGS FOR LOCATIONS 5 A5.02 10'-0" 3' - 8 " + / - 1 10'-0" 1 3' - 8 " + / - MECH UNIT 1 TRAFFIC COATING SEE SHEETS A1.06 AND A1.07 FOR ADDITIONAL INFORMATION ELASTOMERIC COATING TYPICAL AT ALL SIDES, TOP, FRONT, BACK AND BOTTOM CONCRETE COATING LEGEND COPYRIGHT 2024 BY FANNING/HOWEY ASSOCIATES, INC. KEY PLAN WWW.FHAI.COM ARCHITECT BUILDING "A" BUILDING "B" A B SOUTH SUPPORT BUILDING GREYHOUND ACTIVITIES CENTER 5201 E Main Street, Carmel, IN 46033 317-844-9961 8/ 2 2 / 2 0 2 4 5 : 0 1 : 1 2 P M \\ d a t a 1 \ c i t r i x p r o f i l e s $ \ t v a u g h n \ m y d o c u m e n t s \ 2 0 2 3 _ A RC H _ 2 2 2 1 5 4 . 0 2 _ t p v a u g h n . r v t PROJECT NUMBER: 222154.00 222154.00 CARMEL HIGH SCHOOL STADIUM GRANDSTAND RENOVATION PROJECT CARMEL CLAY SCHOOLS 2390 E. SMOKY ROW (HOME SIDE) 2450 E. SMOKY ROW (VISITOR SIDE) CARMEL, IN 46032 BUILDING A ELEVATIONS A3.03 PROJECT ISSUE DATE: 7.26.2024 100% CONSTRUCTION DOCUMENTS DRAWN BY: TPV 317.848.0966 350 E NEW YORK ST. SUITE 300, INDIANAPOLIS IN 46204 PROJECT MANAGER: MKS SCALE: 1/8" = 1'-0" NORTH ELEVATION BUILDING A2 SCALE: 1/8" = 1'-0" SOUTH ELEVATION BUILDING A3 PLAN NORTH SCALE: 1/8" = 1'-0" WEST ELEVATION BUILDING A -FRONT WALLS1 SCALE: 1/4" = 1'-0" TICKET BOOTH WEST ELEVATION4 SCALE: 1/4" = 1'-0" TICKET BOOTH EAST ELEVATION5 SCALE: 1/4" = 1'-0" 6 TICKET BOOTH NORTH ELEVATION SCALE: 1/4" = 1'-0" 7 TICKET BOOTH SOUTH ELEVATION 3 1 2 REV. NO.DESCRIPTION DATE 1 ADDENDUM NO. 2 8.23.2024 FIRST FLOOR EL 100'-0" SECOND FLOOR / CONCOURSE EL 112'-4 1/2" A B PRESS BOX LEVEL 1 (NEW) EL 143'-0" PRESS BOX LEVEL 2 (NEW) EL 155'-0" PRESS BOX TOP OF STEEL EL 167'-4" AD AB 9 A2.02 PRESS BOX LOWER LEVEL EL 139'-8" EL. 132'-4 1/2" A A4.01 CAMERA A405COMMONS A401 COMMONS A301 SPIRIT SHOP A207 ELE. LOBBY A209 COACHES A124 CORRIDOR A116 CHANGING ROOM A115 STORAGE A121STUDENT COMMONS A136 CONCOURSE A208 REMOVE TOP OF BRICK AND CMU WALL AND REBUILD AFTER SLAB CONSTRUCTION A5.04 1 2 A5.04 12 ' - 4 1 / 2 " 7'- 8 1 / 2 " 5 A10.05 14 ' - 8 " 4 A5.03 AA AC 2 A2.03 FIRST FLOOR EL 100'-0" SECOND FLOOR / CONCOURSE EL 112'-4 1/2" PRESS BOX LEVEL 1 (NEW) EL 143'-0" PRESS BOX LEVEL 2 (NEW) EL 155'-0" PRESS BOX TOP OF STEEL EL 167'-4" AD AB PRESS BOX LOWER LEVEL EL 139'-8" A A4.01 AA A4.01 W.H.J.E A408STAIRS A411 COMMONS A401 COMMONS A301 STUDENT COMMONS A136 MECHANICAL B102 CUSTODIAL B123 CORRIDOR A116 HEAD COACH OFFICE B119 VESTIBULE B121 AA AC VERIFICATION NOTE CONTRACTOR SHALL VERIFY ALL DIMENSIONS AND CLEARANCES AND ALL EXISTING FIELD CONDITIONS BEFORE STARTING CONSTRUCTION. COMMENCEMENT OF WORK CONSTITUTES ACCEPTANCE OF CONDITIONS. SHOULD DIFFERENT CONDITIONS BE ENCOUNTERED, CONTACT THE ARCHITECT BEFORE PROCEEDING WITH WORK. COPYRIGHT 2024 BY FANNING/HOWEY ASSOCIATES, INC. KEY PLAN WWW.FHAI.COM ARCHITECT BUILDING "A" BUILDING "B" A B SOUTH SUPPORT BUILDING GREYHOUND ACTIVITIES CENTER 5201 E Main Street, Carmel, IN 46033 317-844-9961 7/ 2 6 / 2 0 2 4 2 : 1 2 : 2 0 P M \\ d a t a 1 \ c i t r i x p r o f i l e s $ \ t v a u g h n \ m y d o c u m e n t s \ 2 0 2 3 _ A RC H _ 2 2 2 1 5 4 . 