Loading...
HomeMy WebLinkAboutCorrespondence DELIVERY TRANSMITTAL Banning Engineering, P.C. . 698 Tower Road, Suite 100 . Plainfield, IN 4616 ~ Phone: (317) 839-2581 . Fax: (317) 838-9171 . E-mail: banning@banning-eng c DATE: Oct. 29, 2002 JOB NO.: 02022 TO: Jon Dobosiewicz Carmel Planning Department One Civic Square Carmel, IN. 46032 Mail Fed Ex Customer Pick-up ~ Delivered By: Banning Employee PROJECT: SEDGWICK PLAT SUBMITTED: 1) 1 - original mylar of plat 2) 2- copies of plat 3) 4) 5) 6) 7) 8) COMMENTS: Jon - I have begun routing the plat through the various county offices. IF THERE ARE ANY QUESTIONS REGARDING THIS TRANSMITTAL, PLEASE GIVE ME A CALL AT 839-2581. THANK YOu. Larry A. McIntire 18/23/2882 88:24 317-776-1181 ON-SIT Date: /ola, lo~ , Project Nall1e: ,cJSi!b~~IOI&.IS Pre,sel1t at Site: .lohn Souto. \-lamiltol1 Co. SWCD. . This Report Provided To: TYPE OF EV ALVA TION: , Inlttal II( Rou ine o Follow-up o Complaint This Ilvaluatlon is intended to assess the level of compliance with 27" C 15-5 (Ru e 5). It is tilso Intended to Identify til'eas where additionallMa1u,tS may be reqlllred to control erosion an sedi tllltlltion. II practices recQlft1IIOlded ill this report .l1hould !)fl evaluated as to their feasibility by a qualified tndtvldua with structur(JI p acticfl$ desiglled hy a quallfled engineer. Atl ero.sic1n and udlment cOlltro[ melUures ,fhall meet tlfe de,dln lterl. standards and specifications outlined In the "Indiana Handbookfor Erosion Control in DevelfJping Area,," ol'$lmilar Jdll tl documfln Current Site Information: , ,. I ~ rY " ~. The Following hems Have Been Eval ted nd Aulgne a Designation of: S = Satisfactory M = Marginal U = Un atisf c:tory N = Not Applicable Construction Site Management for Erosion and Sediment Con roJ c:[) M U NA (I) Disturbed areas have been adequately rote ted through seeding or other appropriate ero.sion and sediment control measures. U NA (2) Appropriate perimeter sediment con I me ures have een implemented. U ~ (3) Conveyance channels have been stabi i~d r protected ith appropriate sediment control measures. U NA (4) Erosion & sediment control measures ra i tailed prop Iy. U @ (5) Storm drain inlets have been adequat y PI' tected, U @:> (6) Outlets have been adequately stabiliz . U NA (7) Existing erosion & sediment control easu es are being maintained. U NA (8) Public & private roadwllYs are being ept c ear of ace ulated sediment or tracked soil. U ~ (9) Erosion & sediment tontrol measures ave een installe and mailltained on individual building sites. @M S M <;OM S M S M ~~ S M Status Of Sediment Retenttofl On~Stte o Site conditions present a l1ign potential for off-site sedim "tati n. o There is evidence of off-site sedimentation. Describe: Satisfactory : Margina.l: Unsatisfactory: Not Applicable: o Please Refer to tbe Comments Section of this Report Deft" iqn,J The item is currently in compliance with the Ru A tOncem has been identified; corrective 3ctiotl A violation has been identified and the site is n DOllS not apply at this stage of constnlctlon N~.,.t!.. (j/l~$Sf H JILt" ()~ S1"/l4w) ~AII/~ r,h$ ",~^,re~f ~ Rl!vi.Jlid <i / PI NING~ ENGINEERING Banning Engineering, P.C. . 698"Tower Road, Suite 100 . Plainfield, IN 46168 Phone: (317) 839-2581 . Fax: (317) 838-9171 . E-mail: ban. 'n October 9,2002 Mr. Jon Dobosiewicz Planning Administrator Dept. Of Community Services City of Carmel One Civic Square Carmel, IN. 46032 RE: SEDGWICK SUBDIVISION, SECONDARY PLAT APPLICATION Dear Jon: We have received and reviewed your letter dated October 1, 2002 on the above reverenced job and having the following comments. 1. I have talked to David Warshaure and Valenti-Held and we have determined the cost of the road improvement commitment to 131 st Street to be around $12500.00. David said that he had given you a formal letter on this issue but if you need more information please him know. 2. A copy of the 4 requested agencies final review letters are enclosed. 3. A key map has been added. 4. We have revised the legend and also shown all the correct monumentation. 5. The source oftitle has been added to sheet 1. 6. We have removed the common lot address. 7. We have added the numbers requested to sheet 1. 8. We have renamed the setback line to read "building setback line". 9. We have the signatures requested. 10. Added note of Owner/Subdivdor. 11. Added note of Surveyor. 12. Added the bottom, normal and 1 OO-year pool elevations. 13. The common area "D" has been removed. At this time we have addressed you concerns and would like to resubmit for approval. If you have any questions or need any additional information, please call... Sincerely ~ill ;~~~anager iLQ Cc: Mark Zukerman - GWZ Development-l LLC David Warshauer - Barnes & Thornburg s: \Projects\02022\docs\joncanne13 .doc 10/10/02 RECEIVED: 10/ 1/02 3:53PM; ->BANNING ENGINEERING' #813; PAGE 2 , OCT-01-2002 rUE ~~:33 PM C~MEL COMMUN.I}~ ~C~_' FAX NO, 317 571 2426 p, 02 ; City of Carmel VIA FAX: 838-9171 Original by Man October 1, 2002 Mr. Lance G. Ferrell Banning Engineering 698 Tower Road, Suite 100 Plainfield, Indiana 46168 RE: Sedgwick Subdivision, Secondary Plat Application Dear Mr. Ferrell: This letter is in response to your Secondary Plat filing for Sedgwick Subdivision. I have attached a copy of a previously recorded plat as an example of what our department requires on the secondary plat. Please allow this document serve as a guide to finalizing your plat. The following comments need to be addressed and plat updated accordingly: 1. Provide an estimate of construction cost of Road Improvements per the Commitment. We will evaluate the estimate and detennine the appropriate action in receiving the improvements per the commitment. 2. Forward a copy of the final review letters from.the following agencies: a. Hamilton County Highway b. Hamilton County Surveyor c. Soil and Water ConselVation District d. Scott Brewer, DOCS Urban Forester 3. Add a key map to page 1. 4. Revise Legend and add to each sheet where appropriate: The monuments and markers should be as required under Section 8.2 of the seo. a. Add concrete monuments at all comers that fonn the boundary of the plat, as required under seo 8.2.1. b. Add monuments at the beginning and ending of all curves along street centerlines, as required under SCO 8.2.2. c. Add monuments at the comers of all lots. S. Add a source oftitle instrument number to sheet 1. 6. Remove common lot address from Legend. 7. Provide primary plat (42-02 PP) and secondary plat (90-02 SP) docket numbers on sheet 1. 8. Rename "building line" in all areas to ''building setback line." Page 1 ONE CIVIC SQUARE CARMEL, INDIANA 46032 317/571-2417 ---------~ ~ ~- ~~- nc~c~vc~. IVI I/V~ ~;O~~M.- --D~NI~~I~U ~Nb~N~~H~Nb- . I OCT -01-2002 TUE 03: 33 PM CARMEL COMMUN ITV SVCS . ""'ld; t-'Al:il:: d ....... .... .__'_._ _ .._ _. ...... ._.__._...._. _M ..~. FAX NO. 317 571 2426 P. 03 if 9. Have mylar signed by property owner and surveyor (with RL.S. seal) prior to signature by director. 10. Add note of "Owner/Subdividor. n 11. Add note of "Surveyor" (identify Banning) 12. Add bottom elevation. nonnal pool. and 100- YR flood elevation for lakes to plat. 13. Remove common area "on as it is now part of Shelbome Park.. Please submit a revised Secondazy Plat with the above-mentioned changes. Once these changes have been made and comments addressed. please produce a mylar copy for signature by this Department. Two paper copies of the plat must be filed with the mylar prior to recording. I will return the signed mylar to you for signature by the County Commissioners. Once recorded, our Department needs three paper copies and a mylar of the recorded plat. Our approval of the secondary plat (signature) will be forthcoming upon revision of the plans according to the items listed above. Sincerely. 1~ I"~~~ C. Dobosiewicz Planning Administrator C: David Warshauer Sedgwiclc-SP 1 Page 2 ONE CMC SQUARE CARMEL. INDIANA 46032 317/571-2417 - ~-~- -~ -- ~ --~-_._-- -. ___m _'r.-:w.......__..,..__DI._...,.__E....,I.~._.___U::a:w.CI=- OS/21/02 14:31 FAX HAMILTON CO HWY. ~001 HAMILTON COUNTY HIGHWAY DEPARTMENT May 21,2002 Mr. Lance G. Ferrell Banning Engineering 698 Tower Road, Suite 100 Plainfield, Indiana 46168 RE: Sedgwick Subdivision Revised Primary Plat N of 131 sI Street / W of Towne Road Clay Township Dear Mr. Ferrell: This letter serves to acknowledge receipt of a transmittal received 5/02102 containing the revised plans for the above-mentioned project. After reviewing the plans the Highway Department has the following comments: 1. The Application for Project Review has not been received. Approval for this project will not be issued until the fees have been received. 