Loading...
HomeMy WebLinkAboutCorrespondencePlan Review - Review Comments Report Project Name: CRC PZ-2024-00196 to 202 Civic Square Condos DP ADLS Variances Workflow Started: 10/8/2024 3:10:08 PM Report Generated: 12/06/2024 10:38 AM REF #CYCLE REVIEWED BY TYPE FILENAME DISCUSSION STATUS 1 1 Planning & Zoning Angie Conn 10/11/24 3:14 PM Comment Please also submit a HPR/ Condominium Application, to be completed before the condo units are sold. You may create and submit the HPR Application on the online application portal: https://cw.carmel.in.gov/PublicAccess/login Responded by: Ben Bemis - 11/12/24 1:53 PM So noted. Resolved 2 1 Planning & Zoning Angie Conn 10/11/24 3:15 PM Comment Please add a few more bicycle parking racks to the site plan. Responded by: Ben Bemis - 11/12/24 2:14 PM Additional bike racks have been added. See sheet C200. Resolved 3 1 Planning & Zoning Angie Conn 10/11/24 3:17 PM Comment Please provide the exterior light fixture design details. Responded by: Ben Bemis - 11/12/24 2:15 PM The included site photometrics plan has exterior light fixture design detail included on the plan. Resolved 4 1 Planning & Zoning Angie Conn 10/11/24 3:18 PM Comment Pleas upload the lighting/photometric plan sheets. Responded by: Ben Bemis - 11/12/24 1:55 PM Site photometric plan has been uploaded. Resolved 5 1 Planning & Zoning Angie Conn 10/11/24 3:21 PM Comment Several BZA variance approvals will be needed, for: increased lot cover percentage, no shade trees in the Monon Green Blvd. right of way, and reduction of street typologies and streetscape facilities for Veterans Way (that are required for Transportation Plan Compliance). Reviewer Response: Angie Conn - 11/15/24 10:32 AM Thank you for planting shade trees in the Monon Green Blvd. right of way, to remove the need for that one variance. Per the City’s Urban Forester, ginkgo trees are fine to plant along Monon Green Blvd.; however, they are not native. Instead, he recommends red oak, hackberry, or hybrid elm for native trees in that area. Please consider changing out the tree species for that area. ---------------------------------------------------------- Responded by: Ben Bemis - 11/12/24 1:55 PM BZA variances have been initiated. Resolved REVIEW COMMENTS Plan Review - Review Comments Report Project Name: CRC PZ-2024-00196 to 202 Civic Square Condos DP ADLS Variances Workflow Started: 10/8/2024 3:10:08 PM Report Generated: 12/06/2024 10:38 AM REF #CYCLE REVIEWED BY TYPE FILENAME DISCUSSION STATUS 6 1 Planning & Zoning Angie Conn 10/14/24 10:28 AM Comment Regarding the BZA Variance requests - a) Please make checks payable to City of Carmel if you are paying via check. b) Provide a copy of the Official List of Adjacent Property Owners from the Hamilton County Auditors Office. (Make sure to check Carmel BZA on their form.) c) *The Current in Carmel only prints on Tuesdays, and their filing deadline is usually 14 days prior to their printing date. Please submit your Microsoft Word file of the legal ad to them before Noon, Fri., October 18 so that it prints on time. Their contact info is 317-489-4444 or legals@youarecurrent.com. (Please refer to the Handout for a template of wording to use for the legal ad and the mailings the Notice of Public Hearing.) d) The mailings/notices to the adjacent property owners should be done by first class mail with Certificate of Mailing (not Certified Mail). (Please provide us with the stamped receipts of the certificate of mailings for the file on or before Noon, Fri. Nov. 15.) e) Please provide the filled out & notarized Placement of Public Notice Sign Placement Affidavit form (found in Handout) once the sign is placed. f) Please provide the filled out & notarized Petitioners Affidavit of Notice of Public Hearing form (found in Handout). g) Please provide the filled out Notice of the Public Hearing