Loading...
HomeMy WebLinkAboutWestfield Blvd. & 111th Street Roundabout Construction Plan Set (Project No 16-ENG-41)WE S T F I E L D B L V D . KE Y S T O N E A V E . 116TH ST. 109TH ST. 106TH ST. E. 110TH ST. E. 110TH ST.109TH ST. RA N G E L I N E R D . E. 111TH ST. 116TH ST. 106TH ST. N. C O L L E G E A V E . 108TH ST. E. 110TH ST. E. 110TH ST. Duke Energy Distribution Cindy Rowland 17526 S. Mill Creek Rd. Noblesville, IN. 46062 Cindy.Rowland@duke-energy.com PH. (317) 776-5341 ELEC. PHONE Vectren Energy Shawn Williams 16000 Allisonville Rd. Noblesville, IN 46061 swilliams@vectren.com PH. (317) 776-5534 GAS AT&T Indiana Jeff Rice 5858 N. College Ave. Indianapolis, IN 46220 jr2647@att.com PH. (317) 225-3313 Clay Township Regional Waste District Ryan Hartman 10701 N. College Avenue, Suite A Indianapolis, IN 46280 ryan.hartman@ctrwd.com PH. (317) 844-9200 SEWER SHEET NO. TYPICAL CROSS SECTIONS INDEX OF DRAWINGS TITLE SHEET & INDEX GEOMETRIC TIE-UP SHEET PLAN & PROFILES CROSS SECTIONS ROUNDABOUT CONSTRUCTION CLAY TOWNSHIP WESTFIELD BLVD. & 111TH STREET PROJECT NO. 16-ENG-41 CURB RAMP DETAILS MAINTENANCE OF TRAFFIC PR O J E C T N O . 16 - E N G - 4 1 - W E S T F I E L D B L V D . & 1 1 1 T H S T . EROSION CONTROL PLAN & DETAILS Spectrum Ron Hinrichs 3030 Roosevelt Ave. Indianapolis, IN 46218 Ronald.Hinrichs@charter.com PH. (317) 339-1949 CATV Carmel Water Steve Cook 3450 W. 131st St. Carmel, IN 46074 scook@carmel.in.gov PH. (317) 733-2855 WATER 1 HONORABLE JAMES BRAINARD, MAYOR UTILITIES COMM Century Link Dewayne Hamilton Nationalrelo@centurylink.com PH. (317) 916-2708 4 5-6 8-13 14-15 ## 18-19 20-21 2-3 PLAT NO. 1 7 www.eticagroup.com Indianapolis |Avon | Fishers | New Haven Indianapolis, IN 46240 | Tel: 317.466.9520 Corporate | 7172 N. Keystone Ave., Suite G SCALE: 1" = 5000' R 4 E R 3 E T 19 N T 18 N T 19 N T 18 N R 4 E R 3 E END PROJECT STA. 8+95.00 "PR-A" BEGIN PROJECT STA. 3+50.00 "PR-A" BEGIN CONSTRUCTION STA. 51+10.50 "PR-B" CONSTRUCTION DETAILS SPOT ELEVATION DETAILS SIGN PLAN & DETAILS PAVEMENT MARKING PLAN LIGHTING PLAN MISCELLANEOUS TABLES SIGN TABLE 22-23 24 25 26 29 30-38 SPLITTER ISLAND DETAILS 16 Zayo Bandwidth Waylon Higgins Dan Jones 2909 Castlegate Drive. Indianapolis, IN 46256 inky-relo@zayo.com FINAL CONSTRUCTION DOCUMENTS 2018 (2038) 14,490 15,900 (2038) COLLECTOR STREET 40 3 3 50 1,590 LEVEL NONE A.A.D.T. A.A.D.T. D.H.V DIRECTIONAL DISTRIBUTION TRUCKS DESIGN SPEED FUNCTIONAL CLASSIFICATION TERRAIN ACCESS CONTROL V.P.D. V.P.D. V.P.H. % ( ) A.A.D.T. D.H.V. % % M.P.H. DESIGN DATA TRAFFIC DATA 111TH STREET WESTFIELD BLVD. 4,940 5,440 2 2 60 544 V.P.D. V.P.D. V.P.H. % A.A.D.T. D.H.V. % % COLLECTOR STREET 35 LEVEL NONE M.P.H. UNDERDRAIN TABLE 27 STRUCTURE DATA TABLE 28 ℄"P R - A " TRAVEL LANE VARIES 12' TO 15'-6" TRAVEL LANE VARIES 12' TO 15'-6"2'2' 2.00%2.00% 2'2' 2.00%2.00% K 27 VARIES 2'-6" TO 11' VARIES 2'-6" TO 10'-8"1' F1 26 K 13 13 C ℄"P R - A " F1 27 1.00%1.50% TRAVEL LANE VARIES 14' TO 18'VARIES6' OR 10' TRAVEL LANE VARIES 13'-6" TO 16'-6"10'1' 1'6' OR 10' 1.50% F F1 1.00% VARIES 15'-6" TO 8'2' ℄"P R - E O P - C E N T E R " 18 2626 A VARIES TYPICAL SECTION - UNCURBED APPROACH STA. 3+50.00 "PR-A" TO STA. 5+13.00 "PR-A" STA. 7+81.00 "PR-A" TO STA. 8+95.00 "PR-A" TYPICAL SECTION - CURBED APPROACH STA. 5+13.00 "PR-A" TO STA. 6+09.18 "PR-A" STA. 7+14.18 "PR-A" TO STA. 7+80.28 "PR-A" TYPICAL SECTION - ROUNDABOUT STA. 0+00.00 "PR-EOP-CENTER" TO STA. 2+29.34 "PR-EOP-CENTER" EXISTING GROUND 3:1 MAX FILL EXISTING GROUND 27 27 VARIES 1% TO 2%VARIES 1% TO 2% 2.00%2.00% 1.00%1.50% CENTER OF ROUNDABOUT STA. 6+61.68 "PR-A" = STA. 53+46.07 "PR-B" P.G. ELEV. P.G. ELEV. P.G. ELEV. TRAVEL LANE 16'8'26'-6"2' 15 15 2'2' 15 F U U U U U K K K 26 HMA Surface SAFETY EDGE ON HMA PAVEMENT DETAIL N.T.S Edge of HMA Surface HMA Intermediate HMA Base 7" Subgrade Treatment 2'-0" 30 ° Proposed Shoulder 45 ° 13 3:1 M A X CUT EXISTING GROUNDEXISTING GROUND EXISTING GROUND 26 6:1 VARIESVARIESEXISTING GROUND 26 2' (TYP.) 2' (TYP.) 2' (TYP.) 2' (TYP.) 1' (TYP.) 1" = 5' N.A.N.A. 16-ENG-41N.A. 2 N.A. N.A.38MHS/RDR JRE JRE NCK 1/10/20 P: \ 2 0 1 7 \ 1 7 0 0 5 3 1 1 1 t h & R a n g e l i n e R o u n d a b o u t \ E n g D e s i g n \ D r a w i n g s \ S h e e t s \ 1 7 0 0 5 3 T y p i c a l S e c t i o n s . d w g TYPICAL SECTIONS LINE "PR-A" & "PR-EOP-CENTER" F LEGEND TRUCK APRON 7" PCCP, COLORED AND JOINTED ON 10" COMPACTED AGGREGATE, NO. 53, ON SUBGRADE TREATMENT, TYPE IB (SEE CARMEL STD. DWG. NO. 10-25A) SPLITTER ISLAND 4" PCCP, ON 6" COMPACTED AGGREGATE, NO. 53, ON SUBGRADE TREATMENT, TYPE IB 4" SIDEWALK, CONCRETE (SEE CARMEL STD. DWG. NO. 10-18) HMA FOR SIDEWALK 165 LB/SY HMA SURFACE, TYPE B, ON 275 LB/SY HMA INTERMEDIATE, TYPE B, ON 6" COMPACTED AGGREGATE, NO. 53, ON COMPACTED SUBGRADE (SEE CARMEL STD. DWG. NO. 10-20) FULL DEPTH PAVEMENT 165 LB/SY HMA SURFACE, TYPE C, 9.5mm ON 275 LB/SY HMA INTERMEDIATE, TYPE C, 19.0mm ON 385 LB/SY HMA BASE, TYPE C, 25.0mm ON 250 LB/SY HMA INTERMEDIATE, TYPE C, OG 19.0 mm ON 330 LB/SY HMA BASE, TYPE C, 25.0mm ON SUBGRADE TREATMENT, TYPE IB UNDERDRAIN (SEE CARMEL STD. DWG. NO. 10-12) BARRIER CURB AT TRUCK APRON (SEE CARMEL STD. DWG. NO. 10-25D) CURB & GUTTER, CONCRETE, TYPE II (SEE CARMEL STD. DWG. NO. 10-14) ROLL CURB FOR TRUCK APRON (SEE CARMEL STD. DWG. NO. 10-25C, D=7.5") NURSERY SODDING SEEDING MIXTURE, U F1 K 15 18 26 27 U C 13 A RECOMMENDED FOR APPROVAL DESIGN ENGINEER DATE DESIGNED: CHECKED: DRAWN: CHECKED: SURVEY BOOK CONTRACT DESIGNATION SHEETS of PROJECT BRIDGE FILESCALE CLAY TOWNSHIP VERT. SCALE TYPICAL SECTION - UNCURBED APPROACH STA. 51+10.50 "PR-B" TO STA. 51+60.00 "PR-B" TYPICAL SECTION - CURBED APPROACH STA. 51+93.50 "PR-B" TO STA. 52+93.57 "PR-B" EXISTING GROUNDEXISTING GROUND ℄"P R - B " TRAVEL LANE VARIES 11' TO 15' TRAVEL LANE VARIES 11' TO 15'2'2' 2.00%2.00% 2'2' 2.00%2.00% 27 3:1 M A X 27 3:1 MAX 27 27 VARIES 2' TO 10' VARIES 2' TO 9'-9"1' F1 26 15 13 13 C ℄"P R - B " 15 F 27 1.00%1.50% TRAVEL LANE VARIES 13' TO 16.5'8'10' TRAVEL LANE VARIES 13' TO 18'6'1' VARIES 10' TO 8.5' 3:1 M A X FILL 27 EXISTING GROUND3:1 MAX 27EXISTING GROUND 27 1.00%1.50% P.G. ELEV. P.G. ELEV. 2'2' 26 K U U U U K KK VARIESVARIES EXISTING GROUND 3:1 MAX CUT VARIES 1% TO 2%VARIES 1% TO 2% 2' (TYP.) 2' (TYP.) 2' 2' (TYP.) 2' (TYP.) 1" = 5' N.A.N.A. 16-ENG-41N.A. 3 N.A. N.A.38MHS/RDR JRE JRE NCK 1/10/20 P: \ 2 0 1 7 \ 1 7 0 0 5 3 1 1 1 t h & R a n g e l i n e R o u n d a b o u t \ E n g D e s i g n \ D r a w i n g s \ S h e e t s \ 1 7 0 0 5 3 T y p i c a l S e c t i o n s . d w g TYPICAL SECTIONS LINE "PR-B" F LEGEND TRUCK APRON 7" PCCP, COLORED AND JOINTED ON 10" COMPACTED AGGREGATE, NO. 53, ON SUBGRADE TREATMENT, TYPE IB (SEE CARMEL STD. DWG. NO. 10-25A) SPLITTER ISLAND 4" PCCP, ON 6" COMPACTED AGGREGATE, NO. 53, ON SUBGRADE TREATMENT, TYPE IB 4" SIDEWALK, CONCRETE (SEE CARMEL STD. DWG. NO. 10-18) HMA FOR SIDEWALK 165 LB/SY HMA SURFACE, TYPE B, ON 275 LB/SY HMA INTERMEDIATE, TYPE B, ON 6" COMPACTED AGGREGATE, NO. 53, ON COMPACTED SUBGRADE (SEE CARMEL STD. DWG. NO. 10-20) FULL DEPTH PAVEMENT 165 LB/SY HMA SURFACE, TYPE C, 9.5mm ON 275 LB/SY HMA INTERMEDIATE, TYPE C, 19.0mm ON 385 LB/SY HMA BASE, TYPE C, 25.0mm ON 250 LB/SY HMA INTERMEDIATE, TYPE C, OG 19.0 mm ON 330 LB/SY HMA BASE, TYPE C, 25.0mm ON SUBGRADE TREATMENT, TYPE IB UNDERDRAIN (SEE CARMEL STD. DWG. NO. 10-12) BARRIER CURB AT TRUCK APRON (SEE CARMEL STD. DWG. NO. 10-25D) CURB & GUTTER, CONCRETE, TYPE II (SEE CARMEL STD. DWG. NO. 10-14) ROLL CURB FOR TRUCK APRON (SEE CARMEL STD. DWG. NO. 10-25C, D=7.5") NURSERY SODDING SEEDING MIXTURE, U F1 K 15 18 26 27 U C 13 A RECOMMENDED FOR APPROVAL DESIGN ENGINEER DATE DESIGNED: CHECKED: DRAWN: CHECKED: SURVEY BOOK CONTRACT DESIGNATION SHEETS of PROJECT BRIDGE FILESCALE CLAY TOWNSHIP VERT. SCALE 6 1 6 1 3+00 4+00 5+00 6+00 7+00 8+00 9+00 10+00 11+00 50 + 0 0 51 + 0 0 52 + 0 0 53 + 0 0 Begin Construction Sta. 51+10.50 "PR-B" EQ: POT Sta. 3+00.00 "PR-A" = OPOT Sta. 33+00.00 "A", 0.23' Rt. EQ: POT Sta. 11+03.27 "PR-A" = OPOT Sta. 41+00.00 "A", 0.00' t. EQ: POT Sta. 50+00.00 "PR-B" = OPOT Sta. 150+00.00 "B", 1.22' Rt. Begin Project Sta. 3+50.00 "PR-A" End Project Sta. 8+95.00 "PR-A" NEPL NE P L NE P L NE P L NE P L NE P L NE P L NEPL NEPL NEPL NEPL NEPL Ex . R / W Ex . R / W Ex . R / W Ex . R / W Ex. R / W Section 1, T18N, R3E Clay Township Hamilton County, IN Section 1, T18N, R3E Clay Township Hamilton County, IN Section 6, T18N, R4E Clay Township Hamilton County, IN Section 6, T18N, R4E Clay Township Hamilton County, IN WOODLAND COUNTRY CLUB, INC. GEODDE, STEVEN R. & KATHRYN E. WENZEL, HUBERT & ROBERTA L. BUNCH, LISA A. MEDLER, ERNEST L. & D. LOUISE GRATZ, PATRICIA M. & THERESA L. O'MAHONEY, NEIL P. OBURN, G. WILLIAM & FRANCIE LEE WOODLEE, JEFFREY & BONITA L. GROSECLOSE, KRISTAN C. GEODDE, STEVEN R. & KATHRYN E. THE ELIZABETH G. CAPASSO REVOCABLE TRUST Ex. Easement NEPL Ex. R/W Ex . R / W Ex . R / W Ex . R / W Ex . R / W Ex . R / W Ex . E a s e m e n t Ex . E a s e m e n t EQ: POT Sta. 53+46.07 "PR-B" = OPOT Sta. 153+44.51 "B", 17.57' Lt. = EQ: O PI Sta. 6+61.68 "PR-A" = OPOT Sta. 36+60.64 "A", 14.91' Lt. EQ: PI Sta. 36+42.81 "A" = POT Sta. 153+59.73 "B" P.C. = 51+93.52 "PR-B" P.T. = 52+90.50 "PR-B" P.R.C. = 52+44.73 "PR-B" P.I. = 10+55.13 "PR-A" P.C. = 5+20.94 "PR-A" P.C. = 7+06.07 "PR-A" P.T. = 6+19.14 "PR-A" P.T. = 7+62.15 "PR-A" P.R.C. = 5+62.90 "PR-A" LI N E " P R - A " LI N E " A " LINE "B" App. Section Line Ap p . S e c t i o n L i n e R/W R/W R/W R / W R/W R / W R/W R/WR/W Ex. R/W Ex. EP & Ex.R/W Ex. EP & Ex.R/W Ex . P L 1"= 50' N.A.N.A. 16-ENG-41N.A. 4 N.A. N.A.38MHS/RDR JRE JRE NCK 1/10/20 P: \ 2 0 1 7 \ 1 7 0 0 5 3 1 1 1 t h & R a n g e l i n e R o u n d a b o u t \ E n g D e s i g n \ D r a w i n g s \ S h e e t s \ 1 7 0 0 5 3 P l a t N o 1 . d w g PLAT NO. 1 SCALE 50 0 50 RECOMMENDED FOR APPROVAL DESIGN ENGINEER DATE DESIGNED: CHECKED: DRAWN: CHECKED: SURVEY BOOK CONTRACT DESIGNATION SHEETS of PROJECT BRIDGE FILESCALE CLAY TOWNSHIP VERT. SCALE HH6 1 6 1 LINE "A" 4+00 5+00 6+00 7+00 8+00 9+00 P.I. = 6+61.68 "PR-A" = P.O.T. = 53+46.07 "PR-B" N = 135945.7332 E = 751829.1460 P.C. = 5+20.94 "PR-A" P.C. = 7+06.07 "PR-A" P.T. = 6+19.14 "PR-A" P.T. = 7+62.15 "PR-A" P.R.C. = 5+62.90 "PR-A" 50 + 0 0 51 + 0 0 52 + 0 0 53 + 0 0 P.O.T. = 50+00.00 "PR-B" = O.P.O.T = 150+00.00 "B", 1.22' RT. N = 135936.2571 E = 751484.2540 P.C. = 51+93.52 "PR-B" P.T. = 52+90.50 "PR-B" P.R.C. = 52+44.73 "PR-B" P.I. = 36+42.81 "A" P.O.T. = 153+59.73 "B" Begin Project Sta. 3+50.00 "PR-A" 111ST