0 2 _ t p v a u g h n . r v t PROJECT NUMBER: 222154.00 222154.00 CARMEL HIGH SCHOOL STADIUM GRANDSTAND RENOVATION PROJECT CARMEL CLAY SCHOOLS 2390 E. SMOKY ROW (HOME SIDE) 2450 E. SMOKY ROW (VISITOR SIDE) CARMEL, IN 46032 BUILDING SECTIONS A4.04 PROJECT ISSUE DATE: 7.26.2024 100% CONSTRUCTION DOCUMENTS DRAWN BY: TPV 317.848.0966 350 E NEW YORK ST. SUITE 300, INDIANAPOLIS IN 46204 PROJECT MANAGER: MKS SCALE: 1/8" = 1'-0" GRANDSTAND A SECTION 55 SCALE: 1/8" = 1'-0" GRANDSTAND A SECTION 66 PLAN NORTH REV. NO.DESCRIPTION DATE FIRST FLOOR EL 100'-0" SECOND FLOOR / CONCOURSE EL 112'-4 1/2" PRESS BOX LEVEL 1 (NEW) EL 143'-0" PRESS BOX LEVEL 2 (NEW) EL 155'-0" PRESS BOX TOP OF STEEL EL 167'-4" AD PRESS BOX LOWER LEVEL EL 139'-8" 2 A5.04 EL. 135'-8" 1'-0" 10 3/8" SHEET WATERPROOFING 4 A5.03 AC 7'- 7 1 / 2 " GEOTEXTILE-FACED WALL INSULATION, DRAINAGE PANELS CAST-IN-PLACE CONCRETE -REFER TO STRUCTURAL DRAWINGS SUMP PIT 8" CMU ACOUSTICAL PANEL CEILING -REFER TO CEILING PLANS CONCRETE SLAB ON METAL DECK -REFER TO STRUCTURAL DRAWINGS STEEL BEAM -REFER TO STRUCTURAL DRAWINGS ACOUSTICAL PANEL CEILING -REFER TO CEILING PLANS MEMBRANE ROOFING SYSTEM (ADHERED) ON 1/4" COVER BOARD ON TAPERED ROOF INSULATION (1/4" PER FOOT, 2" MINIMUM) ON VAPOR RETARDER OVER FLAT METAL ROOF DECK A2.03 4 1'-4" 1'-8 3/8" 7 5/8" 6'-8 3/4" 1'-4" 1'-2" ACOUSTICAL PANEL CEILING -REFER TO CEILING PLANS PLAZA DECK PAVERS AND PAVER PEDESTALS PRECAST CONCRETE PLANKS, REFER TO STRUCTURAL CONCRETE BEAM, REFER TO STRUCTURAL DRAWINGS EL. 110'-4" A2.02 5 SIM. 8" CMU 8" CMU 2 1/8" CAVITY WALL INSULATION MODULAR SIZE FACE BRICK MODULAR SIZE FACE BRICK CONCRETE SLAB ON METAL DECK -REFER TO STRUCTURAL DRAWINGS DIRECT APPLIED EXTERIOR FINISH SYSTEM (DEFS) STEEL BEAM -REFER TO STRUCTURAL DRAWINGS R30 KRAFT-FACED GLASS-FIBER BLANKET INSULATION 8" CMU FORMED METAL WALL PANEL -COLOR A 6" COLD-FORMED METAL FRAMING HEAT AND SMOKE VENT ELEVATOR HOIST BEAM EL. 169'-8" 10" 1'-10 3/8" 7 5/8" 6'-8 3/4" A2.03 5 A2.03 1 ELEVATOR DOOR AND FRAME CONCRETE SLAB ON METAL DECK -REFER TO STRUCTURAL DRAWINGS ACOUSTICAL PANEL CEILING -REFER TO CEILING PLANS CONCRETE SLAB ON METAL DECK IN PIPE CHASE FIREBLOCK STUD CAVITIES AT FLOOR LEVELS, TYPICAL ACOUSTICAL PANEL CEILING -REFER TO CEILING PLANS ELEVATOR DOOR AND FRAME A1.00 3 MEMBRANE ROOFING SYSTEM (ADHERED) ON 1/4" COVER BOARD ON TAPERED ROOF INSULATION (1/4" PER FOOT, 2" MINIMUM) ON VAPOR RETARDER OVER FLAT METAL ROOF DECK CONCRETE COLUMN FOOTING -REFER TO STRUCTURAL DRAWINGS CONCRETE SLAB ON VAPOR BARRIER ON DRAINAGE FILL -REFER TO STRUCTURAL DRAWINGS ELEVATOR DOOR AND FRAME A1.00 4 FIRST FLOOR EL 100'-0" SECOND FLOOR / CONCOURSE EL 112'-4 1/2" PRESS BOX LEVEL 1 (NEW) EL 143'-0" PRESS BOX LEVEL 2 (NEW) EL 155'-0" PRESS BOX TOP OF STEEL EL 167'-4" PRESS BOX LOWER LEVEL EL 139'-8" 6.7 5 A4.04 1 A5.04 CONCRETE FOOTING -REFER TO STRUCTURAL DRAWINGS CONCRETE SLAB ON VAPOR BARRIER ON DRAINAGE FILL -REFER TO STRUCTURAL DRAWINGS GEOTEXTILE-FACED WALL INSULATION, DRAINAGE PANELS SHEET WATERPROOFING CAST-IN-PLACE CONCRETE -REFER TO STRUCTURAL DRAWINGS 8" CMU 8" CMU EL. 110'-4" A2.02 5 A2.02 5 SIM.SIM. PLAZA DECK PAVERS AND PAVER PEDESTALS PRECAST CONCRETE PLANKS, REFER TO STRUCTURAL CONCRETE BEAM, REFER TO STRUCTURAL DRAWINGS 7 5/8"8'-4"7 5/8" 4 5/8" 1'-3 3/8" 1'-4" MODULAR SIZE FACE BRICK 2 1/8" CAVITY WALL INSULATION 8" CMU 8" CMU A1.00 4 A1.00 4 