HomeMy WebLinkAboutCorrespondence
r",
,....
,
u
u
c.
City of Carmel~Y
VIA FAX: 8142231
Original by mail
August 14,2003
Jim White
Primrose Development LLC
1016 3rd Avenue SW, Suite 100
Carmel, IN 46032
RE: Laura Vista Subdivision, Lot 55
Dear Mr. White:
This letter is in response to our recent discussion regarding Lot 55 within the Laura Vista
Subdivision. As you noted it may be the desire of the owner of the property to remove the parcel
from the plat, have access as proposed to Laura Vista Drive including construction of a drive and
gate and ownership of Block "B", maintain access to Dublin Drive within the Danbury
Subdivision, and not have the lot subject to the covenants and restrictions of the neighborhood.
As you may recall this property was added to the subdivision plat with the consent of the owner
in order to among other things eliminate several zoning and subdivision violations including but
not necessarily limited to a lack of frontage on a public street, access to the parcel via an unplated
easement, and setback requirements for an accessory structure. Other issues are also present
regarding access to this parcel including the construction ofa portion of the Cool Creek North
Trail and the provision of a new access drive to the site within Block "B" of the subdivision.
The following are items to be noted when proceeding with the project:
1. That access to proposed lot #55 is restricted to the existing ingress and egress easement to
Danbury Drive until such time that said easement is vacated. Only upon vacation of this
easement may a drive be installed within the proposed Block "B" for Lot #55 onto Laura
Vista Drive as shown on the Secondary Plat and Construction Plans. The owner of the
property identified as "Lot 55" is aware of this condition as they spoke at and attended the
public hearing and granted their consent to the filing of the Primary Plat application.
2. The Department of Community Services will not grant approval of the Secondary Plat
without one of the following: A deed restriction on Block "B" stating the an access drive
and/or gate shall not be constructed on Block "B" until such time as the vacation of the
Page 1
ONE CIVIC SQUARE
CARMEL, INDIANA 46032
317/571-2417
......
/ '
u
u
easement noted in item one above is complete or that this condition of the Primary Plat
approval is satisfied prior to approval of the Secondary Plat.
3. Removal of Lot 55 from the Laura Vista Subdivision Primary Plat would require a replat
application and public hearing in front of the Plan Commission. It is not likely that the
conditions as noted above would change. Removal of the lot from the Laura Vista Plat
would require the creation of a new subdivision of one lot.
4. No Building permit could be issued for construction of any type on Lot 55 due to the
technical violations noted at the time of the Primary Plat review process until the Secondary
Plat is recorded.
5. The Covenants and Restrictions do not have to apply to all the lots within the subdivision.
Lot 55 could be excluded form the covenants intended for the rest of the lots within the
subdivision and even platted as a separate section.
Our approval of the secondary plat will be forthcoming upon adequate resolution of the items
listed above.
Sincerely,
.. ~
Jon C. Dobosie 'cz
Planning Administrator
Laura Vista-Lot 55
Page 2
ONE CIVIC SQUARE
CARMEL, INDIANA 46032
317/571-2417
~
ON-SITE ALUATION FOR EROSION AND SED! T CONTROL
Hamilton County Soil and Water Conservation District
1108 South 9th Street, Noblesville, IN 46060
Phone: 317-773-2181 or Email:john-south@iaswcd.org
Date: June 24, 2003
~\ ~Od- ~Q
Project Name: Laura Vista -
Present at Site: John South, Hamilton Co. SWCD, Jim White, Primrose Development; Dave Graham, Earth Resources, Wayne
Kramer
This report was provided to: Jim White
Primrose Development
1016 3Rd. Avenue, SW Suite 100
Carmel, IN 46032
846-6641
Fax- 814-2231
Surveyor
Carmel DOCS
Wayne Kramer
David Graham, Earth Resources
714-1880 fax: 317-769-4977
TYPE OF EVALUATION: X Initial D Routine D Follow-upD Complaint
This evaluation is intended to assess the level of compliance with 327 lAC 15-5 (Rule 5). It is also intended to identify areas
where additional measures may be required to control erosion and sedimentation. All practices recommended in this report
should be evaluated as to their feasibUity by a qualified individual with structural practices designed by a qualified engineer.
All erosion and sediment control measures shall meet the design criteria, standards, and specifications outlined in the "Indiana
Handbook for Erosion Control in Developing Areas" or similar guidance documents.
Current Site Information:
Clearing has started on the site. Dirt work to start 6/30.
The Following Items Have Been Evaluated and Assigned a Designation of:
S = Satisfactory M = Marginal U = Unsatisfactory NA = Not Applicable
Construction Site Management for Erosion and Sediment Control
S (1) Disturbed areas have been adequately protected through seeding or other appropriate erosion and
sediment control measures.
S (2) Appropriate perimeter sediment control measures have been implemented.
(3) Conveyance channels have been stabilized or protected with appropriate sediment control measures.
na (4) Erosion & sediment control measures are installed properly.
na (5) Storm drain inlets have been adequately protected.
na (6) Outlets have been adequately stabilized.
na (7) Existing erosion & sediment control measures are being maintained.
S (8) Public & private roadways are being kept clear of accumulated sediment or tracked soil.
na (9) Erosion & sediment control measures have been installed and maintained on individual building sites.
Status of Sediment Retention On-Site
D Site conditions present a high potential for off-site sedimentation.
D There is evidence of off-site sedimentation.
Describe:
D Please Refer to the Comments Section of this Report
Compiled By: _John B. South
Satisfactory:
Marginal:
Unsatisfactory:
Not Applicable:
Definitions
The item is currently in compliance with the Rule
A concern has been identified; corrective action is strongly recommended to remain in compliance
A violation has been identified and the site is not in compliance; corrective action is required
Does not apply at this stage of construction Revised 4/98
i
ON-SIlo' ALUA nON FOR EROSION AND SEDI~ CONTROL
COMMENTS
PROJECT NAME: Laura Vista
Page 2
The items checked below must be corrected prior to _N/A , unless otherwise noted.
Install an appropriate sediment control practice between construction areas and lower lying areas.
Replace/Repair silt fence and/or straw bale barriers.
Entrench silt fence (6-8 in.) and/or straw bale barriers (4 -6 in.) and stake straw bales.
Remove accumulated sediment from: 0 sediment traps/basins, 0 behind silt fence/straw bales, 0 around storm drain inlet
protection devices, 0 streets and gutters (Do not flush with water)
Temporary seed, fertilize, and/or mulch:_
Permanent seed, fertilize, and mulch areas that are at final
grade:
Protect storm drain inlets: 0 curb inlets, 0 drop inlets
Reshape and stabilize sideslopes of: 0 sediment traps/basins, 0 detention/retention basins
Install/Maintain construction entrance(s): _Installation is needed.
Reshape and stabilize conveyance channels: _Complete swale on south end and stabilize
Place greater emphasis on erosion and sediment control on building sites; contractors, subcontractors, material vendors, and
others should be made aware of erosion and sediment control requirements. Appropriate perimeter sediment controls
(e.g. silt fence) and stable construction entrances shall be utilized on all sites. Sediment tracked into the street shall be
removed (do not flush with water) at the end of each work day.
Other Requirements:
Report Prepared By: John B. South P.E. CPESC
Revised 4/98
I
I
I
I
I
I
I
I
I
I
I
ii
I
~,;:'
;.'~:
11.\.......
...
.'
,~: .
i~.:J .
.. .
,
I"
I~~.t;
'...
,~~\;
Fo{K~! Kt:FCe;JT I~_~C;~ .(Ai~ e~K. (!~ ~oe~ ^o/S"~OtLtl.-
/1""'- IS-I.r:f. IA. s: r;~ M/d/t" lAW ,:+fiL$ a.c:r4[/-t~ ~S"ts~ If
A"J-f-k-f ~ Skwtrl &.. /Jt/~el ~J~~f,hWti/
5.0
PRELIMINARY ALTERNATIVES
CONSIDERATION
ELIMINATED
,
FROM
FURTHER
Based on the findings of this study, the following Preliminary Alternatives are being eliminated
from further study for the following reasons:
Widen US 31 Alternative'
This alternative does not meet the purpose and need ofthe project.
y!-OZ pi
Alternatives B, C, D and I
These alternativ do not meet the purpose and need of the project.
Alternative E
Alternatives E and G b h provide a similar function of avoiding
residential impacts along existing US 31 corridor in the
comparing these two alterna' es, Alternative E ge y has greater overall impacts than
Alternative G. It also has the hi est number eam crossings (15) and the second greatest
impacts to wetlands ( 11 acres) and Ii ar of streams (7,780 feet) when compared to all of the
other preliminary alternatives. .tion, unlike Alternative G, Alternative E would not
provide the added benefit relieving affic congestion on SR 32 through the Town of
Westfield, which ~es potential Sectio 4(f)1106 sites. Therefore, due to greater overall
impacts and ~ of traffic congestion relief on R 32, Alternative E. was el.iminated in favor of
Alte~G. As for Section 4(f) impacts, both lternative E and G would result in potential
impacts to the same site (i.e., Lindley Farm),
Alternative H
~1ternative H would require the m?st right-of-way (516 acres) and result in the greatest impacts
to agricultural land (327 acres), prime farmland soil (301 acres), linear feet of streams (9,130
feet), floodplain areas (80 acres) and wetlands (21 acres)" More specifically, the majority of the
wetland, stream, and floodplain impacts are related to a longitudinal encroachment along Cool
Creek between SR 431 and l51st Street. This area has been identified b the US Fish and ....
Wi 1 e ervlce as a sensitive ecosystem that should be avoided. It also may be potential ha Itat
'lII""1' - - -
for the federally endangered Indiana bat. With regard to Section 4(f) impacts, Alternative H and
G would result in the same potential impacts to Lindley Farm. However, Alternative H would
result in greater impacts to natural resources than Alternative G.
?his AR.el'1 /lIel~5 1'f6~ 5fl r/Lf(l.aP~ U/4I2,Jq tAsfG
$fA.,O cll'';IS(J~ dr\lJ. -r/vL. setNel' 41'1d -i-~,'t cl~"f'e.,~
Ill,;",? L<>oI c~. as. rut .wl W/tclf,{e. S-"'u<.e. s~.",,/ ~
aJ/.e../ ~ Mt d.JC(,lffW~f l' ~ (5',,/;cJII.//6iW, -/:e4'/~
4' PUI fAit It tId ) In th.s 4 ~ .
~ ~,,-l3l7ewel<-
40
~
US 31 Preliminary Alternatives ~US31
Analysis and Screening Report ~~~ll\tlII'm
,.'<:,/~
I
w
I
.... -
IINDlANAI e.
38 ... 8
KEY: ~
o.
DD,OOO(A) = 2025 ALTERNATIVE'1f' AOfs (LOS) II)
00,000 = 2025 NO-ACTION AOfs
ffi 2025 ALTERNATIVE LOS
"\fJ 2025 NO-ACTION LOS
~~
a:~:j,~
North
NOT TO SCAlE
Alternative H
I
I
G11
~e
~4S:
818~
~~.~
191st Slreet ... .1; ~
1_--'--8---
I ~
I ~/t.'~ '&
fQ - ~ Ill.
....u 1/')" !;t
"'l'"
~
I
I
I~DAHAI
I 32
I
I
i
I
~!
~I
I
I
]
'"
~
i!!
~
~
.[
en
I
I.
I
Ii
I 8 G"11g
0. ~ c'
: <0
--,..-.---1---. 1C61h Slrae!
~J ~~,,_
I
I
II
o
4.5.9 Alternative H
Alternative H would consist of upgrading existing
US 31 to freeway standards between 1-465 and SR
431. Between SR 431 and SR 38, a new alignment
is proposed to the east of US 31. North of SR 32,
the alignment matches Alternative G.