STREET WE S T F I E L D B L V D P.I. = 52+19.26 "PR-B" P.I. = 52+67.65 "PR-B" P.I. = 5+42.00 "PR-A" P.I. = 5+91.09 "PR-A" P.I. = 7+34.29 "PR-A" ALIGNMENT DATA (LINE A) Number L1 L2 Point POT PI Begin Station 10+00.00 36+42.81 End Station 36+42.81 64+68.34 Length 2642.811 2825.532 Radius Line/Chord Direction N00° 05' 21.50"E N00° 32' 21.65"E ALIGNMENT DATA (LINE PR-A) Number L5 C1 C2 L6 L7 C3 L8 Point POT PC PRC PT PI PC PT Begin Station 3+00.00 5+20.94 5+62.90 6+19.14 6+61.68 7+06.07 7+62.15 End Station 5+20.94 5+62.90 6+19.14 6+61.68 7+06.07 7+62.15 10+55.13 Length 220.940 41.964 56.240 42.535 44.386 56.083 292.985 Radius 202.500 350.000 200.000 Line/Chord Direction N00° 09' 37.69"W N06° 05' 49.71"W N07° 25' 49.70"W N02° 49' 37.66"W N15° 50' 44.63"E N07° 48' 44.56"E N00° 13' 15.51"W L11 PI 10+55.13 11+03.27 48.136 N00° 32' 21.65"W ALIGNMENT DATA (LINE B) Number L3 Point POT Begin Station 100+00.00 End Station 126+80.11 Length 2680.110 Radius Line/Chord Direction S89° 12' 33.23"E L4 PI 126+80.11 153+59.73 2679.619 S88° 27' 05.87"E ALIGNMENT DATA (LINE PR-B) Number L9 C17 C18 L10 Point POT PC PRC PT Begin Station 50+00.00 51+93.52 52+44.73 52+90.50 End Station 51+93.52 52+44.73 52+90.50 53+46.07 Length 193.525 51.201 45.772 55.570 Radius 203.000 325.000 Line/Chord Direction S88° 06' 22.08"E N84° 40' 05.48"E N81° 28' 37.77"E N85° 30' 42.49"E End Project Sta. 8+95.00 "PR-A" WE S T F I E L D B L V D L1 L2 L5 L6 L7 C1 C2 C3 L9 L10C4 C5 L4 LINE "B" LINE "PR-B" LINE "A" LINE "PR-A" Ex . E a s e m e n t Ex . E a s e m e n t Ex. Easement NE P L NE P L NE P L NEPL NEPL NE P L NE P L NEPL Ex . R / W Ex . R / W Ex . R / W Ex . R / W Ex. R/W Ex . R / W Ex . R / W LINE "B" GEODDE, STEVEN R. & KATHRYN E. WOODLAND COUNTRY CLUB, INC. GEODDE, STEVEN R. & KATHRYN E. WENZEL, HUBERT & ROBERTA L. GEODDE, STEVEN R. & KATHRYN E. WOODLAND COUNTRY CLUB, INC. MEDLER, ERNEST L. & D. LOUISE GRATZ, PATRICIA M. & THERESA L. O'MAHONEY, NEIL P. OBURN, G. WILLIAM & FRANCIE LEE WOODLEE, JEFFREY & BONITA L. GROSECLOSE, KRISTAN C. WOODLAND COUNTRY CLUB, INC. R/W R / W R/W R/W R/W R/W R/W R / W R/WR/WBegin Construction Sta. 51+10.50 "PR-B" TEMP. R/W LINE "A" Ex. R/W Ex . R / W Ex. R/W Ex. R/W & EP Ex. R/W & EP Ex. R/W & EP L8 P.O.C. = 0+00 "PR-EOP-CENTER" = P.O.C. = 2+29.34 "PR-EOP-CENTER" O.P.O.T = 36+91.08, 35.05 LT. "A" O.P.O.T = 153+23.83, 47.64 RT. "B" N = 135976.3569 E = 751809.2856 1+00 2+00 P.O.T. = 11+03.27 "PR-A" = P.O.T. = 41+00.00 "A" N = 136384.9300 E = 751848.1870 P.I. = 10+55.13 "PR-A" L2 L8 L11 NEPL Ex . R / W Ex . R / W Ex . R / W 11+0011+00 P.O.T. = 3+00.00 "PR-A" = O.P.O.T. = 33+00.00 "B", 0.23' RT. N = 135584.9504 E = 751843.5773 L1 L5 Ex i s t . R / W Ex i s t . R / W 3+00 1" = 30' N.A.N.A. 16-ENG-41N.A. 5 N.A. N.A.38MHS/RDR JRE JRE NCK 1/10/20 P: \ 2 0 1 7 \ 1 7 0 0 5 3 1 1 1 t h & R a n g e l i n e R o u n d a b o u t \ E n g D e s i g n \ D r a w i n g s \ S h e e t s \ 1 7 0 0 5 3 G e o m e t r i c P l a n . d w g GEOMETRIC PLAN CENTER LINES 9+00 RECOMMENDED FOR APPROVAL DESIGN ENGINEER DATE DESIGNED: CHECKED: DRAWN: CHECKED: SURVEY BOOK CONTRACT DESIGNATION SHEETS of PROJECT BRIDGE FILESCALE CLAY TOWNSHIP VERT. SCALE BREAKLINE B BREAKLINE A BREAKLINE B BREAKLINE A RECOMMENDED FOR APPROVAL DESIGN ENGINEER DATE DESIGNED: CHECKED: DRAWN: CHECKED: SURVEY BOOK CONTRACT DESIGNATION SHEETS of PROJECT BRIDGE FILESCALE CLAY TOWNSHIP VERT. SCALE HH6 1 6 1 LINE "A" P.O.C. = 0+00 "PR-EOP-CENTER" = P.O.C. = 2+29.34 "PR-EOP-CENTER" O.P.O.T = 36+91.08, 35.05 LT. "A" O.P.O.T = 153+23.83, 47.64 RT. "B" N = 135976.3569 E = 751809.2856 1+00 2+00 P.O.T. = 5+49.98 "PR-EOP-EAST" O.P.O.T = 38+91.70, 13.8 RT. "A" N = 136176.8141 E = 751860.0515 P.O.T. = 0+00 "PR-EOP-EAST" O.P.O.T = 33+46.66, 11.0 RT. "A" N = 135634.6954 E = 751855.5121 1+ 0 0 2 + 0 0 3+ 0 0 4+ 0 0 5+ 0 0 P.C. = 1+65.71 "PR-EOP-EAST" P.T. = 4+36.09 "PR-EOP-EAST" P.R.C. = 2+06.60 "PR-EOP-EAST" P.R.C. = 2+84.89 "PR-EOP-EAST" P.R.C. = 3+32.17 "PR-EOP-EAST" P.O.T. = 4+12.81 "PR-EOP-NW" O.P.O.T = 151+10.51, 9.00 LT. "B" N = 135943.4575 E = 751595.2003 P.O.T. = 0+00 "PR-EOP-NW" O.P.O.T = 38+91.70, 9.50 LT. "A" N = 136176.5484 E = 751836.6513 1+ 0 0 2+0 0 3+00 4+00 P.C. = 1+18.17 "PR-EOP-NW" P.T. = 3+31.32 "PR-EOP-NW" P.R.C. = 2+00.32 "PR-EOP-NW" P.R.C. = 2+01.67 "PR-EOP-NW" P.O.T. = 4+77.07 "PR-EOP-SW" O.P.O.T = 33+46.66, 11.0 LT. "A" N = 135634.6553 E = 751831.3640 P.O.T. = 0+00 "PR-EOP-SW" O.P.O.T = 151+10.51, 12.50 RT. "B" N = 135921.7403 E = 751594.5743 1+00 2 + 0 0 3+ 0 0 4+ 0 0 P.C. = 0+71.24 "PR-EOP-SW" P.T. = 3+18.08 "PR-EOP-SW" P.C.C. = 1+80.43 "PR-EOP-SW" P.C.C. = 2+14.30 "PR-EOP-SW" P.R.C. = 1+27.89 "PR-EOP-SW" P.I. = 36+42.81 "A" P.O.T. = 153+59.73 "B" 111ST STREET WE S T F I E L D B L V D P.I. = 2+68.87 "PR-EOP-NW" P.I. = 1+62.36 "PR-EOP-NW" P.I. = 0+99.72 "PR-EOP-SW" P.I. = 1+54.78 "PR-EOP-SW" P.I. = 1+98.04 "PR-EOP-SW" P.I. = 2+67.39 "PR-EOP-SW" P.I. = 1+86.21 "PR-EOP-EAST" P.I. = 2+47.87 "PR-EOP-EAST" P.I. = 3+10.27 "PR-EOP-EAST" P.I. = 3+84.42 "PR-EOP-EAST" ALIGNMENT DATA (LINE PR-EOP-EAST) Number L101 C101 C102 C103 C104 L102 Point POT PC PRC PRC PRC PT Begin Station 0+00.00 1+65.71 2+06.60 2+84.89 3+32.17 4+36.09 End Station 1+65.71 2+06.60 2+84.89 3+32.17 4+36.09 5+49.98 Length 165.708 40.888 78.292 47.279 103.920 113.891 Radius 218.000 100.000 52.500 400.000 Line/Chord Direction N01° 00' 32.07"E N04° 21' 51.28"W N12° 41' 29.73"E N09° 19' 17.08"E N09° 02' 06.09"W N01° 35' 32.25"W ALIGNMENT DATA (LINE PR-EOP-NW) Number L106 C106 C107 L107 Point POT PRC PRC PT Begin Station 0+00.00 2+00.32 2+01.67 3+31.32 End Station 1+18.17 2+01.67 3+31.32 4+12.81 Length 118.166 1.345 129.656 81.490 Radius 52.500 200.000 Line/Chord Direction S01° 09' 07.77"W S52° 43' 18.88"W S70° 33' 32.03"W S89° 07' 50.74"W C105 PC 1+18.17 2+00.32 82.157 90.000 S27° 18' 12.56"W ALIGNMENT DATA (LINE PR-EOP-SW) Number L105 C108 C109 C110 C111 L106 Point POT PC PRC PCC PCC PT Begin Station 0+00.00 0+71.24 1+27.89 1+80.43 2+14.30 3+18.08 End Station 0+71.24 1+27.89 1+80.43 2+14.30 3+18.08 4+77.07 Length 71.240 56.647 52.539 33.873 103.780 158.995 Radius 218.000 100.000 50.000 200.000 Line/Chord Direction S85° 01' 52.84"E N87° 31' 28.26"E S84° 52' 05.75"E S50° 24' 33.60"E S16° 08' 10.74"E S01° 16' 15.13"E WE S T F I E L D B L V D 4+00 5+00 6+00 7+00 8+00 9+00 50 + 0 0 51 + 0 0 52 + 0 0 53 + 0 0 L101 L102 C101 C102 C103 C104 L103 L104 C105 C106C107 L105 L106 C108 C109 C110 C111 C112 C113 ALIGNMENT DATA (LINE PR-EOP-CENTER) Number C112 Point POC Begin Station 0+00.00 End Station 1+14.67 Length 114.668 Radius 36.500 Line/Chord Direction S32° 57' 51.74"E C113 PCC 1+14.67 2+29.34 114.668 36.500 N32° 57' 51.74"W LINE "B" LINE "A" Ex . E a s e m e n t Ex . E a s e m e n t Ex. Easement NE P L NE P L NE P L NEPL NEPL NE P L NE P L NEPL Ex . R / W Ex . R / W Ex . R / W Ex . R / W Ex. R/W Ex . R / W Ex . R / W GEODDE, STEVEN R. & KATHRYN E. WOODLAND COUNTRY CLUB, INC. GEODDE, STEVEN R. & KATHRYN E. WENZEL, HUBERT & ROBERTA L. GEODDE, STEVEN R. & KATHRYN E. WOODLAND COUNTRY CLUB, INC. MEDLER, ERNEST L. & D. LOUISE GRATZ, PATRICIA M. & THERESA L. O'MAHONEY, NEIL P. OBURN, G. WILLIAM & FRANCIE LEE WOODLEE, JEFFREY & BONITA L. GROSECLOSE, KRISTAN C. WOODLAND COUNTRY CLUB, INC. LINE "PR-EOP-SW" LINE "PR-EOP-EAST" LINE "PR-EOP-NW" R/W R / W R/W R/W R/W R/W R/W R / W R/WR/W Begin Project Sta. 3+50.00 "PR-A" End Project Sta. 8+95.00 "PR-A" Begin Construction Sta. 51+10.50 "PR-B" TEMP. R/W LINE "A" Ex. R/W Ex. R / W Ex. R/W Ex. R/W & EP LINE "PR-A" Ex. R/W & EP Ex. R/W & EP L108 C114 C115 ALIGNMENT DATA (SOUTHWEST SIDEWALK) Number L108 C114 C115 Point POT PRC PRC Begin Station 10+00.00 10+26.96 10+63.32 End Station 10+26.96 10+63.32 11+00.38 Length 26.964 36.354 37.066 Radius 40.000 192.000 Line/Chord Direction S82° 04' 22.69"E S56° 02' 10.74"E S24° 28' 08.88"E C116 C117 C118 ALIGNMENT DATA (EAST PATH) Number C116 C117 C118 Point PRC PRC PRC Begin Station 10+00.00 10+44.52 11+08.78 End Station 10+44.52 11+08.78 11+82.27 Length 44.519 64.263 73.492 Radius 88.000 80.000 390.000 Line/Chord Direction N14° 51' 39.79"E N06° 20' 28.79"E N11° 16' 21.95"W Begin East Path = 10+00.00 = O.P.O.T. = 35+72.55 "A", 27.48' RT. N = 135857.4616 E = 751871.2490 End East Path = 11+82.27 = O.P.O.T. = 37+49.51 "A", 30.22' RT. N = 136034.1682 E = 751875.1093 Begin Southwest Sidewalk = 10+00.00 = O.P.O.T. = 35+72.55 "B", 27.48' RT. N = 135908.4133 E = 751738.3915 End Southest Sidewalk = 11+00.38 = O.P.O.T. = 35+72.55 "A", 27.48' LT. N = 135851.3922 E = 751809.5518 1" = 30' N.A.N.A. 16-ENG-41N.A. 6 N.A. N.A.38MHS/RDR JRE JRE NCK 1/10/20 P: \ 2 0 1 7 \ 1 7 0 0 5 3 1 1 1 t h & R a n g e l i n e R o u n d a b o u t \ E n g D e s i g n \ D r a w i n g s \ S h e e t s \ 1 7 0 0 5 3 G e o m e t r i c P l a n . d w g GEOMETRIC PLAN EDGE OF PAVEMENTS RECOMMENDED FOR APPROVAL DESIGN ENGINEER DATE DESIGNED: CHECKED: DRAWN: CHECKED: SURVEY BOOK CONTRACT DESIGNATION SHEETS of PROJECT BRIDGE FILESCALE CLAY TOWNSHIP VERT. SCALE MAINTENANCE OF TRAFFIC RECOMMENDED FOR APPROVAL DESIGN ENGINEER DATE DESIGNED: CHECKED: DRAWN: CHECKED: SURVEY BOOK CONTRACT DESIGNATION SHEETS of PROJECT BRIDGE FILESCALE CLAY TOWNSHIP VERT. SCALE N.A. N.A.N.A. 16-ENG-41N.A. 7 N.A. N.A.38MHS/RDR KLM RDR KLM 1/10/20 P: \ 2 0 1 7 \ 1 7 0 0 5 3 1 1 1 t h & R a n g e l i n e R o u n d a b o u t \ E n g D e s i g n \ D r a w i n g s \ S h e e t s \ 1 7 0 0 5 3 M O T . d w g LEGEND Construction Sign, Type A Construction Warning Light, Type A Detour Route Marker Assembly Barricade, Type III-B (REFLECTORIZED Both Side) Barricade, Type III-A (REFLECTORIZED One Sides) Construction Area Westfield Blvd. Detour Route 111TH St. Detour Route WE S T F I E L D B L V D . KE Y S T O N E A V E . 116TH ST. 109TH ST. 106TH ST. E. 110TH ST. KK MM NN FF CC AA EE AA DD BB EEAA AA AA DD CC CC EEPP GG E. 110TH ST.109TH ST. RA N G E L I N E R D . E. 111TH ST. B A B A NOTE TO CONTRACTOR: PLACE SIGN PRIOR TO GORE AREA NOTE TO CONTRACTOR: PLACE SIGN PRIOR TO GORE AREA PP NN KK MMBA MM 116TH ST. E. 111TH ST. 106TH ST. N. C O L L E G E A V E . 