2. A variance will be needed from the Hamilton County Board of Commissioners for the reduced centerline radius. Notice will need to be sent to the Board of Commissioners asking for the variance, please copy the Highway Department on the request. You will need to contact the Hamilton County Auditor's Office to request your placement on the agenda for the next Board of Commissioners meeting. If you have any questions or comments concerning this letter, please feel free to contact me at anytime. Sincerely, /!;i~ Staff Engineer cc: Jon Dobosiewicz 1700 South 10th Street Noblesville, In. 46060 www.co.bamilton.in.us Office (317) 773-7770 Fax (317) 776-9814 EROSION AND SEDIMENT CONTROL PLAN TECHNICAL REVIEW AND COMMENT Hamilton County Soil and Water Conservation District 1108 South 9th Street, Noblesville IN 46060 Ph- 317-773-1432 or Email at john-south@iaswcd.org PROJECT NAME: Sedgwick Construction Plans SUBMITTED BY: GWZ Development 9011 N. Meridian Street Suite 202 Indianapolis, IN 46260 317-573-9301 John B. South P.E. (). J Certified Professionall Erosion and Sediment Control Mr. Lance Brock Banning Engineering 698 Tower Road Suite 100 Plainfield, IN 46168 REVIEWED BY: PLAN REVIEW PROCEDURE: Site Visit Date: Plan Review Date: 8-23-02 Acreage: 33 ac. LOCATION: N side of 13 1st between Towne and Schelboume Roads LEGAL DESCRIPTION: Sec. 29 TOWNSIllP: 18N RANGE: 3E CIVIL TOWNSIllP: Clay SOIL SURVEY MAP SHEET: 49 The technical review and comments are intended to evaluate the completeness of the erosion and sediment control plan for the project. The erosion and sediment control plan submitted was not reviewed for the adequacy of the engineering design. All practices included in the plan, as well as those recommended in the comments should be evaluated as to their feasibility by a qualified individual with structural practices designed by a qualified engineer. The plan has not been reviewedfor local, state, or federal permits that may be required to proceed with this project. Additional information, including design calculations may be requested to further evaluate the erosion and sediment control plan. The erosion and sediment control plan has been reviewed and it has been determined that the plan: X Satisfies the minimum requirements and intent of 3271AC 15-5 (Rule 5). Notification will be forwarded to the Indiana Department of Environmental Management. Proper implementation of the erosion and sediment control plan and inspections of the construction site by the developer or a representative are necessary to minimize off-site sedimentation. The developer should be aware that unforeseen construction activities and weather conditions may effect the performance of a practice or the erosion and sediment control plan. The plan must be ajIexible document, with provisions to modifY or substitute practices as necessary. Revised 4 / 97 Cc: Carmel DOCS Ha. Co. Surveyor Ha. Co. Highway IDEM File .7 " OCT 10 '02 04:24PM P.1/2 u :Kcnflm c. 'Ward, SlI/'I'f}'or '1'(;011' 1';17> 7';,(i.'~4~5 'ral' 1';'7) '(';'b-..~6:!8 Suite L $8 One ,'Hamilton C"",lIy Sill/are .JI(l{J/e~Jlill'j Illdillllll 4G,'6".;UJC October 10, 2.002 Lance Farrell Banning Engineering Re: Sedgwick Subdlvls ~~ · ~O~;;;<, y> .. ) I hav. reviewed the plans fur this project. The following commencs relate to my August 7, september 5 and September 13, and September 25,2002. ConstrudJon Plan. . 5, ok 6. ok 7, ok 8. ok 9. ok 10. ok 11. ok 12. ok 13. ok 14. The landscape plan still shows trees In several locations being prOPQsed directly over storm sewers. Please revise. Since tne landscape plM is a separate plan, I will allow this to be revised without holding up the rest of the construction plan fopproval. Please quickly revise and submit for review. 15. ok 16. ok 17. ok 18. ok Procedural Items: 1. ok 2. ok 3. ok 4. ok Plans. CalCli and Selland,.,. Plat: Erosion Control Plan ~ 19. ok 20. ok 21. ok i OCT 10 '02 04:25PM P.2/2 u ,~' Storm Sewer Plan & prome Sheets - 22. ok 23. ok Detail Sheets - 24. ok 25. ok 26. ok Secondary Plat- 27. ok CalculatJolls - 28. ok 29. ok Other Comments - 30. ok 31. ok 32. ok Please forward seven (7) sets of the latest constNction plms to the Ham/ltoD County Hwy Dept to be stamped "approved." If you have any questions or comments, please feel free to contact this office at (317)776-8495. ~In~ ~_: ?"'~ . ~ Steven T. Cash Plan Reviewer Cc: Carmel Eng. Cannel DOCS Co. Hwy. SCS Fourth Stream Advisors 2 ~ .. u u City of Carmel VIA FAX: 838-9171 Original by Mail October I, 2002 COpy Mr. Lance G. Ferrell Banning Engineering 698 Tower Road, Suite 100 Plainfield, Indiana 46168 RE: Sedgwick Subdivision, Secondary Plat Application Dear Mr. Ferrell: This letter is in response to your Secondary Plat filing for Sedgwick Subdivision. I have attached a copy of a previously recorded plat as an example of what our department requires on the secondary plat. Please allow this document serve as a guide to finalizing your plat. The following comments need to be addressed and plat updated accordingly: 1. Provide an estimate of construction cost of Road Improvements per the Commitment. We will evaluate the estimate and determine the appropriate action in receiving the improvements per the commitment. 2. Forward a copy of the final review letters from the following agencies: a. Hamilton County Highway b. Hamilton County Surveyor c. Soil and Water Conservation District d. Scott Brewer, DOCS Urban Forester 3. Add a key map to page 1. 4. Revise Legend and add to each sheet where appropriate: The monuments and markers should be as required under Section 8.2 of the seo. a. Add concrete monuments at all comers that fonn the boundary of the plat, as required under seo 8.2.1. b. Add monuments at the beginning and ending of all curves along street centerlines, as required under seo 8.2.2. c. Add monuments at the comers of a1110ts. S. Add a source oftitIe instrument number to sheet 1. 6. Remove common lot address from Legend. 7. Provide primary plat (42-02 PP) and secondary plat (90-02 SP) docket numbers on sheet 1. 8. Rename ''building line" in all areas to ''building setback line." Page 1 ONE CIVIC SQUARE CARMEL, INDIANA 46032 317/571-2417 -. u u 9. Have mylar signed by property owner and surveyor (with RL.S. seal) prior to signature by director. 10. Add note of"Owner/Subdividor." 11. Add note of "Surveyor" (identify Banning) 12. Add bottom elevation, normal pool, and 1 00- YR flood elevation for lakes to plat. 13. Remove common area "D" as it is now part of Shelbome Park.. Please submit a revised Secondary Plat with the above-mentioned changes. Once these changes have been made and comments addressed, please produce a mylar copy for signature by this Department. Two paper copies of the plat must be filed with the mylar prior to recording. I will return the signed mylar to you for signature by the County Commissioners. Once recorded, our Department needs three paper copies and a mylar of the recorded plat. Our approval of the secondary plat ( signature) will be forthcoming upon revision of the plans according to the items listed above. Sincerely, AiL, · I~ 7 Jon C. Dobosiewicz Planning Administrator C: David Warshauer Sedgwick-SPl Page 2 ONE CMC SQUARE CARMEL, INDIANA 46032 317/571-2417 Fax u CITY OF CARMEL Department of Community Services One Civic Square Carmel, IN 4ro32 (317) 571-2417 Fax: (317) 571-2426 TO~~~ Fromf'::::::---~ ,LA-- Fax: /.3J'-9/7/ Pages: --3 Phone: Date: /0 ~ /-o~ u Re: ce: o Urgent o For Review 0 P.fease Comment 0 Please Reply o Please Recycle r'1 \.J il 'i SEP 13 '1212 03:34PM P.1/3 .~.> ",::--' ... "'VI ,. Rt. Ct.\'Jen ~t? \~ ?~~tance . t\t\C<!> Bann' \~~ v\J I4:l '~.:J""~ A( '<:::A" ~ /,"'Y ~o \(:1'/ - l-l1.Jct~ve reviewed the plans for this project. The following comments relate to my previous lettor dated August 7 and September 5, 2002. New eomments I elarlnl!8tlon of my previous comments are uow in bald. PIC!lase ~ndent.lld that this latest revised plan submitted September 10th did not satisfy the r.qujrements stated In the prevloullletters. Construction oltbe storm sewer system may not begin uatU all requirement. bave been satisfaetorUy fulfilled and approved by this ornee. Installation of stor... sewers prior to approval will result in a stop work order beinl issued. Xelllotl C. 'J,Om.d, SIll1'ryor lpli/JII/! lJ17) 7';'b.849J '/-n.l. (.317) 77b-~l;.'l.~ SIIIII.' .rBS aliI.' :1fnmi/roll COMfY .~qlllll'f' )Vallll.'.ill/flc, I7Id/(/1l11 ~6,,6o'2:Z3" Friday, September 13, 2002 Re; Sedgwick Subdivision Proeedural (tems: 1. Please provido the signed form to lII.ake the stann sewers regulated. 2. Non-enforcement Permit - Received. 3. please forward an engineers estimate or copy of the contract for ] 00% of the construction costs for monuments and marken. 4. Submit original letters of credit Or bonds for the above amounts. ~n8. Cales and Seeondarv Platl Construction Pllnl - S. ok 6. ok 7. ok 8. ok 9. ok 10. ok 11. For the west lots, show the swale location and flow direction BITOWS. Thts office feels tha! the ClJ1TeJ1t plan for the rear yard drainage Is Inadequate to review and will not drain as intended. The fence row will create 8 blookage along rhe backs o(the lots and Impound water on the lots. This will not 1n: acceDted as shown. Sbow on tbe plans the proposed grades to provide pOlltlve drainage. As currently .hown~ for example, tbe propolled Pilei grade for lots 3 & 4 are 914.5 and 9J3.7. A now arrow at tbe eommOn side lot Une sbowl tbe dralnale ftowlna west to where It sbows "M. E." (for match existing grade). This elevation Is a 910.0. You have .ald tbat tbe drainage will now west and "the fence row will be reworked." Plcase notice that the Iwale nowllne elevation In Shelborne Park Is about a 91Ui at tbls lotation. Tbe swale nOMine iI J W hilher than tile existin, elevation in Shelborno Park than In Sedl!Wlckl Please ua4entand th"t this is only one example of whe", thitJ design will not work. Similar or related problems ean occur aU alonl[ the SEP 13 '02 03:34PM P.2/3 u u west property Illle. II there wlllllot be a .wale In these rear yard.. thell, you mutt demon.tnte on the plans how each lot will be properly graded. Stating that this wDl be don. in the ft.ld is not an adequate rupoDse. 