Proposal
Job# 241060 to 241060
Item/Cost CodeDescriptionAmount
241060 City of Carmel(Fiber Conduit Gradle)
0 - None
10.000Bid MaterialMisc. Supplies875.75
15.500Bid LaborLabor570.00
Phase Total:1,445.75
Grand Total:1,445.75
Notes:
This is a proposal per thecustomer'srequest to add in (1) - 1-1/4" SDR conduit from theP1 cabinet at theNWcorner of Gradle /
Rangeline down to the NE corner of Veterans Way and Gradle. We will pull this conduit back in while we pull the 1" power
conduit for the 5light poles along the north side of Gradle. Pipe is for future use, we are not allowing for pulling anything in it.
Wehave allowed fora quazite to be placed at the west end ofthis run, we will tryto locate an existing sleeve at the P1cabinet
so we can get itinside of the P1 cabinet. Ifno sleeve is existing we will need to work with Carmel for another route to get this
conduit into the P1 cabinet.
Report6-1-11-63 10/01/24
1of1Page 02:37PMomni\\Ty
Proposal
Job# 241059 to 241059
6-1-11-63
1Page 01:42 PM
Report 10/01/24
omni\Ty
Item/Cost Code Description Amount
241059 City of Carmel(Rangeline/Gradle P1)
0 - None
27.000 Bid Vac Trailer Hydro/Excavation per hour basis 425.00
15.500 Bid Labor Labor 3,800.00
10.000 Bid Material Misc. Supplies 3,796.85
22.000 Bid Boring Boring (2) - 2" SDR up to 80 linear feet 4,400.00
15.500 Bid Labor Saw Cutting per hole basis 650.00
10.000 Bid Material Backfill Material (allowance)925.00
Phase Total:13,996.85
Grand Total:13,996.85
Notes:
This is a proposal for Rangeline and Gradle. The customer has an existing P1 cabinet located at the NW corner of the
intersection on an existing base. Customer has a rebuilt P1 cabinet that they would like us to change this existing cabinet out
with one for one. We would pick the new cabinet up from Carmel's shop, swap the cabinets out one for one, take the removed
cabinet back to Carmel's shop. We will bore (2) - 2" conduits from the P1 cabinet to the south where we will get into a 12x12x12
quazite box that will be in the grass at the SW corner of Rangeline and Gradle. Please note we are basing this pricing on their
being sleeves out of the existing P1 cabinet base already.
P1 cabinet will get a new 200 amp single phase meter base mounted to the side. Duke Energy is to get power to the P1
cabinet. We will install #2 AL conductors form the load side of the meter base to the existing 100 amp load center located inside
of the P1 cabinet.
No fees from Duke Energy are accounted for in this pricing.
Pricing is based upon completing this work while we are onsite doing the existing Gradle 10 light pole project.
Omni Electric is not responsible for any untraceable underground utilities that could be damaged.
If we need to cut the asphalt to expose an underground utility we may need to cross it will just get backfilled as Ryan Murt said
this road is getting repaved once we are completed on this project. Pricing will reflect saw cutting on a per saw cut basis as well
as hydro excavation on a per hour basis.
Proposal
2 of 2
Continued...
10/01/24
Page 01:42 PMomni\Ty
Report 6-1-11-63 10/01/24
Item/Cost Code Description Amount
Customer to provide water meter and a location to dump spoils.
10/2/2024
OMNI ELECTRIC LLC
TIPTON, IN 46072 -
112715
2697 SOUTH 300 WEST
City of Carmel
ONE CIVIC SQUARE
CARMEL, INDIANA 46032-2584
FORM APPROVED BY STATE BOARD OF ACCOUNTS FOR CITY OF CARMEL - 1997
INDIANA RETAIL TAX EXEMPT
CERTIFICATE NO. 003120155 002 0
FEDERAL EXCISE TAX EXEMPT
35-6000972
PURCHASE ORDER NUMBER
THIS NUMBER MUST APPEAR ON INVOICES, A/P
VOUCHER, DELIVERY MEMO, PACKING SLIPS,
SHIPPING LABELS AND ANY CORRESPONDENCE
PURCHASE ORDER DATE DATE REQUIRED REQUISITION NO. VENDOR NO. DESCRIPTION
VENDOR SHIP
TO
PURCHASE ID BLANKET CONTRACT PAYMENT TERMS FREIGHT
EXTENSION
Street Department
3400 W. 131ST Street
Carmel, IN 46074-
317) 733-2001
375598
UNITPRICEDESCRIPTIONUNITOFMEASUREQUANTITY
Page 1 of 1
Matt Higginbotham
91939
2201Department:2201Fund:Motor Vehicle Highway FND
43-500.80Account:
P1 Cabinet Upgrade Rangeline / Gradle1 $15,442.60 $15,442.60Each
15,442.60SubTotal
15,442.60
Send Invoice To:
PLEASE INVOICE IN DUPLICATE
DEPARTMENT ACCOUNT PROJECT PROJECT ACCOUNT AMOUNT
SHIPPING INSTRUCTIONS
SHIP PREPAID.
C.O.D. SHIPMENT CANNOT BE ACCEPTED.
PURCHASE ORDER NUMBER MUST APPEAR ON ALL SHIPPING LABEL
AND ACTS AMENDATORY THEREOF AND SUPPLEMENT THERETO.
THIS ORDER ISSUED IN COMPLIANCE WITH CHAPTER 99, ACTS 1945
PAYMENT
A/P VOUCHER CANNOT BE APPROVED FOR PAYMENT UNLESS THE P.O. NUMBER IS MADE A
PART OF THE VOUCHER AND EVERY INVOICE AND VOUCHER HAS THE PROPER SWORN
AFFIDAVIT ATTACHED. I HEREBY CERTIFY THAT THERE IS AN UNOBLIGATED BALANCE IN
THIS APPROPRIATION SUFFICIENT TO PAY FOR THE ABOVE ORDER.
CONTROL NO. 112715
ORDERED BY
TITLE
CONTROLLER
Street Department
3400 W. 131st Street
Carmel, IN 46074-
Lee Higginbotham
317) 733-2001
Commissioner