108TH ST. E. 110TH ST. E. 110TH ST. LL ROAD CLOSED AHEAD XW20-3 DETOUR AHEAD XW20-2 ROAD CLOSED R11-2 DETOUR XM4-10 (R or L) DETOUR XM 4-8 M3-1 or M3-3 M1-5 M5-1(L)S DETOUR XM 4-8 M3-1 or M3-3 M1-5 M6-3S DETOUR XM 4-8 M3-1 or M3-3 M1-5 M5-1(R)S DETOUR XM 4-8 M3-1 or M3-3 M1-5 DETOUR XM 4-8 M3-1 or M3-3 M1-5 M6-1(R)S END XM 4-6S M1-5 END XM 4-6S M1-5 A B E G AA BB CC DD EE FF GG M6-1(L)S MM LL F END CONSTRUCTION XG20-2 H M6-1(L)SM5-1(R)S DETOUR XM 4-8 M5-1(L)S DETOUR XM 4-8 M6-3S DETOUR XM 4-8 M5-1(R)S DETOUR XM 4-8 DETOUR XM 4-8 M6-1(R)S XM 4-8 END XM 4-6S XM 4-8 END XM 4-6S HH JJ KK LL MM NN PP M6-1(L)S M6-1(L)SM5-1(R)S 111TH STREET 111TH STREET 111TH STREET WESTFIELD BOULEVARD 111TH STREET 111TH STREET 111TH STREET E E E F F A A F G HH HH JJ KK HH HH G HH JJ KK HH HH F G AA AA AA AA A 10 0 ' 10 0 ' 20 0 ' NOTES: 1.Road closed to thru traffic. Road closure shall be limited to 45 calendar days. Access will be maintained for local traffic only. 2.Access to driveways & approaches will be provided at all times unless otherwise directed. ** * * * * * * ** * * 100'100'200' 50 0 ' 50 0 ' 10 0 ' 10 0 ' 20 0 ' 500' * (60" x 30") (24" x 12") (24" x 12") (21" x 15") (24" x 24") (24" x 12") (24" x 12") (21" x 15") (24" x 24") (24" x 12") (24" x 12") (21" x 15") (24" x 24") (24" x 12") (24" x 12") (21" x 15") (24" x 24") (24" x 12") (24" x 12") (21" x 15") (24" x 24") (24" x 12") (24" x 12") (21" x 15") (24" x 24") (24" x 12") (24" x 12") (21" x 15") (24" x 24") (24" x 12") (24" x 12") (21" x 15") (24" x 24") (24" x 12") (24" x 12") (21" x 15") (24" x 24") (24" x 12") (24" x 12") (21" x 15") (24" x 24") (24" x 12") (24" x 12") (21" x 15") (24" x 24") (24" x 12") (24" x 12") (21" x 15") (24" x 24") (24" x 12") (24" x 12") (21" x 15") (24" x 24") (24" x 12") (24" x 12") (21" x 15") (24" x 24") (48" x 18") (48" x 30") (60" x 24") (36" x 36")(36" x 36") M1-5M1-5M1-5M1-5 M1-5 M1-5 M1-5 111TH STREET WESTFIELD BOULEVARD WESTFIELD BOULEVARD WESTFIELD BOULEVARD WESTFIELD BOULEVARD WESTFIELD BOULEVARD WESTFIELD BOULEVARD H H H F F SUMMARY OF QUANTITIES ITEM UNIT QANTITY DETOUR ROUTE ASSEMBLY EA 47 ROAD CLOSURE SIGN ASSEMBLY EA 9 CONSTRUCTION SIGN TYPE "A"EA 12 CONSTRUCTION SIGN TYPE "B"EA 3 BARRICADE TYPE III-A LFT 72 BARRICADE TYPE III-B LFT 144 DETOUR XM 4-8 DETOUR XM 4-8 ROAD CLOSED TO THRU TRAFFIC R11-4 HH JJ LL W/ 24 LFT III-B BARRICADE CONSTRUCTION SIGN TYPE "A" ROAD CLOSURE SIGN ASSEMBLIES CONSTRUCTION SIGN TYPE "B" DETOUR ROUTE MARKER ASSEMBLIES M3-2 or M3-4 M3-2 or M3-4 M3-2 or M3-4 M3-2 or M3-4 M3-2 or M3-4 W/ 24 LFT III-B BARRICADE W/ 24 LFT III-B BARRICADE W/ 24 LFT III-B BARRICADE W/ 24 LFT III-A BARRICADEW/ 24 LFT III-A BARRICADE W/ 24 LFT III-A BARRICADE W/ 24 LFT III-B BARRICADE W/ 24 LFT III-B BARRICADE BB DD Note: *Detour Plan shouldbe coordinated with the Detour Plan for the closure of 111th Street & Central Park Drive. 501 S S TFO FO HH (A S P H A L T ) T T W TT (C O N C R E T E ) (M U L C H ) (G R A S S ) (M U L C H ) (C O N C R E T E ) R P.I. = 36+42.81 "A" CURVE DATA P.I. = 5+42.00 "PR-A" Delta = 11°52'24" R = 202.50 ft T = 21.06 ft L = 41.96 ft E = 1.09 ft CURVE DATA P.I. = 5+91.09 "PR-A" Delta = 9°12'24" R = 350.00 ft T = 28.18 ft L = 56.24 ft E = 1.13 ft Begin Project Sta. 3+50.00 "PR-A"End Project Sta. 8+95.00 "PR-A" LINE "PR-A" N15°50 ' 4 5 " E LINE "PR-A" LI N E " B " WESTFIELD BLVD WESTFIELD BLVD P.I. = 5+91.09 "PR-A" P.I. = 7+34.29 "PR-A" Ex . R / W Ex. R/W Ex. R/W Ex. R/W E x . R / W Ex. R/W Ex. R/W Ex. R/WEx. R/WEx. R/W Ex. R/W Ex. Easement JEFFREY & BONITA L. WOODLEE G. WILLIAM & FRANCIE LEE OBURN NEIL P. O'MAHONEY KRISTAN C. GROSECLOSE WOODLAND COUNTRY CLUB, INC. WOODLAND COUNTRY CLUB, INC. STEVEN R. & KATHRYN E. GOEDDE R/W R/W R/ W R / W R/ W R/W R/ W LINE "A" +96, Residential Drive W=12', L=8' +58, Residential Drive W=12', L=8' CURVE DATA P.I. = 7+34.29 "PR-A" Delta = 16°04'00" R = 200.00 ft T = 28.23 ft L = 56.08 ft E = 1.98 ft P.I. = 5+42.00 "PR-A" P.C. = 5+20.94 "PR-A" P.C. = 7+06.07 "PR-A" P.T. = 6+19.14 "PR-A" P.T. = 7+62.15 "PR-A" P.R.C. = 5+62.90 "PR-A" STR. NO. 30+42 "PR-B", 28' LT. STR. NO. 12+90, 29' Rt. STR. NO. 13+89, 30' LT. STR. NO. 16+92, 43' LT. STR. NO. 31+04, 42' LT. STR. NO. 18+30, 29' RT. STR. NO. 10+85 STR. NO. 11+85 STR. NO. 29+42 "PR-B" STR. NO. 28+42 "PR-B" STR. NO. 22+41 STR. NO. 17+29+65.00 "A" 40.0' +50.00 "A" 70.0' +60.00 "A" Ex. R/W +60.00 "A" 50.0' +75.00 Ex. R/W +65.00 "A" Ex. R/W +55.00 "A" Ex. R/W +55.00 "A" 45.0' +88.00 "B" 40.0' +33.00 60.0' +47.00 "B" 35.0' +47.00 "B" 30.0' SEC. 1, T18N, R3E CLAY TOWNSHIP HAMILTON COUNTY SEC. 6, T18N, R4E CLAY TOWNSHIP HAMILTON COUNTY Constr. Limits Constr. Limits Constr. Limits C o n s t r . L i m i t s SEC. 1, T18N, R3E CLAY TOWNSHIP HAMILTON COUNTY NE P L NE P L NE P L CURVE DATA P.I. = 5+91.09 "PR-A" Delta = 9°12'24" R = 350.00 ft T = 28.18 ft L = 56.24 ft E = 1.13 ft LINE "A" Constr. Limits Co n s t r . L i m i t s N00°09'38"W +70 STR. NO. 100 +54 STR. NO. 102 +33 STR. NO. 101 STR. NO. 15+91 STR. NO. 27+37 "PR-B" STR. NO. 19+34 STR. NO. 20+36 STR. NO. 26+36 "PR-B" STR. NO. 14+90 STR. NO. 21+38, 28' LT. EQN: P.I. = 6+61.68 "PR-A" P.O.T. = 53+46.07 "PR-B" P.O.C. Sta. 0+00.00 "PR-EOP-CENTER" = P.O.C. Sta. 2+29.34 "PR-EOP-CENTER", 0.00' 4+ 0 0 5+ 0 0 6+ 0 0 7+ 0 0 8+ 0 0 9+ 0 0 33 + 3 7 . 7 , 2 3 . 3 ' B U S H 33 + 4 2 . 0 , 2 5 . 1 ' D E C I D U I O U S T R E E 33 + 4 3 . 9 , 3 2 . 7 ' H E D G E 33 + 4 4 . 5 , 2 2 . 5 ' B U S H 33 + 4 7 . 4 , 2 6 . 3 ' B U S H 33 + 5 1 . 4 , 3 4 . 7 ' H E D G E 33 + 5 1 . 8 , 3 8 . 6 ' L I G H T P O L E 33 + 6 4 . 7 , 2 9 . 3 ' H E D G E 33 + 6 5 . 0 , 6 3 . 4 ' W E L L 33 + 6 5 . 6 , 2 6 . 4 ' B U S H 33 + 6 7 . 1 , 3 4 . 6 ' H E D G E 33 + 7 4 . 5 , 2 7 . 8 ' H E D G E 33 + 7 9 . 3 , 2 2 . 7 ' P O W E R P O L E 33 + 7 9 . 5 , 7 1 . 9 ' C O N I F E R I O U S T R E E 33 + 8 4 . 6 , 1 9 . 6 ' T E L E P H O N E M A N H O L E 33 + 8 5 . 2 , 2 6 . 6 ' H E D G E 33 + 8 9 . 2 , 2 9 . 0 ' H E D G E 33 + 9 1 . 5 , 1 9 . 5 ' T E L E P H O N E M A N H O L E 34 + 0 2 . 7 , 2 8 . 5 ' H E D G E 34 + 0 4 . 7 , 2 0 . 5 ' H E D G E 34 + 1 1 . 3 , 2 8 . 8 ' H E D G E 35 + 0 6 . 2 , 2 3 . 1 ' P O W E R P O L E 35 + 1 9 . 2 , 4 9 . 5 ' T R A F F I C S I G N A L S T R A I N P O L E 35 + 3 1 . 8 , 3 8 . 3 ' D E C I D U I O U S T R E E 35 + 4 3 . 6 , 4 2 . 7 ' T R A F F I C S I G N A L S T R A I N P O L E 35 + 6 6 . 6 , 2 5 . 8 ' T R A F F I C S I G N A L S T R A I N P O L E 35 + 7 7 . 3 , 2 2 . 2 ' P O W E R P O L E 35 + 7 8 . 5 , 6 2 . 5 ' C O N I F E R I O U S T R E E 35 + 9 5 . 1 , 1 9 . 8 ' T E L E P H O N E M A N H O L E 36 + 0 5 . 0 , 5 5 . 7 ' C O N I F E R I O U S T R E E 36 + 1 8 . 1 , 4 0 . 9 ' D E C I D U I O U S T R E E 36 + 2 2 . 5 , 6 5 . 6 ' A N C H O R F O R G U Y C A B L E 36 + 2 7 . 5 , 5 4 . 3 ' S I N G L E P O S T S I G N S T O P 36 + 7 5 . 0 , 3 4 . 8 ' D R O P I N L E T 36 + 8 0 . 3 , 2 2 . 4 ' S I N G L E P O S T S I G N W E S T F I E L D 1 1 1 T H 36 + 8 6 . 2 , 4 9 . 3 ' F I R E H Y D R A N T 36 + 8 8 . 1 , 5 0 . 7 ' W A T E R S H U T O F F V A L U E 36 + 9 3 . 2 , 7 9 . 5 ' W O O D S / B R U S H L I N E 37 + 0 9 . 8 , 3 6 . 0 ' W O O D F E N C E 37 + 1 4 . 1 , 2 5 . 1 ' W A T E R S H U T O F F V A L U E 37 + 1 8 . 2 , 6 3 . 2 ' W O O D S / B R U S H L I N E 37 + 2 0 . 7 , 2 9 . 3 ' R / W M O N U M E N T 37 + 3 2 . 7 , 3 2 . 9 ' D E C I D U I O U S T R E E 37 + 3 9 . 6 , 2 2 . 4 ' P O W E R P O L E 37 + 4 3 . 0 , 3 5 . 9 ' W O O D F E N C E 37 + 5 8 . 2 , 3 5 . 8 ' W O O D S / B R U S H L I N E 37 + 6 7 . 5 , 2 9 . 8 ' D E C I D U I O U S T R E E 37 + 7 9 . 2 , 2 9 . 7 ' D E C I D U I O U S T R E E 37 + 9 2 . 1 , 3 5 . 1 ' W O O D F E N C E 38 + 0 8 . 1 , 3 3 . 2 ' D E C I D U I O U S T R E E 38 + 4 2 . 3 , 3 0 . 1 ' D E C I D U I O U S T R E E 38 + 4 7 . 0 , 3 4 . 9 ' W O O D F E N C E 38 + 8 5 . 2 , 4 4 . 5 ' W O O D F E N C E 38 + 8 5 . 4 , 3 4 . 0 ' W O O D F E N C E 38 + 8 6 . 6 , 7 5 . 7 ' W O O D S / B R U S H L I N E 38 + 9 0 . 9 , 2 1 . 9 ' P O S T 38 + 9 4 . 9 , 3 7 . 2 ' D E C I D U I O U S T R E E 38 + 9 9 . 6 , 2 5 . 5 ' D E C I D U I O U S T R E E 39 + 0 1 . 7 , 3 0 . 2 ' D E C I D U I O U S T R E E 39 + 0 3 . 5 , 2 2 . 3 ' P O W E R P O L E 33 + 3 0 . 6 , 4 5 . 0 ' W O O D S / B R U S H L I N E 33 + 3 3 . 1 , 1 3 . 3 ' S E W E R M A N H O L E 33 + 3 8 . 1 , 2 0 . 9 ' M A I L B O X 33 + 3 9 . 6 , 2 0 . 8 ' W O O D S / B R U S H L I N E 33 + 4 0 . 9 , 4 6 . 2 ' W O O D S / B R U S H L I N E 33 + 4 9 . 5 , 2 8 . 6 ' P O W E R P O L E 33 + 6 3 . 5 , 6 8 . 8 ' D E C I D U I O U S T R E E 33 + 7 3 . 2 , 4 2 . 4 ' W O O D S / B R U S H L I N E 33 + 8 9 . 0 , 2 3 . 8 ' W O O D S / B R U S H L I N E 33 + 9 0 . 6 , 6 0 . 6 ' W O O D S / B R U S H L I N E 34 + 0 1 . 5 , 3 1 . 6 ' W O O D S / B R U S H L I N E 34 + 0 7 . 8 , 6 6 . 1 ' W O O D S / B R U S H L I N E 34 + 1 8 . 4 , 7 3 . 0 ' P R I V A C Y F E N C E 34 + 2 0 . 7 , 2 4 . 8 ' B Z Z 0 2 B / T U B 34 + 2 2 . 7 , 2 5 . 8 ' T E L E P H O N E S P L I C E T U B 34 + 4 4 . 9 , 7 3 . 3 ' P R I V A C Y F E N C E 34 + 4 5 . 0 , 3 3 . 8 ' W O O D S / B R U S H L I N E 34 + 4 6 . 8 , 6 5 . 3 ' W O O D S / B R U S H L I N E 34 + 5 0 . 1 , 3 6 . 4 ' D E C I D U I O U S T R E E 34 + 7 3 . 8 , 6 7 . 5 ' W O O D S / B R U S H L I N E 34 + 8 2 . 0 , 7 3 . 5 ' W O O D S / B R U S H L I N E 34 + 8 8 . 3 , 2 7 . 7 ' M A I L B O X 34 + 8 9 . 8 , 2 9 . 8 ' P O W E R P O L E 34 + 9 1 . 5 , 7 4 . 0 ' W O O D S / B R U S H L I N E 35 + 4 2 . 2 , 7 3 . 9 ' W O O D S / B R U S H L I N E 35 + 5 0 . 2 , 3 1 . 5 ' D O U B L E P O S T S I G N 35 + 9 3 . 9 , 7 3 . 9 ' W O O D S / B R U S H L I N E 36 + 1 2 . 9 , 2 8 . 6 ' S I N G L E P O S T S I G N U N I T E D M E T H O D I S T C H U R C H 36 + 1 6 . 2 , 3 5 . 8 ' A N C H O R F O R G U Y C A B L E 36 + 1 6 . 2 , 3 5 . 1 ' A N C H O R F O R G U Y C A B L E 36 + 1 6 . 5 , 3 0 . 2 ' P O W E R P O L E 36 + 2 0 . 2 , 3 1 . 1 ' T E L E P H O N E S P L I C E T U B 36 + 2 2 . 0 , 3 2 . 3 ' B Z Z 0 2 B / T U B 36 + 3 4 . 9 , 3 6 . 0 ' H A N D H O L E 36 + 3 6 . 8 , 3 7 . 2 ' B Z Z 0 2 B / H A N D H O L E 36 + 3 7 . 2 , 3 3 . 3 ' S I N G L E P O S T S I G N M O N O N C E N T E R 36 + 4 0 . 4 , 7 4 . 2 ' W O O D S / B R U S H L I N E 36 + 5 4 . 2 , 1 3 . 2 ' S E W E R M A N H O L E 36 + 8 9 . 3 , 7 3 . 5 ' W O O D S / B R U S H L I N E 37 + 4 1 . 2 , 4 8 . 8 ' W O O D S / B R U S H L I N E 37 + 4 7 . 8 , 7 3 . 0 ' W O O D S / B R U S H L I N E 37 + 4 8 . 1 , 3 0 . 6 ' W O O D S / B R U S H L I N E 37 + 6 7 . 8 , 3 4 . 5 ' P O W E R P O L E 37 + 8 9 . 1 , 3 4 . 9 ' A N C H O R F O R G U Y C A B L E 37 + 9 5 . 6 , 2 9 . 9 ' W O O D S / B R U S H L I N E 37 + 9 6 . 1 , 7 2 . 6 ' P R I V A C Y F E N C E 38 + 0 4 . 9 , 7 3 . 1 ' P R I V A C Y F E N C E 38 + 4 2 . 6 , 3 3 . 5 ' W O O D S / B R U S H L I N E 38 + 5 5 . 3 , 5 7 . 2 ' W O O D S / B R U S H L I N E 38 + 6 5 . 4 , 6 3 . 1 ' W O O D S / B R U S H L I N E 38 + 7 3 . 2 , 3 6 . 