Approximately eight miles of this alternative would
be on new alignment. . The US 31/SR 431
interchange would be redesigned to provide all
movements between US 31, SR 431 and 146th
Street. Interchanges would be tentatively provided
(locations remain under review and are subject to
change) at 106th, 116t\ 126th, 136th, 161st streets,
SR 32 and 1915t Street. A new interchange is also
tentatively proposed at the northern terminus of this
alternative to allow for full access to SR 38 and the
unimproved portion of US 31.
$,;,.;,., ~eCDs'(S~
Phase 1: Purpose and Need
Traffic Congestion: Thi~ alternative would result in
improved levels of service at Greyhound Pass and
SR 32. Compared to the No-Action Alternative,
the LOS at these locations would improve from F to
D, meeting INDOT standards. Projected freeway
levels of service range from A through D also
meeting INDOT standards.
Traffic Safety: This alternative will improve safety
on US 31 by reducing travel demand on the non-
freeway section and changing the facility type.
Consistency with Transportation Plans: This
alternative is consistent with INDOT's Long Range Transportation Plan for providing a
"Statewide Mobility Corridor." However, neither INDOT's Long Range Transportation Plan nor
regional transportation plans identify a new freeway facility offthe existing US 31 alignment.
Based on the aforementioned findings, Alternative H meets the project purpose and need and was
advanced to Phase 2 of the screening process.
Phase 2: Environmental Impacts
The potential impacts identified for Alternative H are presented in Appendix A, Table A-I and
Figures A-I through A-4. The largest impacts to land use by this alternative occur to agricultural
35
US 31 Preliminary Alternatives
Analysis and Screening Report
~31
r/ll'IIDUtmtnr
PROJf.CT
I
w
o
I'
land (327 acres). The majority of these impacts occur between 151 st Street and SR 38, where the
alternative is located off-alignment. In addition, most of the agricultural land supports prime
farmland soils (301 acres). The alternative would result in the displacement of approximately 36
single-family residences and 12 retail buildings. The majority of the residential displacements
occur north of l46th Street and at the potential 136th Street interchange. Approximately 21 acres
of wetlands would also be impacted. As for stream impacts, Alternative H would result in 12
stream crossings that would involve 9,130 linear feet of stream. The majority of the stream and
floodplain impacts are associated with a longitudinal encroachment of Cool Creek between S~
431 and 151 st Street. The otential cultural resource im act associated with this alternative
inc ude five archaeological ~itpc li1l'~,1J nnp. p.ligihlp. historic sit~ (i.e., Lindley Farm). In regard to
the historic site, no structures would be directly impacted, rather the direct impact would consist
of land/property takings. As for public parks/recreational areas (i.e., Section 4(f) property),
Alternative H would result in an aerial crossing of the Monon Trail between l36th Street and
Rangeline Road. However, no property or right-of-way will be taken. Because Lindley Farm is
an eligible historic site, it represents the only potential Section 4(f) impact associated with
Alternative H.
I
I
I
I
I I
I
Conclusion
I
Alternative H is being eliminated frnm fip;-rpr consideration based on a comparative analvsis of
~pacts with other altp.m::ltives that wpre gg'.T:!loR~pn to the Phase 2 screenin,g process (See Section -
5.0 - Preliminary Alternatives Eliminated from Further Consideration). --
I
I
I
I
I
,( '.~ .
I
~^^
~i
II
~!{<
M
If..".
I
~~{'
I
~j}:~.;~
36
US 31 Preliminary Alternatives ~31
Analysis and Screening Report ~Jml'r'm""
I
I'
I
I
I
I
I
I
I
,
,
,
,
,
,
-
l
l
-
o
o
3.6 Wetlands
Wetland ecosystems in the project area were identified utilizing National Wetland Inventory
(NWI) maps from the US Fish and Wildlife Service (USFWS). Though not ground-checked, nor
do they define jurisdictional wetlands, they are the industry standard when initially attempting to
identify wetland areas. Wetlands identified in the project area are fragmented and rather small,
primarily less than ten acres (Appendix A, Figure A-3). Most systems are categorized as
palustrine, and thus not associated with a river or lake system, but ra~her dependent on
groundwater or precipitation runoffto sustain their hydrologic regime. They vary from emergent
to scrub-shrub to forested wetland systems. There are several small riverine wetlands that occur
along Cool, Clay and Carmel Creeks near the southern limits of the proiect area. Typical
vegetative species in the wetland areas include black willow, cottonwood, green ash cattails and
various reeds and sedges. -
- ~
3. 7 Vegetation and Wildlife Habitat
Wildlife habitats in the ro'ect area v and are constant! under ressure due to (sub)urban
develo ment. These habitats include terrestrial ecos stems such as fallow fields, sma wooded
lots and aquatic ecosvstems such as small wetlanrls, man-made ponds and some creek habl a .
,Elultitude of both plant and animal species can b~ fmmrl in the proiect area. Examples of typical
...animal species include white-tailed deer.. opossum, raccoons, skunk, rabbits, various smalf
mammals such as mice anrl ntl,er rggentc:::, WPM hhlP nprnn red-tailed hawk, migrating waterfowl
(e.g., Canada geese, mallard, etc.) ~d a variety of songbird specie.s. Aquatic habitats are home
to species such as minnowc:::, ~l1nfish, turtles and various amphibians. Vegetative species inc1uae
oak, maple and various species of pine and shrub. ..
Aquatic systems have the potential for providing habitat for fish, invertebrate and mollusk
species, however species quantity and variety may be low due to continuing disturbances.
Additionall onl Carmel reek 0 I Creek a ear to be sufficient to rovide semi-suitable
habitat for mussel 0 ulations. Due to develo ment in Hamilton County, especially near the U
31 co~suitable and high-quality habitat is limite and quickly being dIminished.
The Indiana Department of Natural Resources (IDNR) specified that Bitternut Woods Nature
Preserve, a state-dedicated nature preserve, is within the boundaries of the project area
(Appendix C). This area, located northwest of the l06th Street and Spring Mill Road
intersection, as detailed in the Natural Heritage Program (NHP) database, contains two high-
quality natural communities, specifically a wet-mesic floodplain forest and a mesic upland forest.
Both are categorized as state-significant by the NHP. Species in riparian forest and forested
floodplain areas along Cool Creek and Carmel. Creek include box elder, silver maple, sugar
maple and Ohio Buckeye. 1
3.8 Threatened and Endangered Species
Information about threatened and endangered species within the project area was provided by the
United States Fish and Wildlife Services (USFWS) and IDNR (Appendix C). The USFWS
II
us 31 Preliminary Alternatives ~31
Analysis and Screening Report ~:U;~f~r'm'"
I
I
I
I
I
I
I
I
I
II
I
I
I
"
I
-
I
-
I
w
o
stated that the project ~ea is within the range of the federally endangered Indiana bat anF
federally threatened bald eagle. There are no current records of Indiana bats near the project
corridor, however, the streams in the affected area haVf'~ not heen !':urv~yed for the species. The
USFWS indicated that there is suitable summer habitat for Indiana bats in forested areas along
Cool Creek and possibly in the other riparian forest areas within the project area. Locally, there
are multiple. records of this species in adi acent Marion County. including a location withi~n
Iiiiles of the project area. It was also reported that there are no bald eagle nests or significant ~
habitat areas near the project corridor. According to the IDNR NHP database (January 31,2002),
the Red Shouldered hawk, a state species of special concern, and the American badger, a state
endangered species, have been reported to occur in the project vicinity, though these reports are
13 to 45 years old. No critical habitat for any threatened or endangered species, including the
Indiana bat, has been identified within the project area.
3.9 Water Resources
Surface Water
Surface water features in the project area are primarily flowing water bodies including creeks and
their tributaries, all of which are collectively contained in the Upper White River watershed. As
indicated on USGS topographic maps, these water bodies include Lindley, Jones and Almond
Ditches, Grassy Branch, Cool, Carmel, Williams, Henley, Elliot, Will, Clay and Center creeks
(Appendix A, Figure A-3). There are no natural lakes in the project area. However, many
residential developments and commercial/office complexes have man-made retention ponds for
recreational, aesthetic, and water storage purposes.
As indicated by the IDNR Division of Water (IDNR web site retrieval February 6,2002), use of
surface water has continued to increase from 1986 through 1997, especially for energy
production, industry, agriculture and public water supply. Little data is available on the water
quality. Volunteer monitors have recorded partial results for only one site near Carmel High
School in Cool Creek (Hoosier Riverwatch, retrieved February 6, 2002). Through the USGS
Natiorial Water Quality Assessment (NA WQA), some regional information is available on
surface water quality in the local watershed, though none on the specific water bodies mentioned
herein. Overall, findings indicated elevated concentrations of pesticide contaminants were of key
concern and that concentrations and types depend heavily on land use in the surrounding area
(USGS website retrieval February 18, 2002).
Groundwater
Groundwater in the area is delivered from the White River Basin aquifer system. According to the
IDNR, annual groundwater withdrawal between 1986 and 1997 has continued to rise for usage in
energy production, agriculture, and public supply (retrieved February 6, 2002). Quality of this
water in the watershed, though not necessarily in the project area, has beenmonitored by the USGS
through 94 monitoring wells. Much like surface water, pesticides were of concern, though none
exceeded any federal guidelines. Volatile organic compounds (VOCs) were also ofconcem as they
were detected in over half of the shallow urban monitoring wells. These compounds, however, did
not exceed federal drinking water standards. Nitrates were also detected in both shallow and deep
wells, with concentrations in shallow wells exceeding federal drinking water standards.
12
US 31 Preliminary Alternatives ~31
Analysis and Screening Report ~b~f&lmfaT
j
,
,.
-.
EROS N AND SEDIMENT CONTR PLAN
TECHNICAL REVIEW AND COMMENT
Hamilton County Soil and Water Conservation District
1108 South 9th Street, Noblesville IN 46060
Ph- 317-773-1432 or Email at john-south@iaswcd.org
PROJECT NAME:
Laura Vista Construction Plans
11--002~P
SUBMITTED BY:
Primrose Development
1016 3rd Avenue SW, Suite 100
Carmel, IN 46032
317 -846-6641
Mr. Brandon Burke
Schneider Corp.
12821 E. New Market Street
Suite 100
Carmel, IN 46032
REVIEWED BY:
John B. South P.E.
Certified Professional in Erosion and Sediment Control
PLAN REVIEW PROCEDURE: Plan Review Date: 1-10-03
Acreage: 35
LOCATION: NW of Carey and Smokey Row Roads intersection
LEGAL DESCRIPTION: Sec. 19
TOWNSHIP: 18N
RANGE: 4E
CIVIL TOWNSHIP: Clay
SOIL SURVEY MAP SHEET: On Plans
-
The technical review and comments are intended to evaluate the completeness of the erosion and sediment control plan for the
project. The erosion and sediment control plan submitted was not reviewed for the adequacy of the engineering design. All
practices included in the plan, as well as those recommended in the comments should be evaluated as to their feasibility by a
qualified individual with structural practices designed by a qualified engineer. The plan has not been reviewedfor local, state,
or federal permits that may be required to proceed with this project. Additional information, including design calculations may
be requested to fUrther evaluate the erosion and sediment control plan.
The erosion and sediment control plan has been reviewed and it has been determined that the plan:
Satisfies the minimum requirements and intent of 3271AC 15-5 (Rule 5). Notification will be forwarded to the
Indiana Department of Environmental Management.