form/template (found in Handout). h) Please provide proof of notice, such as Publishers Affidavit from the newspaper, once you receive them. i) Please make sure to list out your practical difficulties associated with having to comply with the zoning ordinance (each variance will needs its own Findings of Fact). Responded by: Ben Bemis - 11/12/24 2:15 PM Public notices have been completed. See included documentation with this re-submittal. Resolved 7 1 Planning & Zoning Angie Conn 10/14/24 10:35 AM Changemark circle element What will go in this circle? Please provide more details on this. A201 - EXTERIOR ELEVATIONS.pdf Reviewer Response: Angie Conn - 11/15/24 10:32 AM Okay, thank you. ---------------------------------------------------------- Responded by: Ben Bemis - 11/12/24 1:56 PM The medallion on the central pediment will be a unique design. It is still in development and can be shared once finalized. Resolved 8 1 Vectren Energy Chad Miller 10/15/24 8:45 AM Comment Please locate and show on the construction plans all the existing gas mains around the site to avoid damage. Responded by: Ben Bemis - 11/12/24 3:07 PM Existing gas mains have been shown on the plans. See updated sheet C500. Info Only 9 1 Engineering Alex Jordan 10/15/24 11:15 AM Changemark Please provide the MLAG and MFPG for this portion of the condos C300 - GRADING AND DRAINAGE PLAN.pdf Responded by: Ben Bemis - 11/12/24 2:03 PM This note has been added to the plans. Resolved Plan Review - Review Comments Report Project Name: CRC PZ-2024-00196 to 202 Civic Square Condos DP ADLS Variances Workflow Started: 10/8/2024 3:10:08 PM Report Generated: 12/06/2024 10:38 AM REF #CYCLE REVIEWED BY TYPE FILENAME DISCUSSION STATUS 10 1 Engineering Alex Jordan 10/15/24 11:15 AM Changemark The FFE should be 6" higher than the MLAG and MFPG Currently the FFE is below the MLAG and MFPG and should be revised to be 6" above per our standards. C300 - GRADING AND DRAINAGE PLAN.pdf Responded by: Ben Bemis - 11/12/24 2:03 PM A waiver will be requested for this requirement. Resolved 11 1 Engineering Alex Jordan 10/15/24 2:59 PM Changemark Please provide the 100-year ponding in the clogged condition for this inlet Per the parking garage plans, the elevation of the ponding is 837.97, which is above the FFE for the adjacent condos. The FFE will need to be raised above the ponding in this area. C301 - FLOOD ROUTING PLAN.pdf Responded by: Ben Bemis - 11/12/24 2:03 PM As the flood route moves moves north past the 837.97 flood routing point the grade continues to drop as it enters Monon Green Blvd. and continues to Veteran's way. The condos on the north side are not at risk of flooding from this point. The MFPG and MLAG for the Condos on Monon Green Blvd is 835.31. Resolved 12 1 Engineering Alex Jordan 10/15/24 3:13 PM Changemark Please show the roof drains on this sheet and the drainage plan C500 - UTILITY PLAN.pdf Reviewer Response: Alex Jordan - 11/18/24 3:19 PM Is it possible to tie the downspouts into the Veteran's Way storm system rather than discharging onto the parking garage deck? We are concerned that discharging onto the deck as proposed will result in icy conditions when it get colder as well as exceed the capacity of the existing infrastructure. Also, if the drainage is currently directed to the sanitary sewer, Carmel Utilities may have a concern with accepting the additional water during rain events. ---------------------------------------------------------- Responded by: Ben Bemis - 11/12/24 1:33 PM The downspouts for the proposed Condos have been added to the utility plan as well as the existing garage roof drains. Resolved 13 1 Urban Forestry Daren Mindham 10/16/24 8:17 AM Changemark overlapping words Please move the plant schedule wording down so that everything is legible. Is there more wording cut off with wording above the plant schedule? Please