8 ' W O O D S / B R U S H L I N E 1" = 20' N.A.N.A. 16-ENG-41N.A. 8 N.A. N.A.38MHS/RDR JRE JRE NCK 1/10/20 P: \ 2 0 1 7 \ 1 7 0 0 5 3 1 1 1 t h & R a n g e l i n e R o u n d a b o u t \ E n g D e s i g n \ D r a w i n g s \ S h e e t s \ 1 7 0 0 5 3 P l a n & P r o f i l e . d w g PLAN LINE "PR-A" 500 R WE S T F I E L D B L V D MAG NAIL 12" A.G. IN EAST FACE OF POWERPOLE #71 352° 38.63' MAG NAIL 15" A.G. IN SOUTH FACE OF POWER POLE #068445 126° 57.03' BOAT SPIKE 12" A.G. IN EAST FACE OF POWER POLE (NO #)186° 65.52' MARBRO LANE GRASS ISLAND North: 135349.4570 East: 751823.8490 Sta. 30+64.48, 19.13' Lt. Line "A" 501 WE S T F I E L D B L V D 111th STREET R MAG NAIL 12" A.G. IN WEST FACE OF POWER POLE (NO #) 215°84.31' MAG NAIL 6" A.G. IN NE FACEOF POWER POLE #057273 169° 30.21' MAG NAIL W/HCSO WASHER IN EAST FACE OF 4"x4" FENCE POST 317°87.09' North: 135931.2300 East: 751868.8420 Sta. 36+46.51, 24.93' Rt. Line "A" MA T C H L I N E S T A . 9 + 0 0 5000 WE S T F I E L D B L V D 111th STREET MAG NAIL 12" A.G. IN WEST FACE OF POWER POLE (NO #) 69.65 MAG NAIL 6" A.G. IN NE FACE OF POWER POLE #057273 40.65' MAG NAIL W/ HCSO WASHER 12" A.G.IN EAST FACE OF 4"x4" FENCE POST 75.75' Sta. 36+42.81, 0.00' Rt. Line "A" North: 135927.7613 East: 751843.8834 RECOMMENDED FOR APPROVAL DESIGN ENGINEER DATE DESIGNED: CHECKED: DRAWN: CHECKED: SURVEY BOOK CONTRACT DESIGNATION SHEETS of PROJECT BRIDGE FILESCALE CLAY TOWNSHIP VERT. SCALE TBM 50: BOAT SPIKE SET IN EAST FACE OF POWER POLE (NO NUMBER) IN GRASS ISLAND AT WEST SIDE OF INTERSECTION OF RANGELINE ROAD AND MARBRO LANE. STA. 29+99.32 OFFSET 26.05 Lt. ELEVATION = 812.76' NAVD 88 750 760 770 780 790 800 810 820 830 840 750 760 770 780 790 800 810 820 830 840 81 4 . 1 81 3 . 8 81 3 . 4 81 3 . 4 3 81 3 . 1 81 3 . 0 2 81 2 . 7 81 2 . 6 2 81 2 . 2 81 2 . 2 1 81 1 . 7 81 1 . 8 1 81 1 . 3 81 1 . 4 1 81 1 . 0 81 1 . 0 0 81 0 . 6 81 0 . 5 6 81 0 . 2 81 0 . 0 9 80 9 . 9 80 9 . 6 8 80 9 . 7 80 9 . 5 6 80 9 . 4 80 9 . 3 80 9 . 2 80 9 . 2 80 9 . 3 80 9 . 2 80 8 . 9 80 8 . 6 80 8 . 4 80 8 . 2 80 8 . 0 80 7 . 9 3+00 4+00 5+00 6+00 7+00 8+00 9+00 -0.60% +1.02%-0.77% PVI Sta. 7+37.00 EL. = 808.36' VC = 45.00' PVI Sta. 7+80.00 EL. = 808.80' VC = 40.00' PVI Sta. 5+84.14 EL. = 809.44' VC = 50.00' PVI Sta. 5+14.00 EL. = 810.78' VC = 40.00' Begin Project Sta. 3+50.00 El. = 813.43 -1.62% -1.91% +0.79% End Project Sta. 8+95.00 El. = 807.92ROUNDABOUT SEE SPOT ELEVATIONS +0 9 . 1 8 +1 4 . 1 8 STR. NO. 12+91 126 Lft. of 24" Pipe @ 0.64% Req'd. STR. NO. 18+30 315 Lft. of 36" Pipe @ 0.88% Req'd.Inv.: 805.79 Inv.: 803.81Inv.: 804.96 Exist. Ground Proposed Grade Proposed Grade Sta. 6+09.18 El. = 809.590 Sta. 7+14.18 El. = 808.498 STR. No. 101 STR. No. 102 Existing 12" Sanitary Sewer 1" = 20' 1" = 5'N.A. 16-ENG-41N.A. 9 N.A. N.A.38MHS/RDR JRE JRE NCK 1/10/20 P: \ 2 0 1 7 \ 1 7 0 0 5 3 1 1 1 t h & R a n g e l i n e R o u n d a b o u t \ E n g D e s i g n \ D r a w i n g s \ S h e e t s \ 1 7 0 0 5 3 P l a n & P r o f i l e . d w g PROFILE LINE "PR-A" RECOMMENDED FOR APPROVAL DESIGN ENGINEER DATE DESIGNED: CHECKED: DRAWN: CHECKED: SURVEY BOOK CONTRACT DESIGNATION SHEETS of PROJECT BRIDGE FILESCALE CLAY TOWNSHIP VERT. SCALE BM TBM 52 R 503 S (C O N C R E T E ) T (A S P H A L T ) MN T P. I . = 1 0 + 5 5 . 1 3 " P R - A " SEC. 1, T18N, R3E CLAY TOWNSHIP HAMILTON COUNTY SEC. 6, T18N, R4E CLAY TOWNSHIP HAMILTON COUNTY Constr. Limits LINE "A"N00°32'22"E NE P L NE P L NE P L NE P L Ex. R/W Ex. R/W Ex. R/W Ex. R/W Ex. R/W Ex. R/W Ex. R/W NE P L GEODDE, STEVEN R. & KATHRYN E. QUAGLIESI, ROBIN L. & CHRISTOPHER W. GUTWEIN, GRANT B. & JESSICA L. PLOPPER, NICHOLAS E. KELLY, RYAN C. & DEBRA A. WOODLAND COUNTRY CLUB JACKSON, CATHEY M. BAINES, WILLIAM A. NE P L WESTFIELD BLVD NE P L 19 sys of Geotextile Type 2A and 10 tons Revetment Riprap Req'd. +98 STR. NO. 103 STR. NO. 23+45, 24' Rt. 9+ 0 0 10 + 0 0 11 + 0 0 38 + 8 5 . 2 , 4 4 . 5 ' W O O D F E N C E 38 + 8 5 . 4 , 3 4 . 0 ' W O O D F E N C E 38 + 8 6 . 6 , 7 5 . 7 ' W O O D S / B R U S H L I N E 38 + 9 0 . 9 , 2 1 . 9 ' P O S T 38 + 9 4 . 9 , 3 7 . 2 ' D E C I D U I O U S T R E E 38 + 9 9 . 6 , 2 5 . 5 ' D E C I D U I O U S T R E E 39 + 0 1 . 7 , 3 0 . 2 ' D E C I D U I O U S T R E E 39 + 0 3 . 5 , 2 2 . 3 ' P O W E R P O L E 39 + 1 5 . 6 , 2 9 . 5 ' D E C I D U I O U S T R E E 39 + 4 7 . 8 , 3 2 . 9 ' D E C I D U I O U S T R E E 39 + 8 1 . 8 , 2 2 . 9 ' H E A D W A L L 39 + 8 2 . 3 , 2 2 . 7 ' H E A D W A L L 39 + 8 2 . 3 , 1 9 . 2 ' H E A D W A L L 39 + 8 2 . 9 , 1 9 . 3 ' H E A D W A L L 40 + 0 2 . 8 , 5 6 . 6 ' D E C I D U I O U S T R E E 40 + 0 2 . 9 , 7 0 . 3 ' D E C I D U I O U S T R E E 40 + 0 5 . 4 , 5 2 . 0 ' D E C I D U I O U S T R E E 40 + 0 7 . 5 , 7 3 . 3 ' D E C I D U I O U S T R E E 40 + 0 9 . 5 , 5 1 . 6 ' D E C I D U I O U S T R E E 40 + 1 8 . 7 , 2 7 . 5 ' H E A D W A L L 40 + 1 9 . 2 , 2 3 . 0 ' H E A D W A L L 40 + 1 9 . 3 , 2 7 . 5 ' H E A D W A L L 40 + 1 9 . 8 , 2 5 . 3 ' D R A I N A G E P I P E 40 + 1 9 . 8 , 2 3 . 1 ' H E A D W A L L 40 + 2 1 . 3 , 5 0 . 4 ' D E C I D U I O U S T R E E 40 + 2 1 . 9 , 3 6 . 6 ' D E C I D U I O U S T R E E 40 + 2 2 . 5 , 4 8 . 4 ' D E C I D U I O U S T R E E 40 + 2 2 . 8 , 5 1 . 9 ' D E C I D U I O U S T R E E 40 + 3 0 . 4 , 2 2 . 0 ' M A I L B O X 40 + 9 4 . 9 , 7 . 3 ' S E W E R M A N H O L E 41 + 0 2 . 2 , 5 4 . 2 ' D E C I D U I O U S T R E E 41 + 1 9 . 0 , 5 2 . 3 ' D E C I D U I O U S T R E E 41 + 3 6 . 2 , 5 6 . 9 ' D E C I D U I O U S T R E E 41 + 4 1 . 9 , 2 8 . 7 ' D R A I N A G E P I P E 41 + 6 2 . 5 , 2 4 . 8 ' P O W E R P O L E 41 + 6 3 . 1 , 2 4 . 0 ' B E N C H M A R K 41 + 6 4 . 0 , 2 9 . 1 ' D R A I N A G E P I P E 41 + 7 4 . 0 , 2 3 . 6 ' T E L E P H O N E M A N H O L E 39 + 1 5 . 6 , 2 9 . 5 ' D E C I D U I O U S T R E E 40 + 0 2 . 9 , 7 0 . 3 ' D E C I D U I O U S T R E E 40 + 0 5 . 4 , 5 2 . 0 ' D E C I D U I O U S T R E E 40 + 0 7 . 5 , 7 3 . 3 ' D E C I D U I O U S T R E E 40 + 0 9 . 5 , 5 1 . 6 ' D E C I D U I O U S T R E E 40 + 1 8 . 7 , 2 7 . 5 ' H E A D W A L L 40 + 1 9 . 2 , 2 3 . 0 ' H E A D W A L L 40 + 1 9 . 3 , 2 7 . 5 ' H E A D W A L L 40 + 1 9 . 8 , 2 5 . 3 ' D R A I N A G E P I P E 40 + 1 9 . 8 , 2 3 . 1 ' H E A D W A L L 40 + 2 1 . 3 , 5 0 . 4 ' D E C I D U I O U S T R E E 40 + 2 1 . 9 , 3 6 . 6 ' D E C I D U I O U S T R E E 40 + 2 2 . 5 , 4 8 . 4 ' D E C I D U I O U S T R E E 40 + 2 2 . 8 , 5 1 . 9 ' D E C I D U I O U S T R E E 40 + 3 0 . 4 , 2 2 . 0 ' M A I L B O X 40 + 3 7 . 0 , 9 3 . 2 ' R / W M O N U M E N T 39 + 2 3 . 2 , 3 4 . 3 ' P O W E R P O L E 40 + 5 6 . 7 , 3 5 . 0 ' P O W E R P O L E 40 + 7 1 . 8 , 2 7 . 3 ' H E A D W A L L 40 + 7 1 . 8 , 2 6 . 7 ' H E A D W A L L 40 + 7 4 . 8 , 2 7 . 6 ' D R A I N A G E P I P E 40 + 7 7 . 7 , 2 7 . 1 ' H E A D W A L L 40 + 7 7 . 7 , 2 6 . 5 ' H E A D W A L L 41 + 4 5 . 0 , 3 2 . 6 ' B Z Z 0 2 B / T U B 41 + 4 6 . 9 , 3 3 . 7 ' T E L E P H O N E S P L I C E T U B 1" = 20' N.A.N.A. 16-ENG-41N.A. 10 N.A. N.A.38MHS/RDR JRE JRE NCK 1/10/20 P: \ 2 0 1 7 \ 1 7 0 0 5 3 1 1 1 t h & R a n g e l i n e R o u n d a b o u t \ E n g D e s i g n \ D r a w i n g s \ S h e e t s \ 1 7 0 0 5 3 P l a n & P r o f i l e . d w g PLAN LINE "PR-A" 503 WE S T F I E L D B L V D R POST FOR "WATCH FOR LEFT TURN" SIGN 184° 47.16' BOAT SPIKE 12" A.G.IN EAST FACE OF POWER POLE (NO #) 86° 46.24' MAG NAIL 15" A.G. IN EAST FACE OF POWER POLE (NO #) 356° 76.45' North: 136495.2000 East: 751828.7090 Sta. 42+10.08, 20.52' Lt. Line "A" MA T C H L I N E S T A . 9 + 0 0 RECOMMENDED FOR APPROVAL DESIGN ENGINEER DATE DESIGNED: CHECKED: DRAWN: CHECKED: SURVEY BOOK CONTRACT DESIGNATION SHEETS of PROJECT BRIDGE FILESCALE CLAY TOWNSHIP VERT. SCALE TBM 52: BOAT SPIKE SET IN EAST FACE OF POWER POLE (NO NUMBER) ± 12" ABOVE GRADE; ± 42 FEET WEST OF CENTERLINE OF RANGELINE ROAD & BETWEEN DRIVEWAYS FOR HOUSES #11160 & #11180 STA. 41+63.05 OFFSET 24.02 Lt. ELEVATION - 806.80' NAVD 88 750 760 770 780 790 800 810 820 830 840 750 760 770 780 790 800 810 820 830 840 315 Lft. of 36" Pipe @ 0.88% Req'd. Exist. Ground 9+00 10+00 11+00 12+00 80 7 . 9 80 7 . 7 80 7 . 6 80 7 . 4 80 7 . 1 80 7 . 1 80 6 . 9 80 6 . 8 80 6 . 7 STR. No. 103 Existing 12" Sanitary Sewer Inv.: 801.00 Ex. 24" RCP Upstream (Lt.) Inv: 801.07 Downstream (Rt.) Inv: 800.32 STR. NO. 23+45 Profile of Ditch @ Outlet 21 Lft. of 12" Pipe @ 0.34% Req'd. 1" = 20' 1" = 5'N.A. 16-ENG-41N.A. 11 N.A. N.A.38MHS/RDR JRE JRE NCK 1/10/20 P: \ 2 0 1 7 \ 1 7 0 0 5 3 1 1 1 t h & R a n g e l i n e R o u n d a b o u t \ E n g D e s i g n \ D r a w i n g s \ S h e e t s \ 1 7 0 0 5 3 P l a n & P r o f i l e . d w g PROFILE LINE "PR-A" RECOMMENDED FOR APPROVAL DESIGN ENGINEER DATE DESIGNED: CHECKED: DRAWN: CHECKED: SURVEY BOOK CONTRACT DESIGNATION SHEETS of PROJECT BRIDGE FILESCALE CLAY TOWNSHIP VERT. SCALE RELEASE STRUCTURE NO. 23 DETAIL Scale: 1" = 1' Mod. Manhole Type J 34" x 1.5" Rectangular Orifice Invert: 801.00' Rim Elev: 805.62 Outlet Pipe Outlet PipeInlet Pipe 34" x 1.5" Rectangular Orifice Invert: 801.00' Concrete or Steel Plate Wall Top of Wall Elev: 804.37' Casting Type 2 SECTION A-A Plan View Concrete or Steel Plate Wall Top of Wall Elev: 804.37' A A Intlet Pipe Invert: 801.00' Outlet Pipe Invert: 801.00' Inlet Pipe Type 4 Casting Opening 501 S T FO FOHH (CONCRETE) (ASPHALT ) MN T (CONCRETE) (MULCH) (GRASS) (MULCH) (CONCRETE) (MULCH) W(CONCRETE)W (CONCRETE) (CONCRETE) (GRASS) I Begin Construction Sta. 51+10.50 "PR-B" CURVE DATA P.I. = 52+19.26 "PR-B" Delta = 14°27'05" R = 203.00 ft T = 25.74 ft L = 51.20 ft E = 1.63 ft CURVE DATA P.I. = 52+67.65 "PR-B" Delta = 8°04'09" R = 325.00 ft T = 22.92 ft L = 45.77 ft E = 0.81 ft LINE "PR-B" LINE "B" S88°06'22"E N85°30'42"E S88°27'06"E LINE "B"111TH STREET P.I. = 52+19.26 "PR-B" LINE "PR-B" WOODLAND COUNTRY CLUB, INC. GEODDE, STEVEN R. & KATHRYN E. WENZEL, HUBERT & ROBERTA L. MEDLER, ERNEST L. & D. LOUISE GRATZ, PATRICIA M. & THERESA L. GEODDE, STEVEN R. & KATHRYN E. NE P L Ex. R/W NE P L NE P L Ex . R / W Ex . R / W Ex . R / W Ex. R / W Ex . R / W R/W R/ W R/W R/W R/W R / W R/W R/W R/W R/W +77, Residential Drive W=19' L=23' O'MAHONEY, NEIL P. EQ: PI = Sta. 53+46.07 "PR-B" POT = Sta. 6+61.68 "PR-A" P.I. = 52+67.65 "PR-B" STR. NO. 25+50, 21' LT. STR. NO. 30+42, 28' LT. STR. NO. 12+90 "PR-A", 29' RT. STR. NO. 13+89 "PR-A", 30' LT. STR. NO. 16+92 "PR-A", 43' LT. STR. NO. 31+04, 42' LT. STR. NO. 18+31 "PR-A", 29' RT. STR. NO. 10+85 "PR-A" STR. NO. 11+85 "PR-A" STR. NO. 29+42 STR. NO. 28+42 STR. NO. 22+41 "PR-A" STR. NO. 17+29 "PR-A" P.C. = 51+93.52 "PR-B" P.T. = 52+90.50 "PR-B" P.R.C. = 52+44.73 "PR-B" +13.00 "B" 35.0' +05.00 "B" 35.0' +05.00 "B" Ex. R/W +05.00 "B" 30.0' +05.00 "B" Ex. R/W +47.00 "B" 30.0' +47.00 "B" 35.0' +88.00 "B" 40.0' +55.00 "A" Ex. R/W +65.00 "A" Ex. R/W +60.00 "A" Ex. R/W +75.00 "A" Ex. R/W +33.00 "A" 60.0' +60.00 "A" 50.0' +50.00 "A" 70.0' +65.00 "A" 40.0' +55.00 "A" 45.0' SEC. 1, T18N, R3E CLAY TOWNSHIP HAMILTON COUNTY SEC. 6, T18N, R4E CLAY TOWNSHIP HAMILTON COUNTY Const r . L i m i t s +59.00 "B" 30.0' +59.00 "B" 50.0' +94.00 "B" 50.0' +94.00 "B" 30.0' LI N E " P R - A " LI N E " A " LI N E " P R - A " N0 0 ° 3 2 ' 2 2 " E N0 2 ° 4 9 ' 3 8 " W N1 5 ° 5 0 ' 4 5 " E Co n s t r . L i m i t s Constr. Limits Temp. R/W +70 "PR-A" STR. NO. 100 +54 STR. NO. 102 STR. NO. 14+90 "PR-A" STR. NO. 19+34 "PR-A" STR. NO. 20+36 "PR-A" STR. NO. 26+36 STR. NO. 27+37 STR. NO. 24+50, 20' RT. STR. NO. 15+91 "PR-A" STR. NO. 21+38 "PR-A" P.O.C. Sta. 0+00.00 "PR-EOP-CENTER" = P.O.C. Sta. 2+29.34 "PR-EOP-CENTER", 0.00' SEC. 1, T18N, R3E CLAY TOWNSHIP HAMILTON COUNTY DO NOT DISTURB TREES 15 0 + 0 3 . 