HomeMy WebLinkAboutCorrespondencePlan Review - Review Comments Report
Project Name: PZ-2024-00177 ADLS Amend Medical Office Building at The Bridges
Workflow Started: 9/30/2024 11:51:09 AM
Report Generated: 11/04/2024 02:43 PM
REF #CYCLE REVIEWED BY TYPE FILENAME DISCUSSION STATUS
1 1 Sign Permits
Aliza Shalit
10/21/24 1:27 PM
Comment
All signs will require a separate and individual sign permit application and
review process.
Info Only
2 1 Sign Permits
Aliza Shalit
10/21/24 1:29 PM
Comment
Please provide proof of required sign Variance application and fee payment.
Responded by: Doug Staley, Jr. - 10/31/24 5:21 PM
Property owner is has submitted application and is
currently working through the process with Joe. Once
that I confirm fee has been paid, I will get a copy of the
receipt and email it to Aliza.
Resolved
3 1 Sign Permits
Aliza Shalit
10/21/24 1:32 PM
Changemark
Number of signs
Per UDO sign standards a multi tenant, multi level office building is allowed
to have two sign per street frontage. The Bridges PUD does not require the
frontages to be a public street, but still follows UDO standards for number of
signs allowed. A variance is required for number of signs, 4 total allowed, 6
requested (East and West facade signage).
East Elevation.pdf Responded by: Doug Staley, Jr. - 10/31/24 5:21 PM
Understood. Variance application has been submitted
Info Only
4 1 Sign Permits
Aliza Shalit
10/21/24 1:33 PM
Changemark
Allowable signs
Please provide renderings with the approved number of signs. Only two per
frontage are allowed.
West Elevation.pdf Responded by: Doug Staley, Jr. - 10/31/24 5:23 PM
I have uploaded revised renderings.
Info Only
5 1 Sign Permits
Aliza Shalit
10/21/24 1:35 PM
Comment
Sign package may only be approved for the allowable number of signs. 2 per
street frontage. Please provide elevations with the correct number and
location of signs. After variance is granted, then an ADLS Amend-sign will be
required to update the sign package to what is approved through the
variance.
Responded by: Doug Staley, Jr. - 10/31/24 5:23 PM
I have uploaded revised renderings. It is understood
that an ADLS Amend will need to be submitted if/when
variance is granted.
Resolved
REVIEW COMMENTS