MEMBRANE ROOFING SYSTEM (ADHERED) ON 1/4" COVER BOARD ON TAPERED ROOF INSULATION (1/4" PER FOOT, 2" MINIMUM) ON VAPOR RETARDER OVER FLAT METAL ROOF DECK A2.03 5 HEAT AND SMOKE VENT A2.03 5 ACOUSTICAL PANEL CEILING -REFER TO CEILING PLANS ACOUSTICAL PANEL CEILING -REFER TO CEILING PLANS CONCRETE SLAB ON METAL DECK -REFER TO STRUCTURAL DRAWINGS ACOUSTICAL PANEL CEILING -REFER TO CEILING PLANS CONCRETE SLAB ON METAL DECK -REFER TO STRUCTURAL DRAWINGS 8" CMU 8" CMU STEEL BEAM -REFER TO STRUCTURAL DRAWINGS VAPOR-PERMEABLE, FLUID-APPLIED MEMBRANE AIR BARRIER 8" CMU VAPOR-PERMEABLE, FLUID-APPLIED MEMBRANE AIR BARRIER 2 1/8" CAVITY WALL INSULATION MODULAR SIZE FACE BRICK ELEVATOR DOOR AND FRAME WATERSTOP, REFER TO STRUCTURAL DRAWINGS GENERAL NOTES VERIFICATION NOTE CONTRACTOR SHALL VERIFY ALL DIMENSIONS AND CLEARANCES AND ALL EXISTING FIELD CONDITIONS BEFORE STARTING CONSTRUCTION. COMMENCEMENT OF WORK CONSTITUTES ACCEPTANCE OF CONDITIONS. SHOULD DIFFERENT CONDITIONS BE ENCOUNTERED, CONTACT THE ARCHITECT BEFORE PROCEEDING WITH WORK. A. COORDINATE ALL LINTEL AND BOND BEAM REQUIREMENTS WITH STRUCTURAL DRAWINGS AND PROJECT MANUAL. B. REFER TO THE STRUCTURAL DRAWINGS FOR ALL FOUNDATION AND FOOTING CONDITIONS. C. PROVIDE HORIZ. JOINT REFINFORCING, TIES, AND OTHER ANCHORAGE/REINFORCEMENT ITEMS AS REQ'D. PER PROJECT MANUAL. D. ROOF TO EXTERIOR WALL JUNCTIONS: REFER TO DIVISION 07 SECTION "THERMAL INSULATION" FOR SPRAY POLYURETHANE INULATION REQUIRED AT THESE LOCATIONS. E. WALL INSULATION PENETRATIONS: PROVIDE SPRAY POLYURETHANE INSULATION OR SEALANT AROUND ALL PENETRATIONS OF THE WALL INSULATION BY PIPING, CONDUITS, FRAMING, STRUCTURE, ETC. F. ALL VISIBLE CMU WALLS TO BE STACK BOND TO MATCH EXISTING. FIRST FLOOR EL 100'-0" SECOND FLOOR / CONCOURSE EL 112'-4 1/2" 2 CONCRETE SLAB ON VAPOR BARRIER ON DRAINAGE FILL -REFER TO STRUCTURAL DRAWINGS CONCRETE SLAB ON METAL DECK -REFER TO STRUCTURAL DRAWINGS 12" CMU MODULAR SIZE FACE BRICK MEMBRANE ROOFING SYSTEM (ADHERED) ON 1/4" COVER BOARD ON TAPERED ROOF INSULATION (1/4" PER FOOT, 2" MINIMUM) ON VAPOR RETARDER OVER FLAT METAL ROOF DECK METAL DECK -REFER TO STRUCTURAL DRAWINGS. FOR SIZE AND DIRECTION 3" CAVITY WALL INSULATION 5/8" GLASS-MAT GYPSUM WALL (OR SOFFIT) SHEATHING VAPOR-PERMEABLE, FLUID-APPLIED MEMBRANE AIR BARRIER STEEL BEAM -REFER TO STRUCTURAL DRAWINGS ACOUSTICAL PANEL CEILING -REFER TO CEILING PLANS 5/8" GYPSUM WALLBOARD (GWB) ACOUSTICAL PANEL CEILING -REFER TO CEILING PLANS 1'-2 7/8"5 5/8" 1/2" CAVITY WALL FLASHING AND ACCESSORIES, REFER TO TYPICAL DETAIL 4-A5.01 6" COLD-FORMED METAL FRAMING AT 16" O.C. INFILL BETWEEN STRUCTURAL TUBE FRAMING 1.9 A6.03 T2 SIM A2.02 4 TYP. PLAZA DECK PAVERS AND PAVER PEDESTALS FILTER FABRIC ON 4" RIGID ROOF INSULATION ON DRAINAGE COMPOSITE ON 3/16" PROTECTION BOARD ON WATER PROOFING MEMBRANE ON SLOPING CONCRETE TOPPING SLAB PRECAST CONCRETE PLANKS, REFER TO STRUCTURAL SLOPED CONCRETE TOPPING SLAB, 2" MIN AT DRAINS, 1/4" PER FT MIN SLOPE 1'-8 1/2" CONCRETE FOOTING -REFER TO STRUCTURAL DRAWINGS COPYRIGHT 2024 BY FANNING/HOWEY ASSOCIATES, INC. KEY PLAN WWW.FHAI.COM ARCHITECT BUILDING "A" BUILDING "B" A B SOUTH SUPPORT BUILDING GREYHOUND ACTIVITIES CENTER 5201 E Main Street, Carmel, IN 46033 317-844-9961 7/ 2 6 / 2 0 2 4 2 : 1 3 : 1 4 P M \\ d a t a 1 \ c i t r i x p r o f i l e s $ \ t v a u g h n \ m y d o c u m e n t s \ 2 0 2 3 _ A RC H _ 2 2 2 1 5 4 . 