7 , 4 8 . 5 ' W O O D S / B R U S H L I N E 15 0 + 0 6 . 5 , 2 3 . 8 ' R O W O F T R E E S C O N I F E R O U S 15 0 + 0 6 . 9 , 3 1 . 6 ' A N C H O R F O R G U Y C A B L E 15 0 + 0 7 . 0 , 5 0 . 8 ' P O W E R P O L E 15 0 + 0 7 . 4 , 2 8 . 7 ' A N C H O R F O R G U Y C A B L E 15 0 + 0 7 . 7 , 7 2 . 7 ' W O O D S / B R U S H L I N E 15 0 + 0 8 . 5 , 4 5 . 6 ' W O O D S / B R U S H L I N E 15 0 + 0 9 . 6 , 2 5 . 4 ' W O O D F E N C E 15 0 + 2 9 . 2 , 1 2 . 1 ' M A I L B O X 15 0 + 6 5 . 5 , 2 5 . 5 ' W O O D F E N C E 15 0 + 7 9 . 6 , 2 8 . 5 ' W O O D S / B R U S H L I N E 15 0 + 8 4 . 8 , 1 2 . 7 ' M A I L B O X 15 0 + 8 5 . 1 , 4 7 . 1 ' W O O D S / B R U S H L I N E 15 0 + 8 5 . 5 , 4 4 . 7 ' D E C I D U I O U S T R E E 15 0 + 8 6 . 7 , 6 9 . 5 ' W O O D S / B R U S H L I N E 15 1 + 0 5 . 3 , 2 5 . 0 ' G A T E 15 1 + 1 5 . 6 , 2 5 . 0 ' W O O D F E N C E 15 1 + 2 0 . 2 , 4 8 . 1 ' D E C I D U I O U S T R E E 15 1 + 3 9 . 2 , 3 2 . 2 ' C O N I F E R I O U S T R E E 15 1 + 5 1 . 6 , 2 3 . 8 ' D E C I D U I O U S T R E E 15 1 + 5 6 . 7 , 2 6 . 8 ' D E C I D U I O U S T R E E 15 1 + 6 1 . 4 , 2 5 . 6 ' W O O D F E N C E 15 1 + 6 2 . 6 , 3 5 . 2 ' D E C I D U I O U S T R E E 15 1 + 6 5 . 8 , 7 3 . 2 ' W O O D S / B R U S H L I N E 15 1 + 7 4 . 7 , 4 6 . 3 ' W O O D S / B R U S H L I N E 15 1 + 7 8 . 2 , 3 0 . 5 ' D E C I D U I O U S T R E E 15 1 + 8 5 . 6 , 2 5 . 1 ' W O O D F E N C E 15 1 + 8 9 . 0 , 1 2 . 2 ' M A I L B O X 15 2 + 1 3 . 6 , 2 5 . 4 ' W O O D F E N C E 15 2 + 4 8 . 9 , 2 7 . 1 ' W O O D F E N C E 15 2 + 6 1 . 8 , 1 4 . 4 ' S I N G L E P O S T S I G N S P E E D L I M I T 3 5 15 2 + 7 8 . 8 , 2 5 . 5 ' W O O D F E N C E 15 2 + 7 9 . 3 , 4 9 . 0 ' W O O D S / B R U S H L I N E 15 2 + 7 9 . 9 , 2 5 . 4 ' R / W M O N U M E N T 15 2 + 9 5 . 2 , 7 4 . 3 ' W O O D S / B R U S H L I N E 15 3 + 0 8 . 2 , 4 4 . 4 ' W A T E R S H U T O F F V A L U E 15 3 + 0 9 . 6 , 4 2 . 6 ' F I R E H Y D R A N T 15 3 + 2 2 . 6 , 6 6 . 4 ' W O O D F E N C E 15 3 + 2 4 . 3 , 3 1 . 6 ' D R O P I N L E T 15 3 + 2 9 . 1 , 7 7 . 4 ' R / W M O N U M E N T 15 3 + 3 3 . 4 , 7 0 . 8 ' W A T E R S H U T O F F V A L U E 15 3 + 3 6 . 7 , 3 7 . 1 ' S I N G L E P O S T S I G N W E S T F I E L D 1 1 1 T H 50 + 0 0 51 + 0 0 52 + 0 0 53 + 0 0 15 0 + 0 4 . 7 , 7 2 . 5 ' H E D G E 15 0 + 0 5 . 1 , 7 8 . 1 ' H E D G E 15 0 + 0 8 . 9 , 2 3 . 5 ' P O W E R P O L E 15 0 + 1 2 . 0 , 7 3 . 7 ' B U S H 15 0 + 1 7 . 8 , 7 4 . 8 ' B U S H 15 0 + 1 8 . 4 , 2 5 . 0 ' D E C I D U I O U S T R E E 15 0 + 2 2 . 2 , 6 3 . 7 ' W E L L 15 0 + 2 2 . 5 , 7 4 . 5 ' B U S H 15 0 + 2 6 . 3 , 7 1 . 7 ' B U I L D I N G 15 0 + 2 6 . 3 , 7 9 . 6 ' B U I L D I N G 15 0 + 4 9 . 1 , 7 1 . 7 ' B U I L D I N G 15 0 + 7 0 . 3 , 4 8 . 0 ' D E C I D U I O U S T R E E 15 0 + 8 1 . 5 , 7 1 . 9 ' B U I L D I N G 15 0 + 8 1 . 7 , 6 2 . 8 ' W E L L 15 1 + 1 4 . 1 , 3 2 . 4 ' B U S H 15 1 + 2 4 . 7 , 4 7 . 7 ' D E C I D U I O U S T R E E 15 1 + 4 0 . 4 , 2 3 . 7 ' P O W E R P O L E 15 1 + 4 8 . 7 , 7 0 . 2 ' B U S H 15 1 + 5 5 . 4 , 5 9 . 0 ' D E C I D U I O U S T R E E 15 1 + 9 7 . 1 , 5 0 . 6 ' D E C I D U I O U S T R E E 15 2 + 1 3 . 4 , 7 2 . 3 ' B U I L D I N G 15 2 + 2 2 . 2 , 4 1 . 5 ' T R E E S T U M P 15 2 + 3 6 . 8 , 6 6 . 5 ' B U S H 15 2 + 4 2 . 7 , 6 6 . 3 ' B U S H 15 2 + 4 9 . 0 , 4 2 . 1 ' T R E E S T U M P 15 2 + 5 7 . 3 , 6 6 . 5 ' B U S H 15 2 + 6 3 . 4 , 6 7 . 4 ' B U S H 15 2 + 6 7 . 1 , 2 1 . 8 ' P O W E R P O L E 15 2 + 6 8 . 0 , 3 2 . 5 ' T R E E S T U M P 15 2 + 7 6 . 4 , 3 5 . 0 ' T R E E S T U M P 15 2 + 7 8 . 2 , 7 2 . 4 ' B U I L D I N G 15 2 + 9 4 . 7 , 2 2 . 0 ' A N C H O R F O R G U Y C A B L E 15 2 + 9 8 . 9 , 6 5 . 9 ' C O N I F E R I O U S T R E E 1:20 N.A.N.A. 16-ENG-41N.A. 12 N.A. N.A.38MHS/RDR JRE JRE NCK 1/10/20 P: \ 2 0 1 7 \ 1 7 0 0 5 3 1 1 1 t h & R a n g e l i n e R o u n d a b o u t \ E n g D e s i g n \ D r a w i n g s \ S h e e t s \ 1 7 0 0 5 3 P l a n & P r o f i l e . d w g PLAN LINE "PR-B" 502 111th STREETR BOAT SPIKE 6" A.G. IN SOUTH FACE OF POWER POLE #190438 247° 15.07' MAG NAIL 6" A.G. IN EAST FACE OF POWER POLE #190438 193° 34.63' NE CORNER OF MAILBOX POST (11105) 327° 35.08' EC H O C R E S T DR I V E E A S T MB North: 135923.2310 East: 751342.3790 Sta. 148+58.53, 18.08' Lt. Line "B" 501 WE S T F I E L D B L V D 111th STREET R MAG NAIL 12" A.G. IN WEST FACE OF POWER POLE (NO #) 215°84.31' MAG NAIL 6" A.G. IN NE FACEOF POWER POLE #057273 169° 30.21' MAG NAIL W/HCSO WASHER IN EAST FACE OF 4"x4" FENCE POST 317°87.09' North: 135931.2300 East: 751868.8420 Sta. 36+46.51, 24.93' Rt. Line "A" 5000 WE S T F I E L D B L V D 111th STREET MAG NAIL 12" A.G. IN WEST FACE OF POWER POLE (NO #) 69.65 MAG NAIL 6" A.G. IN NE FACE OF POWER POLE #057273 40.65' MAG NAIL W/ HCSO WASHER 12" A.G.IN EAST FACE OF 4"x4" FENCE POST 75.75' Sta. 36+42.81, 0.00' Rt. Line "A" North: 135927.7613 East: 751843.8834 RECOMMENDED FOR APPROVAL DESIGN ENGINEER DATE DESIGNED: CHECKED: DRAWN: CHECKED: SURVEY BOOK CONTRACT DESIGNATION SHEETS of PROJECT BRIDGE FILESCALE CLAY TOWNSHIP VERT. SCALE TBM 51: BOAT SPIKE SET IN SOUTH FACE OF POWERPOLE #060303 ± 6" ABOVE GRADE; ± 20 FEET SOUTH OF CENTERLINE OF 11TH STREET, ± 105 FEET EAST OF CENTERLINE OF ECHOCREST EAST DRIVE. STA. 148+44.80 OFFSET 24.29 Rt. ELEVATION = 816.33' NAVD 88 750 760 770 780 790 800 810 820 830 840 750 760 770 780 790 800 810 820 830 840 81 5 . 8 81 5 . 5 81 5 . 0 81 4 . 6 81 4 . 1 81 3 . 8 81 3 . 6 4 81 3 . 6 81 2 . 8 8 81 3 . 3 81 1 . 7 1 81 3 . 0 81 0 . 4 1 81 2 . 4 80 9 . 6 1 81 1 . 5 80 9 . 4 8 81 0 . 6 80 9 . 7 3 80 9 . 8 80 9 . 4 49+75 50+00 51+00 52+00 53+00 54+00 55+00 55+75 -2.01% -5.33% +1.00% PVI Sta. 52+22.00 EL. = 809.20' VC = 60.00' PVI Sta. 51+47.00 EL. = 813.20' VC = 50.00' PVI Sta. 52+85.00 EL. = 809.83' VC = 17.00' -2.01% -5.33% +1.00% +0.47% PVI Sta. 52+22.00 EL. = 809.20' VC = 60.00' PVI Sta. 51+47.00 EL. = 813.20' VC = 50.00' PVI Sta. 52+85.00 EL. = 809.83' VC = 17.00' STR. NO. 25+50 83 Lft. of 12" Pipe @ 2 . 7 3 % R e q ' d . STR. NO. 30+42 63 Lft. of 15" Pipe @ 0.36% Req'd. STR. NO. 31+04 Inv.: 805.82Inv.: 806.06 Inv.: 808.40 Inv.: 806.06 Begin Construction Sta. 51+10.50 "PR-B" El. = 813.93 Exist. Ground Proposed Grade Sta. 52+93.57 El. = 809.870 ROUNDABOUT SEE SPOT ELEVATIONS Existing 8" Sanitary Sewer STR. No. 102 1" = 20' 1" = 5'N.A. 16-ENG-41N.A. 13 N.A. N.A.38MHS/RDR JRE JRE NCK 1/10/20 P: \ 2 0 1 7 \ 1 7 0 0 5 3 1 1 1 t h & R a n g e l i n e R o u n d a b o u t \ E n g D e s i g n \ D r a w i n g s \ S h e e t s \ 1 7 0 0 5 3 P l a n & P r o f i l e . d w g PROFILE LINE "PR-B" RECOMMENDED FOR APPROVAL DESIGN ENGINEER DATE DESIGNED: CHECKED: DRAWN: CHECKED: SURVEY BOOK CONTRACT DESIGNATION SHEETS of PROJECT BRIDGE FILESCALE CLAY TOWNSHIP VERT. SCALE S S TFO FO HH T T W TT W GM WESTFIELD BLVD 3+ 0 0 4+ 0 0 5+ 0 0 6+ 0 0 7+ 0 0 8+ 0 0 9+ 0 0 P.I. = 6+61.68 "PR-A" P.C. = 5+20.94 "PR-A" P.C. = 7+06.07 "PR-A" P.T. = 6+19.14 "PR-A" P.T. = 7+62.15 "PR-A" P.R.C. = 5+62.90 "PR-A" 51+00 52+00 53+00 CURVE DATA P.I. = 52+19.26 "PR-B" Delta = 14°27'05" R = 203.00 ft T = 25.74 ft L = 51.20 ft E = 1.63 ft S8 8 ° 0 6 ' 2 2 " E N8 5 ° 3 0 ' 4 2 " E N00°09'38"W N02°49'38"W N15°50' 4 5 " E CURVE DATA P.I. = 5+42.00 "PR-A" Delta = 11°52'24" R = 202.50 ft T = 21.06 ft L = 41.96 ft E = 1.09 ft CURVE DATA P.I. = 5+91.09 "PR-A" Delta = 9°12'24" R = 350.00 ft T = 28.18 ft L = 56.24 ft E = 1.13 ft LINE "PR-A" LI N E " P R - B " WESTFIELD BLVD 1 1 0 ° 2 0 ' 2 " 161°19'38" 88° 2 0 ' 2 0 " N00°09'38"W WOODLAND COUNTRY CLUB, INC. GEODDE, STEVEN R. & KATHRYN E. GRATZ, PATRICIA M. & THERESA L. O'MAHONEY, NEIL P. OBURN, G. WILLIAM & FRANCIE LEE WOODLEE, JEFFREY & BONITA L. GROSECLOSE, KRISTAN C. GEODDE, STEVEN R. & KATHRYN E. WOODLAND COUNTRY CLUB, INC. NE P L NE P L NEPL NE P L NE P L NEPL Ex . R / W Ex. R/W Ex. R/W Ex. R/W Ex. R/W Ex. R/W NEPL Easement Easement R/ W R / W R/W R/W R/ W R/ W R/ W Begin Project Sta. 3+50.00 "PR-A" K 26 F1 K 1826 13 26 F 15 26 13 26 F115 A 13 15 27K K End Project Sta. 8+95.00 "PR-A" +96, Residential Drive L=8', W=13' +58, Residential Drive L=8', W=12' +77, Residential Drive L=23', W=19' 12 ' 12 ' 16 ' 12 ' 12 ' +1 3 . 0 +8 1 . 0 +60.0 +65.00 "A" Ex. R/W +65.00 "A" 40.0' +50.00 "A" 70.0' +60.00 "A" 50.0' +60.00 "A" Ex. R/W +75.00 "A" Ex. R/W +55.00 "A" Ex. R/W +55.00 "A" 45.0' +33.00 "A" 60.0' +13.00 "B" 35.0' +05.00 "B" 35.0' +05.00 "B" Ex. R/W +05.00 "B" Ex. R/W +05.00 "B" 30.0' +47.00 "B" 30.0' +47.00 "B" 35.0' +88.00 "B" 40.0' LINE "A" LINE "A"N00°05'22"E N00°32'22"E S8 8 ° 2 7 ' 0 6 " E 26 27 27 27 27 27 27 +94.00 "B" 50.0'+94.00 "B" 30.0' +59.00 "B" 50.0' +59.00 "B" 30.0' Te m p R / W LI N E " B " Co n s t r . L i m i t s Co n s t r . L i m i t s Co n s t r . L i m i t s Cons t r . L i m i t s C o n s t r . L i m i t s Constr. Limits Constr. Limits Constr. Limits Constr. Limits LI N E " P R - B " LI N E " B " 26 CR CR CR CR CR CR STR. NO. 25+50 "PR-B", 21' LT. 83' of 12" RCPInlet E-7 & STR. NO. 24+50 "PR-B", 20' RT. 39' of 12" RCP 24" Pipe Catch Basin & STR. NO. 30+42 "PR-B", 28' LT. 63' of 15" RCP Manhole C-4 & STR. NO. 12+90, 29' RT. 126' of 24" RCPManhole C-4 & STR. NO. 13+89, 30' LT. 112' of 12" RCPManhole C-4 & STR. NO. 16+92, 43' LT. 10' of 12" RCP 24" Pipe Catch Basin & STR. NO. 18+31, 29' RT. 315' of 36" RCPMod. Manhole J-4 & STR. NO. 10+85 5' of 12" RCP Inlet J-10 & STR. NO. 11+85 5' of 12" RCP Inlet J-10 & STR. NO. 29+42 "PR-B" 8' of 12" RCP Inlet M-10 Mod. w/ Oil-Debris Hood & 2.5' Sump & STR. NO. 28+42 "PR-B" 34' of 12" RCP Inlet M-10 & STR. NO. 22+41 5' of 12" RCP Inlet J-10 & STR. NO. 17+29 3' of 15" RCP Inlet M-10 Mod. w/ Oil-Debris Hood & 2.5' Sump & 8' 8 ' 1 0 ' 6' +70 STR. NO. 100 Remove Existing Inlet & Pipe D D D STR. NO. 27+37 "PR-B" 5' of 12" RCP Inlet J-10 & STR. NO. 20+36 47' of 15" RCP Inlet M-10 & STR. NO. 19+34 5' of 12" RCP Inlet J-10 & 22 22 STR. NO. 15+91 3' of 12" RCP Inlet M-10 Mod. w/ Oil-Debris Hood & 2.5' Sump & C 13 C13 22 13 C Sta. 51+90.19' LT. "PR-B" New Mailbox Assembly Req'd. STR. NO. 26+36 "PR-B" 5' of 12" RCP Inlet J-10 & STR. NO. 14+90 3' of 12" RCP Inlet M-10 Mod. w/ Oil-Debris Hood & 2.5' Sump & +4 6 . 