12. ok 13. Show tho drainage Improvements that will occur along the roadway. More speclfically, will a road side ditch be lnstalled or Improved along 131111 If so, then please Identity this on the plans. Onee again, .how on the plait. how the drainage will Interact with the other plaoDed Improvement5 a10D813111. Fro example, are you golnll to InstaU a culvert under the path, etc.? 14. 111e landscape plans should be designed so that there are no street trees I landscaping eonfllcts wI SSD &: stOrm sewers. please provide a landscape plan to verity this. The landseape plan was Ilot designed with the storm ,ewen In mind. Tbe land'eape plall eurrently showl trees In several lo~atlon$ ~elng proposed directly over storm .ewe1'l. This wlllllot be approved. Allo, the landscape plan ollly.how.d a limited area. Are tberestnet trees proposed? IS. ok 16. How will omit, lIl'8a tram the north be handled? To be specific, the east and west sides of Common Area A slobber aeross lots 12 & 13 respectively. Common Area A and those lots contain mIlS where water pocketS. J question the 10ltg range effectiveness of that plan. Show the drainage in these areas being picked up and routed into tbe $tOrm Sewer System. In.tall SSD or pipe 1l0W - Dot .fter it beeomes 8 problem as you suggested. Tbe point is to anticipate and then deslln to avoid dralllage probl.ms for tbe lot owners. Also, when Is structure 108 per your letter? Also. tbe blue with lot 12 IItOl hall Dot been addressed. 17. ok 18. ok Erosion Control Plan. 19. ok 20. ok 21. ok Storm Sewer Plan A ProJ1le Sheets . 22. ok 23. ok DetaU Sheets . Show approved details. These may be obtained from our website www.co.hamilton.in.us , 24. Curb stamp detail. Show the approved Hamilton County detail with the signature block and date. 25. ok 26. ok Secondary Plat. 27. ok Calculation, . 28. ok 29. In addition to what you have $b<Jwn in the summary, please show how the developed conditions discharge compares with the allowable release rate of 0.24 efs per acre. To be more specific, show what you are disehal'llin2 in eft Der acre. Straight comparisons In storms do not satisfY the requirement. Comparisons of designs (old design VB. new design) also do not satisfY the requirement. What needs to be shown is how this sito's developed discharge after detention does not exceed 0.24 cf-s per acre during the 100 ye4r storm event. Show something like this: _ ~ 0.24 cf! per acre. To slImmarlze your revllled drainage report are you stating that: 46.31 efs < 0.24 cis per acre' Other Comments - 30. ok 2 SEP 13 '02 03:35PM P.3/3 u u 31. Show correct structures per structure sizing table. This was the purpose tor requiring detail 0.18. In your lotter you ltate(} that you have "adjusted the structure slzmg table." Do you mean that you revised the storm .tructure chart to "omply with the structure Il2IDg t.ble (DataD )),18)1 32. Regarding the SSD tying into Structure 106. our Inspector hu taised concern about the mounding location. Will there be a swaJe here with this SSD? RMpon.e; No - Ok Ihot, show detail SSD- S. OK - Detail .bon Show & note riser on plans. Also show detail SSD-3. If you have any qucltions or comments, please feel free to contact this office at (317)776.8495. ;]t' ~ ........ ~ Steven T. Cub Plan Reviewer ;J.~~. Cc: Carmel Eng. Cannel DOCS Co. Hwy. SCS Fourth Stream Advisors 3 SEP 05 '02 07:27PM P.1/2 u .'Kentoll C. 'Ward, Surl'eyor (E'fimlc (317' r;,(:;-S4~5 '1=11.\' (317) 7;,1:;..,6:LS Lance Farrell Bannlna Bnglneerlng Re: Sedgwick Subdivision I have reviewed the plans for this project. The following comments rolale to my previous letter dated August 7,2002. Procedurallteml: I. Please provide the sigPed form to make the stonn sewers regulated. 2. Provide the signed Notl-entorcement PermIt form with the appropriate check. 3. Please forward an engineers estimate or copy ot'the contract lOr 100% of the construction costs for storm sewers (including SSD), erosion control, and Monuments and markers. 4. Submit original letters of credit or bonds for the above amounts. Plans. Calcs and SecondarY Plat~ Constru~tion Plans. 5. Please show lot dimensions. Show on sheets 4 &. 5. 6. ok 7. Show the current road names. Show the actual name on the street. Line A, Line B, etc., are not the street names. 8. ok 9. ok 10. ok 11. For the west lots, show the awale location and flow direction arrows. This office feels that the cun-ent plan for the rear yard drainage is inadequate to review and will not drain as Intended. The fence row will create a blockage (Llong the baeks of the lots e.nd impound water on the lots. This wlll hot be accepted, 12. ok 13. Show the drainage improvements that will occur along the roadway. More specifically, will a road side ditch be installed or improved along 131 AI? If so, then please IdentifY this on the plans. 14. The landscape plans should be designed so that there are no street trees I landscaping conflicts wi SSD &. stann sewers, PleDse provide a IllJ1dscape plan to verify this. 15. ok 16. How wl1l ot'f'slte area from the north be handled? To be specitic. the east and west sides of Common Area A slobber acrosS lots 12 & 13 respectively. Common Area A and these lots contain areas where water pockets. I question the tong range effectiveness of that plan. Show the drainage In these areas being picked up and routed Into the storm sewer system. /' SEP 05 '02 07:27PM P.2/2 u u 17. ok. 18. Lot 27 now shows a revised flood protection srade of 911.3. The requirement is that it be at least 2' ~ the 100 year elevation for the pond. Revise grade. Erosion Control Plan .. 19. Show in Inlet protection for the street inlet. Your plans do not show erosion protection in the streets - only behind the curb. 20. ok 21. ok Storm Sewer Plan Ie Profile Sheets . 22. Add a note for open ended inlets for debris guarli to be installed. This note is only for the upstream end ofa pipe, not the downstream end. Remove the note !rom structure 11~ (sheet 16). 23. ok Detail Sbeets ~ Show approved details. These may be obtained from our web,ite www.eo.hamilton In us . 24. Curb stamp detail. Show the approved Hamilton County detail with the signature block and date. 25. Lake cross section. Sbow the approved Hamilton County detail with the signature block and date. 26. Debris guard for use on open encled inlets and pond outfall. Show the approved Hamilton County detail with the signature block and date. Seeondary Plat .. 27. The final recorded plat must have 8 swveyor's stamp. Send us a copy with the surveyors stamp for approval. Calculatiops - 28. ok 29. In addition to what you hllve $hown in the summary, please show how the developed eondltions discharge eompares with the allowable release rate of 0.24 cfs per acre. To be more specific, show what vou are dl!le~arllinll in cta per acre. Straight comparisons in storms do not utMy the l'equirement. Comparisons of designs (old design vs. new design) also do not satisfy the requirement. What needs to be shown is how this sit~'s developed discharge after detention does not exceed 0.24 et'$ per acre during the 100 year storm event. Show something Uke this: ~ ~ 0.24 cfs per acre. Other Comments - 30. Show pad srades or MFF gradell for lots 12" 13. 31. show COlTCct structures per structure sizing table. This was the purpose for requiring detail 1).18 . 32. RellU'ding the SSD tying into structure 106, our Inspector bas raised concern about the mounding location. Will there be a swale here with this SSD? If not, show detail SSD-S. Show & note riser on plana. Also show detail SSO.3. If you have any questions or comments, please feel free to contaCt this office at (3 I 7}776.8495. S;& ... ~ ~..- ~Steven T. CUb Plan lUlviewer r. ~~.