HomeMy WebLinkAboutAddendum No. 1 1i' v /~ Il (lV 6S ()XHALL . "~ i\ /. . !/, . RtC8.. 71/EO }'~.\:.' I~. ' DEe 1; :'.l; . .... . V/lvi7fJp . , "!IIi ..; noes "'j,,' ~';,/" ..,,' "c<. \, ::=-~.:'" I;_r\:\ i\RDENS :~:' . \ I~;:,. ~ : ; ADDENDUM NO.1 for COXHALL GARDENS NORTH PARKI'NG LOT AND RESTROOM FACILITY 116TH Street and Towne Road Carmel, Indiana 46033 .' Prepared for' Hamilton County Parks & Recreation Department 15513 South Union street Carme('lndiana 46033-9445 ~ Cripe ~ December 11, 2006 g;~~~~;~:~:.['7v> ':i:\"~:~i.);'l~~~'::: :. "\ 7172 Graham Road Indianapolis. IN 46250 Phone: (317) 842-6777 FAX: (317) 841-4798 www.cripe.biz 0990433-10400 ,. ~ .....UA"UII \.:7U' UC'I';) North Parking Lot and Restroom Facility @ 2006 Cripe Architects + Engineers ADDENDUM NO.1 TO ALL BIDDERS OF RECORD AND TO WHOM IT MA Y CONCERN: This Addendum is being issued prior to the date for receiving bids. This Addendum forms a part of the Contract Documents and modifies the original Drawings and Specifications as noted below and shall be incorporated into the Contract Drawings. All other provisions of the Drawings and Specifications shall remain unchanged. This Addendum is issued in accordance with the provisions of the Notice to Bidders section of the Project Manual. All Bids shall be based upon work as modified by this Addendum. Acknowledge receipt of this Addendum on the Bid Form. Failure to do so may result in disqualification of the Bidder. This Addendum does not chsmge the Bid Date. GENERAL COMMENTS: 1. See attached Pre-Bid Meeting Minutes dated December 6, 2006 and include as part of this Addendum. CHANGES TO SPECIFICATIONS: Item No.1 Specification Section TOC-1 "Table of Contents" 1. Add Specification Section 01125 "Summary of Multiple Contracts". Item No.2 Specification Section 00300 "Bid Form" 1 . See attached Bid Form reissued in its entirety. Item NO.3 Specification Section 00830 "Wage Determination Schedule" 1. See attached Wage Scale form attached. Item NO.4 Specification Section 01010 "Summary of Work" 1. Part 1 .2. Revise Paragraph A. as follows: "A. The project consists of work under two (2) Prime Bid Categories: General Construction and Site Construction. The Scope will be"." ADDENDUM NO.1 PATH: 0:\ 1999\ 990433\ 10400\docs\Arch\CA \ADDEI'ID-01DOC ADDl - 1 ~ j North Parking Lot and Restroom Facility @ 2006 Cripe Architects + Engineers Item NO.5 Item NO.6 Specification Section 01125 "Summary of Multiple Contracts" 1. See attached Specification Section 01125 "Summary of Multiple Contracts" and include as a part of this Addendum. Specification Section 07311 "Asphalt Shingles" 1 . Part 2.1, Paragraph A.: Add the following manufacturer to the approved manufacturers list. "5. GAF Materials Corporation" CHANGES TO DRAWINGS: Item No.7 Drawing Sheet C201 "Site and Utility Plan" Item No.8 Item NO.9 1. See attached sketch for revised water line connection point and disturbed area limits. Drawing Sheet C202 "Site Details" 1. See attached three (3) sketches for new and/or revised details to be incorporated into the Documents. Drawing Sheet C301 "Grading Plan" 1. See attached sketch for revised grading and disturbed area limits to existing swale south of proposed Restroom Facility. Item No. 10 Drawing Sheet C401 "Erosion Control Plan" Item No. 11 1. See attached sketch for temporary construction staging area for the General Construction Contract. The existing stone base at the North Parking Lot may be used for this area. Remove temporary construction staging area in its entirety, and return to original condition upon completion. Drawing Sheet C402 "Erosion Control Details" 1. See attached two (2) sketches for new or revised details to be incorporated into Construction Documents. ADDENDUM NO.1 PATH: 0:\ 1999\990433\ 10400\docs\Arch\CA\ADDEND-Ol.DOC ADDl -2 " ./"'" JI'-. Cripe .-/ 7172 Graham Road Indianapolis. IN 46250 317.842.6777 FAX: 317.841.4798 www.cripe.biz Architects < Engineers Solullons by Design Since 1937 PRE-BID MEETING AGENDA Coxhall Gardens North Parking lot and Restroom Facility (Job Name) December 7,2006 at 2:00 pm (Date) PREPARED BY: Michael A. Grubb, AlA Cripe Architects + Engineers Cripe Job Number: 990433- 1 0400 PRESENT: See attached Sign-In Roster. INTRODUCTION: History of project and expectations. OWNER'S REPRESENTATIVES Chris Stice - Assistant Director Hamilton .County Parks & Recreation Dept. ARCHITECT'S REPRESENTATIVE Michael A. Grubb, AlA Project Manager/Architect: Civil Engineer: structural Engineer: Same Chris Wiseman, P.E. Electrical Engineer: Dave Haun, ClPE - Design-Aire Engineering Dave Haun, CIPE - Design-Aire Engineering Mechanical Engineer: DESCRIPTION OF PROJECT: The Work shall include, but is not limited to the following: site utilities, concrete curbs, asphalt paving, seeding, erosion control, concrete, concrete masonry, 0:\ 1999\ 990433\ I0400\doc'\Arch\Meeling Minule,\PREBID.DOC face brick, limestone pre-manufactured wood trusses, asphalt shingles, painting, accessories, toilet partitions, mechanical, plumbing and electrical equipment. BID DUE DATE: Bids will be due at 5:00 pm on Mondav December 18, 2006 at the office of the Hamilton County Parks and Recreation Department, 15513 South Union Street Carmel, IN 46033-9445. The bids will be publiclv opened at 7:00 pm in the Cool Creek Nature Center located at 2000 East 151 sl Street Carmel, IN 46033 and taken under advisement for review and recommendation by the Architect. INSTRUCTIONS TO BIDDERS: The project is classified as a public project and will require that common wage rates be utilized when computing your bid. The Wage Scale will be issued in Addendum NO.1. It should be noted that the award of contracts will be contingent upon financing being obtained by the Owner. Completion date for the project is June 1, 2007 for the North Parkinq Lot and June 30, 2007 for the remainder of the proiect. It is asked that all questions and or requestS be addressed directly to the Architect. The answers, qualifications, or information noted during this meeting or during phone conversations that differ from the bidding documents are not to be considered official unless noted in an Addendum. 