revise. C701 - LANDSCAPE NOTES & DETAILS.pdf Responded by: Ben Bemis - 11/12/24 2:23 PM Overlapping words have been removed, and the planting schedule remains in place. Resolved 14 1 Urban Forestry Daren Mindham 10/16/24 8:30 AM Changemark redbud count Looks like this should be 2 CC not 1 CC. please revise. C700 - LANDSCAPE PLAN.pdf Responded by: Ben Bemis - 11/12/24 2:23 PM The plan callout has been corrected. Resolved Plan Review - Review Comments Report Project Name: CRC PZ-2024-00196 to 202 Civic Square Condos DP ADLS Variances Workflow Started: 10/8/2024 3:10:08 PM Report Generated: 12/06/2024 10:38 AM REF #CYCLE REVIEWED BY TYPE FILENAME DISCUSSION STATUS 15 1 Urban Forestry Daren Mindham 10/16/24 8:30 AM Changemark pavement Is this a strip of extra pavement? Can it be removed to enlarge the landscape beds? C700 - LANDSCAPE PLAN.pdf Responded by: Ben Bemis - 11/12/24 2:23 PM The lawn strip has been removed and replaces with plantings. Resolved 16 1 Urban Forestry Daren Mindham 10/16/24 8:33 AM Changemark redbuds Looks like these trees are within a 5' landscape bed against a building. Will there be overhangs here? Maybe a change to emerald green arborvitae would be a better choice to limit issues with clearance along the path over time. C701 - LANDSCAPE NOTES & DETAILS.pdf Responded by: Ben Bemis - 11/12/24 2:24 PM Redbuds have been replaced with arborvitae. Resolved 17 1 Engineering Alex Jordan 10/16/24 9:09 AM Changemark Please note on this detail that it will need to be used for all inlets within City right-of-way C901 - STORMWATER POLLUTION & PREVENTION DETAILS.pdf Responded by: Ben Bemis - 11/12/24 2:03 PM The note has been modified on the SWPP Details page. Resolved 18 1 Engineering Alex Jordan 10/16/24 9:11 AM Changemark Will this O&M be recorded in place of the existing O&M? 316-131-O&M Manual.pdf Responded by: Ben Bemis - 11/12/24 2:04 PM Yes. Resolved 19 1 Engineering Alex Jordan 10/16/24 9:14 AM Library Comment Please verify that there are no direct discharge areas Responded by: Ben Bemis - 11/12/24 2:04 PM Direct discharge is expected from part of the project site to Veterans Way and the Monon Green Blvd. as approved in the master drainage plan. The proposed discharge rates from the Condo project to the storm sewer is equal to the rates proposed in the Civic Square Parking Garage Drainage Report. Resolved 20 1 Engineering Alex Jordan 10/16/24 9:14 AM Library Comment Please verify that all elevations are North American Vertical Datum of 1988 (NAVD) Responded by: Ben Bemis - 11/12/24 2:31 PM All elevations are NAVD 1988. Resolved 21 1 Engineering Alex Jordan 10/16/24 9:14 AM Library Comment Please verify that the horizontal datum of topgraphic map is Indiana State Plane Coordinates, NAD83 Responded by: Ben Bemis - 11/12/24 2:32 PM The horizontal datum is NAD83. Resolved 22 1 Engineering Alex Jordan 10/16/24 9:14 AM Library Comment Please verify that the locations of existing utilities with top of curb and invert elevations, pipe sizes, and direction are shown Responded by: Ben Bemis - 11/12/24 2:35 PM Existing utilities have been identified with elevations per the survey where accessible. See appropriate plan sheets. Resolved Plan Review - Review Comments Report Project Name: CRC PZ-2024-00196 to 202 Civic Square Condos DP ADLS Variances Workflow Started: 10/8/2024 3:10:08 PM Report Generated: 12/06/2024 10:38 AM REF #CYCLE REVIEWED BY TYPE FILENAME DISCUSSION STATUS 23 1 Engineering Alex Jordan 10/16/24 9:14 AM Library Comment Please verify that all existing culverts, pipes, and bridges on existing drives or under the roadway are shown indicating size, type, and invert elevations Responded by: Ben Bemis - 11/12/24 2:35 PM Existing culverts, pipes and bridges on existing drives or under the roadway are shown per the survey. Resolved 24 1 Engineering Alex Jordan 10/16/24 9:14 