~ Cc: Cannel Eng. Cannel DOCS Co. HW)'. SCS 2 7. / ER ON AND SEDIMENT CONT L PLAN TECHNICAL REVIEW AND COMMENT Hamilton County Soil and Water Conservation District 1108 South 9th Street, Noblesville IN 46060 Ph- 317-773-1432 or Email at john-south@iaswcd.org PROJECT NAME: Sedgwick Construction Plans SUBMITTED BY: GWZ Development 9011 N. Meridian Street Suite 202 Indianapolis, IN 46260 3 17-573-9301 Mr. Lance Brock Banning Engineering 698 Tower Road Suite 100 Plainfield, IN 46168 'J sf i q () /0 (/- REVIEWED BY: John B. South P.E. Certified Professional in Erosion and Sediment Control PLAN REVIEW PROCEDURE: Site Visit Date: Plan Review Date: 8-23-02 Acreage: 33 ac. LOCATION: N side of 131 st between Towne and Schelboume Roads LEGAL DESCRIPTION: Sec. 29 TOWNSHIP: 18N RANGE: 3E CIVIL TOWNSHIP: Clay SOIL SURVEY MAP SHEET: 49 The technical review and comments are intended to evaluate the completeness of the erosion and sediment control plan for the project. The erosion and sediment control plan submitted was not reviewedfor the adequacy of the engineering design. All practices included in the plan, as well as those recommended in the comments should be evaluated as to their feasibility by a qualified individual with structural practices designed by a qualified engineer. The plan has not been reviewedfor local, state, or federal permits that may be required to proceed with this project. Additional information, including design calculations may be requested to further evaluate the erosion and sediment control plan. The erosion and sediment control plan has been reviewed and it has been determined that the plan: X Satisfies the minimum requirements and intent of 3271AC 15-5 (Rule 5). Notification will be forwarded to the Indiana Department of Environmental Management. Proper implementation of the erosion and sediment control plan and inspections of the construction site by the developer or a representative are necessary to minimize off-site sedimentation. The developer should be aware that uriforeseen construction activities and weather conditions may effect the performance of a practice or the erosion and sediment control plan. The plan must be a flexible document, with provisions to modifY or substitute practices as necessary. Revised 4 /97 Cc: Carmel DOCS Ha. Co. Surveyor Ha. Co. Highway IDEM File u HAMILTON CO HWY. 444 Carmel DOCD U ~ 0011001 08/23/02 10:33 FAX HAMILTON COUNTY HIGHWAY DEPARTMENT August 23. 2002 Mr. Lance G. Ferrell Banning Engineering 698 Tower Road, Suite 100 Plainfield, Indiana 46168 RE: Sedgwick Subdivision Landscape Plan N of 13181 Street J W of Towne Road Clay Township Dear Mr. Ferrell: qo/tJ;<~~ This letter serves to acknowledge receipt of the landscape plan for the above-mentioned project. After reviewing the plans the Highway Department has the following comments. 1. Any of the trees that are shown along the Lincolnshire Boulevard section that are located between the curb and the multi-use patb must be relocated behind the path. The mounding shown in these areas must also be eliminated. The landscaping plan that is included in the final seven sets must show the correct revisions. If you have any questions or comments conceming this letter, please feel free to contact me at anytime. Sincerely, 4.( &-~- .1~n J. Broermann Staff Engineer cc: Jon Dobosiewlcz Steve Cash ,.---...", -~. " G:\USERS\SB\02TAC\08-23-02sedgwlc:k.doc 1700 South 101b Street Noblesville, In. 46060 www.co.bamilton.ln.us Office (317) 773-7770 Fax (317) 776-9814 u HAMILTON CO HWY. 777 Carmel DOCD U 141 0011002 ;:. ~ 08/19/02 11:09 FAX HAMILTON COUNTY HIGHWAY DEPARTMENT RE: Sedgwick Subdivision Revised Secondary Plat and Construction Plans N of 131st Street / W of Towne Road Clay Township Dear Mr. Ferrell: August 19, 2002 Mr. Lance G. Ferrell Banning Engineering 698 Tower Road, Suite 100 Plainfield, Indiana 46168 This letter serves to acknowledge receipt of a transmittal received 8/15/02 containing the revised plans for the above-mentioned project. After reviewing the plans the Highway Department has the following comments. I have maintained the numbering from the July 15, 2002 comment letter. 1. An Application for Project Review needs to be completed and the appropriate review fees for a Secondary Plat and Construction Plan paid, before any approvals will be granted from this office. The fees and review sheet must be received before approval of the plans will be given. 2. The. right of way documents for the Goold property must be forwarded to the Highway Department for acceptance by the County Commissioners. 3. OK. 4. OK 5. OK. 6. A variance was granted by the Hamilton County Board of Commissioners. 7. The estimate and bond must be received before secondary plat approval will be granted. 8. OK. 9. OK per T AC comments. 10. OK, but a note showing the striping replacement is needed. 11. A Landscaping Plan is needed per approvals will be granted. 12. OK. 13. OK. 14. OK. 15. OK. 16. OK. 17. OK. 18. OK. 19. Still needed. 20. Please add a note at the east and west end of Lincolnshire Boulevard stating that the existing pavement and curb must be saw cut to provide a smooth transition. 1700 South 101. Street Noblesville, In. 46060 www.co.hamiltonJn.us Office (3] 7) 773-7770 Fax (3]7) 776-9814 .' . 08/19/02 11:10 FAX HAMILTON CO BWY. +-H Carmel DOCD ~ 0021002 U U HAMILTON COUNTY HIGHWAY DEPARTMENT 21. All sanitary and storm sewer that enter into the right of way must have full depth granular backfill from right of way line to right of way line. The sanitary run from Structure 12 -18 will also require the backfill or relocate Structure 12 to the south to avoid the right of way conflict. If you have any questions or comments concerning this letter, please feel free to contact me at anytime. Sincerely, ft / 8u.~. --- Steven J. Broennann Staff Engineer cc: Jon Dobosiewicz Steve Cash G:\USERS\SB\02T AC\D8-19-02sedgwlck.doc 1700 South 101ll Street NoblesvUle, In. 46060 www.co.hamiltonJn.us Office (317) 773-7770 Fax (317) 776-9814 ERO N AND SEDIMENT CONTR PLAN TECHNICAL REVIEW AND COMMENT Hamilton County Soil and Water Conservation District 1108 South 9th Street, Noblesville IN 46060 Ph- 317-773-1432 or Email at john-south@iaswcd.org PROJECT NAME: Sedgwick Construction Plans SUBMITTED BY: GWZ Development 9011 N. Meridian Street Suite 202 Indianapolis, IN 46260 317-573-9301 Mr. Lance Brock Banning Engineering 698 Tower Road Suite 100 Plainfield, IN 46168 REVIEWED BY: John B. South P.E. Certified Professional in Erosion and Sediment Control PLAN REVIEW PROCEDURE: Site Visit Date: Plan Review Date: 8-19-02 Acreage: 33 ac. LOCATION: N side of 131 st between Towne and Schelboume Roads LEGAL DESCRIPTION: Sec. 29 TOWNSHIP: 18N RANGE: 3E CIVIL TOWNSHIP: Clay SOIL SURVEY MAP SHEET: 49 The technical review and comments are intended to evaluate the completeness of the erosion and sediment control plan for the project. The erosion and sediment control plan submitted was not reviewed for the adequacy of the engineering design. All practices included in the plan, as well as those recommended in the comments should be evaluated as to their feasibility by a qualified individual with structural practices designed by a qualified engineer. The plan has not been reviewed for local, state, or federal permits that may be required to proceed with this project. Additional information, including design calculations may be requested to further evaluate the erosion and sediment control plan. The erosion and sediment control plan has been reviewed and it has been determined that the plan: Satisfies the minimum requirements and intent of 3271AC 15-5 (Rule 5). Notification will be forwarded to the Indiana Department of Environmental Management. Refer to the comments section for additional information. X Does not satisfy the minimum requirements and intent of 3271AC 15-5 (Rule 5); deficiencies are noted in the checklist and in the comments section. Deficiencies constitute potential violations of the rule and must be adequately addressed for compliance. The information necessary to satisfy the deficiencies must be submitted: Proper implementation of the erosion and sediment control plan and inspections of the construction site by the developer or a representative are necessary to minimize off-site sedimentation. The developer should be aware that unforeseen construction activities and weather conditions may effect the performance of a practice or the erosion and sediment control plan. The plan must be a flexible document, with provisions to modify or substitute practices as necessary. Revised 4 /97 PROJECT: Sedwick constructi~lans w Page 2 of3 Yes No x IA x 1B x IC x ID x IE ARE THE FOLLOWING ITEMS ADEQUA TEL Y ADDRESSED ON THE PLANS? (All Plans Must Include Appropriate Legends, Scales, and North Arrow) (Items that are Not Applicable to this Project are designated by NA) PROJECT INFORMATION Project Location Map (Show project in relation to other areas of the county) Narrative Describing the Nature and Purpose of the Project Location of Planned and/or Existing Roads, Utilities, Structures, Highways, etc. Lot and/or Building Locations Landuse of Adjacent Areas (Show the Entire Upstream Watershed and Adjacent Areas Within 500 Feet of the Property Lines) Yes No TOPOGRAPHIC, DRAINAGE, AND GENERAL SITE FEATURES x 2A Existing Vegetation (IdentifY and Delineate) X 2B Location and Name of All Wetlands, Lakes and Water Courses On and Adjacent to the Site X 2C 100 Year Floodplains, Floodway Fringes, and Floodways (Note if None) X 2D Soils Information (Ifhydric soils are present, it is the responsibility of the owner/developer to investigate the existence of wetlands and to obtain permits from the appropriate government agencies.) X 2E Existing and Planned Contours at an Interval Appropriate to Indicate Drainage Patterns x 2F Locations of Specific Points Where Storm water Discharge Will Leave the Site X 2G Identify All Receiving Waters ( If Discharge is to a Separate Municipal Storm Sewer, IdentifY the Name of the Municipal Operator and the Ultimate Receiving Water) X 2H Potential Areas Where Storm water May Enter