HomeMy WebLinkAboutC902 STORMWATER POLLUTION PREVENTION PLAN NOTESC902
KE
E
L
E
R
-
W
E
B
B
A
S
S
O
C
I
A
T
E
S
2312-011
42
8
1
W
e
s
t
1
0
6
s
t
S
t
r
e
e
t
Ca
r
m
e
l
,
I
N
4
6
0
3
2
La
k
a
w
a
n
t
S
i
n
g
h
&
M
i
k
e
S
i
n
g
h
Si
n
g
h
S
u
b
d
i
v
i
s
i
o
n
65
3
5
C
r
e
s
s
e
n
d
o
P
l
a
c
e
In
d
i
n
a
p
o
l
i
s
,
I
N
4
6
2
5
9
31
7
-
9
8
5
-
8
5
1
3
em
a
i
l
:
l
a
k
w
a
n
t
k
h
a
l
s
a
@
y
a
h
o
o
.
c
o
m
Si
n
g
h
M
i
n
o
r
Su
b
d
i
v
i
s
i
o
n
CA
R
M
E
L
&
T
R
I
C
O
R
E
V
I
S
I
O
N
06
/
2
1
/
2
0
2
4
SWPPP(A21) SOIL STOCKPILE, BORROW AND/OR DISPOSAL
(A20) OFF-SITE CONSTRUCTION PLAN
(A17) EXISTING VEGETATIVE COVER
(A16) CONSTRUCTION LIMITS
(A15) ADJACENT LANDUSE
(A13) 100 YEAR FLOODPLAIN, FLOODWAYS AND FRINGES
(A12) POTENTIAL DISCHARGES TO GROUNDWATER
(A11) RECEIVING WATERS
(A10) SITE WETLANDS, LAKES AND WATER COURSES
(A9) STORMWATER DISCHARGE POINTS
(A8) REQUIRED STATE OR FEDERAL WATER
(A7) HYDROLOGIC UNIT CODE
(A6) LOT LOCATION AND SITE IMPROVEMENTS
(A4) VICINITY MAP
(A3) PROJECT DESCRIPTION
(A5) LEGAL DESCRIPTION
(A1) PLAN INDEX
(A2) PLAN/PLAT SHOWING BOUNDARIES AND LOT NAMES
ASSESSMENT OF CONSTRUCTION PLAN ELEMENTS (SECTION A)
(A18) SOIL MAP
(A22 & A23) EXISITNG & FINAL SITE TOPOGRAPHY
(A19) LOCATION OF PROPOSED STORMWATER SYSTEMS
(B13) MATERIAL HANDLING AND SPILL PREVENTION
EROSION CONTROL MEASURES MAINTENANCE REQUIREMENTS
(B14) MONITORING AND MAITENANCE GUIDELINES
(B1) POTENTIAL CONSTRUCTION POLLUTANTS
ASSESSMENT OF STORMWATER POLLUTION PREVENTION PLAN CONSTRUCTION
COMPONENT (SECTION B)
(B15) EROSION CONTROL SPECIFICATIONS
(B2) STORMWATER QUALITY SEQUENCE
(C5) POST CONSTRUCTION MAINTENANCE GUIDELINES
(C1) POTENTIAL LANDUSE POLLUTANTS
(C4) LOCATION, DIMENSIONS, SPECIFICATIONS,
AND CONSTRUCTION DETAILS OF EACH
STORMWATER QUALITY MEASURE
ASSESSMENT OF STORMWATER POLLUTION
PREVENTION PLAN COMPONENT (SECTION C)
QUALITY PERMITS
EROSION CONTROL MEASURES MAINTENANCE REQUIREMENTS (cont.)
FOR INDIVIDUAL LOTS
(A14) ESTIMATED PEAK DISCHARGE
EROSION CONTROL RESPONSIBLE PERSON
(B12) PERMANENT SURFACE STABILIZATION
(B11) TEMPORARY SURFACE STABILIZATION
(B10) STORMWATER QUALITY DETAILS
(B9) GRADE STABILIZATION MEASURES
(B6) INLET PROTECTION LOCATIONS AND SPECS
(B7) RUNOFF CONTROL MEASURES
(B8) OUTLET PROTECTION SPECIFICATIONS
(B5) CONCENTRATED FLOW SEDIMENT CONTROL
(B4) SHEET FLOW SEDIMENT CONTROL
(B3) CONSTRUCTION ENTRANCE INFORMATION
(C2) DESCRIPTION OF PROPOSED POST-CONSTRUCTION STORMWATER
MEASURES
(C3) PLAN DETAILS FOR EACH STORMWATER MEASURE
CA
R
M
E
L
R
E
V
I
S
I
O
N
S
10
/
2
1
/
2
0
2
4
3
3
3
3