0:\ I ??9\ ?90433\ I0400\cJQc;\Arch\Meeling Minules\PRE8ID.DOC 2 Bid Bond of 5% payable to the Hamilton County Parks & Recreation Department. Performance bond of 100% shall be included in your bid. THIS PROJECT is Tax Exempt. One (1) copy of Bid Form shall be submitted as described in the specifications on the above date and time. BID FORM See specification section 00300 for the Bid Form and See Specification 00100 for specific bidding requirements. CONTRACT INFO: Bidders should note that specification sections may be assigned to more than one account or Scope or Work. The contractor should refer to all specifications sections to note work assigned to their trades and divisions. Each bid shall include the cost for all miscellaneous clips, anchors, covers, etc., required for the complete installation of the system being bid unless specifically noted under another scope of work. Any questions regarding the system bid shall result in the most expensive system being used. Bids shall be guaranteed for 60 days. All contractors shall reference Section 01030 Alternates. These items are to be included in their bids. SPECIAL NOTES: Project Conditions: The park is open to the public. Care and consideration must be given to the existing conditions of the park during construction. Patrons will be utilizing the park during the time of construction. The contractors shall be responsible for securing the construction areas to maintain safety of patrons and security of equipment. Existing landscaped areas and lawns shall be maintained in their original form. Damages to existing landscape or grass areas shall be repaired to their existing 0;\ 1999\990433\ 10400\docs\Arch\/.,\eeling Minules\PREBID,DOC 3 conditions. This is to include areas that is damaged within or outside your construction limits. Cutting and Patching: There is cutting and patching required. Each prime contractor is responsible for cutting and patching associated with their work. Patching shall be performed by finish trades experienced in the repairs of each particular finish. The contractor is responsible for cutting and patching, relocation of equipment of fixtures and other such issues required to perform this work. Construction Schedule: A construction schedule is to be developed in cooperation with the successful prime contractor. It is the contractor's responsibility to provide all personnel, equipment, materials, etc. to meet the completion date. The need for additional work shifts required for this project shall be provided in the contractors bid. The Owner will consider no additional cost for overtime hours after receipt of the bids. Additional Items: A site walk-through was made available to familiarize all parties with the extent of the existing conditions. QUESTIONS AND COMMENTS: Q. Is there an area set aside for Construction Staqinq? A. See Addendum No. 1 for exact locations and details. Q. Will a Buildinq Permit be required from the Citv of Carmel? A. Yes. Contact the City of Carmel for proiected fees. Q. Is there a sanitary sewer tap fee? A. Yes, however this is beinq paid directly by the Parks Department. Q. Can the existinq stone base at the North Parkinq Lot be used for the new stone base? A. No. The Site Construction Prime Contractor shall remove the existinq stone base in it's entirety. The existinq stone may be used for the Construction Staqinq area at the Restroom Facility however the two Prime Contractors will need to work out the details. If it is not used then it shall be removed from the premises. If it is used then the Restroom Buildinq Prime Contractor shall be responsible for removinq it upon construction completion. 0:\ 1999\990433\ 10400\rJu:O\Arch\Meeling Minules\PREBID.DOC 4 Q. Can excess soil from excavation or trenchinq be left for the Parks use? A. No. All excess soil shall be removed from the Park. Q. When do you expect to send a Notice to Proceed? A. Immediately. If the bids come in under the Parks budqet and all the biddinq documents appear complete then the Parks Board may award the contract at the same meetino. CRIPE ARCHITECTS + ENGINEERS c&- Distribution: Those present All contractors of record for drawings 0:\ 1999\990433\ I 0400\dQc;s\Arch\Meeling Minul-=s\PREBID.DOC 5 North Parking Lot and Restroom Facility @ 2006 Cripe Architects + Engineers SECTION 00300 - BID FORM - (REVISED ADDENDUM NO.1) BID FORM FOR: COXHALL GARDENS - NORTH PARKING LOT AND RESTROOM FACILITY 116TH STREET AND TOWNE ROAD CARMEL IN 46033 OWNER: HAMILTON COUNTY PARKS & RECREATION DEPARTMENT 15513 SOUTH UNION STREET CARMEL, IN 46033-9445 TO: The undersigned hereby proposes to furnish all materials, labor, tools, equipment and services required to erect, install and satisfactorily complete the Work, all in accordance with the Contract Documents prepared by PAUL I. CRIPE, INC., Indianapolis, Indiana, including