Groundwater (Note if None) X 21 Location of Stormwater System (Include Culverts, Storm Sewers, Channels, and Swales) Yes No LAND DISTURBING ACTIVITIES x 3A Location and Approximate Dimensions of All Disturbed Areas [i.e., Construction Limits] (Areas Where Vegetative Cover Will Be Preserved Should be Clearly Designated) X 3B Soil Stockpiles and or Borrow Areas (Show Locations or Note if None) Yes No x 4A x 4B x 4C x 4D x 4E x 4F x 4G x 4H x 41 x 4J x 4K EROSION AND SEDIMENT CONTROL MEASURES Sequence of When Each Measure Will Be Implemented (Relative to Earth Disturbing Activities) Monitoring and Maintenance Guidelines for Each Measure Perimeter Sediment Control Measures (Location, Construction Detail, Dimensions, and Specifications) Temporary Seeding (Specifications; Including Seed Mix, Fertilizer, Lime, and Mulch Rates) Temporary Erosion and Sediment Control Measures (Location, Construction Detail, Dimensions, and Specifications) Permanent Erosion and Sediment Control Measures (Location, Construction Detail, Dimensions, and Specifications) Storm Drain Inlet Protection (Location, Construction Detail, Dimensions, and Specifications) Stormwater Outlet Protection (Location, Construction Detail, Dimensions, and Specifications) Stable Construction Entrance (Location, Construction Detail, Dimensions, and Specifications) Erosion and Sediment Control on Individual Building Lots (Specifications) Permanent Seeding (Specifications; Including Seed Mix, Fertilizer, Lime, and Mulch Rates) Revised 4 /97 ~ ER~ION AND SEDIMENT CONTR~ PLAN TECHNICAL REVIEW COMMENTS - PROJECT: Sedwick Construction Plans Page 3 of 3 Note: All erosion and sediment control measures shown on the plans and referenced in this review must meet the design criteria, standards, and specifications outlined in the "Indiana Handbook for Erosion Control in Developing Areas" from the Indiana Department of Natural Resources, Division of Soil Conservation or similar Guidance Documents. Comments: 4A/4C. The majority of this site currently drains offsite at lot 27. To prevent offsite discharge of sediment laden storm water, it is suggested that a diversion swale be cut across lot 27 directing the storm water into the detention basin. The construction sequence needs to identify the southern lake to be constructed first. In addition a plan is needed for the excavation of the southern lake in common area D that will minimize pollution of the existing pond if it is already completed and holding water. Cc: Carmel DOCS Ha. Co. Surveyor Ha. Co. Highway File .. AUG 07 '02 05:59PM u P.1/2 if'- XL'nfoll C. 'Ward, Surveyor 'Niwll' U17} ?,;,tj.~4:'15 'fnl <J'7) 7;-6-91,zS Re; Sedgwick Subdivision Sll/t~ IllS aile .:J(ulllil'oll COl/llty S,/l/Ilre .7VD[,Je.willl', Inclinlln 4I.'ioG,,-n3" Wednesday, August 07, 2,?~~~<J:TIZl??"::>A /(; 41: -90 ;,~7 " / \, .:-:-1 ~ ~X>,\ '\' ' ..4 /,....'/." I ' fiT /'1 --=~ ~/l ,;/., \ .. ~\ '-tJI < i/o, \\ '(~.>" ",~, / Lance Farl'ell Banning Engineering I have reviewed the plans for this project and have the following comments,. PraeeduralltclDI; 1 . Please provide the signed form to make the Btorm sewers regulated. 2. Provide the signed NOl'l-enforcement Permit fonn with the appropriate check. 3. Please forward an engineers estimate or copy of the eontract for 100% of the constrllction costs for storm sewers (Including SSD), erosion control, and monuments and markers. 4. Submit original letters of credit or bonds for the above amounts. PIIDII. Cales Ind seeollda..v Plat: COlUltructioD Plans - 5. Please show lot dimensions. 6. Pipe size, length, !;lope and approved type ofmaterlal used. 7. Show the current road names. 8. Please Dote the right-of-way lines & dimensions. 9. Show street widths. 10. Show a storm sewer struc:ture data cbart to Include the ltemsln comment #6. 11. For the west lotS, show the swale location and flow direction arrows. 12. show the approximate SSD stub locations to each lot. 13. Show the drainage improvements that will occur along the roadway. 14. The landscape plans should be designed so that there are no street trees I landscaping conflicts wI SSD & storm sewers. lS. Structure 121 is located otl'site in Shelborne Park. Has this been coordinated with the developer of the subdivision? 16. How will offsite area from the north be handled? 17. This site shares a pond with Shelbome Park. The 100 year elevation shown for Sedgwic:k is different than the 100 year elevation shown on the Sbelbome Park, Section 1 plans. Please correct. 18. Lot 27 shows a flood protection grade of 909.7. The requirement is that it be at least 2' above the 100 year elevation for the pond. Erosion Control Plan .. 19. Show In Inlet protection for the street inlet. AUG 07 '02 05:59PM P.2/2 '" u o 20. Add a note stating that additional erosion control measures may be required in the field by tbe Inspector as conditions warrant. 21. Change the notation referln,!! to Hendricks County on Sheet 22. Storm Sewer Plan" Profile Sheets - 22. Add a note for open ended Inlets for debris guard to be installed. Our preference is for the storm system to minimize the use of end seotions for inlets. 23. Include note for debris guard to be installed at pond outfall pipe Detail Sheets . Show approved doti'llls. 24. Curb stamp detail. 25. Lake cross section. 26. Debris guard for use on open ended inlets and pond outfall. Se~ondary Plat. 27. The final recorded plat must have a surveyor's starnI'. . Calculations. 28. The overall Drainage Analysis refers to the culvert under 131"1 as the outlet for the pond. The existing culvert is no longer the outlet for the pond (except as an emergency overflow route). The storm routing will go through the proposed storm sewer going to Hayden Run. 29. In addition to what you have shown in the summary, please show how tbe developed conditions discharge compares with the allowable release rate of 0.24 ct's per acre. If you have any questions or comments. please feel free to contact this office at (317)776-8495. A~ ~...::: , 'Steven T. Cash Plan Reviewer ~ Co; Cannel Eng. Cannel DOCS Co. Hwy. SCS 2 I I I_~~~ I U ~C>...Ot. Sf> u - b ~. 1'> So c. '- _f> ._"./\ · 4la..' ~ · ~c>' .", .'2,. :. '-"tolE 041 .~~ 01.) -+ L.:, ~....~.+ ~ 'Z... . Vtz:. ~ ~ LO' -I S' 0fIE I 3. ~ ~~-e~l~~ ~~ - W'JIIfP&CL.~" ,.,1>-': : 'i. ~: 7)7 /01 .o...w lIi~r Soortlf " - w~ "fF /iil><I.- -n;,..r ~ (....",- ~ .. ~ - I t> '-1L AdAtlb'bUih c::.o~ - b.L.,o..V ~ ~ .:..~ /"t1JJJD ~ ""'/'T1t1P ~~ 7. , :!!L'boJrSLI:U:: ~-..-... - OsE ,,~ P""c.lc. ''''''~ - S 1 ~: .P<<M~~ pc:.. I.tt! SJ fS .~O .. ~~~ur rn I -----=-j 0\ u u CARMEL/CLAY TECHNICAL ADVISORY COMMIT~,~~rErr4t(~ AGENDA ./~~)' ~ '\';~\ It~' ., \'.' \ //". ' \,...-... ,LI RECEIVED \::::\ Date: July 17,2002 1;-1 JilL 12 2rn \\~; Place:Department of Community Services Conference Room I,'q Uu2 [:i 3rd Floor - Carmel City HaD \~;\ DOCS /!:?i \V' /"\, ,/~, II \, )'. ./' ". Docket ~o. 90-02 SP; Sedgwick Subdivision (Secondary Plat & ~onstruction PISlr!~"tJr::\0;/ The applIcant seeks. approval of a Secondary Plat and Construction Plans for a 27-1of-- k"?-'- residential subdivision on 33.161:1: acres. The site is located on the north side of West 13151 Street, Yz mile west of Towne Road. The site is zoned S-llResidence - Estate. Filed by David Warshauer for GWZ-l Development, LLC. ~o.m Q'10 a m 10'00 a m 10'7.0 a m 10'40 am 11'00am Docket No. 94-02 PP; Lakeside Park Subdivision (Primary Plat) The applicant seeks approval to plat a 215-10t residential subdivision on 154.8:1: acres. ~/l The site is located on the southwest comer of West 141 st Street and Towne Road. The site "- is zoned S-llResidence - Estate. Filed by Dennis Olmstead of Stoeppelwerth & Associates, Inc. for Roehling Enterprises, Inc. Docket No. 93-02 PV; Shelboume Greene, Section 8, Plat Vacation Petitioner seeks to vacate Section 8 of the Shelboume Green Subdivision. The site is located on the east side of Shelboume Road, 1/8 mile north of West 96th Street. The site is , ~ zoned R-IlResidence. ^t- Filed by Charles D. Frankenberger of Nelson & Frankenberger for the Evangelical Baptist Missions. St. Eli1abeth Ann Seton Parish Rectory (Docket No. SUA-91-02) The petitioner has received Special Use Amendment approval in order to construct a rectory. The site plan is revised from that reviewed by T AC on May 22, 2002. The site is located at 10655 Haverstick Road. The site is zoned S-llResidence - Low 1 ~C- Density. 1\..1\ Filed by Charles D. Frankenberger of Nelson & Frankenberger for St. Elizabeth Ann Seton Parish. Hazel Dell Christian Church Modular Classrooms (Special Use Amendment) The petitioner seeks Special Use Amendment approval in order to locate four (4) modular classrooms on site. ~ The site is located at 14501 Hazel Dell Parkway. The site is zoned S-llResidence - Low /J Density. Filed by Alan K. Peterson for Hazel Dell Christian Church. Lakes at Hayden RUB, Section 1, Block A (Special Use) The petitioner seeks Special Use approval in order to construct an amenity area on 1.249:1: acres. 4:- The site is located northwest of the intersection of West 13151 Street and Towne Road. The site is zoned S-llResidence - Estate. Filed by Thomas L. Kutz of Centex Homes. Panhandle Eastern Pipeline Co. has no company Facilities invofved~his jlroject -;--S 1-1 '71d.:1-..tA-- 7.. /0'01- ~ -0 ate JUL. 12. 