AM Library Comment Please verify that the locations of all existing electrical power vaults, transformers, power lines, gas lines, television cable , and telephone lines are shown Responded by: Ben Bemis - 11/12/24 2:36 PM Existing power transformers and power lines, cable and telephone lines are shown per the survey. Resolved 25 1 Engineering Alex Jordan 10/16/24 9:17 AM Changemark Please replace with the City's street cut repair detail, 10-24 C200 - SITE LAYOUT PLAN.pdf Responded by: Ben Bemis - 11/12/24 2:13 PM Detail has been replaced with City's street cut repair detail, 10-24. Resolved 26 1 Carmel Redevelopment Commission Larysa Glaspie 10/22/24 11:09 AM Comment CRC will provide review comments after the CRC Architectural Review Committee meeting. This meeting will be scheduled soon. Please let us know if you have any questions. Thank you! Info Only 27 1 Fire Carmel Fire 10/23/24 8:36 AM Comment All required fire protection and fire alarm systems for the existing structure shall remain in service and fully functional at all times. Info Only 28 1 Fire Carmel Fire 10/23/24 8:37 AM Comment All required exiting and means of egress for the existing building shall be maintained unobstructed at all times. Info Only 29 1 Sign Permits Aliza Shalit 10/23/24 11:55 AM Comment Please provide more specifics about the possible signage locations per the application. Responded by: Ben Bemis - 11/12/24 2:54 PM Beyond those required by egress and/or addressing, additional signage for this project is not anticipated at this time.” Resolved 30 1 Sign Permits Aliza Shalit 10/23/24 11:56 AM Comment All permanent and Temporary signs require a sign permit application and review process. No sign shall be installed without this process. Please apply using the City of Carmel’s online permitting portal. Info Only 31 1 Transportation Systems David Littlejohn 10/23/24 12:11 PM Changemark direct sidewalk connection to existing sidewalk Please consider widening the sidewalk here to provide a more direct connection to the east/west sidewalk to the east of this project. C200 - SITE LAYOUT PLAN.pdf Responded by: Ben Bemis - 11/12/24 2:17 PM Sidewalk has been widened, or tapered to provide a direct path. Resolved Plan Review - Review Comments Report Project Name: CRC PZ-2024-00196 to 202 Civic Square Condos DP ADLS Variances Workflow Started: 10/8/2024 3:10:08 PM Report Generated: 12/06/2024 10:38 AM REF #CYCLE REVIEWED BY TYPE FILENAME DISCUSSION STATUS 32 1 Transportation Systems David Littlejohn 10/23/24 12:11 PM Changemark ADA ramp alignment Please ensure that the ADA ramp on the south east corner of Monon Green Blvd and Veterans Way aligns with the existing ramp on the south west corner of the intersection to provide a straight crosswalk across Veterans Way. C200 - SITE LAYOUT PLAN.pdf Responded by: Ben Bemis - 11/12/24 2:17 PM Ramp was adjusted to better align with the existing ramp on the southwest corner of Monon Green Blvd. and Veterans Way. See sheet C200 and included Aerial Overlay, C201. Resolved 33 1 Transportation Systems David Littlejohn 10/23/24 12:14 PM Changemark ADA ramp to north side of Monon Green Blvd Revise the plans to include an ADA compliant ramp from the sidewalk along the south side of Monon Green Blvd to the ramp/sidewalk along the north side of Monon Green Blvd. C200 - SITE LAYOUT PLAN.pdf Responded by: Ben Bemis - 11/12/24 2:18 PM Ramp has been added. See updated C 200 plan. Resolved 34 1 Transportation Systems David Littlejohn 10/23/24 1:34 PM Changemark Sidewalk connection to building entrance/exit Revise the plans to include a sidewalk connection to the entrance/exit of the building's trash room. C200 - SITE LAYOUT PLAN.pdf Responded by: Ben Bemis - 11/12/24 2:18 PM Sidewalk connection has been added, see updated C200. plan. Resolved 35 1 Transportation Systems David Littlejohn 10/23/24 