0 2 _ t p v a u g h n . r v t PROJECT NUMBER: 222154.00 222154.00 CARMEL HIGH SCHOOL STADIUM GRANDSTAND RENOVATION PROJECT CARMEL CLAY SCHOOLS 2390 E. SMOKY ROW (HOME SIDE) 2450 E. SMOKY ROW (VISITOR SIDE) CARMEL, IN 46032 WALL SECTIONS A5.04 PROJECT ISSUE DATE: 7.26.2024 100% CONSTRUCTION DOCUMENTS DRAWN BY: TPV 317.848.0966 350 E NEW YORK ST. SUITE 300, INDIANAPOLIS IN 46204 PROJECT MANAGER: MKS SCALE: 3/8" = 1'-0" ELEVATOR SECTION - EAST - WEST1 SCALE: 3/8" = 1'-0" ELEVATOR SECTION - NORTH - SOUTH2 PLAN NORTH SCALE: 3/4" = 1'-0" WALL SECTION3 REV. NO.DESCRIPTION DATE PRESS BOX LEVEL 1 (NEW) EL 143'-0" PRESS BOX LEVEL 2 (NEW) EL 155'-0" PRESS BOX TOP OF STEEL EL 167'-4" AB REFER TO TYPICAL PARAPET AND METAL COPING DETAIL EL. 171'-8" BOTTOM OF SOFFIT MEMBRANE ROOFING SYSTEM (ADHERED) ON 1/4" COVER BOARD ON TAPERED ROOF INSULATION (1/4" PER FOOT, 2" MINIMUM) ON VAPOR RETARDER OVER FLAT METAL ROOF DECK ACOUSTICAL PANEL CEILING -REFER TO CEILING PLANS VAPOR-PERMEABLE, FLUID-APPLIED MEMBRANE AIR BARRIER TOP OF FRAMING 5/8" GYPSUM WALLBOARD (GWB) 6" COLD-FORMED METAL FRAMING AT 16" O.C. INFILL BETWEEN STRUCTURAL TUBE FRAMING VAPOR-PERMEABLE, FLUID-APPLIED MEMBRANE AIR BARRIER 3.1" PLYWOOD -SURFACED, POLYISOCYANURATE FOAM WALL SHEATHING (R16.1) 5/8" GLASS-MAT GYPSUM WALL (OR SOFFIT) SHEATHING CONCRETE SLAB ON METAL DECK -REFER TO STRUCTURAL DRAWINGS EXISTING WALL TO REMAIN VAPOR-PERMEABLE, FLUID-APPLIED MEMBRANE AIR BARRIER PRESS BOX LOWER LEVEL EL 139'-8" 6 PANEL SLIDING DOOR ASSEMBLY 24" HIGH DIMENSIONAL LETTER SIGNAGE, FONT TO BE HELEVTICA A A4.01 EL. 135'-8" 7/8" METAL FURRING (HAT) CHANNELS AT 1'-4" O.C. 1 1/2" COLD FORMED METAL CHANNELS AT 4' O.C., SUSPENDED FROM STRUCTURE ABOVE 5/8" GLASS-MAT GYPSUM WALL (OR SOFFIT) SHEATHING DIRECT APPLIED EXTERIOR FINISH SYSTEM (DEFS) R30 KRAFT-FACED GLASS-FIBER BLANKET INSULATION VAPOR-PERMEABLE, FLUID-APPLIED MEMBRANE AIR BARRIER EL. 133'-1" EL. 135'-4" A5.06 5 CAMERA A405 MEDIA SEATING A304 A2.03 1 9'-11 3/4" TO FACE OF STUD 9'-11 3/4" 9'-11 3/4" EL. 135'-8" REMOVE TOP OF MASONRY WALL FOR INSTALLATION OF NEW VIP SEATING AREA. REBUILD WALL AFTER COMPLETION, LEAVE 1" GAP AT TOP AND FILL WITH SPRAY POLYURETAHNE FOAM AND JOINT SEALANT EL. 141'-8" COUNTERTOP, REFER TO EQUIPMENT PLANS AND DETAILS CO L O R A 2'- 4 " CO L O R B 2'- 8 " CO L O R A 2'- 8 " FORMED METAL WALL PANEL -COLOR A 3.1" PLYWOOD -SURFACED, POLYISOCYANURATE FOAM WALL SHEATHING (R16.1) 5/8" GLASS-MAT GYPSUM WALL (OR SOFFIT) SHEATHING 6" COLD-FORMED METAL FRAMING AT 16" O.C. INFILL BETWEEN STRUCTURAL TUBE FRAMING FORMED METAL WALL PANEL -COLOR A COUNTERTOP, REFER TO EQUIPMENT PLANS AND DETAILS 3 5/8" METAL STUDS AT 1'-4" O.C. (20 GA) 5/8" GYPSUM WALLBOARD (GWB) 5'-3 1/4" 4'-8 1/2" CONCRETE SLAB ON METAL DECK -REFER TO STRUCTURAL DRAWINGS PRECAST CONCRETE SEATING AN VERTICALS, REFER TO STRUCTURAL DRAWINGS A10.01 13 TRAFFIC COATING ON NEW CONCRETE ELASTOMERIC COATING ON ALL EXPOSED CONCRETE SURFACES TRAFFIC COATING ON NEW CONCRETE CO L O R A 2'- 8 " CO L O R B 2'- 8 " EL. 135'-4" FORMED METAL