Addendum No. _ to _ inclusive (the receipt of which is hereby acknowledged) as follows: A. PRIME BASE BID: SITE CONSTRUCTION CONTRACT BASE BID (amount in wordsl $ (figures) GENERAL CONSTRUCTION CONTRACT BASE BID (amount in words) $ (figures) COMBINED CONTRACT BASE BID FOR SITE AND GENERAL CONSTRUCTION (amounl in words) $ (figures) BID FORM PATH: 0:\ 1999\990433\ I 0400\Specs\00300 REV.DOC 00300 - 1 North Parking Lot and Restroom Facility @ 2006 Cripe Architects + Engineers B. ALTERNATE NO.1: SITE LIGHTING (amount in words) $ (figures) C. PERFORMANCE & LABOR AND MATERIAL PAYMENT BONDS The Contractor shall state the amount, which is included in his Bid to furnish Performance & Labor Material Payment Bonds. (See Instructions to Bidders.) % of total Contract Price (100%) D. COMPLETION TIME We agree to complete this project in accordance with the enclosed schedule assuming that: 1. Award of Contract allows start of construction on or before dates indicated on schedule. We are not delayed by strikes or other causes beyond our control. 2. 11/27/06 12/07/06 12/18/05 01/15/07 01/16/07 01/17/07 06/01/07 06/30/07 Drawings Available. Pre-Bid Meeting. Receive Bids. Award Bids. Pre-Construction Meeting. start Work. North Parkin Lot Com letion. Total Project Substantial Completion. BID FORM PATH: 0:\ 1999\ 990433\ 1 0400\Specs\00300 REV.DOC 00300 - 2 .. North Parking Lot and Restroom Facility @ 2006 Cripe Architects + Engineers IN TESTIMONY WHEREOF, the bidder has hereunto set his hand this ,2006. day of IN TESTIMOI'-lY WHEREOF, the bidder, (a firm) has hereunto set its hands this _ day of ,2006. FIRM NAME: . Individual Names ( IN TESTIMONY WHEREOF, the bidder (a corporation) has caused this proposal to be signed by its President and Secretary and affixed its cooperate seal this _ day of , 2006. Name of Corporation President Secretary NOTE: ATTACH CONSTRUCTION SCHEDULE AND ADDENDA. END OF SECTION 00300 BID FORM PATH: 0:\ 1999\990433\ I0400\Specs\00300 REVDOC 00300 - 3 __~.._......._... _ -V---J ~.....vu;.J Cl~~ific~ ...,....... '.' qassc~ W aees Frin~el!. I.l2al Asbestos Abaterne~t ~ Removes and discards asbestos ~aleri81s Skilled 18.00 5.60 23.60 Bl'ick/Bloek/StonelCement Mason . .' -Lays and'sets buildmg materials, l?rie1c and. stone, and finishes surfi1ces . Skilled 17.49 4.39 21.-Sg Semi~sldlled 13.36 4.15 17.51 Unskilled '10.77 3.'15 14.52 . . Carpenter' , . -Cons'tructs, erects, installs and repairs various woods and wallboards i . Skilled' 17.88 4.15 22.03 " . Semi-skilled 13.60 4.00 17.60 Unskilled 10.45 3.21 13.66 Interior Finish Technician . -Erects metal framing, installs drywall, seals and plasters Skilled Sami-sldlled Unskilled 16.95 3.6$ 20.63 12.53 3.10 15.93 -' 9.27 2.25. 11.52 I ... Electrician '::: -Plans, installs, and repairs wiring, fuctures, Jines' and instrumentation controls . . .r, Skilled. 19.24 4.70 23.94 Semi-skilled 14.25 3.50 17.75 , Unskilled 10.75 2.85 13.60 Soutld and Conununication '. -Installs data hardwiring Skilled 17.65 3.20 20.85 Semi-skilled 11.83 2.85 14.68 Unskilled 10.00 2.05 12.05 Glazi,er -Installs 81as$ in windows or on surfaces Skilled 16.45 3.-40 19.BS Semi-skilled 12.75 2.80 15.55 Unskilled 9.50 2.06 11.56 Mechanical Insulator -Covers, seals, fits, rneaSW'eB, cuts, and attaches insulating materials Skilled 17.12 3.58 20.70 S~mi-!lkilled 13;~O. 3.20 16.60 Unskilled 10.63 2.10 12.73 . i ~ .f -~~-- ------~ P aintel' -Applies various liquid coverings to surfaQes Sldlled Semi-,skilled Unskilled 16.00 3.30 12.00, 2..90 9.00 2.00 19.30 14,90 1 LOa - :Roofer . -Covers roof with toofing ma~erials Skilled : 17.2.0 4.10 21.30 Semi-skilled' 13.29 3.52' 16.81 Unskilled 9.96 1.88 11.84 Sprinkler Fitte;c .~, . . -Installs end repaits fire pro~ection systems Skilled 17.62 '4.00 21.62 Semi-skilled 14.05 3.44 17.49 UU9killed 10.25 3.00 13.25 Floor Coverer/Setter :: . -Sets tile and terrazzo, applies pigment and marble, and lays carpet . '. Skilled 16.00 3.50 19.50 Semi~skilled 13.00 3.00 16.00 Unskilled 10.00 2.50 12.50 .' Truck ,Driver . -CDL-licensed to transport equipment, liquid, packaged or grllJ1ular dirt and moves personnel . Skilled 15.82 3.60 19.4Z. S~m{-sldlled 12,95 2.95 15.90 Operating Engineer . -Operates all types of power construction and heavy equipment Skilled 19.005.15 24.15 Semi-skilled 13.63 3.94 17.57 Mechanical Tecbnician (HV AC.'Sheet Met'al) -Fabricates, assembles, installsJ anq. .repairs sheet metal products and HV AC equipment ; Skilled 1&.81 4.50 Semi-skilled 14.19 3.33 Unskilled 1 () .20 2,10 23.31 17.52 12.30 Pipe Worker'(plwnb~. Pipefitter) , :., -Fabricates, assembles, installs and maintains piping and piping systems, fixtures : and equipment for processing systems and drainage systems . Skilled 19.55 4.90 24.45 Semi-skilled 14.42 3.70 18.12 Unskilled 10.95 2.49 13.44 ., , Proj7ctName: .. Common Wage Committee: 'Daled'~is day '-.D~e'If..- 2.>.- ~s:-- Representing tlle Governor ofIDdiana . Indi.&!t2fk ~ Awarding Agency (lndustry Rep.) TOTI\L P.04 \",oV^IIUII \,,7UI UC'II:>> North Parking Lot and Restroom Facility @ 2006 Cripe Architects + Engineers SECTION 01125 - SUMMARY OF MULTIPLE CONTRACTS PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provIsions of the Contract, including General and Supplementary Conditions and other Division 1 Specification Sections, apply to this Section. 