HomeMy WebLinkAboutApplication_HeightCITY OF CARMEL
PLANNING & ZONING APPLICATION
Docket Number: PZ-2024-00165
Date Applied: 9/12/2024
Application Type: DSV - Hearing Officer, All Others
Application Fees: $0.00
Name of Project: Carmel High School Stadium Grandstand Height Variance
Project Address: 2930 E SMOKY ROW
Name of Applicant: Mike Schipp
City/State/Zip:Indianapolis, IN Applicant Address: 350 E New York Street
Name of Contact Person: Todd Fenoglio Company: Carmel Clay School Corp.
Address of Contact Person: 5201 East Main Street City/State/Zip:Carmel, IN, 46033
Email: tfenogli@ccs.k12.in.us Phone: 3174096581
ePlan Review Contact Person: Michael Schipp Phone: 3174077229
Email: mschipp@fhai.com
Name of Landowner: Carmel Clay Schools
Email: tfenogli@ccs.k12.in.us
Parcel ID: 16-10-19-00-00-009.000 Area (in acres) of Property: 49.40
Engineer Contact Person: Phone:
Email:
Attorney Contact Person: Phone:
Email:
Architect Contact Person: Michael Schipp Phone:
Email: mschipp@fhai.com
Zoning Classification: R-1 Overlay Zone:
Legal Description:
Present Use of Property: Carmel HS Stadium Use
Proposed Use of Property: Carmel HS Stadium use
Project Description: Carmel High School Stadium Grandstand Height Variance
Section of UDO being varied from: UDO Section 2.10: Maximum 35-ft building height for principal building allowed;
71'-10" requested.
Explanation of why variance/waiver is being requested: UDO Section 2.10: Regarding the Carmel High School Stadium,
the existing 56’-0” high press box is being replaced with a new press box. The new press box internal floor levels were
established to accommodate improvement to the existing sight lines to the field. In doing so, the resulting press box height
at the highest point is 71’-10” to the top of the parapet, which exceeds that allowable 35 feet. The overall distance does
include a 4’ high parapet which provides a parapet screen around the roof top equipment and provides fall protection for
maintenance. The overall distance also includes the approximate 4 feet down to the finish grade of the playing surface.
The net difference between the existing and new press box is 15’-2” increase.
Attorney: Engineer:
Related Building Permit Number and Builder:
If proposal appeal is granted, when will work commence?
Are there any restrictions, laws, covenants, variances, special uses, or appeals filed in connection with this property that
would relate or affect its use for the specific purpose of this application? If yes, give date and docket number, decision
rendered and pertinent explanation.
No
*Note that required fees are due after the application has received a docket number , and not at the time of application submittal.
Signature: Michael K. Schipp
By typing in my name, I swear that the foregoing statements, and answers herein contained and the information herewith submitted are in
all respects true and correct to the best of my knowledge and belief.