Refer to the comments section for additional information.
x
Does not satisfy the minimum requirements and intent of 3271AC 15-5 (Rule 5); deficiencies are noted in the
checklist and in the comments section. Deficiencies constitute potential violations of the rule and must be
a4equately addressed for compliance. The information necessary to satisfy the deficiencies must be submitted:
i
I
-I
Proper implementation of the erosion and sediment control plan and inspections of the construction site by the developer or a
representative are necessary to minimize off-site sedimentation. The developer should be aware that unforeseen construction
activities and weather conditions may effect the performance of a practice or the erosion and sediment control plan. The plan
must be aflexible document, with provisions to modifY or substitute practices as necessary
~
PROJECT: Laura Vista ConstrucU Plans
Page 2 00
u
Yes No
x IA
x IB
x IC
x ID
x IE
Yes No
.x 2A
x 2B
x 2C
x 2D
x
x
x
2E
2F
2G
x
x
2H
21
Yes
No
x
3A
x
3B
Yes No
x 4A
X 4B
X 4C
x 4D
x 4E
x 4F
x 4G
x 4H
x 41
x 4J
x 4K
ARE THE FOLLOWING ITEMS ADEQUATELY ADDRESSED ON THE PLANS?
(All Plans Must Include Appropriate Legends, Scales, and North Arrow)
(Items that are Not Applicable to this Project are designated by NA)
PROJECT INFORMATION
Project Location Map (Show project in relation to other areas of the county)
Narrative Describing the Nature and Purpose of the Project
Location of Planned and/or Existing Roads, Utilities, Structures, Highways, etc.
Lot and/or Building Locations
Landuse of Adjacent Areas
(Show the Entire Upstream Watershed and Adjacent Areas Within 500 Feet of the Property Lines)
TOPOGRAPHIC, DRAINAGE, AND GENERAL SITE FEATURES
Existing Vegetation (Identify and Delineate)
Location and Name of All Wetlands, Lakes and Water Courses On and Adjacent to the Site
100 Year Floodplains, Floodway Fringes, and Floodways (Note if None)
Soils Information (Ifhydric soils are present, it is the responsibility of the owner/developer to
investigate the existence of wetlands and to obtain permits from the appropriate government agencies.)
Existing and Planned Contours at an Interval Appropriate to Indicate Drainage Patterns
Locations of Specific Points Where Stormwater Discharge Will Leave the Site
Identify All Receiving Waters (If Discharge is to a Separate Municipal Storm Sewer, Identify the
Name of the Municipal Operator and the Ultimate Receiving Water)
Potential Areas Where Storm water May Enter Groundwater (Note if None)
Location of Storm water System (Include Culverts, Storm Sewers, Channels, and Swales)
LAND DISTURBING ACTIVITIES
Location and Approximate Dimensions of All Disturbed Areas [i.e., Construction Limits]
(Areas Where Vegetative Cover Will Be Preserved Should be Clearly Designated)
Soil Stockpiles and or Borrow Areas (Show Locations or Note if None)
EROSION AND SEDIMENT CONTROL MEASURES
Sequence of When Each Measure Will Be Implemented (Relative to Earth Disturbing Activities)
Monitoring and Maintenance Guidelines for Each Measure
Perimeter Sediment Control Measures (Location, Construction Detail, Dimensions, and Specifications)
Temporary Seeding (Specifications; Including Seed Mix, Fertilizer, Lime, and Mulch Rates)
Temporary Erosion and Sediment Control Measures
(Location, Construction Detail, Dimensions, and Specifications)
Permanent Erosion and Sediment Control Measures
(Location, Construction Detail, Dimensions, and Specifications)
Storm Drain Inlet Protection (Location, Construction Detail, Dimensions, and Specifications)
Stormwater Outlet Protection (Location, Construction Detail, Dimensions, and Specifications)
Stable Construction Entrance (Location, Construction Detail, Dimensions, and Specifications)
Erosion and Sediment Control on Individual Building Lots (Specifications)
Permanent,Seeding (Specifications; Including Seed Mix, Fertilizer, Lime, and Mulch Rates)
Revised 4 / 97
i>
EROQN AND SEDIMENT CONTROQLAN
TECHNICAL REVIEW
COMMENTS
PROJECT:
Laura Vista Construction Plans
Page 3 of 3
Note: All erosion ,and sediment control measures shown on the plans and referenced in this review must meet the design
criteria, standards, and specifications outlined in the "Indiana Handbookfor Erosion Control in Developing Areas" from the
Indiana Department of Natural Resources, Division of Soil Conservation or similar Guidance Documents.
3A. For the purpose ofland development not home construction please show the construction limits for
. wooded lots. Generally the construction limit is at the edge of the utility easement. .
4C Please provide information that the sediment trap meets the requirements outlined in the DNR manual. If
the watershed exceeds five acres the trap needs to be a sediment basin and have the proper outlet. A rock
spillway is not acceptable. All the shading makes the berm hard to see on the plan. Please show the top
elevation and where the berm starts and ends.
4E. During rough grading, ditch checks are recommended for the swales behind lots 19-24 and lots 46-47.
Cc: Carmel DOCS
Ha. Co. Surveyor
File
u
o
City of Carmel
Fire Department Headquarters
2 CIVIC SQUARE
CARMEL, INDIANA 46032
Voice (317) 571-2600 Fax (317) 571-2615
Fire Prevention Bureau
Brandon Burke, P.E.
Schneider Corporation
12821 E. New Market St. Suite 100
Carmel, IN 46032
RE: Laura Vista
11-00</;::/
LETTER OF APPROVAL
The undersigned has reviewed the proposed plans for
Laura Vista
and has approved the plans subject to the following:
1. After review of this project, I have no additional requirements to be met at this time.
2.
3.
4.
I
5.
6.
Please respond to the above noted condition(s) in writing and submit to our office prior to the
scheduled Technical Advisory Meeting for this project.
Date: December 16. 2002
By: Gary Hoyt, Fire Marshal
Carmel Fire Department
~
u
- ~~ " I sIft: ~ .....-.:
-
, -.."".
#
I _2.0 ~~~-at.=-~
I -{J _ t:.t:)~.:L__ ....----...
- ~H.~_.Piflti
-
v 4>N~ 7l> E:;ffln-_~~
~- -~.
,
3 ~\...}c... H E:Ma,~1 :@ 6N2NE- ___
A.~~ t/Pn..~
8. h(),4n~
C. ~~ ~iC:-
'b. 1'/ "11~/JL_
- .
- -~~E'.tJr
"'- . -......-..._~_."
~ @ c~~:r!1'ILE61ls..-L: A-.-Qtf--
-- 6. c.o~
Go __f, .. _... .
r, ~'r(~tftr ~
- , e. fIYj l,.f c., ~s:Ei:::::::> -
-
/ ~~,-~~j~ · f.B:
~
_.
--
. ~~--
-' .
- ~V
I
_._--------
--, 1- -- ----
I
u
B/~~~
'"""""_.."'..,....-,----.-~>=---~....-----....._.--...._-=---..~---......_-_.~_...-..--.".>---,.....
~..-----...-.,,--""'-~...--._-----_.--------'".....--,~.~...----~...- .
_J
.- j
~~~--,-----------------.
'-'("JJ~_________j
. _.- .' l
--~"
:m:.._~E :n,t"'\E_._~__
~_7iI ~1J/1~1!:..7.7MtL
1l~_~"I: ".. M.7!..IN_.e. 7!liht...
r.!M(~~
\hf!'t-X~_ wfn\l!tL-.l~~n __
~~~~iti~lL-
MJ~ - - . -V-.-"'-4';f; --I
t~--l .
AoE~
v~
""
,W
u
CITY OF CARMEL
Department of Community Services
One Civic Square
Carmel, IN 4&l32
(317) 571.2417
Fax: (317) 571.2426
Fax
Phone: Date:
Ilel DZ-f/t:1 rf/J?(/)I ,.f~i"f eel
Voya
6
?~ /.5-0~
To: g~dO/1 &rktZ From:
Fax: !~~ ~ 6wo Pages:
o Urgent 0 For Review 0 Please Comment 0 Please Reply
CJ Please Recycle
.[)()CkfZ~ .#
tf;L',,~ J'P
4zv~ ///;1-4 . :5;/~;/.r;:M
( >4~hi(T/ >6'~;I )
AUG-08-2002 11:49AM
FROM-NELSON & FRA~ERGER
3178468782
T-766 P.002/002 F-042
(;)
NELSON
&
F'RANKEt'lBERCiER
^ PROFESSIONAL CORPORATION
ATIORNEVS AT LAW
J.a.MES J. NE!LSON
CHARLES D. f'RANKEl'tBf!RCiI3R
JAMES E. SHlNAVER
LARRY J. KEMPER
JOHN B. PLAn
fIRED R1C LAWREHCE
OF COONSa.
JANE B. MERRILL
3021 EAST 98TIi STREET
SUITE 220
INDIANAPOI.J$. INDIANA 46280
317-844-0106
FAX: 317-846-8'782
August 8, 2002
1;\
r""Y""' ~:,., f
. ~ ,.:Cr !VC:D
8
DOCS
VIA FACSIMILE: 571~242'
"-../
Jou C. Dobosiewicz
Department of Community Services
One Civic Square
Carmel. IN 46032
Re: Primrose Development. LtC - Laura Vista
Dear Ion:
It is my understanding that Primrose's commitments are as follows:
1. Within Common Area A. they will dedicate a 30' easement for the relocated sanitary sewer
interceptor;
2. They will dedicate a 12' easement for the alternative tranSportation path, and pay the eost of
graveling and 3" of asphalt for the path; and
3. They will not convey to the FaustS an access easement until the FaustS have vacated the
easement of Faust Drive.
After you review this, please call me with your questions and comments. Thanks.
v cry truly yours,
NELSON & FRANKENBERGER
C2,",",
Charles D. Frankenberger
CDF/jlw
H:\l'lllIat\PriDIrlIsa\La1llB Vista\Doboaicwicz 11I"010802.wpcI
AUQ-oa-zooz 11:48AM
~ROIMiL$ON , ~R~~'~N8iRQiR
V
3178488782
Q T-7G6 P.001/OOZ ~-04Z
NELSON
&
FRANKENBEROER
A PROFESSIONAL CORPORATION
A1TORNEYS AT LAW
JAMES J. NELSoN
CI-WG.ES D. FlWlKENBEROER
JAMES E. SHINAVER
LARRY J. KEMPER
JOHN B. RAlT
OF COONSEL
JNIE B. MPRRIU..
3021 EMT 98Tt1 STREET
surre 220
INDIANAPOUS, INDIANA 46280
317-844-0106
FAX: 317-846-8782
FAX TRANSMISSION
COVERSBEET
--,----,..---
/,'( i I ,. ;-",>-
//" , -., (>'"
l-'" ~ '<\
r . RECF/VED-\
:~::::: AUG 8 :::.
, I
~ .' I
': DOCS
,.-'\
\,...~..... \
\/..>
'\,: ,/
.'-:., /
Date: August 8, 2002
To: Jon Doboslewi~
Company:
Carmel Department of Services
Fax:
571-2426
From:
Charles D. Frankenberger
317~844-0106
Phone:
Pages:
2
(including cover sheet)
Comments:
Re: Primrose Development - Laura Vista
...........**...........................***........................*****.***....
The information eontab1ed in this facsimile messase is intended OItJy for the use oftbe individual or entity named above.
If the reader or recipient oftbis message is not the Intended recipient or an employee or agent of the fDtez2ded recipient who
is responsible for deUwrlng It to the intended recipient, you are hereby notified that any dissemination, distribution or
copying of this communicadoD is strictly prohibited. If you have received this commUDication in error, please notifY us by
telephone (collect) and remm the origiDal messase to us at 1he abo'Ve bldlcated 8ddress via the U.S. Postal ServIce. R.eeeipt
by anyone olber than the intc:nclec:l recipient is not a waiver of an attomcy..cJient or work product privilege.
I .>.
~-
U U 8/ ,j 01-
~~ .
.