1.2 SUMMARY A. This Section includes a summary of each contract, including responsibilities for coordination and temporary facilities and controls. B. Specific requirements of each contract are also indicated in individual Specification Sections and on Drawings. C. Related Sections include the following: 1. Division 1 Section "Summary of Work" for the Work covered by Contract Documents and for work sequence. 2. Division 1 Section "Project Work Rules" for use of the Project site and for requirements for continued Owner occupancy of premises. 3. Division 1 Section "Project Coordination" for general coordination requirements. 4. Division 1 Section ''Temporary Facilities" for specific requirements for temporary facilities and controls. 1.3 DEFINITIONS A. Permanent Enclosure: As determined by Architect, permanent or temporary roofing is complete, insulated, and weathertight; exterior walls are insulated and weathertight; and all openings are closed with permanent construction or substantial temporary closures. 1.4 COORDINATION A. Project Coordinator shall be responsible for coordination between the General Construction Contract and Site Construction Contract. 1. General Construction Contractor shall act as Project Coordinator. SUMMARY OF MULTIPLE CONTRACTS PATH: 0:\ 1999\ 990433\ I 0400\Specs\0 I 125.DOC 01125-1 ""'''-'1'\.11......11.........-.--..- North Parking Lot and Restroom Facility @ 2006 Cripe Architects + Engineers 1.5 PROJECT COORDINATOR A. Project Coordinator: Full-time Project Coordinator shall be experienced in administration and supervision of building construction and site work. 1. Coordination activities of Project Coordinator include, but are not limited to, the following: a. Provide overall coordination of the Work. b. Coordinate shared access to work spaces. c. Coordinate product selections for compatibility. d. Provide overall coordination of temporary facilities and controls. e. Coordinate. schedule, and approve interruptions of permanent and temporary utilities. including those necessary to make connections for temporary services. f. Coordinate construction and operations of the Work with work performed by each contract. g. Prepare Coordination Drawings to coordinate work by more than one contract. h. Coordinate sequencing and scheduling of the Work. Include the following: 1) Initial Coordination Meeting: At earliest possible date, arrange and conduct a meeting with separate contractors for sequencing and coordinating the Work; negotiate reasonable adjustments to schedules. 2) Prepare a combined Contractor's Construction Schedule for entire Project. Base schedule on Preliminary Construction Schedule. Secure time commitments for performing critical construction activities from separate contractors. Show activities of each contract on a separate sheet. Prepare a simplified summary sheet indicating combined construction activities of contracts. 3) Distribute copies of schedules to Architect. Owner. and separate contractors. i. Provide construction photography. j. Provide quality-assurance and quality-control services specified in Division 1 Section "Quality Control". k. Coordinate sequence of activities to accommodate tests and inspections, and coordinate schedule of tests and inspections. I. Provide information necessary to adjust. move. or relocate existing utility structures affected by construction. m. Locate existing permanent benchmarks. control points, and similar reference points. .and establish permanent benchmarks on Project site. n. Provide field surveys of in-progress construction and site work and final property survey. o. Provide progress cleaning of common areas and coordinate progress cleaning of areas or pieces of equipment where more than one contractor has worked. p. Coordinate cutting and patching. q. Coordinate protection of the Work. SUMMARY OF MULTIPLE CONTRACTS PATH: 0:\ 1999\ 990433\ 10400\Specs\01125.DOC 01125-2 . North Parking Lot and Restroom Facility @ 2006 Cripe Architects + Engineers r. Coordinate preparation of Project Record Documents if information from more than one contractor is to be integrated with information from other contractors to form one combined record. s. Print and submit Record Transparencies if installations by more than one contractor are indicated on the same Contract Drawing or Shop Drawing. t. Collect Record Specification Sections from other contractors, collate Sections into numeric order. and submit complete set. u. Coordinate preparation of operation and maintenance manuals if information from more than one contractor is to be integrated with information from other contractors to form one combined record. 2. Responsibilities of Project Coordinator for temporary facilities and controls include, but are not limited to, the following: a. Provide portable toilets for common-use. B. Site Contract Coordinator: Full-time Site Coordinator shall be experienced in coordination of site construction, including coordination of type of operations required for this Project. 1. Coordination activities of Site Coordinator include, but are not limited to, the following: a. Schedule and sequence of site construction activities. b. Coordinate sharing access to work space by Site Contractor. c. Coordinate protection of Site Contractor's work. d. Prepare Site Coordination Drawings. e. Coordinate tests and inspections for site work. f. Coordinate site temporary services and facilities. 1.6 CONTRACTS, GENERAL A. Extent of Contract: Unless the Contract Documents contain a more specific description of the Work, names and terminology on Drawings and in Specification Sections determine which contract includes a specific element of Project. 