5 +8 1 . 0 +0 7 . 0 +62.0 +91.0 STR. NO. 21+38 2' of 15" RCPMahole C-4 & SEC. 6, T18N, R4E CLAY TOWNSHIP HAMILTON COUNTY SEC. 1, T18N, R3E CLAY TOWNSHIP HAMILTON COUNTY SEC. 1, T18N, R3E CLAY TOWNSHIP HAMILTON COUNTY SEC. 6, T18N, R4E CLAY TOWNSHIP HAMILTON COUNTY CURVE DATA P.I. = 52+19.26 "PR-B" Delta = 14°27'05" R = 203.00 ft T = 25.74 ft L = 51.20 ft E = 1.63 ft P.I. = 52+19.26 "PR-B" P.O.C. = 0+00.00 "PR-EOP-CENTER" = P.O.C. = 2+29.34 "PR-EOP-CENTER", 0.00' STR. NO. 31+04, 42' LT. 54' LT. 49' of 15" RCPManhole C-4 & Begin Construction Sta. 51+10.50 "PR-B" P.I. = 7+34.29 "PR-A" P.C. = 51+93.52 "PR-B" P.T. = 52+90.50 "PR-B" P.R.C. = 52+44.73 "PR-B" P.I. = 52+67.65 "PR-B" P.I. = 5+42.00 "PR-A" P.I. = 5+91.09 "PR-A" DO NOT DISTURB TREES RECOMMENDED FOR APPROVAL DESIGN ENGINEER DATE DESIGNED: CHECKED: DRAWN: CHECKED: SURVEY BOOK CONTRACT DESIGNATION SHEETS of PROJECT BRIDGE FILESCALE CLAY TOWNSHIP VERT. SCALE 1" = 20' N.A.N.A. 16-ENG-41N.A. 14 N.A. N.A.38MHS/RDR JRE JRE NCK 1/10/20 P: \ 2 0 1 7 \ 1 7 0 0 5 3 1 1 1 t h & R a n g e l i n e R o u n d a b o u t \ E n g D e s i g n \ D r a w i n g s \ S h e e t s \ 1 7 0 0 5 3 C o n s t r D e t a i l . d w g CONSTRUCTION DETAIL LINE "PR-A" 11 1 T H S T R E E T F LEGEND TRUCK APRON SPLITTER ISLAND RESIDENTIAL DRIVE 6" PCCP ON 6" COMPACTED AGGREGATE NO. 53 (SEE CARMEL STD. DWG. 10-21A) 4" SIDEWALK, CONCRETE HMA FOR SIDEWALK FULL DEPTH PAVEMENT BARRIER AT TRUCK APRON CURB & GUTTER, CONCRETE, TYPE II ROLL CURB FOR TRUCK APRON CONCRETE CURB END TREATMENT (SEE CARMEL STD. DWG. NO. 10-38) NURSERY SODDING SEEDING MIXTURE, U CURB RAMP F1 K 15 18 26 27 D 13 A NOTES 1.See Sheet 16 for splitter island details 2.See Sheet ## for curb ramp details 3.Lines PR-A & PR-B are to be constructed 4.All Right-Of-Way is described by Line A, unless otherwise noted 5.Structures are referenced from lines "PR-A" & "PR-B" 6.See Sheet 2 for Legend item descriptions 10' 8' CR C 22 501 S T FO FOHH MN T T WW R I WE S T F I E L D B L V D Begin Construction Sta. 51+10.50 "PR-B" CURVE DATA P.I. = 52+67.65 "PR-B" Delta = 8°04'09" R = 325.00 ft T = 22.92 ft L = 45.77 ft E = 0.81 ft S88°06'22"E N85°30'42"E CURVE DATA P.I. = 7+34.29 "PR-A" Delta = 16°04'00" R = 200.00 ft T = 28.23 ft L = 56.08 ft E = 1.98 ft P.I. = 5+42.00 "PR-A" P.I. = 7+34.29 "PR-A" P.I. = 52+19.26 "PR-B" P.I. = 52+67.65 "PR-B" LINE "PR-B" CURVE DATA P.I. = 52+19.26 "PR-B" Delta = 14°27'05" R = 203.00 ft T = 25.74 ft L = 51.20 ft E = 1.63 ft 110°2 0 ' 2 " 16 1 ° 1 9 ' 3 8 " 88°20'20" GEODDE, STEVEN R. & KATHRYN E. WENZEL, HUBERT & ROBERTA L. MEDLER, ERNEST L. & D. LOUISE OBURN, G. WILLIAM & FRANCIE LEE GR O S E C L O S E , NEPLNEPL NEPL NEPL NE P L Ex. R/W Ex . R / W Ex . R / W Ex . R / W Ex . R / W NE P L NE P L Ea s e m e n t Easement Ea s e m e n t NE P L Ex. R/W 50 + 0 0 51 + 0 0 52 + 0 0 53 + 0 0 5+00 6+00 7+00 R/W R/W R / W R/W R/W R/W R/W 16' K 27 26 27 K 18 26 13 F 27 15 26 13 26 F1 A 13 15 K 27 26 F1 27 27 15 26 P.I. = 36+42.81 "A" = P.O.T. = 153+59.73 "B" +65.00 "A" Ex. R/W +65.00 "A" 40.0' +50.00 "A" 70.0' +60.00 "A" 50.0' +60.00 "A" Ex. R/W +75.00 "A" Ex. R/W +33.00 "A" 60.0' +13.00 "B" 35.0' +05.00 "B" 35.0' +05.00 "B" Ex. R/W +05.00 "B" Ex. R/W +05.00 "B" 30.0' +47.00 "B" 30.0'+47.00 "B" 35.0' +88.00 "B" 40.0' +55.00 "A" 45.0' +55.00 "A" Ex. R/W S88°27'06"E P.C. = 51+93.52 "PR-B" P.T. = 52+90.50 "PR-B" P.R.C. = 52+44.73 "PR-B" +94.00 "B" 30.0' +94.00 "B" 50.0' +59.00 "B" 50.0' +59.00 "B" 30.0' 13 Temp R/W LINE "B" Constr. Limits Constr. Limits Constr. Limits C o n s t r . L i m i t s Const r . L i m i t s Co n s t r . L i m i t s Co n s t r . L i m i t s Co n s t r . L i m i t s LINE "PR-B" LINE "B" 26 CRCR CR CR CRCR STR. NO. 25+50, 21' LT. 83' of 12" RCP Inlet E-7 & STR. NO. 24+50, 20' RT. 39' of 12" RCP 24" Pipe Catch Basin & STR. NO. 30+42, 28' LT. 63' of 15" RCP Manhole C-4 & STR. NO. 12+90 "PR-A", 29' RT. 126' of 24" RCP Manhole C-4 & STR. NO. 13+89 "PR-A", 30' LT. 112' of 12" RCPManhole C-4 & STR. NO. 18+31 "PR-A", 29' RT. 315' of 36" RCP Mod. Manhole J-4 & STR. NO. 10+85 "PR-A" 5' of 12" RCP Inlet J-10 & STR. NO. 11+85 "PR-A" 5' of 12" RCP Inlet J-10 & STR. NO. 29+42 8' of 12" RCP Inlet M-10 Mod. w/ Oil-Debris Hood & 2.5' Sump & STR. NO. 28+42 34' of 12" RCP Inlet M-10 & STR. NO. 22+41 "PR-A" 5' of 12" RCPInlet J-10 & STR. NO. 17+29 "PR-A" 3' of 15" RCP Inlet M-10 Mod. w/ Oil-Debris Hood & 2.5' Sump & STR. NO. 31+04, 42' LT. 49' of 15" RCP Manhole C-4 & 8' 8' 10' 6' +70 STR. NO. 100 Remove Existing Inlet & Pipe D D STR. NO. 26+36 5' of 12" RCP Inlet J-10 & 22 C 13 13 22 C 22 C 13 Sta. 51+90, 19' LT. New Mailbox Assembly Req'd. STR. NO. 14+90 "PR-A" 3' of 12" RCP Inlet M-10 Mod. w/ Oil-Debris Hood & 2.5' Sump & STR. NO. 16+92 "PR-A", 43' LT. 10' of 12" RCP 24" Pipe Catch Basin & STR. NO. 27+37 5' of 12" RCP Inlet J-10 & STR. NO. 20+36 47' of 15" RCP Inlet M-10 & STR. NO. 19+34 "PR-A" 5' of 12" RCP Inlet J-10 & STR. NO. 15+91 "PR-A" 3' of 12" RCP Inlet M-10 Mod. w/ Oil-Debris Hood & 2.5' Sump & +13.0 +81.0 P.I. = 5+91.09 "PR-A" +81.0 +07.0 +6 2 . 0 +9 1 . 0 +6 0 . 0 CURVE DATA P.I. = 5+91.09 "PR-A" Delta = 9°12'24" R = 350.00 ft T = 28.18 ft L = 56.24 ft E = 1.13 ft I C D = 1 0 5 ' STR. NO. 21+38 "PR-A" 2' of 15" RCP Mahole C-4 & P.O.C. = 0+00.00 "PR-EOP-CENTER" = P.O.C. = 2+29.34 "PR-EOP-CENTER", 0.00' SEC. 1, T18N, R3E CLAY TOWNSHIP HAMILTON COUNTY P.I. = 6+61.68 "PR-A" P.C. = 5+20.94 "PR-A" P.C. = 7+06.07 "PR-A" P.T. = 6+19.14 "PR-A" P.T. = 7+62.15 "PR-A" P.R.C. = 5+62.90 "PR-A" DO NOT DISTURB TREES 111TH STREET RECOMMENDED FOR APPROVAL DESIGN ENGINEER DATE DESIGNED: CHECKED: DRAWN: CHECKED: SURVEY BOOK CONTRACT DESIGNATION SHEETS of PROJECT BRIDGE FILESCALE CLAY TOWNSHIP VERT. SCALE 1" = 20' N.A.N.A. 16-ENG-41N.A. 15 N.A. N.A.38MHS/RDR JRE JRE NCK 1/10/20 P: \ 2 0 1 7 \ 1 7 0 0 5 3 1 1 1 t h & R a n g e l i n e R o u n d a b o u t \ E n g D e s i g n \ D r a w i n g s \ S h e e t s \ 1 7 0 0 5 3 C o n s t r D e t a i l . d w g CONSTRUCTION DETAIL LINE "PR-B" +96, Residential Drive L=8', W=13' +77, Residential Drive L=23', W=19' F LEGEND TRUCK APRON SPLITTER ISLAND RESIDENTIAL DRIVE 6" PCCP ON 6" COMPACTED AGGREGATE NO. 53 (SEE CARMEL STD. DWG. 10-21A) 4" SIDEWALK, CONCRETE HMA FOR SIDEWALK FULL DEPTH PAVEMENT BARRIER AT TRUCK APRON CURB & GUTTER, CONCRETE, TYPE II ROLL CURB FOR TRUCK APRON CONCRETE CURB END TREATMENT (SEE CARMEL STD. DWG. NO. 10-38) NURSERY SODDING SEEDING MIXTURE, U CURB RAMP F1 K 15 18 26 27 D 13 A NOTES 1.See Sheet 16 for splitter island details 2.See Sheet ## for curb ramp details 3.Lines PR-A & PR-B are to be constructed 4.All Right-Of-Way is described by Line A, unless otherwise noted 5.Structures are referenced from lines "PR-A" & "PR-B" 6.See Sheet 2 for Legend item descriptions CR C 22 C201 C202 C203 C204 C205 C206 P.O.C. = 10+00.00 "PR-A-1" O.P.O.C. = 35+24.02 "A" 1.710 RT. N = 135808.9689 E = 751845.4086 P.R.C. = 10+37.09 "PR-A-1" P.R.C. = 10+84.18 "PR-A-1" P.R.C. = 10+86.31 "PR-A-1"P.R.C. = 11+02.35 "PR-A-1" P.R.C. = 11+08.36 "PR-A-1" P.O.C. = 11+89.05 "PR-A-1" O.P.O.C. = 35+24.01 "A" 3.941 LT. N = 135808.9689 E = 751840.5038 L i n e " P R - A - 1 " P.O.C. = 10+00.00 "PR-A-2" O.P.O.C. = 37+56.91 "A" 1.885 LT. N = 136041.8354 E = 751846.8421 P.O.C. = 11+12.19 "PR-A-2" O.P.O.C. = 37+56.95 "A" 5.877 RT. N = 136041.8354 E = 751850.8341 P.R.C. = 10+43.95 "PR-A-2" P.R.C. = 10+46.03 "PR-A-2"P.R.C. = 10+63.05 "PR-A-2" P.R.C. = 10+69.39 "PR-A-2" C207 C208 C209 C210 C211 Li n e " P R - A - 2 " P.O.C. = 10+00.00 "PR-B-1" O.P.O.C. = 152+01.92 "B" 4.270 RT. N = 135927.7571 E = 751686.0146 1 1 + 0 0 12+00 P.O.C. = 12+01.78 "PR-B-1" O.P.O.C. = 152+01.78 "B" 0.272 LT. N = 135931.7570 E = 751685.9828 C212 C213 C214 C215 C216 C217 P.R.C. = 10+43.15 "PR-B-1"P.R.C. = 10+90.74 "PR-B-1" P.R.C. = 10+92.87 "PR-B-1" P.R.C. = 11+08.46 "PR-B-1" P.R.C. = 11+14.47 "PR-B-1" Line "P R - B - 1 " ALIGNMENT DATA (LINE PR-B-1) Number C212 C213 C214 C215 C216 C217 Point POC PRC PRC PRC PRC POC Begin Station 10+00.00 10+43.15 10+90.74 10+92.87 11+08.46 11+14.47 End Station 10+43.15 10+90.74 10+92.87 11+08.46 11+14.47 12+01.78 Length 43.153 47.590 2.131 15.583 6.009 87.312 Radius 205.000 101.000 1.000 52.500 3.000 201.000 Line/Chord Direction N83° 30' 47.16"E S89° 01' 07.71"E N43° 26' 36.14"E N09° 05' 24.04"W N57° 57' 57.48"W S77° 05' 57.56"W ALIGNMENT DATA (LINE PR-A-2) Number C207 C208 C209 C210 C211 Point POC PRC PRC PRC POC Begin Station 10+00.00 10+43.95 10+46.03 10+63.05 10+69.39 End Station 10+43.95 10+46.03 10+63.05 10+69.39 11+12.19 Length 43.947 2.083 17.015 6.345 42.796 Radius 91.000 1.000 52.500 3.004 401.000 Line/Chord Direction S18° 22' 13.83"W S28° 46' 34.40"E S79° 10' 08.85"E N49° 36' 01.62"E N05° 01' 17.45"W ALIGNMENT DATA (LINE PR-A-1) Number C201 C202 C203 C204 C205 C206 Point POC PRC PRC PRC PRC POC Begin Station 10+00.00 10+37.09 10+84.18 10+86.31 11+02.35 11+08.36 End Station 10+37.09 10+84.18 10+86.31 11+02.35 11+08.36 11+89.05 Length 37.090 47.091 2.129 16.040 6.014 80.684 Radius 205.120 101.000 1.000 52.500 3.000 201.000 Line/Chord Direction N06° 30' 42.03"W N01° 39' 44.04"E N45° 58' 04.37"W S81° 47' 51.78"W S33° 07' 03.76"W S12° 48' 55.36"E AS SHOWN N.A.N.A. 16-ENG-41N.A. 16 N.A. N.A.38MHS/RDR JRE JRE NCK 1/10/20 P: \ 2 0 1 7 \ 1 7 0 0 5 3 1 1 1 t h & R a n g e l i n e R o u n d a b o u t \ E n g D e s i g n \ D r a w i n g s \ S h e e t s \ 1 7 0 0 5 3 G e o m e t r i c P l a n . d w g SPLITTER ISLAND DETAILS RECOMMENDED FOR APPROVAL DESIGN ENGINEER DATE DESIGNED: CHECKED: DRAWN: CHECKED: SURVEY BOOK CONTRACT DESIGNATION SHEETS of PROJECT BRIDGE FILESCALE CLAY TOWNSHIP VERT. SCALE SOUTH SPLITTER ISLAND SCALE: 1"=10' NORTH SPLITTER ISLAND SCALE: 1"=10' WEST SPLITTER ISLAND SCALE: 1"=10' P.R.C. = 52+44.73 "PR-B" L i n e "P R -B " R/W Ex. R/W Ex. R/W Cons t . L i m i t Const. Limi t R/W 7 . 2 8 % 8 . 0 1 ' 1 . 5 0 % 1 0 . 0 1 ' 1.1 5 % 1 0 .0 1 ' 1 . 5 0 % 1 0 . 0 0 ' 7 . 3 6 % 8 . 0 0 ' 1 .1 0 % 1 0 .0 0' 1 .1 6 % 1 0 .0 0 ' 1 . 