I c::::..o~", Cl!.fo!) ~EA ~"",J-r.liJJt1I~ .
. j
, ,
1 I
. ~'OIwo\~\WN~_~&u""" ~&., ~ A'~JhLoE
2... ~~: ~ ~
I - 2... () , 4W~""IPIL~"'CoJ'C ~~~
,
i
.
- .:4 t> &12'~.~C .s~L~
I
~
{" A- kot=-'=~ . 0P.frss-.J~
. ~
~
-
'"
Pvk..lC.I~.~ M tk~S '\.
~
f4 -
(t:o~~~
, ~ ~~-t----e~
M c>-no~ .
~~". .. r-t~ .
---.;.-~
- ~;_.- ---
&-~
------- ----....-...-._---
- - ----""--.. --,_._~- ~ ---.$.
, -
, ; l ~ . ,. t__t_'l.-.:,...-'-______
.---...... -_._----~--
- -
------- - ----~~----_.- ---..",..- ~-
.~--- -'-'--~"""",--- .._-~- ----"'------------. --
-
-- ---
- -------
=-'
-__- 'I
u
w
s,4/4ft.
LA~ V\~~
1 -
i
I c. \1M.\..'~_~_LS:$J&!~ ~ ~f.s 1 ~-z:...
: P-JAFF: \. ~c..L~~~ ur~r
!
I '2-. 1>.3 -"2-\ S-~I>~
,
. j
~ i
I
II
;1
'l'-.
--
.. f~ c,. ~J~~. S-tMi. f~clE. - DIe ,.... ..........~
f!'!- ~~". ~~~_~fo~~c;,.~
~_-~.~p. O~ -............- M,1~4L~..rn-~":~~
~'-~--1N (0_.... ~__(\...t\eK l>F/~t:b:J_
_As. C.\~-Il;;;f-OP_'~_~)C!$.~_
__A..-.b~ ~~. - ~ M"~~'E:~~a:
,.w.... lSE\1.-
c. ~ ~ 0,", -=r. ~~
"
--
, Go~~ n'1~ ~\.E.-~--'-G--epl::>~ 71> Vll*,!)Ifa,,/L ~I. L-r>""" .r r
i' >-____
1':& Ae;,:.~ '1b __~~~ ""1"'- 4c. ~__
--
.___ tZi j 1)c:..~~IA-_~s:r:: : 1.11I1fW'~ e>J=- I~J#(I_IJlGb!lP1it>-
-i
__________ 2..1107 11I_~_o.~'P./BII ~~ ___
_._ _. _ __ I.~ti€~b ~__~_~l'l~~-Q~~E.~----------
- 1/. "'II> .sl(C_-9JII_~7)__~_~JlIl""l:> ~----l
----d!ll~&.-&,,$. ~ ~. NEw :r:>lE..~1i:~c...GPtu€..=1f7.c... -- :
--
~.
,---
L
I
~
I
J
u
u
~)6/(jwz.
~~ .. ..' .~. . ._~~=_==~~~_=~~-=~~------~-~~~-_.__w._'-~~~]
__ . __ - L.f k'~S-)~~~~~9..~S_.c'",,~~"('-~~,~---~-----~--~
- c..."~'j_~_b!J.\'b ..s:.e~~~{~-----_._------------------'-
__ - Li:-.s.s_.__.c:-Q~sr~.~te-PI~L..........----------1
_ - ~iY ~t~L..s,c:;-~!Ik-.-.~ -.------~-------
· ,~- ,-~-- ---'--~~J
~. -~~~_. - J
k.o_~~~E: ~b/-~1C.yoIg.,--'-------:--==J
...---_-c=..___........__.._->.-~____-
~~
-:-__,,----~--.--.... ~.,._________.__-o".-___._._._
...-="._.-;-.~-,=-,--.;;,O>r-~"""_______"'______"'" o_.~~--_._------_.._..-:--.,.
.jo~ :
"
-~
~~.. .1k~~O':" ~,,~J;l\'''~~''.--~~J-----!,
fit!.,~ -....._~--~,,~-_. . ----
. ,
~.,..,-__..__..____~._,""""",~._..~~_C'--'-'--~--"._----~.-
.3
~~ WM.~~ ~~'YI.~
;.., .11-
\. Y-1d'C...,--,,~ ' .
'l-. 4W\ f()tL ~~..~r~t.L~~
3. ~~OClS c:;.~e."-Ia_~.A-~~-
""----=--------
1.\,_
t&\~fLk~ti"~
Mo"o~ ~
~, :... .
,:
~~\
-......-.-_"._~.w,__......_,_____.____'__......_~
~~--_._-_._...--...,.,......._~_._~ ._-~-~~--_..---
Fax
u
CITY OF CARMEL
Department of Community SelVices
One Civic Square
Carmel, IN 4&X32
(317) 571-2417
Fax: (317) 571-2426
To: d'r4~"~ 4rk(l;
Fax: /02(, - 600
Phone: ~?- r//~
Re:~-f- ,e~?o,...-f-
cc:
u
o Urgent 0 For Review 0 P.lease Comment 0 Please Reply
o Please Recycle
fl-o~ lOP
~vr~ ;;sh, ~,6~;I';,;,.,
11- O^t:l.r1Y'
J'/- o~ 6 sW
1/_ ()~ a.. rW
F/- o~ q cr~
r/-08. e s
u
o
CITY OF CARMEL <
De~rtment of Community SetVic:es
One Clvio Square
Carmel, IN 46032
(317) 571-~417
Fax: (317) 571-2426
Fax
To: .~rtr~/7 &n?e
Fax: !4 - 600
Phone: af1- !'//~
Re:~l"d ~'.,L~ dJ~dt//~,'e,/1
~ce
/
From:
Pages:
l3
?-d-Oo{
Date:
cc:
o Urgent 0 For Review 0 Please Comment D Please Reply
D Please Recycle
-5Jjd>r;'~~ ~/TJ///ee 'fyC'/l/.r
~ck~~. ?/-Od #
f/- 00( 9 sW
. f/--- 0..;2 b ..svV
1/-- tJ a. G .5W
cf/- t7~ d SW
tf/- t'/d? e s y(
\.-.1
u
o
Mr. David Cremeans
C/Carmel Planning Commission
Subdivision Committee
July 24, 2002
Dear Mr. Cremeans,
We have mixed feelings regarding the Laura Vista development. We are realistic and understand that this
land will be developed some day and we see several positives with this development.
1. We support the residential use of this property, particularly in light of the Greyhound Pass
commercial development.
2. We support the type of community proposed by Primrose Development. The empty nester
community with an estimated target selling price of $350,000 per home will blend well with
Foster Estates.
3. We applaud the plan to preserve as much of the existing natural surroundings as possible.
This "open space" or Common Area is good for both our developments and also the City of
Carmel.
4. We know the developer. Steve Schultz has an excellent reputation in the area and is a
homeowner in Foster Estates. His partner, Will Wright shares the reputation for high quality
work.
Along with these positives we have some real concern about Laura Vista.
1. The developer has explained that the minimum cost of a home in this development will be
$350K to $450K with the median being about $375K. The Laura Vista home values will
impact upon the majority of the Foster Estates homeowners. The Foster Estates homeowners
are requesting that the value of the Laura Vista homes be reflected in the neighborhood
covenants i.e., percentage of brick exteriors, square footage of home, landscaping, etc. We
request that the Plan Commission impose and insure those requirements that lead to quality
home construction.
2. The developer has shown a common area between Foster Estates and Laura Vista. The Foster
Estates homeowners request the Planning Commission require this common area be neatly
planted and maintained during and after construction. To prevent additional back yard
flooding situations, we also request that grading be done in this area to alleviate this problem.
We are also concerned about the other common area. The Foster Estates homeowners request
that a restriction be placed on the property Deed excluding other structures or commercial
development in these common areas.
3. Most of construction traffic, as it now stands, will enter FE at Jason St and travel south on
Jeremy Dr to Laura Drive and then west into Laura Vista. This is unacceptable to the
homeowners adjacent to Jeremy Dr, Jason St, Hazel Foster Dr and Maralice Drive. The only
acceptable solution is a temporary construction entrance dedicated to construction traffic. We
have learned that Primrose has requested such a temporary construction access from Hamilton
County. The route requested is along a frontage road adjacent to Keystone Ave, between
Smokey Row Rd and the new development. We request that the C/Carmel assist the developer
and the Foster Estates homeowners in jointly acquiring this temporary access. The City of
Carmel is presently repaving our streets after 12 years. Should we be unsuccessful in securing
a temporary construction access, the Foster Estates homeowners request the Commission to
require that the developer keep the streets clean and repair damage done to the effected roads.
We intend to meet with Primrose prior to the August 6th meeting. Thank you for the opportunity to
present the homeowners side of this project.
~9a
Albert Koeske
Secretary Treasurer
Foster Estates Homeowners Assoc.
. 07/22/02 11:12 FAX
u
HAMILTON CO HWY. ~~~ Carmel DOCD
o
Igj 001/003
HAMILTON COUNTY
HIGHWAY DEPARTMENT
July 22, 2002
Mr. AI Koeske
14208 Joshua Drive
Carmel, Indiana 46033
RE: laura Vista Subdivision
Clay Township
'1,...~p
e>' .... C>
Dear Mr. Koeske:
I am including the letter that you requested concerning the above-mentioned project, I
have also included a copy of our response to the request. If you have any questions or
comments concerning this letter, please feel free to contact me at anytime.
~i$~
Steven J. Broennann
Staff Engineer
cc: Jon Dobosiewicz
G:\USERS\SB\02T AC\07-22~21auravlsla.doc
1700 South 10" Street
Noblesville, In. 46060
www.co.hamiJton.in.us
Office (317) 773-7770
Fax (317) 776-9814
. 07/22/02 11:12 FAX
Q
HAMILTON CO BWY. ~~~ Carmel DOCD
U
!gJ 0021003
~~
Schneider
July 9, 2002
Steve Broermann
Hamilton County Highway Department
1700 South 101h Street
Noblesville, Indiana 46060
rg: ~ .,,="", - 'l)
: ' '. .' . '. '.' r",,\
r:" .I
J U L 1 0 2002
RE: Laura Vista
HAM'L.O,\i i,; J
HIGHWAY oepi
Dear Steve:
Please find enclosed one revised copy of the Primary Plat for the Laura Vista development.
Primrose Development presented this project at the June 19.2002 meeting of the Carmel
Technical Advisory Committee. Please review the enclosed material and forward to me, any
comments or concerns that you may have.
Please submit in writing a response to the ability to gain an access point to the existing stub street
in Danbury Estates or along or western border. I am currently under the impression that access
to Danbury Estates or any point along our western boundary will not be allowed due to the
construction of the proposed off ramp from SR 431 to 1461h Street.
This project is intended to be annexed to the City of Carmel and will be presented at the July 16.
2002 Plan Commission public hearing.
If you have any questions or require additional information, please feel free to contact me at your
convenience.
Sincerely.
THE SCHNEIDER CORPORATION
BY:? - ~~
Brandon Burke. P.E.
Project Engineer
--
Enclosure
N:\4k\4067\OO 1\do<:s\highway070902.doc
THE SCHfilElDER CORPORA1'ION
12821 E. New Market St. Suite 100 Carmel, Indiana 46032 317-569-8112 Fax 31H12&6410
www.schneldercorp.com
. 07/22/02
11:13 FAX
Q
HAMILTON CO HWY. ~~~ Carmel DOCD
~ 003/003
July 15, 2002
u
HAMILTON COUNTY
HIGHWAY DEPARTMENT
. a !AXE~
mlttof1
Mr. Brandon Burke
The Schneider Corporation
12821 East New Market Street
Carmel, Indiana 46032
RE: Laura Vista Subdivision
Primary Plat
S of 146th street / E of US 431
Clay Township
Dear Mr. Burke:
This letter serves to acknowledge receipt of a transmittal received 7/10102 containing the plans
for the above-mentioned project, After reViewing the plans the Highway Department has the
following comments:
1. The laura Vista property is currently under the jurisdiction of the Hamilton County Highway
Department. If the property is to be annexed into the City of Carmel, no construction may
begin until the annexation is completed or an Interlocel Agreement between the County and
City is executed.