1. Unless otherwise indicated, the Work described in this Section for each contract shall be complete systems and assemblies, including products, components, accessories, and installation required by the Contract Documents. 2. Local custom and trade-union jurisdictional settlements do not control the scope of the Work of each contract. When a potential jurisdictional dispute or similar interruption of work is first identified or threatened, affected contractors shall negotiate a reasonable settlement to avoid or minimize interruption and delays. 3. Trenches for the Work of each contract shall be provided by each contract for its own Work. 4. Cutting and patching for the Work of each contract shall be provided by each contract for its own Work. 5. Within five working days after preliminary horizontal bar-chart-type construction schedule submittal has been received from Project Coordinator, submit a matching preliminary horizontal bar-chart schedule showing construction operations sequenced and coordinated with overall construction. SUMMARY OF MULTIPLE CONTRACTS PATH: 0:\ 1999\ 990433\ I 0400\Specs\0 I I 25.DOC 01125-3 . North Parking Lot and Restroom Facility @ 2006 Cripe Architects + Engineers B. Substitutions: Each contractor shall cooperate with other contractors involved to coordinate approved substitutions with remainder of the Work. C. Temporary Facilities and Controls: In addition to specific responsibilities for temporary facilities and controls indicated in this Section and in Division 1 Section "Temporary Facilities"; each contractor is responsible for the following: 1. Installation, operation, maintenance, and removal of each temporary facility usually considered as its own normal construction activity, and costs and use charges associated with each facility. 2. Plug-in electric power cords and extension cords, supplementary plug-in task lighting, and special lighting necessary exclusively for its own activities. 3. If deemed necessary, Its own field office, complete with necessary furniture, utilities, and telephone service. ' 4. Its own storage and fabrication sheds. 5. Temporary enclosures for its own construction activities. 6. Special or unusual hoisting requirements for its own construction activities, including hoisting loads in excess of 2 tons (2000 kg), hoisting material or equipment into spaces below grade, and hoisting requirements outside building enclosure. 7. Waste disposal facilities, including collection and legal disposal of its own hazardous, dangerous, unsanitary, or other harmful waste materials. 8. Progress cleaning of its own areas on a daily basis. 9. Secure lockup of its own tools, materials, and equipment. 10. Construction aids and miscellaneous services and facilities necessary exclusively for its own construction activities. D. Temporary Heating, Cooling, and Ventilation: The General Construction Contract is responsible for temporary heating, cooling, and ventilation, including utility-use charges. E. Use Charges: Divide cost of providing and using common-use temporary services and facilities, including use charges, among the General Construction Contract and Site Contract. The Contract Sum of each contract shall include cost of providing and using temporary services and facilities, including use charges. F. If it becomes necessary to refer to the contract documents to determine which prime Contract includes a specific element of required work, begin by referring to the prime Contracts, themselves; then if a determination cannot be made from the prime Contracts, refer, in the following order. to the Supplemental Conditions, followed by the Division 1 Specifications, and finally the drawings and other sections of the Specifications. 1. IF AFTER REFERRING TO THE CONTRACT DOCUMENTS IT CANNOT BE CLEARLY DETERMINED WHICH PRIME CONTRACTOR WILL PERFORM A SPECIFIC ITEM OR REQUIRED WORK, THEN, THAT ITEM OF WORK WILL BE INCLUDED AS PART OF THE PRIME CONTRACT FOR GENERAL CONSTRUCTION WORK. SUMMARY OF MULTIPLE CONTRACTS PATH: 0:\ 1999\990433\ 10400\Specs\OI125.DOC 01125-4 . North Parking Lot and Restroom Facility @ 2006 Cripe Architects + Engineers 1.7 GENERAL CONSTRUCTION CONTRACT A. Work in the General Construction Contract includes, but is not limited to, the following: 1 . Foundations, including footings and foundation walls. 2. Slabs-on-grade, including earthwork, subdrainage systems, and insulation. 3. Below-grade building construction, including excavation, backfill. and thermal and moisture protection. 4. Superstructure, including floor and roof construction. 5. Exterior closure, including walls, doors and windows. 6. Roofing, including coverings, flashings roof specialties and openings. 7. Interior construction, including partitions, doors, interior windows, and fittings, unless noted by Owner. 8. Interior finishes. 9. Equipment, including restroom accessories, unless noted by Owner. 10. Mechanical. electrical and plumbing systems. 11 . All work associated with the Restroom Facility and Pedestrian Walkways with lights leading to it. 1 2. Seeding and erosion control for both sites. B. Temporary facilities and controls in the General Construction Contract include, but are not limited to, the following: 1 . Temporary facilities and controls that are not otherwise specifically assigned to the Site Contract or Greenhouse Contract. 2. Unpiped temporary toilet fixtures, wash facilities, and drinking water facilities, including disposable supplies. 