Loading...
HomeMy WebLinkAboutChange Order #1/ENG/$7,250/JKES Inc., dba Smith Projects/22-SW-01 Spring Mill Run Culvert ReplacementBy Sergey Grechukhin at 4:44 pm, Dec 11, 2024 Docusign Envelope ID: 9276DBCF-8D4E-4A99-A43B-B8FE7E0471CE TO: Brad Pease City Engineer City of Carmel Indiana One Civic Square Carmel, IN 46032 CTTY OF CARMEL CONTRACT CHANGE ORDER NO.: DATE: Dec _ e _m_b-er_4 ___ 2 _0-24 ___ _ PROJECT NAME: Spring Mill Run Culver Replacement CITY REQ. NO.: CITY PO NO.: 22-SW-01CITY PO DATE: T.You are directed to make the following changes in this Contract: Change order is being added to Contract 22-SW-01 for additional pumps to assist with dewatering the excavation due to above average rainfall. The pumps were brought to site to control the rising water levels of the creek to allow construction to stay on schedule and to assist with the installation of the precast box structure. TTEM AMOUNT SCHEDULED ADJUSTMENT (+) OR ( -) DAYS IT. The following referenced Documents further describe the changes outlined in Paragraph T, and are to be considered a part of this Change Order: R.F.P.: N/A W.D.C. NO.: N/A The changes result in the following adjustment of Contract Price and Contract Time: Contract Price prior to this Change Order $ 418,898.85 Contract Price will be increased by this Change Order $ 7,250.00 New Contract Price including this Change Order $ 426,148.85 Contract Time prior to this Change Order ___ Days Closure _____ Substantial Completion Date Contract Time prior to this Change Order _____ Final Completion Date Net increased/decreased resulting from this Change Order _____ Days Current Contract Time including this Change Order ___ Days Closure _____ Substantial Completion Date Cun-ent Contract Time including this Change Order _____ Final Completion Date This Change Order is for full and final settlement of all direct, indirect, impact costs and time extensions incmTed at any time resulting from the perf01mance of the changed work. The Above Changes Are Recommended American Slruclurc oinl In ENGINEER 9025 River Road, Suite 200 Add,ess Indianapolis, IN 46240 City/Stale/Zip Phone: 317-281-9563 Date: December 4, 2024 The Above Changes Are Accepted JK.ES Inc .. dba Smith Projects CONTRACTOR 238 N. Main lreet Atltl,ess Maxwell. IN 46154 City/Stale/Zip Bya,v I Phone:__3JJ. 'I II,· ?111 Date: IJ./S'/J,'I Approved James Barlow, Member Laura Campbell, Member ATTEST: Jacob Quinn, City Clerk Date: --------- Docusign Envelope ID: 9276DBCF-8D4E-4A99-A43B-B8FE7E0471CE 12/18/2024 Docusign Envelope ID: 9276DBCF-8D4E-4A99-A43B-B8FE7E0471CE Docusign Envelope ID: 9276DBCF-8D4E-4A99-A43B-B8FE7E0471CE Docusign Envelope ID: 9276DBCF-8D4E-4A99-A43B-B8FE7E0471CE Docusign Envelope ID: 9276DBCF-8D4E-4A99-A43B-B8FE7E0471CE Docusign Envelope ID: 9276DBCF-8D4E-4A99-A43B-B8FE7E0471CE Docusign Envelope ID: 9276DBCF-8D4E-4A99-A43B-B8FE7E0471CE