1:43 PM Changemark Bike rack location The proposed location of the bike racks is adjacent to the trash room's entrance/exit and garage door. There is also covered public bicycle parking just south of the proposed location. Please consider moving the proposed bike racks to the other side of the building to provide better bicycle parking access for the whole building/site. C200 - SITE LAYOUT PLAN.pdf Responded by: Ben Bemis - 11/12/24 2:18 PM Bike racks have been move close to the front entrance to the Condos, additional bike racks have been included near the south garage entrance. Resolved 36 1 Planning & Zoning Rachel Keesling 10/24/24 3:46 PM Changemark Siding and trim color Were any colors besides gray looked at for siding or trim colors? Along with the gray roof, it just seems like A LOT of gray. Especially on the back facade over the parking garage. A different trim color or accent color could complement the overall design nicely. A201 - EXTERIOR ELEVATIONS.pdf Reviewer Response: Rachel Keesling - 11/14/24 4:43 PM That is correct, thank you. ---------------------------------------------------------- Responded by: Ben Bemis - 11/12/24 1:56 PM The s shingle selection has been revised to compliment the cladding materials. Through discussions with the CRC, the design team was directed to keep the grey. Resolved 37 1 Planning & Zoning Rachel Keesling 10/24/24 3:46 PM Changemark Balcony areas Please confirm that the balcony areas (for the entire project) will be open air and that there are no screens or glass proposed to fully enclose the space. A201 - EXTERIOR ELEVATIONS.pdf Reviewer Response: Rachel Keesling - 11/14/24 4:37 PM Thank you. ---------------------------------------------------------- Responded by: Ben Bemis - 11/12/24 1:56 PM Confirmed. Resolved Plan Review - Review Comments Report Project Name: CRC PZ-2024-00196 to 202 Civic Square Condos DP ADLS Variances Workflow Started: 10/8/2024 3:10:08 PM Report Generated: 12/06/2024 10:38 AM REF #CYCLE REVIEWED BY TYPE FILENAME DISCUSSION STATUS 38 1 Planning & Zoning Rachel Keesling 10/24/24 3:46 PM Changemark Roof element Will there be any roof element to cover the balcony on the fourth floor? It appears like there is one for the NW corner balcony space, but it is hard to tell for the other locations. (Same question for the other 4th floor balcony areas.) A201 - EXTERIOR ELEVATIONS.pdf Reviewer Response: Rachel Keesling - 11/14/24 4:37 PM Thank you. ---------------------------------------------------------- Responded by: Ben Bemis - 11/12/24 1:57 PM Confirmed. Resolved 39 1 Planning & Zoning Rachel Keesling 10/24/24 3:46 PM Changemark 1st floor balcony/patio areas What is the material at the base of the building in front of the patio/balcony? Is it concrete? Will it be brick to match the rest of the building? Please provide more details. A201 - EXTERIOR ELEVATIONS.pdf Reviewer Response: Rachel Keesling - 11/14/24 4:42 PM Ok, thank you. ---------------------------------------------------------- Responded by: Ben Bemis - 11/12/24 1:58 PM The brick of the First FL will run through when the balcony is taller than grade Resolved 40 1 Planning & Zoning Rachel Keesling 10/24/24 3:46 PM Changemark Signage Do you plan to have any signs on the exterior of the building? (other than addressing) A201 - EXTERIOR ELEVATIONS.pdf Reviewer Response: Rachel Keesling - 11/14/24 4:41 PM Ok, please note that if there will be any signs, they must receive sign permit approval from DOCS prior to manufacturing or installing. ---------------------------------------------------------- Responded by: Ben Bemis - 11/12/24 1:58 PM Defer to owner. None at this time. Resolved 41 1 Planning & Zoning Rachel Keesling 10/24/24 3:46 PM Changemark HVAC equipment Where will HVAC equipment be located? Is it concealed within the pitched roof portion of the building? A201 - EXTERIOR