2002 9: 52AM t:)NES THORNBURG 317-231-7433 u NO. 204 P. 1 ~ -:-.. BARNES & THORNBURG Attorneys at Law 11 South Meridian Street Indianapolis, Indiana 46204-3535 (317) 236-1313 Fax Number: (317) 231-7433 TO: NAME Steve Broennan FAX COVER SHEET COMPANY NAME Hamilton County Highway Department Cannel DOCS >-~ ~ c> -0 "t--' TELECOPY NO. 776-9814 Jon Dobosiewicz 571-2426 FROM: David R. Warshauer DIRECT DIAL: (317) 231-7346 DATE: July 12, 2002 E-MAIL: davld.warshauer@btIaw.com TIME SENDING: NUMBER OF PAGES (INCLUDING THIS COVER SHEET): 2 If)'Oll have diffiCUlty receiviDg thls Pax, please call Barnes . !homburg at (XI<ON) 317-231-749' an4 ask for Vt~ 'Steve: At the T AC meeting on the primary plat for Sedgwick, you indicated that we would be required to offer to buy right-of.way from Robert Goold, who ownS the seven acres along 131st Street between Sedgwick and the Ukes at Hayden Run. Attached is a copy of the letter making that otTer which I hand-delivered to him on June 19. I am meeting with his attorney to discuss this on Tuesday, July 16. I hope to have a response in time for the secondary plat TAC meeting on the 17th. \J~ \ Response once received: Please deliver immediately. CLffiNT# 32062 0 Original to follow by mail MA. TTER# 1 Ii!J Original will not follow by mail CONFIDENTIALITY NOTICE: This message is for the exclusive use of the individual or entity to whioh it is addressed and is confidential. If you are not the addressee Or en employee Or agent of the addressee responsible for deIiverins it to the addressee, please do not read, use, d.iselose, copy or diSlribute this message and do Dot take aft)" action in reliance upoD it If you have received this messase in error, please DOUfY us immediately by telephone (conect) to arrange for its retIU1l. Wo do not intend to waive any att01'1l~~1iOllt or work produ.ct privilege by the ttaDSmission of this message. Indianapolis Fort Wayne SOllm Bend Blkhart Chicago Wasbmgton, D.C. Route to: Re$a.lenkins JUL. 12. 2002 9: 52AM BARNES THORNBURG 317-231-7433 U u NO. 204 P. 2 .: .-:. SEDGWICK June 18, 2002 Mr. Robert R. Coold 3000 West 131st Street CauDd, Indi8Da 46032 Dear Mr. Goold; In c:onnection with our development of Sedgwick. north and west of your property on 13111 Street, the Hamil10D County Highway DeparUna bas asked that we ofter to acquite a ftom you a total half right-of-way, 01eaSmed 1i'om. 1I1e centerline, of 50 feet for 131d Street. in accordance with the 1'ho.roughfare Plan. As you may be aware, 1he developers of the three pIOposed subdivisions on the north side of 131 S\! Street between Shetbome and Towne have all agreed to dedicate this right-of-way as part of their plats. The amount dedicated is 33.5 feet. in addition to the existiDg balf rightMof:.way of 16.5 feet. In aecordauce with the Highway Department's request, we offer you $8,750 to be paid upon yom execution and delivery of an iDstmm.ent in the fonn requh~ by the Hishway Depsrtmeut to dedicate a total of so feet across your 460 feet of &omage on 131- Street to Hamilton C01D1ty for Jisbt-of-way purposes. This is based upon a per acR price of $25,000 for 15,410 square feet (0.35 acres), the product of 460 feet owltiplied by 33.5 feet, the dift'erence between the SO feet of right-of-way ~ and the 16.5 feet existiug. While we do not believe'that the Highway Departmeat has my immAtlUD plans to widen 131 at, it would like to obtain as Innch risht-of.-way ill accordance with the Thorougb.fare Plan 80S is possrole. 'Ibis proposal shall remain open UD.til .July 10, 2002, and our ob1iga1iou in the eveut it is acoepted are conditioned on 0.. conDIlraci!lg development of Sedpick 0J1 Of before September ~, 2002. In the event we do not, the aareemeat contemplated by ibis p-oposal 8Ild an acc:eptanoe sball1:e:rmina1c. Please indicate whether you accept or reject this proposal in the space provided below. Thank you for your oonsidcratioa. ow:-rfi;; - By. Ma1k~- - ~ The undersigned hereby L accepts]f does not accept] the foregoiDg ptOp~ Robert R. Goold Dated: . 2002 9011 N. Merldfan Street, Suite 202, Indianapolis, Indiana 46260 Telephone: 317...s~9301 Telefax: 317-573-9100 "... ERO ON AND SEDIMENT CONTR PLAN TECHNICAL REVIEW AND COMMENT Hamilton County Soil and Water Conservation District 1108 South 9th Street, NoblesvilIe IN 46060 Ph- 317-773-1432 or Email at john-south@iaswcd.org PROJECT NAME: Sedwick Construction Plans q () -01. S, SUBMITTED BY: GWZ Development 9011 N. Meridian Street Suite 202 Indianapolis, IN 46260 317-573-9301 Mr. Lance Brock Banning Engineering 698 Tower Road Suite 100 Plainfield, IN 46168 REVIEWED BY: John B. South P.E. Certified Professional in Erosion and Sediment Control PLAN REVIEW PROCEDURE: Site Visit Date: Plan Review Date: 7-16-02 Acreage: 33 ac. LOCATION: N side of 131 st between Towne and Schelboume Roads LEGAL DESCRIPTION: Sec. 29 TOWNSHIP: 18N RANGE: 3E CIVIL TOWNSHIP: Clay SOIL SURVEY MAP SHEET: 49 The technical review and comments are intended to evaluate the completeness of the erosion and sediment control plan for the project. The erosion and sediment control plan submitted was not reviewed for the adequacy of the engineering design. All practices included in the plan, as well as those recommended in the comments should be evaluated as to their feasibility by a qualified individual with structural practices designed by a qualified engineer. The plan has not been reviewedfor local, state, or federal permits that may be required to proceed with this project. Additional information, including design calculations may be requested to further evaluate the erosion and sediment control plan. The erosion and sediment control plan has been reviewed and it has been determined that the plan: Satisfies the minimum requirements and intent of 3271AC 15-5 (Rule 5). Notification will be forwarded to the Indiana Department of Environmental Management. Refer to the comments section for additional information. X Does not satisfy the minimum requirements and intent of 3271AC 15-5 (Rule 5); deficiencies are noted in the checklist and in the comments section. Deficiencies constitute potential violations of the rule and must be adequately addressed for compliance. The information necessary to satisfy the deficiencies must be submitted: Proper implementation of the erosion and sediment control plan and inspections of the construction site by the developer or a representative are necessary to minimize off-site sedimentation. The developer should be aware that unforeseen construction activities and weather conditions may effect the performance of a practice or the erosion and sediment control plan. The plan must be a flexible document, with provisions to modifY or substitute practices as necessary. Revised 4 / 97 " PROJECT: Sedwick Constructio~ans u Page 2 of3 Yes No x 1A x 1B x 1C x 1D x 1E Yes No x x x x x x x x x Yes No x x Yes No x 4A x 4B x 4C x 4D x 4E x 4F x 4G x 4H x 41 x 4J x 4K ARE THE FOLLOWING ITEMS ADEQUA TEL Y ADDRESSED ON THE PLANS? (All Plans Must Include Appropriate Legends, Scales, and North Arrow) (Items that are Not Applicable to this Project are designated by NA) PROJECT INFORMATION Project Location Map (Show project in relation to other areas of the county) Narrative Describing the Nature and Purpose of the Project Location of Planned and/or Existing Roads, Utilities, Structures, Highways, etc. Lot and/or Building Locations Landuse of Adjacent Areas (Show the Entire Upstream Watershed and Adjacent Areas Within 500 Feet of the Property Lines) TOPOGRAPHIC, DRAINAGE, AND GENERAL SITE FEATURES 2A Existing Vegetation (Identify and Delineate) 2B Location and Name of All Wetlands, Lakes and Water Courses On and Adjacent to the Site 2C 100 Year Floodplains, Floodway Fringes, and Floodways (Note if None) 2D Soils Information (Ifhydric soils are present, it is the responsibility of the owner/developer to investigate the existence of wetlands and to obtain permits from the appropriate government agencies.) 