3. Temporary enclosure for building exterior, except as indicated. 4. Temporary roads and paved areas. 5. Dewatering facilities and drains. 6. General hoisting facilities for materials and personnel, up to 2 tons (2000 kg). 7. Project identification and temporary signs. 8. General waste disposal facilities. 9. Pest control. 10. Temporary stairs. 11. Temporary fire-protection equipment. 12. Barricades, warning signs, and lights. 13. Site enclosure fence. 1 4. Covered walkways. 15. Security enclosure and lockup. 1 6. Environmental protection. 17. Erosion control measures for both sites. 1.8 SITE CONTRACT A. Work in the Site Contract includes, but is not limited to, the following: 1 . Site preparation, including cleaning and earthwork. 2. SHe improvements, including roadways, parking lots, pedestrian paving, site development furnishings and equipment and landscaping. 3. Tunnels for site utilities. SUMMARY OF MULTIPLE CONTRACTS PATH: 0:\ 1999\ 990433\ 10400\Specs\01125.DOC 01125-5 ....VAI.......I '-"1'\,,11 \"IClloiJ . . North Parking Lot and Restroom Facility @ 2006 Cripe Architects + Engineers 4. Site water supply and distribution. 5. Site sanitary sewer. 6. Site storm sewer. 7. Site fuel distribution. 8. Site special plumbing systems. 9. All work associated with this North Parking Lot including Pedestrian Walkways leading to Parking Lot. 10. Finish grading of the disturbed areas. Seeding and erosion control to be provided by General Construction Contract. B. Temporary facilities and controls in the Site Construction Contract includes, but are not limited to, the following: 1. Unpiped sewers and drainage, including drainage ditches, dry wells, stabilization ponds and containers. 2. Erosion control to be provided by the General Construction Contract. PART 2 .. PRODUCTS (Not Used) PART 3 .. EXECUTION (Not Used) END OF SECTION 01125 SUMMARY OF MULTIPLE CONTRACTS PATH: 0:\ 1999\990433\ I0400\Specs\OI125.DOC 01125-6 /6.44 ,,,' '. tofU 75,49 Vy'ET - --- -- 2"W 2"W 2"W ---------- en. ,~ ''''r CONNECT TO EXISTING 8' WATER MAIN WITH 2" TAPPING SLEEVE AND VALVE. EXISTING LINE TO BE WET TAPPED. en. '-, COORDINATE WITH VEOUA WATER. BE ~ '-...... AWARE OF OTHER EXISTING UTR.ITIES IN ~ THIS AREA WHILE PERFORMING THIS -----W.Q13K. ___ - ., " m"o,"""" COCAnoR OF :l: EXISTING 8' WATER MAIN. CONTRACTOR TO FIELD VERIFY L..QCA TION PRIOR TO - CONSTRUCTIOril . J I ----' o .{':;:'t;f:;.! CGic.1Vll,Jl: I !- - - --. - - .--1 ~ N en. ~ I ir---''----l I I : .....L.L ~- . ~l I ! j en ~ ~. '" . ~I --_.~~.,-_...'.. "\ '\ J'STYtfl: en. ...., -- .-- ~ '-. I "~=-~i ~ ~ " <Ii" .~t:'~:"___-.__. :l:'-~, " J"W '",- '. "'-...." ! i -Ir'~ - ~ ~ tw -=:J :::-:::-:::-:::- y. rjt..m.- ~ ~ t"W ----- ;.;::>tllt:X.~;s! o:r.:.t>,Jl / / ./ ...... ',- "', ".... I i TITLE- ADDENDUM ~. - Cripe - ~ 1-REFERNCE TO SHEET C20 Architects + Engineers Sobb>s...o..tgn.....,... . 7172 GRAHAM ROAD INDIANAPOLIS, INDIANA 46250 (317) 842-6777 FAX (317) 841-4798 E-Mail cripe@cripe.biz Dote: 12-11-( 1 "=40' . ARCHITECTURE . CIVIL /TRANSPORTATION ENGINEERS . LAND PLANNING . LAND SURVEYING . GIS SCALE: PROJECT NO: 990433-10400 -, NOTE: CASTING SIW1 BE IHSTAillD SO lHAT THEY DO NOT CONTACT 1HE LATERAl. OR LAl!JlAl. C.l.P. llIHIlIUIl I" a: YAXIIMl 4' 20" W:STAl CASTING 'MlH 12"~ UDCl.EARAH" FllaJ Ta> (J' lDTERfll 'SOEJl" 'MlH CN' TO BOTTOM (J' CASTING PENTAGONAl. Ba.T/l.OCl< I . Ha>E PIPE TO EXTEND 6" P~ \ ~ I FlHAI. ~ Il1II1IlUII J' A80~ STIllE \ -~ ~ H NOTE: CONCIlE1E APRlIl AND CASTlHG 9IH.lllE 1NST#UBl SO lHAT 1HEY DO NOT CONTACT 1HE LATERAl. OR LATERAl. CAP. NEENAIf R-Ig72-Al al EAST JalDAN V-1SO\-1 YIllH SEllER ON CASTING . NOTE:All SlAB AND ClAIIt SPA" CONNECTIONS WST BE A NlffiIIU\l (J' 3" BELOW 1HE FOOTER AND ElIIT 1HE BUIlDIHG AT 1HE FRONT (J' 1HE SlRUClURE TO PROIlOE 1HE SHORltST. YOST lXRECT ROOT[ FROH 1HE IIUILOIIlG TO 1HE EXIST11lG LATERAl. STUB. 6" FROII TIJ' Of PIPE TO BOTTOM Of METER PlT. CONTRACTOR SHAll. NOT AllOW METER PIT TO CCl'ITACT LATtRAl.jrEE-WYE CONCRETE CN'. lEIlPORART \ GUJED eN' (5" X S' X S1lEE-WlE 5" IIIH1t.tlJII. SEE SAHlTART SE1lER TRENCHING, 8EDOlNG AND BAO<FI1. llETAl. s" . ~" REOtJtal GUJED YIl1lllH r (J' 1HE FOONllATlON OR GASGElED OUTSlllE Of 1HE FOONllATlON S" SOER LATERAl. f8 STONE BB.OW CONtRE1E Al'RON TO PRE\elT SETTUNG. EXlBlD 10 UNIllS1IJRlBI [ARlH. (IlAROSCAPE SURfACES AND All OlHER INSTAI.lA1IOHS IlEltIlD 1IIlEE FEET (J' 1lUIlDNG) ." ..._..____wo ..........__ _______.._] ~ I NOlE:TOP (J'CAS1IHG al C1EAIfOOTC.l.P SHAU. EXIOO D.2ll f~;~~-;;;~~;;-~ ~OOTS" --; ! "=~OR ~~~A~ lRWS~ ":" I ARE 10 BE S" SOIl J5 GASCETEO PIPE All aLlNO\JT RTTlNGS I : ENGIIeR. SAIlITARY SE1eI CAS1INGS m aLlNOOTS MUST NOT ARE 10 BE SOIl 26 , , I BE YIl1Hlll ONE (I) FOOT HlRZOHTAI. asTAHCE (J' AllY PAlm I i , ,_~~ .SURfACES.. .. ... __. ... _. . _... ! : 5" SE1eILAlERAl CLEANOUT TYPE 2 (GRASS OR lANOSCAPE SlJRFACES IlEYOHO lHREE FID' (J' BUIlDING) CLEANOUT TYPE 1 ((JIlT lANDSCAPED SURFACES 1lI1H1N tHREE FEET CF BUIlDlHG) TYPICAL CLEANOUT DETAILS NOTE: CONTRACTOR TO USE THESE CLEAN-OUT DETAILS RATHER THAN THE PREVIOUSLY SPECIFIED SA-1 A AND SA-1 DETAILS. TITLE. ADDENDUM r _ Cripe - ./ ArchItects + Engineers SclutlQns by DesIgn SInce 1937 1-REFERNCE 1 OF 3 TO SHEET C202 7172 GRAHAM ROAD Date: 12-11-( . ARCHITECTURE INDIANAPOLIS, INDIANA 46250 . CIVil [TRANSPORTATION ENGINEERS . LAND PLANNING SCALE: NA (317) 842-6777 FAX (317) 841-4798 . LAND SURVEYING E-Mail cripe@cripe.biz PROJECT NO: . GIS 990433-1040C ~; ~/ ~ /" /?,,/ /.::'~~ ~ .,f/ <~. :'~ , ./ .!