HomeMy WebLinkAboutCorrespondencePlan Review - Review Comments Report
Project Name: PZ-2024-00225 SP - The Enclave of Carmel Lot 33 Replat
Workflow Started: 12/5/2024 12:23:04 PM
Report Generated: 04/30/2025 11:24 AM
REF #CYCLE REVIEWED BY TYPE FILENAME DISCUSSION STATUS
1 1 Vectren Energy
Chad Miller
2/24/25 9:27 AM
Comment
No comment on replat.
Info Only
2 1 CrossRoad
Engineers
Willie Hall
2/25/25 12:32 PM
Changemark
BSL
Per the plat for the Enclave of Carmel, the rear BSL is also the outer limits of
the Drainage and Lake Maintenance Easement, which will need to be
maintained. Please confirm that this easement is not being removed from
the two lots.
B41883 re-plat 2-14-2025.pdf Responded by: Jeremey Place - 3/21/25 4:26 PM
Updated Plot Uploaded in Site Drawings
----------------------------------------------------------
Reviewer Response: Willie Hall - 3/10/25 8:51 AM
Please show the limits of the D&LME on the plat.
----------------------------------------------------------
Responded by: Jeremey Place - 3/7/25 4:11 PM
I can confirm the easement is not being removed from
the two lots.
Resolved
3 1 Engineering
John Thomas
2/27/25 12:38 PM
Comment
Please address all comments from Crossroad Engineers. Engineering will
resolve this comment once their comments are resolved.
Responded by: Jeremey Place - 3/21/25 4:27 PM
Items Addressed
----------------------------------------------------------
Responded by: Jeremey Place - 3/7/25 4:11 PM
Updates Made to Plat
Resolved
5 1 Planning & Zoning
Christina Jesse
3/5/25 10:40 AM
Changemark
Docket Number
Please revise docket number to read: "Docket No. PZ-2024-00225 SP"
B41883 re-plat 2-14-2025.pdf Responded by: Jeremey Place - 3/7/25 4:11 PM
Docket No. PZ-2024-00225 SP updated on Plat
Resolved
6 1 Planning & Zoning
Christina Jesse
3/5/25 10:40 AM
Changemark
Date of submission
Please add date of latest revision
B41883 re-plat 2-14-2025.pdf Responded by: Jeremey Place - 3/7/25 4:31 PM
Date Added
Resolved
7 1 Planning & Zoning
Christina Jesse
3/6/25 4:29 PM
Changemark
Lot size
Please add lot size in sq. ft.
B41883 re-plat 2-14-2025.pdf Responded by: Jeremey Place - 3/7/25 4:31 PM
Lot Size Added
Resolved
8 1 Planning & Zoning
Christina Jesse
3/6/25 4:31 PM
Changemark
Lot number
Since this is a replat, we need to label the lot as "33A"
B41883 re-plat 2-14-2025.pdf Responded by: Jeremey Place - 3/7/25 4:31 PM
Lot Labeled Corrected
Resolved
REVIEW COMMENTS
Created in ProjectDox version 9.4.9.4
Plan Review - Review Comments Report
Project Name: PZ-2024-00225 SP - The Enclave of Carmel Lot 33 Replat
Workflow Started: 12/5/2024 12:23:04 PM
Report Generated: 04/30/2025 11:24 AM
REF #CYCLE REVIEWED BY TYPE FILENAME DISCUSSION STATUS
9 1 Planning & Zoning
Christina Jesse
3/6/25 4:35 PM
Changemark
BPW memebers
Please revise the members of the BPW to read as follows:
Laura Campbell is the Presiding Officer,
Alan Potasnik is a Member,
James Barlow is a Member, and
Jacob Quinn is the Clerk of the City
B41883 re-plat 2-14-2025.pdf Responded by: Jeremey Place - 3/7/25 4:31 PM
Board Members Updated
Resolved
10 1 Planning & Zoning
Christina Jesse
3/6/25 4:40 PM
Changemark
Notary section
Please rewrite the notary section to read:
"Before me the undersigned Notary Public, in and for the County and State,
personally appeared (Name) , (Name) , (Name) , for each separately and
severally acknowledged the execution of the foregoing instrument as his or
her voluntary act and deed, for the purposes therein expressed.