3 3 % 1 . 5 0 ' 0. 2 5 % 3. 9 3 ' 1.88% 10.12' 0. 4 2 % 4. 8 2 ' 1 . 5 0 % 3 . 3 5 ' 1.7 0 % 1 0 .0 2' 6. 4 7 % 9. 1 5 ' 1. 5 0 % 6. 0 0 ' 1.45% 9.80' 1. 4 3 % 6. 0 0 ' 6. 0 8 % 10 . 0 0 ' 1.30% 10.02' 1.46% 10.01' 809.10 809.69 809.78 809.92 809.84 809.23 809.17 809.75 809.90 810.02 809.87 809.53 809.55 809.54 809.73 809.75 809.70 809.27 809.32 +55.21 18.05' +52.05 37.78' +52.62 17.04' +47.00 33.40' 809.14 809.61 6' 809.86 6' 809.28 6' 6' 809.58 809.84 809.21 P.T. = 7+62.15 "PR-A" Line "PR-A" 808.35 808.31 +55.17 17.43' +63.10 36.32' 808.29+52.04 16.55' +54.95 36.29' 808.25 R/W Ex . R / W Co n s t . L i m i t Const. Limit Co n s t . L i m i t Ex . R / W 7.32 % 8.06' 1.50 % 10.09 ' 0.43% 10.03' 1.50 % 10.00 ' 7.35 % 8.00' 0.40% 10.02' 0.61 % 3.26' 0.35% 2.82' 0.30% 10.02' 1.04% 4.81'0.88 % 4.56' 0.30% 10.08' 7.46% 8.00' 1.50% 10.00' 0.50% 10.00' 1.50% 10.00'7.33% 8.00' 0.40% 10.00' 0.50% 10.00' 0.42% 10.03' 808.31 808.90 809.01 808.86 808.77 TC 808.27 BC 808.50 808.48 808.47 808.44 808.25 808.85 808.95 808.80 809.00 809.05 808.49 808.53 6' 6' 6' 808.70 808.81 808.21 808.86 P.R.C. = 5+62.90 "PR-A" L i n e " P R - A " +70.91 33.54' +62.63 43.63' 809.33 +73.11 21.76' 809.35 +71.17 19.34' 809.45 R/W Ex . R / W Ex . R / W C o n s t . L i m i t Const. Lim i t 7.49% 6.01' 1.50% 6.01' 0 . 4 0 % 1 0 . 0 0 ' 1.50% 6.00' 8.00% 6.00' 0 . 7 0 % 1 0 . 0 0 ' 0 . 4 0 % 1 0 . 0 0' 0.45% 4.49' 0.53% 5.64' 1.69% 10.07' 0.71% 4.26'1.11% 2.69' 1 . 6 0 % 1 0 . 0 3 ' 0.71% 10.02' 3.23% 15.46' 1.50% 10.07' 0.70% 9.97' 1.50% 10.00' 4.33% 15.46' 1.00% 10.02' 809.29 809.74 809.83 809.79 809.70 809.72 TC 809.22 BC 809.41 809.91 810.06 810.13809.98 809.81 TC 809.31 BC 809.53 809.58 809.75 809.72 809.69 809.26 809.81809.90 1 . 7 8 % 6 . 1 9' 1 . 8 3 % 6 . 0 0' 1.50% 6.00' 809.55 809.99 6' 6 ' 809.89 AS SHOWN N.A.N.A. 16-ENG-41N.A. 17 N.A. N.A.38MHS/RDR JRE JRE NCK 1/10/20 P: \ 2 0 1 7 \ 1 7 0 0 5 3 1 1 1 t h & R a n g e l i n e R o u n d a b o u t \ E n g D e s i g n \ D r a w i n g s \ S h e e t s \ 1 7 0 0 5 3 C u r b R a m p D e t a i l s . d w g CURB RAMP DETAILS LINES "PR-A" & "PR-B" NORTH APPROACH Scale: 1" = 5' SOUTH APPROACH Scale: 1" = 5' WEST APPROACH Scale: 1" = 5' CURB RAMP LEGEND: 827.28 2.00% 4.48' 827.64 DETECTABLE WARNING SURFACE PROPOSED SPOT ELEVATION EXISTING SPOT ELEVATION PROPOSED SLOPE & DISTANCE RECOMMENDED FOR APPROVAL DESIGN ENGINEER DATE DESIGNED: CHECKED: DRAWN: CHECKED: SURVEY BOOK CONTRACT DESIGNATION SHEETS of PROJECT BRIDGE FILESCALE CLAY TOWNSHIP VERT. SCALE 203 4+ 0 0 5+ 0 0 6+ 0 0 7+ 0 0 8+ 0 0 9+ 0 0 11 1 T H S T R E E T WESTFIELD BLVD LI N E " P R - B " 51+00 52+00 53+00 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 2324 25 26 27 28 29 3031 32 33 34 35 36 3738 39 40 41 42 43 44 45 46 47 48 49 50 EOP Spot Elevations Location 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 Alignment PR-A PR-A PR-A PR-A PR-A PR-A PR-A PR-A PR-A PR-A PR-A PR-A PR-A PR-A PR-A PR-A PR-A PR-A PR-A PR-A PR-A PR-A PR-A PR-A PR-A PR-A PR-B PR-B PR-B Station 5+24.02 5+39.66 5+53.77 5+71.84 5+82.55 5+92.91 6+03.83 6+14.71 6+28.13 6+42.25 6+75.22 6+90.23 7+04.00 7+14.82 7+24.60 7+32.85 7+42.66 7+52.51 7+61.23 7+80.65 7+80.72 7+62.73 7+53.45 7+44.00 7+33.28 7+19.72 53+31.47 53+19.33 53+05.55 Offset 15.50 Rt. 15.39 Rt. 15.32 Rt. 17.43 Rt. 19.87 Rt. 22.98 Rt. 27.09 Rt. 32.08 Rt. 40.38 Rt. 48.77 Rt. 50.72 Rt. 44.06 Rt. 35.76 Rt. 29.29 Rt. 24.53 Rt. 21.36 Rt. 18.48 Rt. 16.48 Rt. 15.41 Rt. 14.44 Rt. 14.44 Lt. 15.98 Lt. 17.80 Lt. 20.08 Lt. 22.74 Lt. 27.94 Lt. 54.63 Lt. 45.18 Lt. 36.68 Lt. Elevation 810.26 809.93 809.68 809.44 809.35 809.26 809.15 809.02 808.81 808.60 808.44 808.35 808.29 808.25 808.22 808.22 808.24 808.30 808.37 808.52 808.52 808.40 808.34 808.31 808.35 808.51 808.74 809.16 809.43 EOP Spot Elevations Location 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 49 50 51 52 53 Alignment PR-B PR-B PR-B PR-B PR-B PR-B PR-B PR-B PR-B PR-B PR-B PR-B PR-B PR-B PR-A PR-A PR-A PR-A PR-A PR-A PR-A PR-A PR-A PR-A Station 52+93.34 52+82.40 52+73.82 52+64.97 52+55.12 52+41.38 52+23.87 52+01.14 52+01.85 52+24.54 52+40.90 52+52.69 52+62.95 52+74.06 6+33.55 6+27.50 6+17.91 6+07.93 5+97.75 5+82.76 5+73.10 5+57.87 5+41.05 5+22.97 Offset 30.28 Lt. 25.26 Lt. 22.18 Lt. 19.80 Lt. 18.03 Lt. 17.00 Lt. 16.30 Lt. 15.25 Lt. 15.00 Rt. 15.01 Rt. 15.26 Rt. 17.06 Rt. 19.36 Rt. 22.62 Rt. 60.63 Lt. 48.53 Lt. 37.85 Lt. 31.19 Lt. 26.53 Lt. 21.70 Lt. 19.73 Lt. 18.27 Lt. 17.16 Lt. 15.87 Lt. Elevation 809.52 809.51 809.43 809.32 809.21 809.11 809.29 810.03 810.04 809.30 809.11 809.14 809.27 809.46 809.63 809.83 809.83 809.64 809.40 809.26 809.33 809.62 809.94 810.27 201 Roundabout Spot Elevations Location 201 202 203 204 205 206 207 208 209 210 211 212 213 214 215 216 217 218 219 220 Alignment PR-A PR-A PR-A PR-A PR-A PR-A PR-A PR-A PR-A PR-A PR-A PR-A PR-A PR-A PR-A PR-A PR-A PR-A PR-A PR-A Station 6+26.31 6+30.82 6+38.35 6+48.17 6+71.09 6+81.53 6+90.02 6+95.74 6+98.13 6+96.94 6+92.31 6+84.68 6+74.79 6+63.62 6+61.68 6+52.68 6+42.19 6+33.61 6+27.77 6+25.26 Offset 9.00 Rt. 19.49 Rt. 28.07 Rt. 33.91 Rt. 35.26 Rt. 30.63 Rt. 23.00 Rt. 13.11 Rt. 1.94 Rt. 9.42 Lt. 19.85 Lt. 28.35 Lt. 34.06 Lt. 36.45 Lt. 36.50 Lt. 35.37 Lt. 30.86 Lt. 23.33 Lt. 13.51 Lt. 2.37 Lt. Elevation 809.72 809.42 809.14 808.92 808.76 808.67 808.65 808.69 808.79 808.96 809.20 809.49 809.78 810.00 810.16 810.24 810.27 810.23 810.12 809.95 202 204 205 206 207 208 209 210 211 212 213 214 215 216 217 218 219 220 251 252 253 254 255 256 257 258 Roundabout Spot Elevations Location 251 252 253 254 255 256 257 258 259 260 261 262 263 264 265 266 267 268 269 270 Alignment PR-A PR-A PR-A PR-A PR-A PR-A PR-A PR-A PR-A PR-A PR-A PR-A PR-A PR-A PR-A PR-A PR-A PR-A PR-A PR-A Station 6+10.48 6+17.13 6+28.10 6+42.25 6+75.22 6+90.75 7+02.45 7+10.28 7+13.99 7+12.86 7+05.74 6+94.76 6+80.54 6+64.47 6+61.68 6+48.73 6+33.65 6+21.30 6+13.24 6+09.39 Offset 12.84 Rt. 28.03 Rt. 40.41 Rt. 48.77 Rt. 50.72 Rt. 44.26 Rt. 33.07 Rt. 18.91 Rt. 2.95 Rt. 13.43 Lt. 28.55 Lt. 40.77 Lt. 49.00 Lt. 52.43 Lt. 52.50 Lt. 50.88 Lt. 44.39 Lt. 33.55 Lt. 19.49 Lt. 3.55 Lt. Elevation 809.40 809.10 808.81 808.60 808.44 808.34 808.33 808.37 808.47 808.64 808.88 809.16 809.46 809.68 809.84 809.92 809.95 809.91 809.80 809.63 259 260 261 262 263264 265266 267 P.I. = 6+61.68 "PR-A" P.C. = 5+20.94 "PR-A" P.C. = 7+06.07 "PR-A" P.T. = 6+19.14 "PR-A" P.T. = 7+62.15 "PR-A" P.R.C. = 5+62.90 "PR-A" P.O.T. = 53+46.07 "PR-B" P.C. = 51+93.52 "PR-B" P.T. = 52+90.50 "PR-B" P.R.C. = 52+44.73 "PR-B" P.I. = 5+91.09 "PR-A" P.I. = 52+67.65 "PR-B" P.I. = 5+42.00 "PR-A" P.I. = 7+34.29 "PR-A" P.I. = 52+19.26 "PR-B" LINE "PR-A" 515253 268 269 270 STR. NO. 24 Rim Elev.=811.87 STR. NO. 25 Rim Elev.=811.90 STR. NO. 30 Rim Elev.=811.56 STR. NO. 31 Rim Elev.=809.92 STR. NO. 14 Rim Elev.=809.27 STR. NO. 13 Rim Elev.=809.82 STR. NO. 12 Rim Elev.=809.79 STR. NO. 16 Rim Elev.=809.46 STR. NO. 27 Rim Elev.=809.11 STR. NO. 15Rim Elev.=809.25 STR. NO. 26Rim Elev.=809.11 STR. NO. 18Rim Elev.=808.73 STR. NO. 10 Rim Elev.=809.24 STR. NO. 20 Rim Elev.=808.31 STR. NO. 19 Rim Elev.=808.20 STR. NO. 28 Rim Elev.=809.09 STR. NO. 11Rim Elev.=809.31 STR. NO. 29 Rim Elev.=809.08 STR. NO. 17 Rim Elev.=808.19 STR. NO. 22 Rim Elev.=808.29 O.P.O.T. Sta. 2+29.34 "PR-EOP-CENTER" = O.P.O.T. Sta. 2+29.34 "PR-EOP-CENTER", 0.00' LINE "PR-A" STR. NO. 21 Rim Elev.=808.84 RECOMMENDED FOR APPROVAL DESIGN ENGINEER DATE DESIGNED: CHECKED: DRAWN: CHECKED: SURVEY BOOK CONTRACT DESIGNATION SHEETS of PROJECT BRIDGE FILESCALE CLAY TOWNSHIP VERT. SCALE 1" = 20' N.A.N.A. 16-ENG-41N.A. 18 N.A. N.A.38MHS/RDR JRE JRE NCK 1/10/20 P: \ 2 0 1 7 \ 1 7 0 0 5 3 1 1 1 t h & R a n g e l i n e R o u n d a b o u t \ E n g D e s i g n \ D r a w i n g s \ S h e e t s \ 1 7 0 0 5 3 S p o t E l e v a t i o n D e t a i l s . d w g SPOT ELEVATIONS LINE "PR-A" & "PR-B" 4+ 0 0 5+ 0 0 6+ 0 0 7+ 0 0 8+ 0 0 9+ 0 0 11 1 T H S T R E E T WESTFIELD BLVD LI N E " P R - B " 51+00 52+00 53+00 101 102 103 104 105 106 107 108 109 110111 112113 114115116 161 162163 164 165 166 167 168 169 170 171 121 122 123 124 125 126 127 128 129 130 131 132 133 134 135 Island 1 Spot Elevations Location 101 102 103 104 105 106 107 108 109 110 111 112 113 114 115 116 Alignment PR-A PR-A PR-A PR-A PR-A PR-A PR-A PR-A PR-A PR-A PR-A PR-A PR-A PR-A PR-A PR-A Station 5+23.98 5+39.59 5+53.73 5+74.75 5+86.78 5+98.50 6+07.41 6+08.76 6+07.63 6+07.75 6+03.87 5+86.62 5+75.56 5+58.96 5+42.15 5+24.06 Offset 2.48 Rt. 2.40 Rt. 2.32 Rt. 3.14 Rt. 4.98 Rt. 7.77 Rt. 10.58 Rt. 9.42 Rt. 1.49 Rt. 6.52 Lt. 9.64 Lt. 4.93 Lt. 3.27 Lt. 2.57 Lt. 2.50 Lt. 2.42 Lt. Elevation 810.52 810.19 809.92 809.66 809.67 809.62 809.42 809.44 810.05 809.63 809.60 809.53 809.62 810.02 810.25 810.54 Island 3 Spot Elevations Location 161 162 163 164 165 166 167 168 169 170 171 172 Alignment PR-A PR-A PR-A PR-A PR-A PR-A PR-A PR-A PR-A PR-A PR-A PR-A Station 7+60.16 7+49.88 7+39.40 7+27.71 7+16.05 7+15.75 7+15.40 7+19.40 7+28.61 7+39.55 7+50.51 7+60.18 Offset 2.02 Lt. 3.07 Lt. 4.78 Lt. 7.45 Lt. 10.89 Lt. 1.31 Lt. 7.18 Rt. 10.33 Rt. 7.19 Rt. 4.46 Rt. 2.72 Rt. 1.97 Rt. Elevation 808.57 808.50 808.47 808.52 808.58 808.58 808.43 808.38 808.38 808.43 808.48 808.57 Island 2 Spot Elevations Location 121 122 123 124 125 126 127 128 129 130 131 132 133 134 135 155 156 Alignment PR-B PR-B PR-B PR-B PR-B PR-B PR-B PR-B PR-B PR-B PR-B PR-B PR-B PR-B PR-B PR-A PR-A Station 52+01.85 52+24.54 52+42.04 52+55.66 52+67.25 52+79.97 52+91.58 52+93.25 52+92.05 52+92.01 52+88.02 52+78.30 52+68.24 52+57.06 52+42.00 6+55.06 6+54.78 Offset 2.00 Rt. 2.00 Rt. 2.00 Rt. 2.43 Rt. 3.76 Rt. 6.28 Rt. 9.57 Rt. 8.54 Rt. 0.85 Rt. 6.94 Lt. 9.95 Lt. 6.66 Lt. 4.28 Lt. 2.62 Lt. 2.00 Lt. 121.22 Lt. 143.68 Lt. Elevation 810.28 809.57 809.41 809.54 809.73 809.71 810.00 809.89 809.86 809.79 809.72 810.00 809.68 809.52 809.46 810.00 810.32 P.I. = 6+61.68 "PR-A" P.C. = 5+20.94 "PR-A" P.C. = 7+06.07 "PR-A" P.T. = 6+19.14 "PR-A" P.T. = 7+62.15 "PR-A" P.R.C. = 5+62.90 "PR-A" P.O.T. = 53+46.07 "PR-B" P.C. = 51+93.52 "PR-B" P.T. = 52+90.50 "PR-B" P.R.C. = 52+44.73 "PR-B" P.I. = 5+91.09 "PR-A" P.I. = 52+67.65 "PR-B" P.I. = 5+42.00 "PR-A" P.I. = 7+34.29 "PR-A" P.I. = 52+19.26 "PR-B" Island #1 Island #2 Island #3 LINE "PR-A" 155 156 172 STR. NO. 24 Rim Elev.=811.87 STR. NO. 25 Rim Elev.=811.90 STR. NO. 30 Rim Elev.=811.56 STR. NO. 31 Rim Elev.=809.92 STR. NO. 14 Rim Elev.=809.27 STR. NO. 13 Rim Elev.=809.82 STR. NO. 12 Rim Elev.=809.79 STR. NO. 16 Rim Elev.=809.46 STR. NO. 27 Rim Elev.=809.11 STR. NO. 15Rim Elev.