WALL PANEL -COLOR A 3.1" PLYWOOD -SURFACED, POLYISOCYANURATE FOAM WALL SHEATHING (R16.1) FIREBLOCK STUD CAVITIES AT FLOOR LEVELS, TYPICAL FIREBLOCK STUD CAVITIES AT FLOOR LEVELS, TYPICAL EL. 151'-0" GLAZED ALUMINUM CURTAIN WALL AA EL. 157'-2" EL. 164'-0" 7 1/2" DEEP ALUMINUM CURTAINWALL FRAME 3'- 6 " 42" HIGH POWDER COATED ALUMINUM FLOOR MOUNTED PIPE RAIL FULL LENGTH OF SLIDING WINDOWS 1 9 PRESS BOX LEVEL 1 (NEW) EL 143'-0" PRESS BOX LEVEL 2 (NEW) EL 155'-0" PRESS BOX TOP OF STEEL EL 167'-4" MEMBRANE ROOFING SYSTEM (ADHERED) ON 1/4" COVER BOARD ON TAPERED ROOF INSULATION (1/4" PER FOOT, 2" MINIMUM) ON VAPOR RETARDER OVER FLAT METAL ROOF DECK REFER TO TYPICAL PARAPET AND METAL COPING DETAIL ACOUSTICAL PANEL CEILING -REFER TO CEILING PLANS SOLID SURFACE WINDOW SILL 5/8" GYPSUM WALLBOARD (GWB) EL. 151'-0" SOLID SURFACE WINDOW SILL CONCRETE SLAB ON METAL DECK -REFER TO STRUCTURAL DRAWINGS PRESS BOX LOWER LEVEL EL 139'-8" T./FRAMING B./OPENING 8.9 EL. 171'-8" A2.03 1 EL. 135'-8" B. SOFFIT A5.06 5 1'-2 3/4" 11 1/8" 3/4" 3 1/4" +/- 3'-0" 3 1/4" +/- EL. 146'-2" EL. 164'-0" CO L O R A 2'- 8 " CO L O R B 2'- 8 " CO L O R A 2'- 4 " 1'-3" 6" 1'-2 3/4" 6" FIREBLOCK STUD CAVITIES AT FLOOR LEVELS, TYPICAL FIREBLOCK STUD CAVITIES AT FLOOR LEVELS, TYPICAL STEEL STRINGER, CONCRETE FILLED METAL PAN STAIRS. PROVIDE TRAFFIC COATING ON CONCRETE WALKING SURFACES, PAINT STEEL SURFACES STEEL TUBE (PAINT) -REFER TO STRUCTURAL DRAWINGS DIRECT APPLIED EXTERIOR FINISH SYSTEM (DEFS) VAPOR-PERMEABLE, FLUID-APPLIED MEMBRANE AIR BARRIER 5/8" GLASS-MAT GYPSUM WALL (OR SOFFIT) SHEATHING 7/8" METAL FURRING (HAT) CHANNELS AT 1'-4" O.C. 1 1/2" COLD FORMED METAL CHANNELS AT 4' O.C., SUSPENDED FROM STRUCTURE ABOVE R30 KRAFT-FACED GLASS-FIBER BLANKET INSULATION CO L O R B 2'- 8 " CO L O R A 2'- 8 " FORMED METAL WALL PANEL -COLOR A VAPOR-PERMEABLE, FLUID-APPLIED MEMBRANE AIR BARRIER 3.1" PLYWOOD -SURFACED, POLYISOCYANURATE FOAM WALL SHEATHING (R16.1) 5/8" GLASS-MAT GYPSUM WALL (OR SOFFIT) SHEATHING 6" COLD-FORMED METAL FRAMING AT 16" O.C. INFILL BETWEEN STRUCTURAL TUBE FRAMING 5/8" GYPSUM WALLBOARD (GWB) CONCRETE SLAB ON METAL DECK -REFER TO STRUCTURAL DRAWINGS EL. 157'-2" GLAZED ALUMINUM CURTAIN WALL GLAZED ALUMINUM CURTAIN WALL 6" COLD-FORMED METAL FRAMING AT 16" O.C. INFILL BETWEEN STRUCTURAL TUBE FRAMING 6" COLD-FORMED METAL FRAMING AT 16" O.C. INFILL BETWEEN STRUCTURAL TUBE FRAMING C12 STRINGER WITH 1/4" STEEL CLOSURE PLATE (PAINT) 1 A10.03 5 9 PRESS BOX LEVEL 1 (NEW) EL 143'-0" PRESS BOX LEVEL 2 (NEW) EL 155'-0" PRESS BOX TOP OF STEEL EL 167'-4" EL. 171'-8" MEMBRANE ROOFING SYSTEM (ADHERED) ON 1/4" COVER BOARD ON TAPERED ROOF INSULATION (1/4" PER FOOT, 2" MINIMUM) ON VAPOR RETARDER OVER FLAT METAL ROOF DECK REFER TO TYPICAL PARAPET AND METAL COPING DETAIL 5/8" GYPSUM WALLBOARD (GWB) VAPOR-PERMEABLE, FLUID-APPLIED MEMBRANE AIR BARRIER CONCRETE SLAB ON METAL DECK -REFER TO STRUCTURAL DRAWINGS PRESS BOX LOWER LEVEL EL 139'-8" T./ FRAMING 8.9 A5.06 5 FIREBLOCK STUD CAVITIES AT FLOOR LEVELS, TYPICAL ALUMINUM PIPE AND TUBE RAILING C12 WITH 1/4" PLATE AROUND ENTIRE PERIMETER OF BALCONY (PAINT) FORMED METAL WALL PANEL -COLOR A 5/8" PLYWOOD WALL SHEATHING A5.06 5 SIM. 1 5/8" METAL STUDS AT 1'-4" O.C. (20 