Project Name: PZ-2024-00150 V Narla Accessory Structure Variance
Workflow Started: 9/25/2024 5:01:08 PM
Report Generated: 10/31/2024 10:46 AM
REF #CYCLE REVIEWED BY TYPE FILENAME DISCUSSION STATUS
1 1 Planning & Zoning
Angie Conn
10/3/24 9:47 AM
Comment
Please respond in writing to the preliminary review comments listed at the
bottom of the 09/25 docket no. assignment email, and please do that before
noon Friday, October 18. For your convenience, the remaining unaddressed
review comments are listed below: c) *The Current in Carmel only prints on
Tuesdays, and their filing deadline is usually 14 days prior to their printing
date. Please submit your Microsoft Word file of the legal ad to them before
Noon, Fri., October 4 so that it prints on time. Their contact info is 317-489-
4444 or legals@youarecurrent.com. (Please refer to the Handout for a
template of wording to use for the legal ad and the mailings the Notice of
Public Hearing.) e) Please provide the filled out & notarized Placement of
Public Notice Sign Placement Affidavit form (found in Handout) once the
sign is placed. h) Please provide proof of notice, such as Publishers Affidavit
from the newspaper, once you receive them. j) Additional review comments
(if any) will be issued through ProjectDox, our online electronic plan review
software.
Responded by: Brian Brown - 10/3/24 10:46 AM
The ad for the Current in Carmel and Westfield have
been submitted. Once we have the publishers
confirmation of publication, we will upload it. The sign
is ready for placement and the Affidavit will be signed
and uploaded once itis placed. BZA information packet
has been uploaded to the Correspondence Folder.
Resolved
2 1 Planning & Zoning
Angie Conn
10/3/24 9:51 AM
Comment
The Petitioner still needs to dedicate street right of way, for the
Transportation Plan compliance required by UDO section 1.07. (Based off the
new Thoroughfare Plan and the existing conditions to the east, the city
requests a 78-ft wide street ROW for this section of 131st Street. This is
largest extent of the Local Road standard in the Comprehensive Plan and will
allow for the 10-ft wide multiuse path to be built and connected to the
existing path to the east. So, for this site, the city will require a 39-ft half
ROW be dedicated to the city (from the centerline of the street). Please work
with Caleb Warner in the Carmel Engineering Dept. on that street ROW
dedication process - cwarner@carmel.in.gov)
Reviewer Response: Angie Conn - 10/18/24 3:05 PM
okay. the finalization of the street ROW dedication be a
condition of approval.
----------------------------------------------------------
Responded by: Brian Brown - 10/3/24 10:46 AM
This is in process. Payment and easement have been
submitted to Carmel
UnResolved
3 1 Planning & Zoning
Angie Conn
10/3/24 10:13 AM
Comment
The Petitioner has already paid into the Thoroughfare Fund for what it would
cost to construct the multiuse path along their street frontage.
Info Only