Witness my hand and notarial seal this day of , 20 ."
B41883 re-plat 2-14-2025.pdf Responded by: Jeremey Place - 3/7/25 4:31 PM
Notary Section Updated
Resolved
11 1 Planning & Zoning
Christina Jesse
3/6/25 4:44 PM
Library Comment
Please work with Caleb Warner in the City Engineering Dept. to get on a BPW
(Board of Public Works) meeting agenda, which has a filing deadline. His
number is 571-2441, and his email address is cwarner@carmel.in.gov
Responded by: Jeremey Place - 3/7/25 4:32 PM
Pending
Info Only
12 1 Planning & Zoning
Christina Jesse
3/6/25 4:44 PM
Library Comment
Staff has been advised that we cannot present a Secondary Plat to the
Director for signature from this point forward until Ms. Terry Krueskamp
(tkrueskamp@carmel.in.gov) in Information Systems has received an e-mail
with an electronic file attached (MicroStation .dgn is preferred, or AutoCad
.dwg of the subdivision) and it (the e-mail) has been copied to myself
(cjesse@carmel.in.gov), OR please upload a .dgn or .dwg file of the proposed
plat.
Responded by: Jeremey Place - 3/7/25 4:32 PM
Pending
Info Only
13 1 Planning & Zoning
Christina Jesse
3/6/25 4:44 PM
Library Comment
Please submit a revised Secondary Plat after making above-mentioned
changes. Once these changes have been made and comments addressed,
please produce a Mylar copy (with the surveyors and land owners signatures)
for signature by this Department. 1 digital copy of the plat must be provided
with the Mylar copy, prior to recording, and then 1 paper copy and 1
electronic copy of the scanned, recorded plat must be submitted following
recording of the document. Our approval of the secondary plat (signature)
will be forthcoming upon revision of the plans according to the items listed
above.
Responded by: Jeremey Place - 3/7/25 4:32 PM
Pending
Info Only
Created in ProjectDox version 9.4.9.4
Plan Review - Review Comments Report
Project Name: PZ-2024-00225 SP - The Enclave of Carmel Lot 33 Replat
Workflow Started: 12/5/2024 12:23:04 PM
Report Generated: 04/30/2025 11:24 AM
REF #CYCLE REVIEWED BY TYPE FILENAME DISCUSSION STATUS
14 1 Planning & Zoning
Christina Jesse
3/6/25 4:44 PM
Library Comment
Lastly, please submit a .pdf or .jpg file of the scanned, recorded plat.
Responded by: Jeremey Place - 3/7/25 4:32 PM
Pending
Info Only
Created in ProjectDox version 9.4.9.4
Shestak, Joe
From:Conn, Angelina V
Sent:Monday, April 7, 2025 12:53 PM
To:Shestak, Joe
Cc:Jesse, Christina
Subject:FW: B-2024-01170 and PZ PZ-2024-00225
Follow Up Flag:Follow up
Flag Status:Completed
FYI – related to 12635 Enclave Ct…
From: Shively, Matthew <mshively@carmel.in.gov>
Sent: Friday, March 28, 2025 12:41 PM
To: Hohlt, William G <WHohlt@carmel.in.gov>; Huff, Jarrod <jhuff@carmel.in.gov>
Cc: Hollibaugh, Mike P <MHollibaugh@carmel.in.gov>; Conn, Angelina V <Aconn@carmel.in.gov>; Brown, Libby
<lbrown@carmel.in.gov>; Hollibaugh, Mike P <MHollibaugh@carmel.in.gov>; Conn, Angelina V <Aconn@carmel.in.gov>;
Brown, Libby <lbrown@carmel.in.gov>
Subject: RE: B-2024-01170 and PZ PZ-2024-00225
Good Afternoon,
The variance was approved but we are still waiting on them to go through the replat process and provide a new site
plan. They have filed for their replat so they are close to finalizing everything.