2E Existing and Planned Contours at an Interval Appropriate to Indicate Drainage Patterns 2F Locations of Specific Points Where Storm water Discharge Will Leave the Site 2G Identify All Receiving Waters ( If Discharge is to a Separate Municipal Storm Sewer, Identify the Name of the Municipal Operator and the Ultimate Receiving Water) 2H Potential Areas Where Storm water May Enter Groundwater (Note if None) 21 Location of Storm water System (Include Culverts, Storm Sewers, Channels, and Swales) LAND DISTURBING ACTIVITIES 3A Location and Approximate Dimensions of All Disturbed Areas [i.e., Construction Limits] (Areas Where Vegetative Cover Will Be Preserved Should be Clearly Designated) 3B Soil Stockpiles and or Borrow Areas (Show Locations or Note if None) EROSION AND SEDIMENT CONTROL MEASURES Sequence of When Each Measure Will Be Implemented (Relative to Earth Disturbing Activities) Monitoring and Maintenance Guidelines for Each Measure Perimeter Sediment Control Measures (Location, Construction Detail, Dimensions, and Specifications) Temporary Seeding (Specifications; Including Seed Mix, Fertilizer, Lime, and Mulch Rates) Temporary Erosion and Sediment Control Measures (Location, Construction Detail, Dimensions, and Specifications) Permanent Erosion and Sediment Control Measures (Location, Construction Detail, Dimensions, and Specifications) Storm Drain Inlet Protection (Location, Construction Detail, Dimensions, and Specifications) Stormwater Outlet Protection (Location, Construction Detail, Dimensions, and Specifications) Stable Construction Entrance (Location, Construction Detail, Dimensions, and Specifications) Erosion and Sediment Control on Individual Building Lots (Specifications) Permanent Seeding (Specifications; Including Seed Mix, Fertilizer, Lime, and Mulch Rates) Revised 4 / 97 .. .' ER~ON AND SEDIMENT CONTR~PLAN TECHNICAL REVIEW COMMENTS PROJECT: Sedwick Construction Plans Page 3 of 3 Note: All erosion and sediment control measures shown on the plans and referenced in this review must meet the design criteria, standards, and specifications outlined in the "Indiana Handbookfor Erosion Control in Developing Areas" from the Indiana Department of Natural Resources, Division of Soil Conservation or similar Guidance Documents. Comments: !B Please include when the project will start and end and who the contact person will be. 2A. Label on sheet #2. 2D. As a minimum, please list the soil types. 2G. The receiving water is the Brendel Drain and/or Long Branch Creek. 3 B. Show locations for topsoil mounds and other spoil piles or describe where the mounds should not be placed. 4A/4C. The majority of this site currently drains off site at lot 27. To prevent offsite discharge of sediment laden storm water, it is suggested that a diversion swale be cut across lot 27 directing the storm water into the detention basin. In addition a plan is needed for the excavation of the detention basin that will minimize pollution of the existing pond if it is already completed. Other . An operation and maintenance plan is recommended for all common areas. . The existing tile that crosses lot 27 should be abandoned properly. Cc: Carmel DOCS Ha. Co. Surveyor Ha. Co. Highway File ~p 't-" u u Dobosiewicz, Jon C From: Sent: To: Andy Kern [Andy.Kern@ctrwd.org] Monday, July 15, 20021:47 PM rfarrand@ccs.k12.in.us; AKeeling@cLcarmel.in.us; CTingley@cLcarmel.in.us; DHill@ci.carmel.in.us; DPattyn@ci.carmel.in.us; Ghoyt@ci.carmel.in.us; GStahl@ci.carmel.in.us; JDobosiewicz@ci.carmel.in.us; JKendall@ci.carmel.in.us; JPFoster@ci.carmel.in.us; KHahn@ci.carmel.in.us; LLillig@cLcarmel.in.us; MFogarty@ci.carmel.in.us; MHollibaugh@ci.carmel.in.us; MMcBride@ci.carmel.in.us; MSnyder@ci.carmel.in.us; PMorrissey@ci.carmel.in.us; PPace@ci.carmel.in.us; RAuler@ci.carmel.in.us; RHancock@ci.carmel.in.us; SBrewer@ci.carmel.in.us; SJohnson@cLcarmel.in.us; slillard@cLcarmel.in.us; W Akers@cLcarmel.in.us; sprater@cmsenergy.com; sjb@co.hamilton.in.us; stc@co.hamilton.in.us; Jay Alley; john- south@iaswcd.org; heck@iquest.net; jeffry. farmer@timewarnercable.com; tskolak@usps.gov; cshupperd@vectren.com Candy Feltner; sueellen@hotmail.com; rlauritsen@slmaco.com July 17th Carmel/Clay TAC Agenda Cc: Subject: Hello everyone: Following are CTRWD comments on the agenda items effecting our sanitary sewers or service area for the July 17 TAC meeting. Please feel free to copy and distribute this email or attach it to your meeting minutes. We have also created a new page on our website linked to the "Construction" page where we have posted all CTRWD TAC comments from 2001 and 2002 meetings held to date. We will continue to add to this page every month so please let jeveryone know they can view our comments online now too. Sedgwick Subdivision (Secondary Plat & Construction Plans) The plans received by the District do not show the most recent version of the specifications. Final revisions will be required. Building permits should NOT be issued unless the District has issued connection permits. Lakeside Park Subdivision (Primary Plat) The District has not received any plans for this proposal. Building permits should NOT be issued unless the District has issued connection permits. Shelbourne Greene, Section 8, Plat Vacation The District has no comments on the re-plat unless it effects the sanitary sewers in development. Lakes at Hayden Run, Section 1, Block A (Special Use) The plans received by the District do not show a sanitary sewer connection or contain the District's Sanitary Sewer Specifications. Revised plans need to be submitted showing a sanitary connection and the District's specifications. Building permits should NOT be issued unless the District has issued connection permits. Please remind all TAC applicants to provide plans directly to the District at our main office address in care of Andy Kern at: 10701 N. College Ave., Suite A, Indianapolis, IN 46280-1098. If there are questions about the District's requirements, then please refer to our website for current information on the District's construction specification and permit standards. We are a member of the IUPPS underground locate network so call 1-800-382-5544 before you dig! Please feel free to contact Jay or me if you have questions or need additional information. Thanks! 1 ~~dY ~;rn, Project specialis~ Clay Township Regional Waste District Hamilton County, IN, USA http://www.ctrwd.org/ 317-844-9200 (phone) 317-844-9203 (fax) u 2 07/15/02 09:11 FAX u HAMILTON CO HWY. ~~~ Carmel DOeD U ~ 0011002 .~ HAMILTON COUNTY HIGHWAY DEPARTMENT July 15, 2002 Mr. Lance G. Ferrell Banning Engineering 698 Tower Road, Suite 100 Plainfield, Indiana 46166 RE: s~' o -(2-. Sedgwick Subdivision '\, Secondary Plat and Construction Plans N of 1316t Street I W of Towne Road Clay Township Dear Mr. Ferrell: This letter serves to acknowledge receipt of a transmittal received 6124/02 containing the plans for the above-mentioned project. After reviewing the plans the Highway Department has the following comments: 1. An AppllcaUon for Project Review needs to be completed and the appropriate review fees for a Secondary Plat and Construction Plan paid, before any approvals will be granted from this office. I have enclosed a blank form for your use. 2. The westbound lane of 13181 Street will need to be widened 3 feet across the frontage of the property. This includes acquiring additional right of way from the Goold property to install the widening across their frontage. The widening will consist of a 14" stone base, 5" HAC binder and 1" HAC surface, plus a 3' stone shoulder. I have received the faxed copy of the letter sent to Mr. Goold, please keep me informed of the status. 3. The plat should read Hamilton County, not Hancock County. 4. Please note that decorative signs, sprinkler systems, trees, landscaping mounds, light poles or other such amenities are not permitted in the right of way. Include the note on the secondary plat and construction plans 5. Please use dimension lines to show the right of way on the plat. 6. The centertlne radius for Oonlegal Circle does not meet the HCHD minimum of 150'. If the street is to remain as shown, a variance will be needed from the standard. The variance should be obtained from the Hamilton County Board of Commissioners. 7. Before any approvals are granted for the Secondary Plat, an Engineers Estimate broken Into the following categories will need to be SUbmitted, along with a Performance Bond or Letter of Credit in the amount of 100% of the estimate: * Stone Base * HAC Binder '* HAC Surface '* Concrete Curbs '* Street Name and Regulatory Signs 8. A 2' non-access easement is needed along 131'1 Street. 1700 South 10dl Street Noblesville,ln. 46060 www.co.hamllton.ln.u!i Office (317) 773~7770 Fax (311) 116-9814 :. 07/15/02 09:12 FAX ~ 002/002 ~ u HAMILTON CO HWY. ~~Carme1 DOCD HAMILTON COUNTY HIOHWA Y DEPARTMENT 9. The path along the north side of Lincolnshire Bloulevard will not be permitted to meander as It is shown on the plans. Please show the path In a straight line. 10. Please Include a sheet showing the widening and stone shoulders across the front of the Goold property as well as the portion of 131sl Street that is fronted by the Sedgewick parcel. The pavement of 131$1 Street will need to be milled at the east end of the Gould property as well as the west end of the Sedgwick parcel and the road resurfaced with 1" of HAC surface. All pavement markings will need to be replace with thermoplastic markings. 11. Please Include a Landscaping Plan with the revisions. 12. Please Include the following note on all sanitary sewer plan sheets: All sanitary sewer laterals that cross the street must be backfilled with full depth granular backfill. 13. The median on Lincolnshire Boulevard should be wide enough to permit a maximum of 16' from back of curb to back of curb. 14. Please note on the water distribution sheets that no water valves will be permitted between the curbs. 15. Please Include the 25-MPH design speed on the cover sheet 16. Please Include the subsurface drain in the street cross section and the development plans. 17. Wentworth COurt must be minimum of 28' from back of curb to back of curb. 18. Please label and dimension the right 01 way and street widths on the construction plans. 