2. You requested a possible access to Danbury Estates to provIde a second entrance, after
speaking to Mr. Jim Neal, Project Manager for the US431 ramp project, it was determined
that no access would be granted to Danbury Estates or Dublin Drive.
3. You also asked about the Frontage Road along US 431 and possIble access to it. While the
Frontage Road is under the jurisdiction of the Highway Department, no access will be granted
to it. The traffic hazards that would be created at the intersection of the Frontage Road and
136th Street prohibit the use of the Frontage Road for access to the Laura Vista Subdivision.
Please keep this office informed of the status of the annexation or the possibility of an Interlocal
Agreement for this project. If you have any questions or comments concerning this letter, please
feel free to contact me at anytime.
A/k.
StevelJ', ~roermann
Staff Engineer
cc: Jon Dobosiewicz
Steve Cash
G:\USERS\SB\02T AC\07-15-02Iauravlsta.doc
1700 South 1011I Street
Noblesvllle, In. 46060
www.co.hamilton.in.U5
Office (317) 113-7710
Fax (311) 776-9814
u
u
NATURAL RESOURCES
PLAN REVIEW AND COMMENT
Hamilton County Soil and Water Conservation District
1108 South 9th Street, Noblesville IN.. 46060
Ph- 317-773-1432 or Email at john-south@iaswcd.org
Project Name- Laura Vista Primary Revised
Location- Sec. 19 T-18N R-3E
Acreage- 35 Ac.
Owner/Developer-
Primrose Development
1016 3rd Avenue SW, Suite 100
Carmel, IN 46032
Engineer-
Mr. Brandon Burke
Schneider Corporation
12821 E. New Market Street
Suite 100
Carmel, In 46032
Reviewed By:
John B. South P.E.
Certified Professional in Erosion and Sediment Control
Plan Review Date: July 16, 2002
I have reviewed the revised primary plat. The two previous comments have not been addressed. I
have no additional comments.
Cc: Jon Dobosiewicz, Carmel DOCS
Steve Cash, Surveyor
Steve Broermann, County Highway
File
Q
o
July 12, 2002
-~L'-~''''
,/S \ '/;) It; ~.) I '"
A"~c;;.c-....<.......I~
/::;/ t '/, J\
/?/ Rr.CENEU \:<\
t~~! . J~\- ,1~ lQ~2 : ':.1
\~,\" uoc~ , ;/
\.~A
~->/'''' /
,/ :I''/'..~ \ "_
'-../ ,. "f"'r" .' \ :./
':..~...~L_l. ..:-~~ ..:y'
Mr. Jon c. Dobosiewicz
Planning Administrator
Department of Community Services
City of Carmel
One Civic Square
Carmel, Indiana 46032
Mr. Dobosiewicz:
Thank you for taking the time to meet with me regarding Laura Vista and answering my
questions regarding rules and procedures for land development in Carmel. I have had a
subsequent conversation with Jim White and Steve Shutz and gained further clarification
and would like to voice my support for the project.
As you are aware, I am the owner and inhabitant of Lot 62, 14286 Matt Street in Foster
Estates; and will be directly affected by the development of Laura Vista. After reading
the Development Report and conversing with Jim and Steve, I support the project as
planned and am anxious for it to get started and finished.
My dealings with these two gentlemen in their roles with Quadrant Development have
always been positive. I have found them to be responsive, honest and sensitive to the
quality and value of the homes in Foster Estates, and I anticipate they will be with Laura
Vista as well.
Due to a previously planned trip, I am unable to attend the Carmel Plan Commission
meeting on July 16, but wanted to voice my support and have it included as part of the
record of the hearing.
. -Thanks again for your time and help.
Best personal regards,
Steve Scattaregia
14286 Matt St.
Carmel, IN 46033
~
METROBANK
IKE G. BATALIS
President and
Chief Executive Officer
Carmel
Westfield
N oblesville
Fishers
317/573' 2400
10333 N. Meridian, P.O. Box 80451
Indianal)olis, Indiana 46280-0451
u
u
July 15, 2002
Mr. Dan Dutcher
CARMEL CITY HALL
One Civic Square
Carmel, IN 46032
~
REUWfD
t:'''_ 16 ..,
DOCS
RE: Docket No. 81-02 PP; Laura Vista Subdivision (primary Plat)
Dear Mr. Dutcher:
I am a resident of the Foster Estates Subdivision and reside at 14490 Jeremy
Drive. Foster Estates is adjacent to the applicant's proposed development. The
purpose of this letter is to register my support for the waivers as proposed for this
new subdivision and approval of the plat.
The principals, Steve Schutz and Will Wright, of the entity seeking this approval
are of outstanding character and possess exemplary skills in subdivision
development. Other entities that they are involved with are good corporate
citizens and I am confident they would conduct themselves likewise in this
development. In fact, Mr. Schultz is a resident of the Foster Estates. It is not
feasible for him to do anything that would hurt the residents of Foster Estates
simply because he would be personally adversely affected as well.
Concerns have been raised about construction traffic to and from the site. I, too,
will be affected by this construction traffic. Since I live on Jeremy Drive, some of
the construction traffic will be going right in front of my home. Unfortunately,
that is the price we pay for living in a growing, vibrant community. The
development of this site will have the same construction traffic and ongoing traffic
impact as if this would have been another section of Foster Estates. It is only 54
more building sites adjacent to a subdivision that already has approximately 300
existing sites.
Also, I believe that the housing product that is proposed for this subdivision is very
desirable. The "empty nester" segment of our population will continue to grow as
the baby boomer generation progresses to scaled down activities. This segment of
the population tends to have above average disposable income and is willing to pay
for high quality housing and the amenities that come with a development such as
proposed. The developer has taken care to assure of a quality subdivision as
evidenced by the materials filed with the plat petition. Additionally, all of the
homes in this subdivision are to be constructed by the. principals of the
development or other affiliated entities. Once again, these gentlemen are highly
skilled tradesmen in the home construction industry.
w
(J
July 15, 2002
Docket No. 81-02 PP
Page 2
Finally, I believe the time is right and the product is right for this development.
Please lend your support for ultimate approval of the waivers and plat, as
presented.
Ike G. Batalis
President and CEO
IGB/cjs
7
<:::;
;U
u
711s-lor.
e l-Ol.,... pp
- -"'. --- ..-.~~----"""~--
L-A"k>. "cSTe:
L__~M."lE.~~~AR..~~ ~ ~$I::r.:'C. I. ~:L ~.'L-P.~"Ifb_~--
. _ ~~~, I~L-f.-'" ~1i"'1!!t:>. -'
- PA-~__~c.<-oIQ.~'--~ ....I!\'l~-
... 2.. Cot ~~~~
'="-~~~~~
.-',,",-- ~-_:_'-"--"'-~'
-=- .,._.""-.--'~'---~
-~'- ..sY5~ ~A.s'1lC.~
.~=-~l~~~t~€ultt.. . ~~@1 hl_D.~~
,,,'-~ ,_, .-" "-~~CT-~--"'" ".-=---"",~-~-
i-------- r-' - 0,:0 <';Q~_,::,@<I!!E..,..
\ ~~~_ ~_ ~ ~_~~'::!:'_~~-t6 ~ _t~~~b'nl of c;"~~ ~-~~ ~~.,
\~_~<~,_.,- __,_-~, 2. _Lo~~-..'~-~':!' ~,- .
I_'-~------ ' }-,_.e~~~<>,AE:...fi!! "t)"-lI':!: _-4fitus'r~I!i<t~~~
1'----'- 11_~_~____.!L....J...s.::' ""',1;>."n:f :_____-lI!I).:usL--- ---
I<.="~_~_.__.l _~~..~__~- 5. ~ 'Ol~ ~~~~8_0~'!lk..y.~~CJs.:.
i II . .
I- ----,---- ,_____~.l~-A~.!>lwt-\l-€...f!'~-~- ,- '
_ _~~. . . I -_~~m...,~.J.~~=~~~.tt"'~i~.~-o U'k_a~/~lb1~.
\
l-......
~_~,__:~=_ ~_QB~~.~~~"""~\. 3c>O\<. ~ ZoQ\<. Ii~-~
II"~~~~__ -'2.. su.sY. ~~~ Go.~~~.s'"m~!'3:
.1
---,,-~ 't--~-~~
---~---ln--
r-------il\~
I------Ht- . " 1h~ II"'-V~ ---
'"I
I ",w_ ...--\11------- c:-.tI~-""~,--
I----~~~.~~~~~~-
-------1 = ......b \.."""\.K>_j,,-~
l-- ---1; ------- 3. ~c.__I""'~ Jot....E~7_L'A;~'-IO:,.._--
[,..--------t - -- -~..~--------._---
I __ -----u_.----Ht- - -.- .~..- --- -".- 4 ._1)Eo,l"1J!b.__-,,~....).n--_/e:..~ __l~,--,--
...~ -"'-----,~.......,
~~-'
~~=-=<-==~=~~~.
c>fi~ ~M~
'3. 5 ~ "of:Jr D1:~~ C?f ~"-'_l1tJ a::Y........O'C\C~~~_.
Y.~\-n~~"M- TJ""E,. 'n><"Pb~
C6~ S:r; '1M:.C'Elc..
r
-~
u
~ -rY2- p~
w
7/15/02..
K~4i"rE: : ~. VPn..~
eo.."
voo~~
'U>o>'15: · . p.~
C. ~Sl~~ O~ ~~
~
.
.
2. 8"\ c. L~~
~.....~,
I ttL-~
. ~ ~~ ~
. ~ ~..c.- J ..' I "IH.J 'JJ'rE....'r: .b~ T \1~
A. ~DC"" ..."'c..tt-
~ / ~~~ "...~~
I
~~ t. \ .c:..e.~J.
"c:;nb~
01==
. '. ~4:1J1
.., ., It..
fc>~ A- '1b '7'
,
30 'fJ&.I~_~
~ -"t'1> Vt~" bQ.'~ "'P~
~,Jl\
. "~1E."~ CtJOT \.:E~
~l..~c..~ ~c..l~
l..\. W\V\V -/T1 W
_ B. ($) l. ou Iii
Z.
. r 75" ~ 7l> 5.5 .. ~QUI"'t\ I
v_ I
.. Cue.. -~-~ l..IlW~ .
~.-:~~ "
ttoft\:\_~~&:MJ:).~~b) i
. E1_~~~ .
,,-,,-.-EL b~~'1"
l._ro~1Do",fL. '''~E_'"'R>~~ ~_~_
2.. !s:J~ ~ ~ .5'"~ ~ A~
3. 511.)&t~ ~ f~~OF ~_l8.~I.!:$~
~
~<> ~c~ ~1&c..~l> vr ~.H...s~
~_._~~-tfi:x::r-~~E._~~Sl'C
Iii
r. i I
I
I
I
I,
-ill
~
III
~-- =- ~I'
i
I
m-
:'~=+
w
flf/O~
e I.... OL. p~
f"8~1~ H~
-~~~.::..b 7ft
.'~ ,
-
~-~
Ii
'.-~= l
.J
---~,--,~ ~-~>--<~~--]
'---~--'~~-'-'-~--~ -~-~~'-'-~-~-'-'-I
- ,< "
Fax
.W
Q
CITY OF CARMEL
Department of Community Services
One Civic Square
Carmel, IN 46032
(317) 571-2417
Fax: (317) 571-2426
To~jadS /ri, //1
Fax: (d/7) /6 7- 3>wD
-"
Phone:
~ 7"Ce--
,
From~
Pages:
Date:
7--/..5- 00l.