ELEVATIONS.pdf Reviewer Response: Rachel Keesling - 11/14/24 4:45 PM Thank you for providing a roof plan as well. ---------------------------------------------------------- Responded by: Ben Bemis - 11/12/24 1:59 PM HVAC units will be located on the flat roof portions of the roof. Resolved Plan Review - Review Comments Report Project Name: CRC PZ-2024-00196 to 202 Civic Square Condos DP ADLS Variances Workflow Started: 10/8/2024 3:10:08 PM Report Generated: 12/06/2024 10:38 AM REF #CYCLE REVIEWED BY TYPE FILENAME DISCUSSION STATUS 42 1 Planning & Zoning Rachel Keesling 10/24/24 3:46 PM Changemark 1st floor balcony/patio egress Will there be gates for egress from the first floor balconies? A201 - EXTERIOR ELEVATIONS.pdf Reviewer Response: Rachel Keesling - 11/14/24 4:40 PM Ok, thank you for confirming. ---------------------------------------------------------- Responded by: Ben Bemis - 11/12/24 1:59 PM No gates will be provided at the First FL balconies Resolved 43 1 Planning & Zoning Rachel Keesling 10/24/24 3:46 PM Changemark Back of brick tower Is this the back of the red brick tower portion of the building? If so, can it too be red brick instead of siding? A201 - EXTERIOR ELEVATIONS.pdf Reviewer Response: Rachel Keesling - 11/14/24 4:38 PM Ok, thank you for confirming. ---------------------------------------------------------- Responded by: Ben Bemis - 11/12/24 1:59 PM The brick cannot be suspended over the existing garage or stair towers Resolved 44 1 Planning & Zoning Rachel Keesling 10/24/24 3:46 PM Changemark cornice detail termination Can you provide a view of the north side of this corner? I would like to see how the cornice terminates on the side adjacent to the 4th floor balcony. Is it similar to the picture included of the east facade? (Same request for the south facing side of the building too) A201 - EXTERIOR ELEVATIONS.pdf Reviewer Response: Rachel Keesling - 11/14/24 4:22 PM Thank you for clarifying. ---------------------------------------------------------- Responded by: Ben Bemis - 11/12/24 1:59 PM Yes, the picture provided shows how the cornice returns approx. 36". This condition is consistent on all gable ends. Resolved 45 1 Planning & Zoning Rachel Keesling 10/24/24 3:46 PM Changemark Siding on back of building Could the large expanse of gray siding be broken up on the back of the building? I drew some vertical lines following the rooflines above - perhaps there could be different colors in the different sections? Or maybe some trim boards and a different kind of siding? A202 - EXTERIOR ELEVATIONS.pdf Reviewer Response: Rachel Keesling - 11/14/24 4:24 PM Thank you for making the adjustments. ---------------------------------------------------------- Responded by: Ben Bemis - 11/12/24 2:00 PM Spandrel areas have been added between the Third and Fourth FL windows to help break up the walls. Additional area with a sloped roof will receive a complimentary siding color. Resolved Plan Review - Review Comments Report Project Name: CRC PZ-2024-00196 to 202 Civic Square Condos DP ADLS Variances Workflow Started: 10/8/2024 3:10:08 PM Report Generated: 12/06/2024 10:38 AM REF #CYCLE REVIEWED BY TYPE FILENAME DISCUSSION STATUS 46 1 Planning & Zoning Rachel Keesling 10/24/24 3:46 PM Changemark "faux" cornice Could you create a faux cornice with some trim boards and maybe a different color than the siding to add interest on the back facade? (yellow lines on elevation) A202 - EXTERIOR ELEVATIONS.pdf Reviewer Response: Rachel Keesling - 11/14/24 4:44 PM Thank you, the color changes help as well. ---------------------------------------------------------- Responded by: Ben Bemis - 11/12/24 2:00 PM Scuppers and downspouts have been added to the garage-facing elevations. This should help to break up and add interest to the top portion of the walls Resolved 47 1 Planning & Zoning Rachel Keesling 