19. A Testing and Inspection Agreement will be needed for this project. The necessary documents will be forwarded to the Developer. Please note that no construction may begin on the site until the construction plans have been approved and the Testing and Inspection Agreement executed. 20. Additional comments may be necessary after the revisions have been made. If you have any questions or comments concerning this letter, please feel free to contact me at anytime. Sincerely, ~If!---- , Steven J. Broermann Staff Engineer cc: Jon Dobosiewicz Steve Cash G:\U5ERS\SB\02TAC\07.15-025edgwick.cIoe 1700 South 10111 Street Noblesville, Ill. 46060 Office (317) 773-7770 FaJ (317) 776-9814 www.co.harnlltoaJo.s1 Fax u CITY OF CARMEL Department of Community Services One Civic Square Carmel, IN 46032 (317) 571-2417 Fax: (317) 571-2426 To: DAY'?! h/ar~)trv~r Fax: 02 3/- ? i4~ ?~~ Phone: ~ t3 /- Re: A-~A4 '" 7-/7-~ cc: u o Urgent 0 For Review 0 P.lease Comment 0 Please Reply o Please Recycle 5€?c:5JW,;k, JJ6a'l;":S";" .9tJ-Oa. -'7")0 u u '\ CITY OF CARMEL Department of Community SelVices One Civic Square Carmel, IN 4&X32 (317) 571-2417 Fax: (:317) 571-2425 Fax To: ;'tlr, h1l rslaver Fax: c5?3/- ?~33 Phone: 0?31-73~' Re: Srzt{9J11C/' :::V~cllv/~~/} From: VyCtZ Pages: c::q Date: 6-d?-O~ cc: o Urgent 0 For Review 0 Please Comment 0 Please Reply o Please Recycle ~Je /Jp/e-; 9tJ--o~ 0';0 Carmel June 26, 2002 Lance G. Ferrell Banning Engineering 698 Tower Road, Suite 100 Plainfield, IN 46168 RE: Sedgwick Job No.: 02022 Dear Mr. Ferrell: u artmen t u /r ,'\, (_/ ~1~ ~ -~-\ ~~ 4;:~ -~ ./\ I"~ ':/ ~ , , {,">-. /'" '/ '-.... /.~>,.. ...:{;, ) '< / ,'- __rf\ -V "'0J.j-1-<;:1 \ V -.-=------- I have received and reviewed the information for the above-mentioned project. At the present time, I see nothing in the plans that would hamper law enforcement efforts. If we can be of any further assistance to you, please contact us. Respectfully ~~~{rii Chief of Police MDF:vb cc: Dept. of Community Services rcement Agency _ Fax (317) 571-2512 (317) 571-2500 A Nationally Accredit Banning Engineering, P.C. . 698 Tower Road, Suite 100 . Plainfield, IN 46168 Phone: (317) 839-2581 . Fax: (317) 838-9171 . E-mail: banning@banning-eng.com June 24, 2002 Mr. Jon Dobosiewicz Planning Administrator Dept. Of Community Services City of Carmel One Civic Square Carmel, IN. 46032 RE: SEDGWICK SUBDIVISION Dear Jon: Please find enclosed 2 sets of final construction plan, 2 secondary plats, copies of the dirt balance takeoff sheet and a reduced version of the landscape plan for your review. David Warshauer will be forwarding you the application and fees later this week. I have also sent out construction plans, grading/utility plans and plats to the Technical Advisory Committee Members list. We are planning on attending the July 17th meeting date and would like-for you to fax over an agenda when it is complete. If you have any questions or need any additional information, please call... Cc: Mark Zukerman - GWZ Development-l LLC David Warshauer - Barnes & Thornburg S:\Projects\02022\docs\joncarmeI2.doc 6/24/ / ~\~ . .1 lii.iiiiI._".~"a. ......SW'..... 1IIa:W'..alll :F.4~~la..~I_."ICII."I..:..".__i"-';'__=r.:...:t"ct~ M.~Y-l~~2P02 THU 03:49 PM CARMEL COMMUNITY SVCS FAX NO. 317 571 2426 , P. 01 , - City of Carmel DEPARTMENT OF COMMUNITY SERVICES --..- - -- ----- -'--- - David Warshauer Barnes & Thomburg 11 South Meridian Street Indianapolis, IN 46204 RE: Sedgewick Subdivision, Primary Plat Landscape Plans Phone IF May 14, 2002 Fax' Fax. 'S"1 \ - "Z."fl fJ Dear Mr. Warshauer: After our phone conversation today, I reviewed the entrance and common area landscape plans for Plan Commission submission. My comments on the subdivision are as follows: 1. An engineered site plan showing all required and proposed landscaping needs to be submitted. This plan must include perimeter bufferyard requirements found in Chapter 26.4 of the 'Carmel/Clay Zoning Ordinance. A table should be included that shows required plant totals and totals provided on the proposed plan. A designated landscaping easement should be established for these plantings to avoid conflict with drainage and utility easements. 2. These plans must include a plant schedule with totals, and planting notes and graphic planting details. 3. Landscaping in the medians on Lincolnshire Boulevard should include shade trees, low-growing shrubs and plants and ground covers. Turf should be eliminated if possible to avoid the need to mow weekly. 4. Species comments: Two-needle pines such as Austrian Pine (Pinus nigra) should be avoided because of long-term health and pest concems. Spruce (Picea) species, deciduous evergreens such as Dawn Redwood (Metasequoia glyptosfroboides), or Fir' (Abies) Species are much better alternatives. Crabapple species should be chosen from the Indiana Urban Forest Council's recommended list (see attached). 'Floribunda' variety is acceptable; 'Profusion' and 'Snowdrift' are not. ONE CIVIC SQUARE CARMEL,INDlANA46032 317/571.2417 . H f1A V -18- 2002 THU 03: 50 IPM CARMEL COMMUN!TV SVCS HcCEIVED: 5/16/02 3:57PM; ->BANNING ENGINEERING; #53; PAGE 2 P. 02 , , FAX NO. 317 571 2428 Cross-pollination between ornamental pear species of the "callery" family is becoming an invasive problem. Please choose an alternative ornamental tree species. Such species could include Yellowwood (Cladrastis kentukea), Hornbeam (Carpinus), Hop Hornbeam (Ostrya virginiana), Tri-color Beech (Fagus sylvatica 'Purpurea Tri-color'. Pagoda Dogwood (Comus altemifolia), or Redbud (Cereis canadensis). Please reply to these comments in writing and by amended pla.n. If you have any questions or comments, please contact me be phone at 317-571..2478 or by email atSbrewer@ci.carmel:in.us. . Sincerely, SuN~ Scott Brewer Urban Forester, City of Carmel CC: Jon Dobosiewicz, DOCS Lance Ferrell. Banning Engineering _I' -, -II:;. ""'.....,ur.w., --CAI~I~~I\IU t::.1'U.:i~NccHJ..Nl:i; #53; PAGE 3 MAY-16-2002 THU 03:50 PM CARMEL COMMUNITY SVCS rAY 2000 FAX NO. 317 571 2426 .' P. 03 JnIUFC Education Committee R~ort... . . Selecting Crab apples . . . Tre~'ofthe Malus species. Crabapples. Vou love them or you hate them.. To somo they arc a priceless landscape specimen with' . . o~tanding flower display. To others they are a maintenance headache with COD stant base sprouting. Some crabapples can be: . plagued with disease. like apple scab and also be defoliated by Japanese beetles. But by choosing your crabapple cultivars wisely, you can be assured of healthy trees. A 1997 publication of Purdue Cooperative Extension by Cliff Sador. Department of Entomology and Paul pecknOld, Department of Botany and Plant Pathology oullined crabapples resistant to apple scab and lapanese beetles in Indiana and also those species , not rec~mmended. Note that some of the popular street tree species like Snowclrift crabapple are on the latter list. Keep in mind, also. that cl'i1bapples came in all shapes Bnd sizes. They ara ideal under power lines and in narrow grow spaces. When choosing B crabapple species, use the list below to assure plant health and note the eventual width of the tree you plant. If yo~ keep in mind requirements for sidewalk and street cleal'lllces, 8 proper selec,tion can minimize pruning needs. And don't' forget to request "tree form" when ordering if you want a single stem tree that is ~Iready pruned. Recommended Crabappta Cultivars: pultivar Adirondack Bac:cata "Jackif' Bechtel Centurion David J!arvesl Gold Japanese Flowering Louisa Molto'n Lava PiDk Spires Prorimue Red.Baron Red Jewel " ,Sinai Fire Tea Van Eseltin~ Wintor Gold Zumi Calocarpa J'felght U'H 30'M 30'1{ 20'H 12'H 25'H WRwl 10'W 20'W lS'W IS'W 12'W 20"W 2S'W IS'W weeping, rrue pink flowers, glossy leaves somi-weeping pink flowers. purple leaves pinkish red flowers., purple sreen leaves dark rod flowers, purple leaves white flowers, bright red fiuit , white flowers, gloss)' leaves; red fruit unique spread upright vase Comments: white flowers wbite flowers. glossy leaves: rose red flowers, vase upright whits flowers, glossy leaves gold fruit 15'H 20'H 18'H 15'H (S'H 2S'H 20'H 12'W 20'W 8'W 12'W IS'W 2S'W. 12'W 20'W 24'W "Red Bud" Crab, wide; while flowers Crabapple Cultivars Not Recommended: , ~e followtng should not be us.ed because of insect and d;seas8 susceptlbl7ity Adams BlISkatong Brandywine Candied Apple Donald Wyman Doubloons Page 4 Indian Magie Indian Summer Liset Madonna Mal)' Potter Prane Maid Profusion Robinson Selkirk Sen~i,nel Snowdrift. Sugar T)'me Velvet Pillar White Cascade White Candle' u Q Lance G. Ferrell Banning Engineering 698 Tower Road, Suite 100 Plainfield, IN 46168 RE: Sedgwick Subdivision LETTER OF APPROVAL The undersigned has reviewed the proposed plans for Sedgwick Subdivision and has approved the plans subject to the following: 1. Will there be an amenity building associated with this project? If so, we request that a Knox box be installed on that building for emergency access. 3. 4. 5. 6. Please respond to the above noted condition(s) in writing and submit to our office prior to the scheduled Technical Advisory Meeting for this project. Date: March 25. 2002 By: Gary Hoyt, Fire Marshal Carmel Fire Department