Re: Z>"de>T P /- o~ ~ cc:
Cl Urgent Cl For Review D P.lease Comment 0 Please Reply
o Please Recycle
~Vrej tl5~'l 3:76d~'J( ~"l
G
0 0 7}cJ.-e.
. < " ,.
~ l./ <<18- -- H€ .
of"
, -
i 3 L6C> )
fi3)<. . 30 ( ab7-
.
,
,., I'J.~
I r LWl,1lf
i ,/
,
,
i
I
, I
;;,0;.,' -.,__"'~
f
,
;
i!ll
I ~
I
I
:
,
i
--
,
I -.
"
~~" .-
" i
l- -"-~_.~----~-~>.-----~-
'-=--------- --
--.....~~ _..--"~
-,,~--.--.......
07/15/02 10:34 FAl
I \
~
HAMILTON CO BWY. ~1~ Carmel DOCD
Q
~ 0011001
HAMILTON COUNTY
HIGHWAY DEPARTMENT
JlJly 15, 2002
/(\5.'
/" ;/
,('1/ 1;^- <<:#
f/::i c4:' <L)-:1Y
1_.1 r 7 ,..'t-^
r-'~ "',J' , >J
V;'; <?OCo i~ )
\.........\ U /-j
\>-\ . ''.:7
\~?>~~(~'!;. /
"'-..I I ''";'-r-'''-r,~\ \
"--:"''E.:__L:.-'"-'
Mr. Brandon Burke
The Schneider Corporation
12821 East New Market Street
Carmel, Indiana 46032
RE: laura Vista SubdMslon
primary Plat
S of 146l1\ Street I E of US 431
Clay Township
Dear Mr. Burke:
This letter serves to acknowledge receipt of a transmittal received 7/10/02 containing the plans
for the above.mentioned project. After reviewing the plans the Highway Department has the
following comments;
1. TI'Ie Leura Vista property Is currently under the jurisdiction of the Hamilton County Highway
Department. If the property Is to be annexed Into the City of Carmel, no construction may
begin until the annexation is completed or an Inter10cal Agreement between the County and
City is executed.
2. You requested a possible access to Danbury Estates to provide iIil second entrance, after
speaking to Mr. Jim Neal. Project Manager for the US431 ramp project. it was determined
that no access would be granted to Danbury Estates or Dublin Drive.
3. You also asked about the Frontage Road along US 431 and possible access to It. While the
Frontage Road Is under the Jurisdiction of the Highway Department. no access will be granted
to it. The traffic hazards that would be aeated at the intersection of the Frontage Road and
136'" Street prohibit the use of the Frontage Road for access to the Laura Vista Subdivision.
Please keep this office informed of the status of the annexation or the possibility of an Inter/ocal
Agreement for this project. If you have any questions or comments concerning ttlis letter, please
feel free to contact me at anytime.
;4/h ·
Stever;. ~roermann
Staff Engineer
ec: Jon Oobosiewicz
Steve Cash
G:\USERS\SEl\02TAC\07-15-02lauravlsta.doc
1700 South J Olh Street
Nobh:sville.ln.46060
www.co.hamilU!Q"iQ.Ql
Office (317) 773.7770
Fax (317) 776-9814
/' .
.'
--
u
o
July 12,2002
Alternative Transportation
City of Carmel
To whom it may concern:
It has come to our attention that there is an alternative transportation master plan that has
received preliminary approval which includes a proposed approach from 146th street,
extending south, located east of highways 31 and 431 toward the existing Monon trail.
We would like to take this opportunity to express our concerns regarding this proposed
section.
We have lived in our home, which is adjacent to the above referenced property, for 28
years. We have helplessly watched local development consume and destroy valuable
greenspace and wildlife habitat in the area. It is our opinion that, with the actual Monon
trailless than one mile west of this proposed "shortcut", there is no legitimate reason to
cut through a mature forest. This would endanger the habitat for many animals that have
taken refuge in this remaining area. The trees that would be lost are irreplaceable in our
lifetime. In addition, much of the proposed trail is located in wetlands. Further
complicating the location of the proposed "shortcut" trail, is imminent construction of the
north 431 exit ramp which would have to be crossed. The new 146th street bridge has a
dedicated and barricaded bike/walking lane, which is in use, and adapted to, by the
public. When one compares value received for this proposed "shortcut" to the potential
expense and loss to C'.onstruct it, the proposal seems simply not justifiable.
Secondarily, if our concerns are ignored, and this leg of your master plan is built, this will
directly impact our access to our property, a recorded easement, which will also have to
be crossed. Due to liability issues, we have had to maintain a security gate; this would
have to be relocated between the location of the trail and our property. And there would
need to be fencing erected along our property lines. Are you prepared to include this in
your expense?
Please reconsider your proposal for this additional walking trail.
If you have questions regarding our concerns, please contact us.
S0~~ ~=.?~
Cynthia and Gary Faust
1301 North Rangeline Road
Carmel, IN 46032
846-3314
" u 0
g, . 7/2./02-
i
I ~~~""'Y'E ~b~:no~ Co....."'" -'l'.1EE.
[
1---.-,. \ . e_~ i"\o.&o.~ ~~_l~_''''' I--~ej)ll~
I
- ~JlItEL"TY : T~~.s_CN6:nON~_eft.8J(_.ss.<<,^~)
~.
.
- ""'<<. ._{J"'\~6--E8\)~]:
- b88l~_ft:QE-R1>-""----b~6JlI.Y_LO_eo_C>-L_~€&;)(,
:
I
2.. La_VJ~A_V.!.S~ :
I
- :effnl_n \f''s:m ~d
- NC') ~C-n ,~.~
- ~r-bt...\\lI:.
}------- I
- ~ (i~
r----~- - ~_M:
V\ '-.1& hg,,~__ -
-
---'--.- ---.
-
- ~~"":'CtD~l!oI_~~q__~,~_~
I
~-,
~---
--'--~- --
I
-_..~---~_.... - ------ --~-
!
--- ---- - ---- -----._------_.~._~--------
-~_._~-_._~._-- -,-
--,--
-~._-_._----_._-- -- ----
--.- -.--"--------- -----
---- -.-; -- ...--
I
- ---...._----~-~---_.- ._-_.~-_.
~---_._-- ..---
!
------ -
- --
-
~
Fax
o
CITY OF CARMEL
Department of,Community Services
One Civic Square
Carmel, IN 4&l32
(317) 571-~417
Fax: (317) 571-2426
Q
'.. ~:
~-:;~
1. '~'i~Y
~....~"
From'~~~~
Pages: 62-
~......~
To: ~
Fax: f? :9-'7rl .'
Phone: E?'f9 -060/
Re:
Date: 7-/;2. -0 2-
CC:
o Urgent 0 For Review 0 PIease Comment 0 Please Reply
o Please Recycle
I
,
I
COR-t-J.EJL;
S. 1/2, N. W. i l
SECTION 19- 118
/'-7~-'-,
r:'TUl ESTA TES sEcn~ 6A'..,
I EXISTING Z~ING R-~~
---- ,
---- ,
'. I. /' ------..., . .......
-- : a . , ........"., \ h r-)
~ ~ "J .~~
.' h
. ..,
..,
N
... ~
· ~ U /
~ .' . /
~ < ....: ''"-' ..-
z ~ vi /,/
I ~;;; ---\
~~ '
I :::II .... \
~ N \,
~.', (..)
le!
..',./" // .J
\
.
=~
.~-
I
.~- -f
.~ 11,JJl S.F. ':l'
<4
9,750 S.F. ~
5
9.750 S.F.
I of
~I \(: 6
?ll 12.664 S.F.
L _'20!, '!.? ::::::...._ _
~. I~' DV4\t I" M'\
J<f rs .r IlO' 2+00 JJ.~~ 12 00'
LAURA 0Rt\t
2:i'1l.
7 ~
12,664 S.F. ~
8 )!:
9.750 S.F. ~
9
I~' OU.SE
)!:
ic:
;S -:'
~ ..
':l
~
./../"
_i.
;a
i:l
)!:
of
lil ~! .
5
'!l
55
of
~///
~/ L
- /"\.. ~ESTA:"StC~Ql 60
~ EXISTING Z~ING R-::,l
~
I
-~
I
ASSUMED
SCALE: 1
/
HOLEY M
" DC
[
BL
i
"IT'S T
CAU. 2 IIGlKING
1-800-
C.\U
PEIlINOIANA 5
IT IS AGAINST
V.HHO\JT HonF'
LOCA nON SERv
OAYS BEFORE C
v
u
CITY OF CARMEL
Department of Community Services
One Civic Square
Carmel, IN 46032
(317) 571-~417
Fax: (:317) 571-2426
Fax
To: ,g1't1/.1~ /J &r;/e.--
Fax: fTcX~ - bpi 0
Phone: ~9- %I/~
Re:l/lr./ rq /;5/4 J;.;6d~;.s'~/1
From: 0yce
Pages:
Date: 7--/01--08\
cc:
o Urgent D For Review D P.lease Comment 0 Please Reply
o Please Recycle
j)~c~e/- /c. f/-o;(, y::/~
J/-O~&? 5W
f/- Oc<,f ..sW
f/- 00( c: ...5/1)/
F /- Oo? d .s- f;/
T/-- 002 e ::>-;1
u
Q
C<8\Jrm<e1
artm<ent
July 9,2002
/~<)r;.-; . ·
l~/ ~ ;(.\)
/,:~/ ~~\~.
I__~ ~\-~ .~~ I,:
~; ~\. <0\)"'0
,\<"A
'(/'j.
-..:, Ii
":.....:.. i::
Brandon Burke, PE
The Schneider Corporation
12821 E. New Market Street, Suite 100
Carmel, IN 46032
RE: Laura Vista
Dear Mr. Burke:
I have received and reviewed the information for the above-mentioned project.
At the present time, I see nothing in the plans that would hamper law enforce-
ment efforts.
If we can be of any further assistance to you, please contact us.
Respectfully,
~~j:f
Chief of Police
MDF:vb
cc: J Dept. of Community Services
(317) 571.2500
A Nationally Accredit
1{>
orcement Agency
Fax (317) 571.2512
Fax
u
u
CITY OF CARMEL
Department of Community SelVices
One Civic Square
Carmel, IN 4E032
(317) 571-2417
Fax: (:317) 571-2426
From:
Pages:
Date:
cc:
W"~ce.,
~
7-I'-OD{
o Urgent 0 Far Review 0 Please Comment 0 Please Reply
To~ 8r4~ diD/} .dvrke
Fax: !,Ol.' - ~j/;D
Phone: t.5tD9- P/Ol
Re: ~~I'1dQ 1-/~ - O~
o Please Recycle
LiWl7I I/,s~ S'~d:"'~I;'/)
J/- O~ ~)O
u
~~
Schneider
'W
July 3, 2002
---~ -- ,- .,-- ~ -:-::--.....
/' ('. ,1 J.. 17'.
/" \ \... ", __I , . "-
/:,.,,':,)/' ~,I ".
/' -~/ At {>._,
!~"/ 4' .
, ~ ( . RECEIVED
I~r r!UL 8 ?"
\:;\ DOCS
\....)\
\/':"
\, .~- ')';..........
""'~!~;-I I \.
-.~ - -'---"
, ,
, ,
Jon C. Dobosiewicz
City of Cannel
Planning Administrator
One Civic Square
Cannel, IN 46032
\ ,., 'I
t-..-,
t~.~J
,'~.I
/.<j
,,-:/
~sS~/
RE: Laura Vista, Primary Plat
Dear Jon,
We have received your letter dated June 26,2002, which was a review of the primary plat submittal for the
above referenced project. I have addressed each of your items individually with a numbering system
consistent to your comment letter.