10/24/24 3:46 PM Changemark Different material or color? Could this eave area be a different siding pattern or color to make it more of a feature? A202 - EXTERIOR ELEVATIONS.pdf Reviewer Response: Rachel Keesling - 11/14/24 4:38 PM Ok, thank you for explaining. ---------------------------------------------------------- Responded by: Ben Bemis - 11/12/24 2:01 PM It is the designer's opinion that providing a more uniform appearance on the gables helps compliment the rest of the materials and focuses attention to other features like the brick corbeling, projecting balconies, etc. Resolved 48 1 Planning & Zoning Rachel Keesling 10/24/24 3:46 PM Changemark Exposed garage? Is this portion of the garage exposed concrete? Was that always the plan or can it be included with this project to conceal that portion? A202 - EXTERIOR ELEVATIONS.pdf Reviewer Response: Rachel Keesling - 11/14/24 4:39 PM Thank you for addressing this overlooked section. ---------------------------------------------------------- Responded by: Ben Bemis - 11/12/24 2:01 PM The exposed garage will be completed to match adjacent character Resolved 49 1 Planning & Zoning Rachel Keesling 10/24/24 3:46 PM Changemark Brick detailing Could you add some brick detailing in this middle area of the bay window? Same color, perhaps a different pattern or a border? (Applies to all three bay windows on the NW red brick portion of the building) A202 - EXTERIOR ELEVATIONS.pdf Reviewer Response: Rachel Keesling - 11/14/24 4:39 PM Thank you for adding the detailing. ---------------------------------------------------------- Responded by: Ben Bemis - 11/12/24 2:01 PM Additional brick detailing that compliments the primary middle bay has been added to the bay windows Resolved Plan Review - Review Comments Report Project Name: CRC PZ-2024-00196 to 202 Civic Square Condos DP ADLS Variances Workflow Started: 10/8/2024 3:10:08 PM Report Generated: 12/06/2024 10:38 AM REF #CYCLE REVIEWED BY TYPE FILENAME DISCUSSION STATUS 50 1 Planning & Zoning Rachel Keesling 10/24/24 3:46 PM Changemark 1st floor 3 window header I am torn about having the header go over all three windows on the first floor. Should it have some kind of different brick detailing between the windows or a continued "sill"? Or maybe some extra framing on the side? Would like to hear your thoughts on this particular design element. A202 - EXTERIOR ELEVATIONS.pdf Reviewer Response: Rachel Keesling - 11/14/24 4:40 PM Thank you for providing an explanation and looking into the concern. ---------------------------------------------------------- Responded by: Ben Bemis - 11/12/24 2:01 PM The extended header is intended to provide an element to differentiate the First FL as the base of the building Resolved 51 1 Planning & Zoning Rachel Keesling 10/24/24 3:50 PM Changemark Bike rack proximity to trash room The bike racks here are unprotected from the garage door entrance to the trash room. What kind of trash bins will be used? Is it individual totes? Or a larger commercial size? Some bollards may be beneficial if the bike racks remain in this location. C200 - SITE LAYOUT PLAN.pdf Reviewer Response: Rachel Keesling - 11/14/24 4:17 PM Thank you for making modifications. ---------------------------------------------------------- Responded by: Ben Bemis - 11/12/24 2:16 PM These bike racks have been move closer to the front entrance. Resolved 52 1 Planning & Zoning Rachel Keesling 10/24/24 3:50 PM Changemark Potential bike rack location This might be a good spot for bike racks located closer to the front door. C200 - SITE LAYOUT PLAN.pdf Reviewer Response: Rachel Keesling - 11/14/24 4:18 PM Thank you. ---------------------------------------------------------- Responded by: Ben Bemis - 11/12/24 2:16 PM Bike racks have been moved to this location. Resolved 53 1 Planning & Zoning Rachel Keesling 10/24/24 4:04 