/ :;: ~%' / ~ ~:; /~}//,~ ;% /' A ~ .,-;:/ .// ~ S::,tl' // ~ r~}'/ ,_,~'Y?; .f'/> i ,f., ~j~ '.' ;/ /. ?i.. '% _.~"/ . /j i:/~/ (/ ~ ~/ /1" ~ ~;; .;;/ ~ ~ ;f// h.: ~ /f .//?3, %// /-; %; 0:>'7 ~ %; // ,0': i .// 0 // ,.// ->':x ~: /f/ #?i v, #~' // -;: ?~ .>::/ % ~. /:.J ~ -,; yo" i% ;;; // ..;{. ~ /,' ..,~~ ;:-; $ g/%: (~f/ ,~':/'/ ~ ~? y?-3 ~; /-f/ ~ :8 . W .0?-3 i:;'.j" /f/ ~ ;%' ..;/ .'/ r/ ~/;m:/;:-;::t'::;i-:;#/7/~;~ ;:;',}.C:f'-i "!:'-:'.;;~ i" iP-' mp1: ~ '0 jf'.;P' ~ // 0 l' ~/a ~ 0 ~ ?7/ff~ ~ .~ ~... / ~ 'ij/./ij////.~ 00 Sj~,N ......0 o "0 ~ ~ o o o ~ ~ a o i% ~ !a ~ o fa ~ o ra ~ ~ o ~ %: o o o o fa ~ fa ~ o %: ~ ~ ~ 0. i'/ .....j :f.z.1 "f;;1 j TITLE. ADDENDUM ~ - Cripe - ./ Architects + Engineers Sclul!ons by DesIgn SInce ,.37 CLAY TOWNSHIP REGIONAl. WASiE aSTRICT SUMMARV~l.A"'blINST.ALLAT1ON ~L.R~ 1. NI hausa. buklngs. dc.. st13Il conned lathe QslrICl's $al'Ibrylewet 5Y*m wIhln acmys oI'nCCi= DrOWkIno I S_ Iswt:hln300 I'aeI. fcrHamltCl CountyCl'100feelk:t8oClneCcunt)'dlhe~lne. OnIyt:rletlulllinglnB)'c::nnf!CIto the JeWel' msIn perlllentl unless c:theN.111e IPPl'CNeclbyltle 0t5IrId.. 2 Nofaundlton cr other stc:rm water drU\s shaD be h1enxnm:tecS to e.c sewer lIlerallna.Bed Ind ccnneded to !he Dslricrs sanitary sewer. 3. The IfJ:is&1Ds_...lne~th'~Dtolh. :JePlictankrneyQnl)'bevudlfltslocatecfUfldet '~acscIlian.patjo. pordI CI' p...w dri~, Nr luti. tc:QUired to shOW' f aececuble fer Ill-USC. The property CIWnCf shalbear the ccsl of IIlt=stftg,1beOlstrid.lnspecterrnu1lbecnsilll!fcrhdurdllfldlhelirll${. 4, The o-ner CIl' ~CII:I' stI.. nctlfyU'le Ds:rlCl ~to -ema thelmtalelf1Bterelsothst ltIe Olstl\d. eM lNlce Irl ~CXllodelelmin.o:nd.-.ce-.llhtleDislricrs_Ul.~ !i!Uc:bndilc:eticnIhdbe mIlde24 hcurs prtarlothenccdlr:rthelnspedion. ll'Vl.ctlnspccllcln tals InclesccClndlnspecllc:n lsl"ctCJll'ed. orr:cntrwcCl'lsnCil en SIle farsd'l.~cdhspcctlcn.CI'failstocancelln$pectlon.ltl Iddlicnalft:eClfS1OCl.OOwll bcCle, This must be Dlidpriarla ItlcllmedthcfolOVl'uplnSPCdlcn. 5. Pr~ownCBaretleretJy acMsed flat the CCUI!)' Boan:l Of Heelll rcgulll:es the q)Cl'lItIllfl ancl mantenance oIPJlNI sewage lisposal (seplieJ syslem$. ~ Count)'Ordnance pl'QIo'icleSlnpart ltta. upon t'CI'IfteQicn 10 I putIfic _.' sepliclan!c-...stlal bce~ed end 1Iled WIh artlcn maled.stt I Slfe end senltIry InIImlcr: Aelse CO'ltKt the ~lc O:luntyElCllrrJdHeeIlh torbtherlnfOC1l'lllion, 6. Acccplable Roe MalerWr. PVC PIPE: SOR 35. ASTM Q.303.4, SIXINCH PIPE PVCPlPE: SOR21.A5TMD-241.SlXINCHPlPE GASKETS JOINTS ASTM 0 3212 GASKETS ASTM F-4n F1TTINGS~ SDR-2S DUCTILE IRON Ms:::HANICAl. COUPUNG WTH PROPER FrrTlNGS. ClEAN OUTS TO BE LOCATB:! THREE FEeT \'\1THlN THE FOUNDATION AND NO MORe-THAN 100 FEET' APART. 7. BeddIng:- USI!! Number B crushed stone or Number 8 frac:tLIred face aggregate FDI material Is to be placed tRIm S indies below to S ind'les above the pipe Thetrendl should be. minimum or18 Inches wide 8. Leterals shill be Installed no doser then 20 feet fr'DrII water wdIs lWeSS PVC p"euur.;radc llge is used meeting SDR 2181ldASTM 0.2241. htypraposedlnstllltlfcnrequlr\ngpteS$Ul"e ~ shIIIbc reviNe:lend s02pledbyltlcOrstrid: endlfto Clntcl's ~eer DrIorlD lMf.nallon. 9. Where. trBnslIcn Isrmocfe between SDR35 p/JM al\d paU'e I7lde SOR 21 ~. aClc&le h:rt vaskelcd mechanical eouFf!ngslutlbeusecl. 1D.latcnlssllaDtern*IalcwllttIn3I:dc:lthetdldinDUt1CSSltlecondtia\slnkm#3lbO\11i::ltemd NDrluf'dninP.VUln!!e Wdalert........... """'tM_ hmrbI"- _lit 11. AddiIcnclInIc:1mwticn en DistJfd 5tandan:lsend spedficeticnsmaybcobta/neCl trcmlhc District's oIIce durhg bushess houl's at 8:00a.m. to.:30 p.m. Ucnday lhr'algh Friday ,Ill Oistrid $landards an be lecated c:.'I CUI' wdl de at htID.11www eIrwd rrrJI Clay Township Regional VVaSlIr Di$tict 10701 Ncx1h College Suite A. Indi:anapolis. Indona .4S200 Phone: 844-9200 Fa: 644.9203 12. ScptIel'llluentlb!!!..t!sllbepuoTlpedoutlntolheAlntaryR'Oo"Ct'system. 13. n.Okdrlet !lMft1nt:rt-' ALL Went!!:, Ple8se call the DsIrid cIlIccel844-92DO 2. rw:urspriDrlollme ofinspeclio1. 14. ContI'llClDl"!l:dteIll_1.__oIIdVlfntltwenllrellPnnthDftfwbrer:al \/lohllstabeplaccdcntop'llt:thelatel1ll. lhcOiAic:l:ln1pectorwllYCrffypl2~orthewlre. Mer IInptctilln. bedtlngls to be ptBctd cn top. 15. c:ea befcn:)'CO cf;. IuPPS 1-aOO'38MS,t.... hl:u"s prior 10 cfPD. Ultr"-re1l.01-13-06cf 1-REFERNCE OF 2 3 TO SHEET C202 7172 GRAHAM ROAD INDIANAPOLIS. INDIANA 46250 (317) 842-6777 FAX (3 J 7) 841-4798 E-Mail cripe@cripe.biz Dote: 12-11-( ARCHITECTURE CIVIL /TRANSPORTATION ENGINEERS LAND PLANNING LAND SURVEYING GIS . . . . . SCALE: NA PROJECT NO: 990433-10400 CONCRETE TRAIL / ~\.~~~)<'< ;("'~~ .,.~y:>,// '{0~:, EXISTING fAR1H AREAS UNDER CONCRETE 1RAIl (MECHmICAl COI.4PACTIOIl N...".--..... TO 95% PROCTOR OENSI1Y) v~ . ~&~ ;' , ,'. 11:'2 0.0. ~ \ z?% ' ' (BUOW lHE BEli) / \ ~~'/X>>.; '7/>7:0'}7 / .~ ',:< ~10v~ '/'<<)2< ...., "~/4~~)~~~ y /' ", "-' "-- ,~- ",_/,~_/,~ ::'~'^~;1'':'~~~--':~~0iTi0J;lf../'- PVC & HOPE ~ '. ;'L~:;'L'.f~~~J.. MlNIt.lUM WlDTH= J;~ 1 25(00 I + 12'p f AREAS NOT SUBJECT TO VEHICUlAR TRAFFlC MAY . -" - . _, j' BACKFlU.ED WITH CI.fAN FIll MAlIRlAL. FREE OF 12 Y ROCKS, FROZEN SOIL WOOD OR OTHER .. , EXTRANEOUS MATERIALS. ~~~ ."- COMPACTED NO.53 STONE "'\ LJ~ \ l ! 1/ ~~~,,*~_Jj g'~[.-.jr:~7~~~31LJC l::;'f~'l"l:~~ ~~}f'" ~ ilf ti < '. ~,:" NO SCALE PVC & HOPE TITLE. ADDENDUM 1-REFERNCE ~ - Cripe ~.J' 3 OF 3 TO SHEET C202 7172 GRAHAM ROAD INDIANAPOLIS. INDIANA 46250 (317) 842-6777 FAX (317) 841-4798 E-Mail cripe@cripe.biz Architects + Engineers SoIvUcns byCeslgnSZl"lCl! 1937 . ARCHITECTURE . CIVIL /TRANSPORTATION ENGINEERS . LAND PLANNING . LAND SURVEYING . GIS Dote: 12-11 -( SCALE: 1 "=40' PROJECT NO: 990433-1040C -- ~ 00 OO~ 7 ------. I!itJ OO~O '~I /._7 , , / .. .' ""~ ), /.