I. Signage examples and open space maintenance issues are being submitted within the
informational brochures. An open space plan was submitted derming regions and type along with
calculations; comments regarding those from Scott Brewer were revised based on written
comments received at TAC. We are attempting to contact Scott to discuss further requirements.
2. Landscape easement was removed and sign placed outside of easements.
3. (a.-d.) All easements were revised.
4. Lot #54 (this lot is now lot 55 per other revisions);
a. The adjoining lot line was moved to provide setback.
b. Primrose has secured consent to include in plat, any required signatures will be addressed
at time of secondary platting.
c. Existing easement with instrument number was shown and labeled.
5. A 6' multi purpose path is shown connecting Vista Drive to the 10' multi-purpose path located
northwest of cool creek.
6. Sidewalks were update to 5' and the general note for sidewalks was revised. Internal paths are
shown at 6' and the path along cool creek is indicated at 10'. The 10' multi-purpose path was
shown based on an interpolated sanitary relocation plan provided by City of Cannel Utilities.
7. Northern cul-de-sac on Vista Drive was removed and turned into a stub street. An additional lot
was incorporated, please note lot count revised from 54 to 55. A revised application and fee will
be submitted by Primrose.
8. Waivers
a. Subdividing within Floodway. It appears that Lot 55 (existing lot) will have floodway
and/or floodplain that will be subdivided to be included within the plat. There is a row of
lots that abut Cool Creek which has mapped Flood zone, every attempt has been made to
not subdivide within the floodplain. The floodplain was interpolated and provided by
Miller Surveying.
b. With the elimination of the cul-de-sac on the north side of Vista Drive and turning it into
a stub street, will this waiver still be required? If a stub street is deemed a dead end
street, then will an additional waiver be required on the south end cul-de-sac?
c. Current open space width is 55', with a 20' easement. It's noted a waiver will be
required.
d. The remaining open space west of Vista Drive has been given two points of access via
two 6' paths. Open Space was revised, only the buffer yard open spaces do not have two
points of access.
e. Noted.
THE SCHNEIDER CORPORATION
12821 E. New Market St. Suite 100 Carmel, Indiana 46032 317-569-8112 Fax 317-826-6410
www.schneidercorp.com
u
u
If you should have any questions, or are in need of additional information, please feel free to contact me at
your convenience at 569-8112.
Sincerely,
THE SCHNEIDER CORPORATION
'~ ~
By: \
. on Burke, P. .
Project Engineer
Enclosure
N :\4k\4067\OO 1 \docs\dobosiewicz070302.doc
Fax
u
CITY OF CARMEL
Department of Community Services
One Civic Square
Carmel, IN 4&X32
(317) 571-2417
Fax: (317) 571-2426
To: (!/ar):Z ;:::rzVJlt?/J.be';1(!?T
Fax: j~- f'lFd,
Phone: f../~ 010(:;
Re:
cc:
u
o Please Recycle
o Urgent 0 For Review 0 P.Jease Comment 0 Please Reply
~tf)e.. /?ole:
~aum r;si;
~ /.J irk tt/t"f/CS
.....-J V ~ CT/ ';;,~ ....; /)
,
u
u
City of Carmel
VIA FAX: 826-6410
Original by Mail
June 26, 2002
Mr. Brandon Burke, P.E.
The Schneider Corporation
12821 E. New Market Street, Suite 100
Carmel, IN 46032
RE: Laura Vista Subdivision, Primary Plat Application (Revised)
Dear Mr. Burke:
This letter is in response to your Primary Plat filing for Laura Vista Subdivision. The following
comments need to be addressed and plans updated accordingly:
1. Provide Landscape Plan and include signs. Note that Open Space Conservation Plan (per
Exhibit "B" ofROSO requirements) has not been received. Please contact Scott Brewer with
our office.
2. Exclude Landscape/Sign easements from drainage and utility easements of CA A & B.
3. Provide/revise easements as follows:
a. Need 15' wide easement along north side oflots # 1 and 53
b. Need 15' wide easement along south side oflot # 18
c. Widen easements between lots # 12-13, 32-33, 33-34,44-45,39-40 to 20' total
d. easement at rear oflots 46 and 47 needs to be 20' in width
4. Lot # 54:
a. Remove existing structure at southeast comer, setback violation.
b. Need consent to include in plat - signature on Secondary
c. Show existing access easement
5. Identify construction of path per Alternative Thoroughfare Plan (ATP):
a. Provide connection to ATP path from street (along proposed access easement and over
existing crossing as option), developer will construct all paths
6. Alternative transportation plan requirements:
a. Sidewalks required at 5', asphalt path required at 10', and asphalt paths within
subdivision, not master path, required at 6' .
7. Eliminate north cul-de-sac and provide stub to property to north. This may allow room for
additional lot on west side of proposed Vista Drive. If stub is not provided a waiver will be
necessary.
8. Potential Waivers needed:
a. 6.2.1 (subdividing Floodway)
b. 6.3.7 (Faust Court exceeds 600' in length)
c. 7.6.3 (Open Space is not 75' width as required and has less than 2 points of access)
d. 7.6.3 (Open Space has less than 2 points of access)
e. 6.5.1 (Lot # 54 has < 50' of frontage on street right-of-way)
Page 1
ONE CMC SQUARE
CAR.l\ffiL, INDIANA 46032
317/571-2417
~
o
Q
Please submit a revised Primary Plat with the above-mentioned changes for further consideration.
Sincerely,
If:::iz
Planning Administrator
C: Charlie Frankenberger, Nelson and Frankenberger
Jim White - Primrose Development, 1016 3m Avenue, SW Suite 100
Laura Vista - PPl
Page 2
ONE CMC SQUARE
CARMEL, INDIANA 46032
317/571-2417
u
NELSON
&
FRANKENBERGER
A PROFESSIONAL CORPORATION
ATI'ORNEYS-AT-lAW
o
JAMES J. NELSON
CHARLES D. FRANKENBERGER
JAMES E. SlDNA VER
lAWRENCE J. KEMPER
JOHN B. FlATI
of counsel
JANE B. MERRllL
3021 EAsr 98th Snwrr
SUITE 220
1ND1ANAPOus, INDIANA 46280
317-844-0106
FAX: 317-846-8782
June 26, 2002
.....r\-':":I I ' _
h1\ \, --L..1..:. I .
/~<'..,.::' -""( /
I'. '.... ".~"'i
/"/ 'J: \~
~-.'.'_.-./ RECE\\JEU \::')
-:;:J \\\\\~, 1~~1 ~v
'0 uU\'l t)OC~
~
VIA HAND DELIVERY
Jon Dobosiewicz
Department of Community Services
One Civic Center
Carmel, IN 46032
Re: Primrose Development, LLC - Laura Vista
Docket No. 81-02 PP
Dear Jon:
Please find enclosed for the file the executed Owner's Consent and Authorization forms from
Gary and Cynthia Faust, the Ward R. Fenstermaker Family, L.P., and the S.E. Fenstermaker Jr.
Family, LP.
Should you have any questions, please contact me.
Very truly yours,
NELSON & FRANKENBERGER
ci-
Charles D. Frankenberger
CDF/jlw
Enclosures
H :\Janet\Primrose\FenstennakeTIDobosiewicz ItT 062602. wpd
u
u
CITY OF CARMEL
Department of Community SelVices
One Civic Square
Carmel, IN 4SJ32
(317) 571-2417
Fax: (317) 571.2426
Fax
~"'I
To: :Z:::::;rit€/7do") P(/ r~e-
From:
J r] 46os/e'~~ C!..-
'7 Fax: /~0-~%O
Phone: 56 r - cf //~
Pages: ...3
Date: ~ - c::;6 -o~
Re: ~ra t?~~ J)~d /,...,$;#'/1 cc:
o Urgent ;!( Far Review 0 Please Comment 0 Please Reply
o Please Recycle
Fax
u
u
CITY OF CARMEL
Department of Community Sentices
One Civic Square
Carmel, IN 46032
(317) 571-2417
Fax: (317) 571-2426
To: J4J frd/e
'/ Fax: JV~- ~31
Phone: f.y6 - ~0#
Re: l..tl-J,?{ ~j ~ S;;~d,;;.~",
From: ~ ~.60..s7e',y/;'.L.-
Pages: J'
Date: 6~~-~
cc:
o Urgent J4 Far Review 0 P.lease Comment 0 Please Reply
o Please Recycle
u
o
CITY OF CARMEL
Department of Community Seavices
One Civio Square
Carmel, IN 4E032
(317) 571-2417
Fax: (317) 571-2426
Fax
To: C~r,,(e: fr~/l&Akr~/
v
'/ Fax: j7~ -r7!~
Phone: c1~1/- O/Ob
Re:kJrtf Y;5~ .;vbd ;;;,.;/)
From: J/l... )ok-/~;f2-
Pages: 3
Date: 6 ---1:Q6 -oc=o(
cc:
o Urgent ~ For Review 0 Please Comment 0 Please Reply
o Please Recycle
06/20/02
09:34 FAX
HAMILTON CO HWY. ~~~ Carmel DOCD
Q
HAMILTON COUNTY
HIOHWA Y DEPARTMEfSIJl!/"'."
kclY ~ ' "
(;;/ RECEIVED
I~?~ JUN 20 2002
\-'\ . ,j
\;;\ DOCS '-,/
\'/\, '- I
\' /.....;,,!>/
<>:>>, ' . : ~/
'~/ ,; ,,' I \- \ '/...-/
...._......:......:~l.-.J.-:--
@ 001/001
u
June 20, 2002
Mr. Brandon Burke
The Schneider Corporation
12821 East New Market Street
Carmel, Indiana 46032
RE: Laura Vista Subdivision
Primary Plat
S of 14611I Street I E of SR 431
Clay Township
Dear Mr. Burke:
This letter serves to follow up comments made during the Carmel TAC meeting held on June 19,
2002, conceming the above-mentioned project. I have listed the items below:
1. I have attached a copy of the Interlocal Agreement for your execution. The agreement will
give the City of Carmel the ability to enforce their standards, due to the pending annexation of
the site.
2. Any discussions concerning the relocation of the sanitary sewer or placement of paths along
the ramp project should be coordinated with Jim Neal of this office.
3. When construction plans and secondary plats are prepared for thIs project, the HCHD
requests that a full set be delivered to our office for archives in coordination with the ramp
project.
If you have any questions or comments concerning this letter, please feel free to contact me at
anytime.
Sincerely,
~{!:::-
Staff Engineer
cc: Jon Doboslewicz
Steve Cash
1700 South 10th Street
NoblesviJIe, In. 46060
www.co.hamilton.in.us
Office (317) 773-7770
Fax (3J7) 776-9814
u
u
Dobosiewicz, Jon C
From:
Sent:
To:
Subject:
Akers, William P
Thursday, June 13, 2002 4:20 PM
Dobosiewicz, Jon C
TAC meeting on June 19th
Hi Jon,
I will be unable to attend the TAC meeting on June 19th due to attending a conference in Indy.
I do however have a few things i would like for you to mention to the petitioners.
(Laura Vista Subdivisio.1----Please mention to them that I have sent in for their Street names to be approved. They will
hWetC>sum'nin:lrfotner name to replace Vista Drive, it is already being used in Clay Township.
Keystone Office Park---I had assigned an address to this building a while back, but I think it never went thru at that time.
Let them know I sent a letter to Len Wolfson of WOlfson,Young Architects back on May 5th,2000. He was requesting an
address back then for this building.
They will have to contact me for the address.
Carey lake-----I have sent their street name in for approval.
