Loading...
HomeMy WebLinkAboutOmni Electric, LLC/STREET/$28,624.25/West Carmel Drive Fiber ASA #7CzBmmjtpoMzodi.NdHsbuibu21;62bn-Efd22-3135 OMNIElectricLLC Omni Proposal2697S300West12/06/24Tipton, IN. 46072 Job # 241256 CityofCarmel 3400 West 131 StreetCityofCarmel (West Carmel Drive Fiber) Carmel IN 460743400West131Street DescriptionMaterialLaborEquipmentOther Amount Misc. Supplies 6,284.256,284.25 Labor 285.00285.00 Boring 12,800.0012,800.00 Minnie Excavator 1,780.001,780.00 Private Locates Allowance 4,800.004,800.00 Safety Equipment 1,750.001,750.00 Vac Truck / Trailer PER HOUR 275.00275.00 Hard Surface Cut / Repair PER HOLE 650.00650.00 Sub Total:6,284.25935.0016,605.0028,624.25 Sales Tax: 0 %Tax ExemptSalesTaxforMaterial: Grand Totals:$28,624.25 NotesThis is a proposal for the City of Carmel at West Carmel Drive. This will be the underground portion of getting a conduit from the P1 cabinet atWest Carmel Drive back tothe P1 cabinet to the south that has fiber. We will continue the overhead conduit down to be under ground where it will go into a24x24x24 quazite box. We will then bore (2) - 1-1/4" SDR conduits up to 800 linear feet to the north to the existing P1 cabinet in the wooded area to thenorth of 190 West Carmel Drive, mid-way we will need to stop and install the customer an additional quazite box for apull point. Once at the north P1 cabinet we will more than likely have to come up out of grade and poke into the cabinet exposed using aGRC condulet. This will get the customer achase between both cabinets. Please note that we will need to shut down alane at atime to get across the Monon Trail overpass. We have not allowed for any permits in this pricing. Work to be completed during normal business hours. We will plan to use an arrow board, road signage, and cones set back a good distance towarn drivers that thelane is closed coming up. No final grading, landscape repairs, grass seeding are accounted for in this proposal. Omni is not liable for any untraceable underground utilities. Vac Truck isbased upon an hourly basis that will be totaled up at the end of the project for afinal number. Hard surface cuts / restoration are based upon aper hole price that will be totaled upat the end ofthe project forafinal number. Page 1of1