- -- <Z Z L1. / / < 0 / // WLLOW / o Z / <I-::i a:w;: C!l w 0' oL1.LJ I- m'LL ~C!l Oz~ 1--1- /o-lCl) . < (0- / a:C')~ / / ~-lo O~I- OQw. ~~ / / / / --- / / / / / / / I / / I / / / / ./ // / ~ ::> c OJ is //ZW ,0.\ ~ I - \'- , t k // ~O .i- ~i t:oU< / 1-<( ""."..... " " / // /' " r/ ....", ~...,..' / ./ /' ,..,," -----.-...... .,........1'-..........- ....,..r...'.. ,...... / " / / .,..", .,,' ,r .....-. .,......... .............. ............ / / ./ ".....// """.,."... .....' / j/ / ,/ /' ".... ,r ...,.... ..,/"'" / / / /r / / / ./ ,.,.., ,/ ,,-.,,.. ...... / o OJ o Qj I- ~ W W I: (f) o I- W o Z c: W u.. W c: I ,... '-' o o "<:l- n 0 ~ ,II g I" ~ I- n un W w"<:l- i (3 g ~ 8: 0) Vl C<: W W Z (!j Z w Z o !( ~e>0 wOz~ o<:ll.->- ;:,VlZW I-Zz> U<(<(o<: W~-.J:) !=t::.ll.Vl x-'oo U5ZZVl ~a~~(!j . . . . . 00 DO- LO" C'l"1 '-O~N o "'t ""t.- <(<(oo.q OZR& ~ <( ~ 'C ~o!2.u <(Zx@ -<CCI) :c. Q. <( ~ u.. 'C ~-1"u 021:::= N<(-.oO "zN:;E ~<(~1h 0- z!:::: -!2. ADDENDUM 1-REFERNCE TO SHEET ~. - Cripe ~ "',~ '" '" '" + + + + ~ ----- - .... L. "" ............,.... "'" ". -, " NOTE. CONTRACTOR CAN USE EXISTING GRAVEL FROM NORTH PARKING lOT IF COORDINATED WITH OWNER PRIOR TO CONSTRUCTION. IF MORE STONE IS REQUIRED FOllOW DETAil EC-26 ON SHEET C402. GRAVEL ST AGING AREA TO BE REMOVED AND HYDRO-SEEDED AFTER CONSTRUCTION. IF TEMPORARY ACCESS ROAD DESTROYS THE EXISTING GRASS. CONTRACTOR IS REQUIRED TO HYDRO-SEED THAT AREA AS WEll. ", TITLE. Arc:hitects + Engineers . ScklCIons brtle:09lSh:81!l37 7172 GRAHAM ROAD INDIANAPOLIS. INDIANA 46250 (317) 842-6777 FAX (317) 841-4798 E-Mail cripe@cripe.biz L_._..... .: ~ 50' C401 Date: 12-11-0 1"-50' . ARCHITECTURE . CIVIL {TRANSPORTATION ENGINEERS . LAND PLANNING . LAND SURVEYING . GIS SCALE: PROJECT NO: 9904.3.3-10400 . >1 1. PREPARE SOIL BEF'ORE INSTALLING BLANKETS. INCLUDING APPLICATION OF LIME. FERTILIZER. AND SEED. 2. BEGIN AT THE TOP OF THE CHANNEL BY ANCHORING THE BLANKET IN A 6"DEEP x 6'WIDE TRENCH. BACKFILL AND COMPACT THE TRENCH AFTER STAPLING. 3. ROLL CENTER BLANKET IN DIRECTION OF WATER FLOW ON BOTTOM OF CHANNEL. 4. PLACE BLANKETS END OVER END (SHINGLE STYLE) WITH 6"OVERLAP. USE A DOUBLE ROW OF STAGGERED STAPLES 4" APART TO SECURE BLANKETS. 5. FULL LENGTH EDGE OF BLANKETS AT TOP OF SIDE SLOPE MUST BE ANCHORED IN 6"DEEP x 6'WIDE TRENCH. BACKFILL AND COMPACT THE TRENCH AFTER STAPLING. 6. BLANKETS ON SIDE SLOPES MUST BE OVERLAPPED 4" OVER THE CENTER BLANKET AND STAPLED. 7. IN MEDIUM/HIGH FLOW CHANNEL APPLICATION. A STAPLE CHECK SLOT IS RECOMMENDED AT 30 TO 40 FOOT INTERVALS. USE A ROW OF STAPLES 4" APART OVER ENTIRE WIDTH OF THE CHANNEL. PLACE A SECOND ROW 4" BELOW THE FIRST ROW IN A STAGGERED PATTERN. B. THE TERMINAL END OF THE BLANKETS MUST BE ANCHORED IN A 6"DEEP x 6"WIDE TRENCH. BACKFILL AND COMPACT THE TRENCH AFTER STAPLING. A A ~~~ CRITICAL POINTS ~V6 C A. OVERLAPS AND SEAMS C. B. PROJECTED WATER LINE C. CHANNEL BOTTOM/SIDE SLOPE VERTICES. NOTE: HORIZONTAL STAPLE SPACING SHOULD BE ALTER IF NECESSARY TO ALLOW STAPLES TO SECURE THE CRITICAL POINTS ALONG THE CHANNEL SURFACE. REFER TO GENERAL STAPLE PATTERN GUIDE ON EROSION CONTROL DETAIL EC-14 FOR CORRECT STAPLE PATTERN RECOMMENDATIONS FOR CHANNELS. HANNEL EROSION CONTROL BLANKET EC-17 NO SCALE TITLE. ADDENDUM REFERENCE 1 OF 2 1 TO SHEET 7172 GRAHAM ROAD INDIANAPOLIS. INDIANA 46250 (317) 842-6777 FAX (317) 841-4798 E-Mail cripe@cripe.biz Architects + Engineers Sclu1Ions byDedgn Slna> 1937 NOTE; CONTRACTOR TO ADD 600 SY (SQUARE YARDS) OF OVERLOT SEEDING TO THE BUDGET DUE TO WATERLINE AND SWALE REVISIONS. CONTRACTOR TO INSTALL NORTH AMERICAN GREEN BLANKET S75 OR ENGINEERED EQUAL 3' EACH WAY OF CENTERLINE OF SWALE FOR 6' TOTAL WIDTH. USE STAPLE PATTERN B. NOTE: SEED EARTH PRIOR TO INSTALLING BLANKET. C402 Dote: 12-11-06 SCALE: NA PROJECT NO: 990433-10400 . ARCHITECTURE . CIVIL / TRANSPORTATION ENGINEERS . LAND PLANNING . LAND SURVEYING . GIS Filtrexx@ DitchChexx™ Wooden Stake(r.r) ThnlughCtntaroffilttrSou" 1l!YCl'J'5'lineall &CUI Sock M3terfal ID be- DraMlln and llldOfflDSbkur: IlothEnds Drainage Ditch/8wale ...... 1. All mattrt:af to mntFlftrt::08sptdlicatlCJft$. 1. C~molterlaftD btI41pfttd on sitIt, lIS ddeminllfby EnliPneer. Fillrexx@ FilterSo:o: T. Filtrexx@ FilterSoxx™ Section CONTRACTOR TO SUBSTITUTE THE F1LTREXX DITCHCHEXX IN PLACE OF THE ROCK DONUTS AS DENOTED PER PLAN. TITLE. ADDENDUM ~. - C~IRe Architects + Engineers .........."""'"'.....,"'" <\ .." . NOTE: CONTRACTOR TO NOT INSTALL ANY SILT FENCE AND TO REMOVE FROM SLOPE OF SERVICE AND ADD INlET PROTECTION AROUND THE TWO (2) INLETS TO THE NORTH OF THE PARKING AREA. r I r I. t 3' 2 ~ 4' I 3'Y .5'i. 3' ---L.5' 4' X 4' -'1-20~ X 6' r L L J'--=! X X X X 4' X X X X X A B C 0 X X X X X X X 1 STAPLES PER SQ. YD. 1.5 STAPlES PER SO. YD. 2 STAPLES PER SO. YD. 3.5 STAPLES PER SO. YD. C B C C B C 0 A A B B 300 275 g 250 :z: ~ 225 ~ 200 o vl 175 150 125 100 75 50 25 It. 4:1 3:1 2:1 NO SCALE 5T APLE PATTERN GUIDE SLOPE GRADIENT 1-REFERNCE 2 OF 2 TO SHEET 7172 GRAHAM ROAD INDIANAPOLIS, INDIANA 46250 (317) 842-6777 FAX (317) 841-4798 E-Mail cripe@cripe.biz . ARCHITECTURE . CIVIL /TRANSPORTATION ENGINEERS . LAND PLANNING . LAND SURVEYING . GIS 1:1 LOW MED/HIGH FLOW FLOW CHANNEL CHANNEL AND SHORElINE C402 Dote: 12-11-0 SCALE: NA PROJECT NO: 990433-10400