GA) VAPOR-PERMEABLE, FLUID-APPLIED MEMBRANE AIR BARRIER DIRECT APPLIED EXTERIOR FINISH SYSTEM (DEFS) VAPOR-PERMEABLE, FLUID-APPLIED MEMBRANE AIR BARRIER 5/8" GLASS-MAT GYPSUM WALL (OR SOFFIT) SHEATHING 7/8" METAL FURRING (HAT) CHANNELS AT 1'-4" O.C. 1 1/2" COLD FORMED METAL CHANNELS AT 4' O.C., SUSPENDED FROM STRUCTURE ABOVE THRESHOLD ALUMINUM STOREFRONT FRAMING FORMED METAL WALL PANEL -COLOR A 3.1" PLYWOOD -SURFACED, POLYISOCYANURATE FOAM WALL SHEATHING (R16.1) 5/8" GLASS-MAT GYPSUM WALL (OR SOFFIT) SHEATHING 6" COLD-FORMED METAL FRAMING DIRECT APPLIED EXTERIOR FINISH SYSTEM (DEFS) VAPOR-PERMEABLE, FLUID-APPLIED MEMBRANE AIR BARRIER 5/8" GLASS-MAT GYPSUM WALL (OR SOFFIT) SHEATHING 7/8" METAL FURRING (HAT) CHANNELS AT 1'-4" O.C. 1 1/2" COLD FORMED METAL CHANNELS AT 4' O.C., SUSPENDED FROM STRUCTURE ABOVE R30 KRAFT-FACED GLASS-FIBER BLANKET INSULATION 5/8" GYPSUM WALLBOARD (GWB) CO L O R A 2'- 8 " CO L O R B 2'- 8 " 1 1 ' - 4 " A2.03 1 4' LONG SOFFIT VENT FOR DEFS 1 GENERAL NOTES VERIFICATION NOTE CONTRACTOR SHALL VERIFY ALL DIMENSIONS AND CLEARANCES AND ALL EXISTING FIELD CONDITIONS BEFORE STARTING CONSTRUCTION. COMMENCEMENT OF WORK CONSTITUTES ACCEPTANCE OF CONDITIONS. SHOULD DIFFERENT CONDITIONS BE ENCOUNTERED, CONTACT THE ARCHITECT BEFORE PROCEEDING WITH WORK. A. COORDINATE ALL LINTEL AND BOND BEAM REQUIREMENTS WITH STRUCTURAL DRAWINGS AND PROJECT MANUAL. B. REFER TO THE STRUCTURAL DRAWINGS FOR ALL FOUNDATION AND FOOTING CONDITIONS. C. PROVIDE HORIZ. JOINT REFINFORCING, TIES, AND OTHER ANCHORAGE/REINFORCEMENT ITEMS AS REQ'D. PER PROJECT MANUAL. D. ROOF TO EXTERIOR WALL JUNCTIONS: REFER TO DIVISION 07 SECTION "THERMAL INSULATION" FOR SPRAY POLYURETHANE INULATION REQUIRED AT THESE LOCATIONS. E. WALL INSULATION PENETRATIONS: PROVIDE SPRAY POLYURETHANE INSULATION OR SEALANT AROUND ALL PENETRATIONS OF THE WALL INSULATION BY PIPING, CONDUITS, FRAMING, STRUCTURE, ETC. F. ALL VISIBLE CMU WALLS TO BE STACK BOND TO MATCH EXISTING. G. CAVITY WALL INSULATION AT CAST-IN-PLACE CONCRETE TO EXTEND TO TOP OF PAVERS 1 COPYRIGHT 2024 BY FANNING/HOWEY ASSOCIATES, INC. KEY PLAN WWW.FHAI.COM ARCHITECT BUILDING "A" BUILDING "B" A B SOUTH SUPPORT BUILDING GREYHOUND ACTIVITIES CENTER 5201 E Main Street, Carmel, IN 46033 317-844-9961 8/ 2 3 / 2 0 2 4 9 : 2 8 : 3 6 A M C: \ U s e r s \ a s h t o n . h o y i n g \ D o c u m e n t s \ 2 0 2 3 _ A R C H _ 2 2 2 1 5 4 . 0 2_ a s h t o n . h o y i n g . r v t PROJECT NUMBER: 222154.00 222154.00 CARMEL HIGH SCHOOL STADIUM GRANDSTAND RENOVATION PROJECT CARMEL CLAY SCHOOLS 2390 E. SMOKY ROW (HOME SIDE) 2450 E. SMOKY ROW (VISITOR SIDE) CARMEL, IN 46032 WALL SECTIONS -PRESSBOX A5.05 PROJECT ISSUE DATE: 7.26.2024 100% CONSTRUCTION DOCUMENTS DRAWN BY: TPV 317.848.0966 350 E NEW YORK ST. SUITE 300, INDIANAPOLIS IN 46204 PROJECT MANAGER: MKS SCALE: 1/2" = 1'-0" WALL SECTION - FRONT OF PRESSBOX1 SCALE: 1/2" = 1'-0" WALL SECTION - PRESSBOX SIDE2 SCALE: 1/2" = 1'-0" WALL SECTION - BALCONY DOOR3 PLAN NORTH REV. NO.DESCRIPTION DATE 1 ADDENDUM NO. 2 8.23.2024 GENERAL NOTES VERIFICATION NOTE CONTRACTOR SHALL VERIFY ALL DIMENSIONS AND CLEARANCES AND ALL EXISTING FIELD CONDITIONS BEFORE STARTING CONSTRUCTION. COMMENCEMENT OF WORK CONSTITUTES ACCEPTANCE