Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
C110 TOPO DEMO PLAN
CONTRACTOR TO REMOVE AND REUSE GATE AND REPLACE GATE AREA WITH FENCE CONTRACTOR TO REMOVE EXISTING PIPES AND STRUCTURES CONTRACTOR TO REMOVE EX. BUILDING, ASSOCIATED UTILITIES, PAVEMENT, AND RETAINING WALLS CONTRACTOR TO REMOVE SAND & OIL TRAP IN ACCORDANCE WITH THE HAMILTON COUNTY HEALTH DEPARTMENT AND IDEM REQUIREMENTS CONTRACTOR TO REMOVE FENCE GATE AND TREES FOR ROAD INSTALLATION CONTRACTOR TO REMOVE AND REPLACE EXISTING POND OUTFALL PIPE. SEE PLAN AND PROFILE ON SHEET C601. CONTRACTOR TO GROUT EXISTING OPENING AND CORE NEW OPENING FOR STORM INSTALL CONTRACTOR TO REMOVE TREES FOR ROAD INSTALLATION CONTRACTOR TO REMOVE 8" PLUG FOR WATER MAIN INSTALL CONTRACTOR TO REMOVE EXISTING CULVERT, REGRADE DITCH TO MATCH CULVERT GRADES CONTRACTOR TO REMOVE EXISTING CULVERT CONTRACTOR TO REMOVE EX 36" PIPE. CONTRACTOR TO ENSURE POSITIVE DRAINAGE BETWEEN TWO FLARED END SECTIONS AT ALL TIMES DURING CONSTRUCTION OF NEW PIPE. CONTRACTOR TO DEWATER AND FILL IN EXISTING POND. REFER TO SHEET C334 FOR DEWATERING BAG DETAIL CONTRACTOR TO REMOVE SANITARY PIPE AND STRUCTURES AFTER INSTALLATION OF NEW MAIN CONTRACTOR TO LOCATE AND REDIRECT 8" SSD INTO PROPOSED STORM SYSTEM CONTRACTOR TO REMOVE PIPE AND INLET CONTRACTOR TO PRESERVE PINE TREES IF POSSIBLE CONTRACTOR TO REMOVE AND REPLACE EXISTING POND OUTFALL PIPE. SEE PLAN AND PROFILE ON SHEET C601. © AS H E R W O O D SO U T H NORTH C110 TO P O D E M O PL A N SURVERYOR NOTE UTILITY CROSSINGS BENCHMARK INFO WV T M DYH BTC BCTV CTV E BEC S LEGEND MATCHLINE - SEE LEFT MATCHLINE - SEE RIGHT NOTES