Thats alii have for this Month.
Thanks for passing it on.
Bill
BILL AKERS
Operations Supervisor
Carmel Communications Center
(317)571-2586 Fax 317-571-2585
cell # 847-8301
wakers@ci.carmel.in.us
1
u
o
CITY OF CARMEL
Department of Community Services
One Civic Square
Carmel, IN 4€032
(317) 571-2417
Fax: (:317) 571.2426
Fax
TO:~~
Fax: ff~ ~ - ~If/O
Phone: e:< ~ - (, '10 2..
From:
~/4t
;2...
6 -/~ ~() L.
Pages:
Date:
Re:
eel
o Urgent 0 For" Review 0 P.lease Comment 0 Please Reply
o Please Recycle
o(~ V~
~/-():l 7P
~..:ILL ~ :{ '6 t1o. vV
,..
..... ~
....-..::-.:c.c>c>:
......~~4-k::~
~.- ... '{(<'::"'"
'.~:U~\.
~~. \~ SJ.. :
:',. -i\ ''Q' .
-:::~2rON-ci~: .
W w
City of Carmel
DEPARTMENT OF ENGINEERING
June 6, 2002
~
RECEIVED
JUN 7 2002
DOCS
;-i
. 'I
,<.:./
Mr. Brandon Burke
The Schneider Corporation
12821 E. New Market St., Suite 100
Carmel, IN 46032
\~/..,
''''<?~'r. .
.!~~"~'-~' 1-____
r'., ..'
.\'-<~'/
.. .}./
RE: Laura Vista Subdivision-Project Review #1
Dear Mr. Burke:
We have reviewed the primary plat submitted for this project and offer the following comments:
GENERAL INFORMATION
1. The project site is located within current City of Carmel Corporate Limits.
2. Jurisdictions:
. Streets and Right of Way - City of Carmel
. Water, Sanitary Sewers, Storm SewerslDrainage - City of Carmel
3. Board of Public Works and Safety Requirements:
. Water and Sanitary Sewer Availability
. Temporary Construction Entrance
. Any permanent improvement to be installed within dedicated right of way or dedicated
easements. This approval would require a Consent to Encroach Agreement between the
Owner and the City of Carmel.
I am also enclosing a schedule for Board of Public Works and Safety meeting dates and agenda
deadlines for your use. Please use the Engineering Department deadlines for submissions to the
Board.
Any submission to the Board requires prior approval by the Carmel Clay Plan Commission
and/or the Board of Zoning Appeals (if applicable) and completion of review by the Technical
Advisory Committee. AU written requests to be placed on the Board's agenda must include the
appropriate Docket Number and the date (or dates) of approval by the Plan Commission and/or
the Board of Zoning Appeals (if applicable).
4. T.A.C. ReviewlDrawings submitted for approval:
We request that all comments and comment letters generated by this office be answered in writing
and be accompanied by a drawing reflecting requested revisions. Final drawings will not be
approved for construction until all Engineering Department and Utility Department issues have
been resolved. The design engineer must certify all drawings submitted for final approval. This
office will require a minimum of five-sets of drawings for approval after all issues have been
resolved. The drawings will be stamped as approved and will be signed by the City Engineer and
Director of Carmel Utilities. The Owner will receive one-set which is to be maintained on the
construction site at all times. Carmel Utilities will receive two-sets, our Public Works Inspector
will receive one-set and one-set will be maintained in the Engineering Department
5. Please be advised that any installation of signs, walls, irrigation systems, etc. within dedicated
right of way or dedicated easements will require a Consent to Encroach Agreement with the City
of Carmel.
ONE CIVIC SQUARE CARMEL, INDIANA 46032 317/571-2441
:,;' ..
w
w
Mr. Brandon Burke
June 6, 2002
Page 2
6. Cannel Utilities should be provided drawings for review of water and sanitary sewer issues. They
will provide a separate review regarding these issues.
7. Cannel Utilities does not subscribe to "Holey Moley" and should be contacted directly for all
water main and sanitary sewer main locations.
8. I am including copies of the following with this correspondence:
. Subdivision Project Approval Procedures
. Performance Release Procedure
. Subdivision Building Pennits
. Pennit Data, Contacts, etc.
BONDING REQUIREMENTS
9. Individual Perfonnance Guarantees will be required for the following subdivision improvements:
. Streets
. Curbs
. Water Mains
. Sanitary Sewers
. Stonn SewerslDrainage
. Monuments and Markers
. Street Signs
. Sidewalks (builders lot sidewalks and common area/perimeter right of way sidewalks may be
bonded separately).
The amount of the Performance Guarantee is based upon a certified Engineer's Estimate for 100%
of the cost of labor and materials to construct the individual improvements, to be provided by the
design engineer. Upon completion and release of individual Perfonnance Guarantees, a three-year
Maintenance Guarantee will be required. The Maintenance Guarantee amount is based upon 15%
of the Performance amount for Streets and Curbs and 10010 of the Performance amount for all other
improvements. Perfonnance Guarantees may be Perfonnance or Subdivision Bonds, Irrevocable
Letters of Credit or Cashier'slCertified/Official Checks. Please reference the enclosures for more
detailed explanation of our procedures.
AVAILABILITY AND CONNECTION FEES
10. Availability (acreage) Fees must be paid after all other Engineering Department requirements have
been satisfied and prior to start of construction activities (the exception is that you are allowed to
move dirt on site). Availability Fees are based upon total platted acreage for the development at
the rate of $1,010.00 per acre for Water Availability and $1,365.00 per acre for Sanitary Sewer
Availability. Connection Fees are $1,310.00 per single-family residence and $795.00 per single-
family residence. Connection Fees are paid when the infrastructure has been completed,
satisfactory test results obtained and the subdivision has been released for permits. Connection
Fees are paid on a lot-to-lot basis.
PROJECT COMMENTS
11. Please be advised that this office will require the following statement to be placed on Site
Development Plans and on Stonn Sewer Plan and Profile Sheets when construction drawings are
submitted:
.
.. 'i.
w
w
Mr. Brandon Burke
June 6, 2002
Page 3
THE STORM SEWER SYSTEM SHALL BE CONSTRUCTED PER DESIGN SPECIFIED
AND AS APPROVED BY THE CITY OF CARMEL ON THE FINAL APPROVED
CONSTRUCTION PLANS*. DEVIATIONS FROM THE APPROVED DESIGN SHALL
ONLY BE PERMITTED DUE TO SPECIAL CIRCUMSTANCES OR DIFFICULTY DURING
CONSTRUCTION AND WILL REQUIRE PRIOR FIELD APPROVAL FROM A
DESIGNATED REPRESENTATIVE OF THE CITY OF CARMEL IN ADDITION TO
SUPPLEMENTAL APPROVAL BY THE DESIGN ENGINEER. AN EXPLANATION OF
ANY SUCH DEVIATION SHALL BE INCLUDED AS A REQUIREMENT ON AS-
BUILT/RECORD DRAWINGS SUBMITTED FOR RELEASE OF PERFORMANCE
GUARANTEES. APPROVED DESIGN SLOPES IDENTIFIED AS GENERATING
VELOCITIES OF 2.5 FPS OR LESS SHALL REQUIRE AS-BUILT CERTIFICATION AT
THE TIME OF CONSTRUCTION.
*THE CONTRACTOR SHALL FIELD CHECK EACH SECTION OF STORM PIPE AS IT IS
BEING INSTALLED TO ENSURE COMPLIANCE WITH THE DESIGN PLANS.
12. This office would prefer aligmnent of the tops of the inlet and outlet rather than inverts when
possible. If it is not possible to align the tops of pipes, we would request the inlet pipe invert to be
raised above the outlet pipe invert.
13. Do you plan to develop this project as one or multiple sections?
14. There appear to be two driveways for the existing residence on Lot 54. We believe the driveway
into Danbury Estates is an existing driveway.
. Is the driveway listed as "driveway by others" existing or proposed?
. With this construction, will both driveways be maintained?
. Will the driveway by others connect to the dedicated street?
. Are you planning to incorporate a non-access easement into the lots adjacent to this
driveway?
We reserve the right to provide additional comments upon receipt of detailed construction drawings and
drainage calculations for this project.
If you have questions, contact Kate Weese, Mike McBride or me at 571-2441.
~
Dick Hill, Assistant Director
Department of Engineering
Enclosures
Cc: M. Kate Weese, City Engineer (w/o encl.)
Mike McBride, Assistant City Engineer (w/o encl.)
Jon Dobosiewicz, Department of Community Services (w/o encl.)
Laurence Lillig, Department of Community Services (w/o encl.)
John Duffy, Director Carmel Utilities (w/o encl.)
Jim White, Primrose Development
S:\PROJREV02\ WILLIAMSRIDGE
u
u
Carmel
~
/ -'/ 11. RECEIVED '
C! ~y 22 2002 ',--;
\:;\ Docs,l1
\//.... -<.;.(;)
'/t)).).. /\,'" .
"-t...l 'rj-o. ;-,-,--n:;;; ,
-......1.... l ~7! i.
May 21,2002
Brandon Burke, PE
The Schneider Corporation
12821 E. New Market Street, Suite 100
Carmel, IN 46032
RE: Laura Vista
Dear Mr. Burke:
I have received and reviewed the information for the above-mentioned project.
At the present time, I see nothing in the plans that would hamper law enforce-
ment efforts.
If we can be of any further assistance to you, please contact us.
Respectfully,
~b.-~
Michael D. FOgart! Y
Chief of Police
MDF:vb
cc: Dept. of Community Services
A Nationally Accredit
(317) 57l-2500
rcement Agency
FAX (317) 57l-2512
u
u
May 17,2002
~~
Schneider
/ :-~-~Jr--....
<,\.~_::J J.._.l,~
,( ,," --<~ >-
//~;Y ~C\
1- ': '). ~~ ,,)\
(~~7 ~C''0'\\ t~\\. 'C..\
'-': 0' '-':\ 1\).. I I
, . t "~ --
\ ....~=, ~ \. I~I
',>: ~~ ~,,~ !::f
\. ~ ~7
Dear Jon, \/>-. / / ;,;
'./:":. ./' ^-.. I'
Please fmd enclosed the following materials related to the above referenced project being'prop..~e-:a:j15fI5irifr;;se
Development LLC and requesting primary plat approval under the Residential Open Space Ordlnance(ROSO):
Jon Dobosiewicz
Department of Community Services
One Civic Square
Carmel, IN 46032
RE:
Laura Vista
1. 2 sets ofthe Primary Plat Plans
a) TitleSheet-PIOI
b) Primary Plat - P102
c) Open Space Plan - PI03
d) Landscape Plan - Tree PreservationlBuffer Yard - LIOI
2. 2 copies Development Report
a) Introduction
b) Covenants, Conditions & Restrictions
c) Homeowner's Association
d) Architectural Review
e) Existing and Proposed Conditions
t) Primary Plat Application
g) Open Space Schedule/Summary
h) Legal Description
i) Area Map
j) Aerial Map
k) Zoning Map
I) Soils Map
m) Service Letters
The above referenced materials are for your review and suggestions with respect to Primary Platting. It is my
understanding that this matter will be on the agenda of the June 19, 2002 Technical Advisory Committee meeting.
In the interim, if you should have any questions, or are in need of additional information, please feel free to contact
me at your convenience.
Sincerely,
THE SCHNEIDER CORPORATION
By: ~L-~~
randon Burke, P.E.
Project Engineer
Enclosure(s)
Cc: Jim White & Charles D. Frankenberger
N :\4k\4067\OO I \docs\dobosiewicz.doc
~
THE SCHNEIDER CORPORATION
12821 E. New Market Street Suite 100 Carmel, Indiana 46032 317..569-8112 Fax 317-826-6410
www.schneidercorp.com