Matthew Shively
Planner II/Architectural Plan Examiner
City of Carmel Dept. of Community Services
One Civic Square, Carmel, IN 46032
317.571.2266
From: Hohlt, William G <WHohlt@carmel.in.gov>
Sent: Friday, March 28, 2025 12:32 PM
To: Huff, Jarrod <jhuff@carmel.in.gov>
Cc: Shively, Matthew <mshively@carmel.in.gov>; Hollibaugh, Mike P <MHollibaugh@carmel.in.gov>; Conn, Angelina V
<Aconn@carmel.in.gov>; Brown, Libby <lbrown@carmel.in.gov>; Shively, Matthew <mshively@carmel.in.gov>;
Hollibaugh, Mike P <MHollibaugh@carmel.in.gov>; Conn, Angelina V <Aconn@carmel.in.gov>; Brown, Libby
<lbrown@carmel.in.gov>
Subject: Re: B-2024-01170 and PZ PZ-2024-00225
Ok thank you
Matt, we still need planning a variance for replat correct?
1
William Hohlt
On Mar 28, 2025, at 12:29 PM, Huff, Jarrod <jhuff@carmel.in.gov> wrote:
They have an approved and recorded Consent to Encroach on file. I have attached it here.
Jarrod Hu?, P.E.
Sta? Engineer
Engineering Department
One Civic Square
Carmel IN, 46032
O?ice: 317-571-2441
Direct: 317-571-2309
Email: Jhu?@carmel.in.gov
What's Happening in Carmel?
From: Hohlt, William G <WHohlt@carmel.in.gov>
Sent: Friday, March 28, 2025 12:20 PM
To: Shively, Matthew <mshively@carmel.in.gov>; Huff, Jarrod <jhuff@carmel.in.gov>
Cc: Hollibaugh, Mike P <MHollibaugh@carmel.in.gov>; Conn, Angelina V <Aconn@carmel.in.gov>;
Brown, Libby <lbrown@carmel.in.gov>
Subject: B-2024-01170 and PZ PZ-2024-00225
Hello,
I have confirmed with our front office team that 12635 ENCLAVE CT permit has not been
released for a deck and porch as an encroachment and variance is needed. Please note
that we will be posting a Stop Work Order SWO and it may spawn some calls or emails.
Looking in PD, I see the last activity from the builder was on 1-22-25 and nothing since.
Thanks
Bill
William Hohlt
2
Shestak, Joe
From:Jeremey Place <jeremey@westdesignbuild.com>
Sent:Wednesday, February 19, 2025 2:50 PM
To:Jesse, Christina
Cc:Shestak, Joe; Andrew West
Subject:Re-Plat for 12635 Enclave Ct
Attachments:B41883 re-plat 2-14-2025.pdf
Follow Up Flag:Follow up
Flag Status:Completed
Hi Christina,
After what seems like forever, I have the re-plat done and uploaded to the task. I have also attached it to
this email.
Let me know if you need anything else to get the replat application completed.
Thank you,
Jeremey Place
Director of Operations - Partner
West Design Build
jeremey@westdesignbuild.com
317-774-4454
1
Shestak, Joe
From:Jesse, Christina
Sent:Wednesday, December 11, 2024 2:07 PM
To:Jeremey Place
Cc:hecht.dw@gmail.com; Shestak, Joe
Subject:RE: The Enclave of Carmel Lot 33 Replat Application
Follow Up Flag:Follow up
Flag Status:Completed
Good afternoon, Jeremey –
Thank you for the follow-up email. I just got off the phone with our legal department and after some research, it was
determined that the development standard variance (PZ-2024-00181) for lot coverage was not required. The Enclave of
Carmel subdivision was granted a variance in 1993 for the entire subdivision to have a 45% maximum lot coverage.
Because of this, we will mark the variance as void and proceed with the required replat and apply the amount paid for
the previous filing toward the replat petition (PZ-2024-00225).