PM Changemark Site details Please add site details such as lot size, lot coverage, number of units, number of bike parking spaces, etc. to the site plan. C200 - SITE LAYOUT PLAN.pdf Reviewer Response: Rachel Keesling - 11/14/24 4:19 PM Thank you. ---------------------------------------------------------- Responded by: Ben Bemis - 11/12/24 2:16 PM See Site Data information on title sheet and C200. Resolved 54 2 Transportation Systems David Littlejohn 11/14/24 1:31 PM Changemark Bike installation specs Please ensure that the bike racks will be installed according to the city's bike rack installation standards. Racks are to be installed a minimum of 24" from any obstructions with a minimum of 30" of space between each rack. Refer to section 5.29 of the city's UDO for more information/details on the city's bike rack installation standards/requirements. C800 - SITE DETAILS.pdf Info Only Plan Review - Review Comments Report Project Name: CRC PZ-2024-00196 to 202 Civic Square Condos DP ADLS Variances Workflow Started: 10/8/2024 3:10:08 PM Report Generated: 12/06/2024 10:38 AM REF #CYCLE REVIEWED BY TYPE FILENAME DISCUSSION STATUS 55 2 Urban Forestry Daren Mindham 11/14/24 2:24 PM Changemark plant count Looks like this should be 2 THO not 1 THO. please revise. C700 - LANDSCAPE PLAN.pdf Resolved 56 2 Urban Forestry Daren Mindham 11/14/24 2:24 PM Changemark plant count2 These plants and the 3 more to the west are not labeled. Please label. C700 - LANDSCAPE PLAN.pdf Resolved 57 2 Urban Forestry Daren Mindham 11/14/24 2:24 PM Changemark plant count3 This plant count should be 5 not 9. Please revise. C700 - LANDSCAPE PLAN.pdf Resolved 58 2 Carmel Redevelopment Commission Larysa Glaspie 11/15/24 11:12 AM Comment CRC staff to review medallion design. Info Only 59 2 Engineering Alex Jordan 11/19/24 1:45 PM Comment We have no further comments on the plans. Before we can issue a stormwater management permit, the following items will need to be submitted: 1. A signed and recorded O&M manual 2. A stormwater engineers estimate breaking down the cost of all temporary and permanent stormwater control measures 3. A non-expiring stormwater performance bond for 100% the approved estimate (once approved) 4. A right-of-way permit and $5,000 license and permit bond (this can be applied for here: https://cw.carmel.in.gov/PublicAccess/login) Info Only November 12, 2024 Mr. Alex Jordan City of Carmel- Engineering Department One Civic Square Carmel, IN 46032 Dear Mr. Jordan: Subject: Carmel Civic Square Condos Development: 50 Red Truck Road Carmel, IN 46032 CEC Project 316-131 Civil & Environment Consultants, Inc., on the behalf of the Carmel Civic Square Condos development, respectfully request the following to be presented to the Board of Public Works for the 0.49 acre project located at 50 Red Truck Road. 1. Request waiver for the requirement of the Minimum Flood Protection Grade/Minimum Lowest Adjacent Grade of all structures fronting a pond or open ditch shall be no less than 1-foot above any adjacent local flood route. (STSM 303.07) The reason for the waiver is due to the existing grades. The existing project site has significant from east to west. The condo finish floor elevation (FFE) is bound by the FFE of the garage to the east and the table top roadway crossing in Veterans Way to the west. The FFE is at least 6 inches above the local flood route and there is positive drainage away from the site towards Rangeline road. We are confident that the proposed design will not be adversely impacted by this waiver. At this time, we ask to be placed on the agenda for the next available Board of Public Works meeting. We appreciate your time and consideration of our request. Please call our office at (317) 655-777 if you have any questions. Sincerely, CIVIL & ENVIRONMENTAL CONSULTANTS, INC. Nicholas Justice, PE Project Manager