OF CONDITIONS. SHOULD DIFFERENT CONDITIONS BE ENCOUNTERED, CONTACT THE ARCHITECT BEFORE PROCEEDING WITH WORK. A. COORDINATE ALL LINTEL AND BOND BEAM REQUIREMENTS WITH STRUCTURAL DRAWINGS AND PROJECT MANUAL. B. REFER TO THE STRUCTURAL DRAWINGS FOR ALL FOUNDATION AND FOOTING CONDITIONS. C. PROVIDE HORIZ. JOINT REFINFORCING, TIES, AND OTHER ANCHORAGE/REINFORCEMENT ITEMS AS REQ'D. PER PROJECT MANUAL. D. ROOF TO EXTERIOR WALL JUNCTIONS: REFER TO DIVISION 07 SECTION "THERMAL INSULATION" FOR SPRAY POLYURETHANE INULATION REQUIRED AT THESE LOCATIONS. E. WALL INSULATION PENETRATIONS: PROVIDE SPRAY POLYURETHANE INSULATION OR SEALANT AROUND ALL PENETRATIONS OF THE WALL INSULATION BY PIPING, CONDUITS, FRAMING, STRUCTURE, ETC. F. ALL VISIBLE CMU WALLS TO BE STACK BOND TO MATCH EXISTING. G. CAVITY WALL INSULATION AT CAST-IN-PLACE CONCRETE TO EXTEND TO TOP OF PAVERS 1 5 PRESS BOX LEVEL 1 (NEW) EL 143'-0" PRESS BOX LEVEL 2 (NEW) EL 155'-0" PRESS BOX TOP OF STEEL EL 167'-4" PRESS BOX LOWER LEVEL EL 139'-8" 5.1 2 A5.06 3 A5.06 1'-9" A2.03 1 A5.06 5 MEMBRANE ROOFING SYSTEM (ADHERED) ON 1/4" COVER BOARD ON TAPERED ROOF INSULATION (1/4" PER FOOT, 2" MINIMUM) ON VAPOR RETARDER OVER FLAT METAL ROOF DECK ACOUSTICAL PANEL CEILING -REFER TO CEILING PLANS 5/8" GYPSUM WALLBOARD (GWB) 8" COLD-FORMED METAL FRAMING EL. 135'-8" CO L O R A 2' - 8 " CO L O R B 2' - 8 " CO L O R A 25 ' - 4 " CO L O R B 2' - 8 " CO L O R A 2' - 8 " STRUCTURAL COLUMN -REFER TO STRUCTURAL DRAWINGS STEEL BEAM -REFER TO STRUCTURAL DRAWINGS CONCRETE SLAB ON METAL DECK -REFER TO STRUCTURAL DRAWINGS STEEL BEAM -REFER TO STRUCTURAL DRAWINGS FORMED METAL WALL PANEL -COLOR A EL. 171'-8" STEEL STAIR STRINGER 6" COLD-FORMED METAL FRAMING 8" COLD-FORMED METAL FRAMING 5/8" GYPSUM WALLBOARD (GWB) STRUCTURAL STEEL FRAMING (PAINT) VAPOR-PERMEABLE, FLUID-APPLIED MEMBRANE AIR BARRIER 3.1" PLYWOOD -SURFACED, POLYISOCYANURATE FOAM WALL SHEATHING (R16.1) 5/8" GLASS-MAT GYPSUM WALL (OR SOFFIT) SHEATHING 6" COLD-FORMED METAL FRAMING PRESS BOX LEVEL 1 (NEW) EL 143'-0" PRESS BOX LEVEL 2 (NEW) EL 155'-0" PRESS BOX TOP OF STEEL EL 167'-4" AD PRESS BOX LOWER LEVEL EL 139'-8" 1 A5.06 A2.03 1 EL. 135'-8" A5.06 5 CO L O R A 2' - 8 " CO L O R B 2' - 8 " CO L O R A 25 ' - 4 " CO L O R B 2' - 8 " CO L O R A 2' - 8 " MEMBRANE ROOFING SYSTEM (ADHERED) ON 1/4" COVER BOARD ON TAPERED ROOF INSULATION (1/4" PER FOOT, 2" MINIMUM) ON VAPOR RETARDER OVER FLAT METAL ROOF DECK FORMED METAL WALL PANEL -COLOR A VAPOR-PERMEABLE, FLUID-APPLIED MEMBRANE AIR BARRIER 3.1" PLYWOOD -SURFACED, POLYISOCYANURATE FOAM WALL SHEATHING (R16.1) 5/8" GLASS-MAT GYPSUM WALL (OR SOFFIT) SHEATHING 8" COLD-FORMED METAL FRAMING 5/8" GYPSUM WALLBOARD (GWB) STEEL STAIR STRINGER 10" 2" 3'-0 1/2" 2" 4 7/8" 2" 3'-0 1/2" 2" ACOUSTICAL PANEL CEILING -REFER TO CEILING PLANS CONCRETE SLAB ON METAL DECK -REFER TO STRUCTURAL DRAWINGS 6" COLD-FORMED METAL FRAMING 8" COLD-FORMED METAL FRAMING 6" COLD-FORMED METAL FRAMING ACOUSTICAL PANEL CEILING -REFER TO CEILING PLANS CONCRETE SLAB ON METAL DECK -REFER TO STRUCTURAL DRAWINGS AC 5 AD 5.1 1 A5.06 1'-9" 10 " STRUCTURAL COLUMN -REFER TO STRUCTURAL DRAWINGS 6" COLD-FORMED METAL FRAMING 6" COLD-FORMED METAL FRAMING 5/8" GLASS-MAT GYPSUM WALL (OR SOFFIT) SHEATHING 3.1" PLYWOOD -SURFACED, POLYISOCYANURATE FOAM WALL SHEATHING (R16.1) VAPOR-PERMEABLE, FLUID-APPLIED MEMBRANE AIR BARRIER FORMED METAL WALL PANEL -COLOR A ALL FORMED METAL PANELS CORNERS TO BE MITERED AC 5 AD 5.1 1 A5.06 10 " 1'-9" STRUCTURAL COLUMN -REFER TO STRUCTURAL DRAWINGS 8" COLD-FORMED METAL FRAMING 8" COLD-FORMED METAL FRAMING 5/8" GLASS-MAT GYPSUM WALL (OR SOFFIT) SHEATHING 3.1" PLYWOOD -SURFACED, POLYISOCYANURATE FOAM WALL SHEATHING (R16.1) VAPOR-PERMEABLE, FLUID-APPLIED MEMBRANE AIR BARRIER FORMED METAL WALL PANEL -COLOR A ALL FORMED METAL PANELS CORNERS TO BE MITERED AC 1 FORMED METAL WALL PANELS VAPOR-PERMEABLE, FLUID-APPLIED MEMBRANE AIR BARRIER 3.1" PLYWOOD -SURFACED, POLYISOCYANURATE FOAM WALL SHEATHING (R16.1) 5/8" GLASS-MAT GYPSUM WALL (OR SOFFIT) SHEATHING FORMED METAL WALL PANEL CLOSURE TRIM AIR BARRIER TRANSITION MEMBRANE INFILL WITH TREATED WOOD BLOCKING CUT AS REQUIRED 6" COLD-FORMED METAL FRAMING AT 16" O.C. INFILL BETWEEN STRUCTURAL TUBE FRAMING 7/8" METAL FURRING (HAT) CHANNELS AT 1'-4" O.C. 1 1/2" COLD FORMED METAL CHANNELS AT 4' O.C., SUSPENDED FROM STRUCTURE ABOVE 5/8" GLASS-MAT GYPSUM WALL (OR SOFFIT) SHEATHING VAPOR-PERMEABLE, FLUID-APPLIED MEMBRANE AIR BARRIER DIRECT APPLIED EXTERIOR FINISH SYSTEM (DEFS) CONCRETE WALL, REFER TO STRUCTURAL DRAWINGS (EAST WALL OF PRESSBOX ONLY) R30 KRAFT-FACED GLASS-FIBER BLANKET INSULATION 9 PRESS BOX LEVEL 1 (NEW) EL 143'-0" PRESS BOX LOWER LEVEL EL 139'-8" 8.9 TO EDGE OF SLAB 2'-2 1/2" EL. 141'-0" ALUMINUM PIPE AND TUBE RAILING CONCRETE SLAB ON METAL DECK -REFER TO STRUCTURAL DRAWINGS FORMED METAL WALL PANEL CLOSURE TRIM DIRECT APPLIED EXTERIOR FINISH SYSTEM (DEFS) FORMED METAL WALL PANELS VAPOR-PERMEABLE, FLUID-APPLIED MEMBRANE AIR BARRIER TRAFFIC COATING ON NEW CONCRETE FORMED METAL WALL PANELS VAPOR-PERMEABLE, FLUID-APPLIED MEMBRANE AIR BARRIER 3.1" PLYWOOD -SURFACED, POLYISOCYANURATE FOAM WALL SHEATHING (R16.1) 5/8" GLASS-MAT GYPSUM WALL (OR SOFFIT) SHEATHING PREFORMED JOINT SEAL TRAFFIC COATING INSTALLER TO RUN DETAIL FLASHING OVER GAP AND UP WALL 4" AND COVER WITH TRAFFIC COATING FORMED METAL WALL PANEL CLOSURE TRIM8" COLD-FORMED METAL FRAMING 8" COLD-FORMED METAL FRAMING COPYRIGHT 2024 BY FANNING/HOWEY ASSOCIATES, INC. WWW.FHAI.COM ARCHITECT 5201 E Main Street, Carmel, IN 46033 317-844-9961 8/ 2 2 / 2 0 2 4 5 : 0 2 : 3 7 P M \\ d a t a 1 \ c i t r i x p r o f i l e s $ \ t v a u g h n \ m y d o c u m e n t s \ 2 0 2 3 _ A RC H _ 2 2 2 1 5 4 . 0 2 _ t p v a u g h n . r v t PROJECT NUMBER: 222154.00 222154.00 CARMEL HIGH SCHOOL STADIUM GRANDSTAND RENOVATION PROJECT CARMEL CLAY SCHOOLS 2390 E. SMOKY ROW (HOME SIDE) 2450 E. SMOKY ROW (VISITOR SIDE) CARMEL, IN 46032 WALL SECTIONS -PRESSBOX A5.06 PROJECT ISSUE DATE: 7.26.2024 100% CONSTRUCTION DOCUMENTS DRAWN BY: TPV 317.848.0966 350 E NEW YORK ST. SUITE 300, INDIANAPOLIS IN 46204 PROJECT MANAGER: MKS SCALE: 3/4" = 1'-0" WALL SECTION1 SCALE: 3/4" = 1'-0" WALL SECTION2SCALE: 3/4" = 1'-0" PRESSBOX CORNER COLUMN DETAIL - LOW3 SCALE: 3/4" = 1'-0" PRESSBOX CORNER COLUMN DETAIL - HIGH4 SCALE: 1 1/2" = 1'-0" PRESSBOX SOFFIT DETAIL5 SCALE: 3/4" = 1'-0" BALCONY TO WALL DETAIL6 REV. NO.DESCRIPTION DATE 1 ADDENDUM NO. 2 8.23.2024