I’m not sure why the HOA states there are no rear building setback lines as they are shown in our record of The Enclave
of Carmel subdivision plat from 1991. Don, if you could provide context on this, that would be very helpful. Because the
building setback lines are platted, the only way to adjust these lines is through the replat process. It should be a
relatively easy process, assuming your HOA is okay with the encroachment into the drainage & lake maintenance
easement. Considering the deck footprint has been on site and you are just covering it, I don’t anticipate any issues.
Please contact me with questions as you work with a surveyor to develop your proposed plot plan with the revised
building setback line. Please also work on a letter of approval of this new plot plan with Don.
Best,
Christina Jesse, AICP, CNU-A
Planning Administrator
Pronouns: she/her/hers
City of Carmel Dept. of Community Services
One Civic Square, Carmel, IN 46032
317.571.2417 | cjesse@carmel.in.gov
From: Jeremey Place <jeremey@westdesignbuild.com>
Sent: Wednesday, December 11, 2024 1:10 PM
To: Jesse, Christina <cjesse@carmel.in.gov>
Subject: Re: The Enclave of Carmel Lot 33 Replat Application
Hi Christina,
Just checking in to see if you were able to find out anything about the set-back line?
Thank you,
1
On Tue, Dec 10, 2024 at 2:29 PM Jesse, Christina <cjesse@carmel.in.gov> wrote:
Thank you, Jeremey. This is very helpful. I will be in touch tomorrow with an update.
Thanks,
Christina Jesse, AICP, CNU-A
Planning Administrator
Pronouns: she/her/hers
City of Carmel Dept. of Community Services
One Civic Square, Carmel, IN 46032
317.571.2417 | cjesse@carmel.in.gov
From: Jeremey Place <jeremey@westdesignbuild.com>
Sent: Tuesday, December 10, 2024 2:28 PM
To: Jesse, Christina <cjesse@carmel.in.gov>
Cc: Shestak, Joe <jshestak@carmel.in.gov>; hecht.dw@gmail.com
Subject: Re: The Enclave of Carmel Lot 33 Replat Application
Christina,
Here is Donald Hecht’s contact information, he took over for his wife who was the HOA board president. I’ve also CC’d
Don on this email.
317-258-5562
hecht.dw@gmail.com
2
Thank you in advance for your help on this.
Jeremey Place
Director of Operations - Partner
West Design Build
jeremey@westdesignbuild.com
317-774-4454
On Tue, Dec 10, 2024 at 1:06 PM Jesse, Christina <cjesse@carmel.in.gov> wrote:
Hi Jeremey,
Thank you for your email. This is something I am researching and working on clarification with our legal department. I
hope to have guidance on this to share tomorrow morning. Thank you for your patience and for passing along this
information from the HOA. Do you have contact information that you can share for the HOA?
Thanks,
Christina Jesse, AICP, CNU-A
Planning Administrator
Pronouns: she/her/hers
City of Carmel Dept. of Community Services
One Civic Square, Carmel, IN 46032
317.571.2417 | cjesse@carmel.in.gov
3
From: Jeremey Place <jeremey@westdesignbuild.com>
Sent: Tuesday, December 10, 2024 8:51 AM
To: Jesse, Christina <cjesse@carmel.in.gov>
Subject: Re: The Enclave of Carmel Lot 33 Replat Application
Good morning Jesse,
I’ve been informed by the HOA there isn’t a rear setback line. Which would make sense considering how close all the
houses are to the easement and not being on the plot plan that I have. How do I get some clarification on this?
Thanks for your help,
Jeremey Place
Director of Operations - Partner
West Design Build
jeremey@westdesignbuild.com
317-774-4454
On Thu, Dec 5, 2024 at 9:34 AM Jesse, Christina <cjesse@carmel.in.gov> wrote:
Good morning, Jeremey –
I wanted to send over some examples of replats that were approved and recorded for your reference:
PZ-2023-00188 SP: Woodland Golf Club Subdivision Replat, Lots 37 and 38
th
PZ-2024-00092 SP: Replat of lots 106 and 108 in Sanctuary at 116 Section 3
PZ-2023-00068 SP: Replat of Asherwood Subdivision Lots 19 & 20
4