=809.25 STR. NO. 26Rim Elev.=809.11 STR. NO. 18Rim Elev.=808.73 STR. NO. 10 Rim Elev.=809.24 STR. NO. 20 Rim Elev.=808.31 STR. NO. 19 Rim Elev.=808.20 STR. NO. 28 Rim Elev.=809.09 STR. NO. 11Rim Elev.=809.31 STR. NO. 29 Rim Elev.=809.08 STR. NO. 17 Rim Elev.=808.19 STR. NO. 22 Rim Elev.=808.29 O.P.O.T. Sta. 2+29.34 "PR-EOP-CENTER" = O.P.O.T. Sta. 2+29.34 "PR-EOP-CENTER", 0.00' LINE "PR-A" STR. NO. 21 Rim Elev.=808.84 RECOMMENDED FOR APPROVAL DESIGN ENGINEER DATE DESIGNED: CHECKED: DRAWN: CHECKED: SURVEY BOOK CONTRACT DESIGNATION SHEETS of PROJECT BRIDGE FILESCALE CLAY TOWNSHIP VERT. SCALE 1" = 20' N.A.N.A. 16-ENG-41N.A. 19 N.A. N.A.38MHS/RDR JRE JRE NCK 1/10/20 P: \ 2 0 1 7 \ 1 7 0 0 5 3 1 1 1 t h & R a n g e l i n e R o u n d a b o u t \ E n g D e s i g n \ D r a w i n g s \ S h e e t s \ 1 7 0 0 5 3 S p o t E l e v a t i o n D e t a i l s . d w g SPOT ELEVATIONS LINE "PR-A" & "PR-B" 6 1 6 1 S S TFO FO HH T T W TT W 11 1 T H S T R E E T WESTFIELD BLVD 3+ 0 0 4+ 0 0 5+ 0 0 6+ 0 0 7+ 0 0 8+ 0 0 9+ 0 0 51+00 52+00 53+00 Begin Construction Sta. 51+10.50 "PR-B" LINE "PR-A" LI N E " P R - B " P.C. = 51+93.52 "PR-B" P.T. = 52+90.50 "PR-B" P.R.C. = 52+44.73 "PR-B" P.I. = 6+61.68 "PR-A" P.C. = 5+20.94 "PR-A" P.C. = 7+06.07 "PR-A" P.T. = 6+19.14 "PR-A" P.T. = 7+62.15 "PR-A" P.R.C. = 5+62.90 "PR-A"End Project Sta. 8+95.00 "PR-A" WOODLAND COUNTRY CLUB, INC. GEODDE, STEVEN R. & KATHRYN E. GRATZ, PATRICIA M. & THERESA L. O'MAHONEY, NEIL P. OBURN, G. WILLIAM & FRANCIE LEE WOODLEE, JEFFREY & BONITA L. GROSECLOSE, KRISTAN C. GEODDE, STEVEN R. & KATHRYN E.TH E E L I Z A B E T H G . C A P A S S O RE V O C A B L E T R U S T NE P L NE P L NE P L NE P L NEPL NEPL Ex . R / W Ex. R/WEx. R/W Ex. R/W Ex. R/W Ex . R / W Easement Easement TH E E L I Z A B E T H G . C A P A S S O RE V O C A B L E T R U S T WOODLAND COUNTRY CLUB, INC. WESTFIELD BLVD 810 806 807 808 808 80 8 808808 809 8 1 1 8 1 2 8 1 3 8 1 4 8 1 2 8 1 1 809 809 809 8 0 9 813 8 1 2 811 81 1 81 1 811 812 813 814 813 8 1 1 81 1 8 1 2 810 81 0 8 1 0 8 1 0 810 810 81 4 LINE "A" LI N E " B " LI N E " B " LINE "A" 81 3 812812 811 810 8 1 2 8 1 1 810 809 808 809 81 1 81 2 81 3 R/W R/W R/ W R/ W R/ W R/ W R / W R/ W R/WR/W STR. NO. 12+90 STR. NO. 13+89 STR. NO. 16+92 STR. NO. 31+04 STR. NO. 18+30 STR. NO. 10+85 STR. NO. 11+85 STR. NO. 22+41 STR. NO. 17+29 STR. NO. 30+42 STR. NO. 25+50 STR. NO. 24+50 STR. NO. 28+42 STR. NO. 29+42 Constr. Limits Constr. Limits Constr. Limits Con s t r . L i m i t s C o n s t r . L i m i t s Co n s t r . L i m i t s Co n s t r . L i m i t s Constr. Li m i t s LI N E " P R - B " Begin Project Sta. 3+50.00 "PR-A" P.I. = 36+42.81 "A" +4 8 +9 7 +5 2 +6 4 +9 0 +0 2 +4 2 +87 +10 STR. NO. 27+37 STR. NO. 26+36 STR. NO. 15+91 STR. NO. 19+34 STR. NO. 20+36 STR. NO. 14+90 P.O.C. = 2+29.34 "PR-EOP-CENTER" = P.O.C. = 2+29.34 "PR-EOP-CENTER", 0.00' LINE "PR-A" STR. NO. 21+38 DO NOT DISTURB TREES RECOMMENDED FOR APPROVAL DESIGN ENGINEER DATE DESIGNED: CHECKED: DRAWN: CHECKED: SURVEY BOOK CONTRACT DESIGNATION SHEETS of PROJECT BRIDGE FILESCALE CLAY TOWNSHIP VERT. SCALE 1" = 20' N.A.N.A. 16-ENG-41N.A. 20 N.A. N.A.38MHS/RDR JRE JRE NCK 1/10/20 P: \ 2 0 1 7 \ 1 7 0 0 5 3 1 1 1 t h & R a n g e l i n e R o u n d a b o u t \ E n g D e s i g n \ D r a w i n g s \ S h e e t s \ 1 7 0 0 5 3 E r o s i o n C o n t r o l . d w g EROSION CONTROL PLAN LEGEND Inlet Protection Silt Fence MA T C H L I N E S T A . 9 + 0 0 S MN P.I. = 10+55.13 "PR-A" Ex. R/W Ex. R/W 805 802803804 8 1 3 STR. NO. 23+44.6 801 800 799 807 80 5 804 80380280 1 808807 806805804813 810 806 814 812 807 808 806 806 809 LINE "A" LINE "PR-A" RECOMMENDED FOR APPROVAL DESIGN ENGINEER DATE DESIGNED: CHECKED: DRAWN: CHECKED: SURVEY BOOK CONTRACT DESIGNATION SHEETS of PROJECT BRIDGE FILESCALE CLAY TOWNSHIP VERT. SCALE N.A. N.A.N.A. 16-ENG-41N.A. 21 N.A. N.A.38MHS/RDR JRE JRE NCK 1/10/20 P: \ 2 0 1 7 \ 1 7 0 0 5 3 1 1 1 t h & R a n g e l i n e R o u n d a b o u t \ E n g D e s i g n \ D r a w i n g s \ S h e e t s \ 1 7 0 0 5 3 E r o s i o n C o n t r o l . d w g EROSION CONTROL DETAILS MA T C H L I N E S T A . 9 + 0 0 NOTES 1.THE CONTRACTOR SHALL INSTALL ALL TEMPORARY CULVERT PROTECTION SHOWN ON THE PLANS PRIOR TO ANY LAND DISTURBING ACTIVITIES. 2.CONTRACTOR SHALL SEED/MULCH BANKS OF PROPOSED DITCH AS SOON AS GRADE ESTABLISHED. 3.CONTRACTOR SHALL KEEP AN UP-TO-DATE RECORD ONSITE OF ANY ALTERATIONS TO THE STORM WATER POLLUTION PREVENTION PLAN. 4.CONTRACTOR SHALL NOTIFY THE HAMILTON COUNTY OIL AND WATER CONSERVATION DISTRICT AT LEAST 48 HOURS PRIOR TO BEGINNING OF CONSTRUCTION. 5.THE CONTRACTOR HAS FULL RESPONSIBILITY OF INSPECTING THE EROSION CONTROL MEASURES ON A DAILY BASIS. AT A MINIMUM, PRACTICES NEED TO BE INSPECTED WEEKLY, WITHIN 24 HOURS AFTER EACH STORM EVENT OVER 1/2" AND DAILY DURING PROLONGED STORM EVENTS. FAILING PRACTICES SHALL BE REPAIRED OR REPLACED IMMEDIATELY. 6.ANY SEDIMENT TRACKED OUT OF PROJECT AREA ONTO PUBLIC STREETS MUST BE CLEANED UP THE SAME DAY IT OCCURS. 7.CONTRACTOR SHALL SUBMIT CONSTRUCTION STAGING PLAN DETAILING ALL VEHICLE AND EQUIPMENT PARKING AREAS, FUELING LOCATIONS, CONSTRUCTION TRAILER PLACEMENT, AND DESIGNATED CONCRETE TRUCK WASHOUT AREAS. 8.IF CONSTRUCTION WINDOW EXTENDS THROUGH WINTER, TEMPORARY MULCHING AS SPECIFIED IN CHAPTER 7 OF THE INDIANA STORM WATER QUALITY MANUAL SHALL BE REQUIRED. 9.TEMPORARY SEEDING SHALL BE INSTALLED ON ANY CLEARED AREA THAT WILL BE UNDISTURBED FOR 15 DAYS OR MORE. 10.IT IS THE RESPONSIBILITY OF THE CONTRACTOR TO MAINTAIN AND CONTAIN CONCRETE WASHOUT AREAS AND STAGING AREAS. 11.CONTRACTOR IS REQUIRED TO PROVIDE A SPILL PREVENTION AND CONTAINMENT PLAN PRIOR TO BEGINNING CONSTRUCTION. 12.CONTRACTOR IS REQUIRED TO SUBMIT A CONSTRUCTION SEQUENCE PLAN TO HAMILTON COUNTY SOIL AND WATER CONSERVATION DISTRICT PRIOR TO ANY LAND DISTURBING ACTIVITIES. 11 1 T H S T R E E T WESTFIELD BLVD Begin Project Sta. 3+50.00 "PR-A" Begin Construction Sta. 51+10.50 "PR-B" LINE "PR-A" LI N E " P R - B " End Project Sta. 8+95.00 "PR-A" WESTFIELD BLVD Sta. 3+70 R2-1 (40) (24X30) Sta. 51+80 R2-1 (35) (24X30) Sta. 52+66 W11-2 (30X30) W16-7P(24X12) Sta. 52+70 EX. SPEED LIMIT SIGN (REMOVE) Sta. 6+92 EX. SIGN (111TH ST. & WESTFIELD BLVD.) (REMOVE) Sta. 7+61 W11-2 (30X30) W16-7P(24X12) Sta. 7+41 W11-2 (30X30) W16-7P(24X12) Sta. 7+53 R4-7 (24X30) Sta. 8+84 R2-1 (40) (24X30) Sta. 9+10 W2-6 (30X30) W16-8P (2) (30X8) W13-1P (15) (18X18) Sta. 7+18 D1-1d (1) (48X10) Sta. 52+90 D1-1d (2) (48X10) Sta. 5+52 EX. SIGN THE MONON CENTER (RELOCATE) Sta. 6+08 EX. SIGN UMC DIRECTION (RELOCATE) Sta. 6+05 R1-2 (36X36X36) Sta. 6+05 D1-1d (1) (48X10) Sta. 5+32 R4-7 (24X30) Sta. 3+70 W2-6 (30X30) W16-8P (2) (30X8) W13-1P (15) (18X18) Sta. 53+12 EX. STOP SIGN (REMOVE) Sta. 52+86 R1-2 (36X36X36) Sta. 52+48 W11-2 (30X30) W16-7P(24X12) Sta. 52+10 R4-7 (24X30) Sta. 51+10 W2-6 (30X30) W16-8P(1) (42X8) W13-1P (15) (18X18) Sta. 5+65 W11-2 (30X30) W16-7P(24X12) Sta. 5+84 W11-2 (30X30) W16-7P(24X12) Sta. 7+19 R1-2 (36X36X36) Sta. 6+29 EX. SIGN THE MONON CENTER (RELOCATE) Sta. 6+54 R6-1 (36x12) Sta. 6+76 R6-1 (36x12) Sta. 6+47 R6-1 (36x12) 3+ 0 0 4+ 0 0 5+ 0 0 6+ 0 0 7+ 0 0 8+ 0 0 9+ 0 0 51+00 52+00 53+00 40 35 40 15 M.P.H. 15 M.P.H. 15 M.P.H. ONE WAY ONE WAY ONE WAY 10 1020 LINE "PR-A" Sta. 6+78 MONON CENTER WAYFINDING SIGN (SEE SPECIAL PROVISIONS) Sta. 32+84 "LINE A" MONON CENTER WAYFINDING SIGN (SEE SPECIAL PROVISIONS) RECOMMENDED FOR APPROVAL DESIGN ENGINEER DATE DESIGNED: CHECKED: DRAWN: CHECKED: SURVEY BOOK CONTRACT DESIGNATION SHEETS of PROJECT BRIDGE FILESCALE CLAY TOWNSHIP VERT. SCALE 1" = 20' N.A.N.A. 16-ENG-41N.A. 22 N.A. N.A.38MHS/RDR JRE JRE NCK 1/10/20 P: \ 2 0 1 7 \ 1 7 0 0 5 3 1 1 1 t h & R a n g e l i n e R o u n d a b o u t \ E n g D e s i g n \ D r a w i n g s \ S h e e t s \ 1 7 0 0 5 3 S i g n i n g P l a n . d w g SIGN PLAN10 LEGEND SIGN, GROUND MOUNTED PRIVATE SIGN TO BE RELOCATED SIGN, GROUND MOUNTED, 2 POSTS EXISTING SHEET SIGN ON NEW SUPPORTS 20 Notes 1.ALL SIGNS AND SHEETING SHALL CONFORM TO THE LATEST EDITION OF INDIANA MUTCD STANDARDS AND SPECIFICATIONS UNLESS OTHERWISE NOTED. 2.ALL SIGN POSTS AND INSTALLATION SHALL CONFORM TO 2020 INDOT SPECIFICATIONS. 3.FOR DETAILS OF STREET NAME IDENTIFICATION SIGNS, REFER TO CITY OF CARMEL STANDARD DWG. NOS. 10-11A, 10-11B, AND 10-11C AND TECHNICAL SPECIFICATIONS. 4.ALL SIGN POSTS INSTALLED ON THIS PROJECT SHALL HAVE BLACK POWDER COATING. 5.THE MOUNTING HEIGHT FOR THIS SIGN (CODE R6-1) SHALL BE 4' FROM BOTTOM TO FINISHED GRADE. RECOMMENDED FOR APPROVAL DESIGN ENGINEER DATE DESIGNED: CHECKED: DRAWN: CHECKED: SURVEY BOOK CONTRACT DESIGNATION SHEETS of PROJECT BRIDGE FILESCALE CLAY TOWNSHIP VERT. SCALE AS SHOWN N.A.N.A. 16-ENG-41N.A. 23 N.A. N.A.38MHS/RDR JRE JRE NCK 1/10/20 P: \ 2 0 1 7 \ 1 7 0 0 5 3 1 1 1 t h & R a n g e l i n e R o u n d a b o u t \ E n g D e s i g n \ D r a w i n g s \ S h e e t s \ 1 7 0 0 5 3 S i g n i n g P l a n . d w g SIGN DETAILS D1-1d (1)D1-1d (2)W16-8p (1) W16-8p (2) 11 1 T H S T R E E T WESTFIELD BLVD Begin Project Sta. 3+50.00 "PR-A" End Project Sta. 8+95.00 "PR-A" Begin Construction Sta. 51+10.50 "PR-B" LINE "PR-A" LI N E " P R - B " 49 52 47 53 50 52 52 53 50 53 53 52 52 52 52 50 53 53 47 49 52 52 49 47 WESTFIELD BLVD 11.1'11.1' 57 57 57 2.5'2.5' +1 3 +8 2 +0 5 +62 +60 +8 1 +8 1 +88 +19 57 59 59 59 3+ 0 0 4+ 0 0 5+ 0 0 6+ 0 0 7+ 0 0 8+ 0 0 9+ 0 0 51+00 52+00 53+00 LINE "PR-A" 17.4' 15 . 6 ' 16. 1 ' RECOMMENDED FOR APPROVAL DESIGN ENGINEER DATE DESIGNED: CHECKED: DRAWN: CHECKED: SURVEY BOOK CONTRACT DESIGNATION SHEETS of PROJECT BRIDGE FILESCALE CLAY TOWNSHIP VERT. SCALE 1" = 20' N.A.N.A. 16-ENG-41N.A. 24 N.A. N.A.38MHS/RDR JRE JRE NCK 1/10/20 P: \ 2 0 1 7 \ 1 7 0 0 5 3 1 1 1 t h & R a n g e l i n e R o u n d a b o u t \ E n g D e s i g n \ D r a w i n g s \ S h e e t s \ 1 7 0 0 5 3 P a v e m e n t M a r k i n g . d w g PAVEMENT MARKING PLAN 12 ' 12 ' 11 . 7 ' 11 . 7 ' LEGEND CENTER CURB, TYPE D WITH 4 RPM'S, YELLOW (SEE CITY OF CARMEL STD. DWG. 10-38) LINE, THERMOPLASTIC, SOLID, WHITE, 4" LINE, THERMOPLASTIC, SOLID, WHITE, 6" 12 ' 12 ' 1 7 . 5 ' 16' 1 4 . 6 ' 12 ' 12.3'12' 2'1' 3' DETAIL "A" N.T.S. 12 ' 3' 3' 2. 5 ' 2. 5 ' 47 49 50 52 53 57 LINE, THERMOPLASTIC, SOLID, YELLOW, 4" TRANSVERSE MARKING, THERMOPLASTIC, WHITE, CROSSWALK LINE, 24" X 10' (24" SPACING) TRAVERSE MARKING, THERMOPLASTIC, YIELD LINE, WHITE, 36" "SHARK TEETH", SEE DETAIL 'A' THIS SHEET 59 LINE, THERMOPLASTIC, DOTTED, WHITE, 8" (24" LINE, 24" SPACING) TFO FO HH T W W 11 1 T H S T R E E T WESTFIELD BLVD 3+ 0 0 4+ 0 0 5+ 0 0 6+ 0 0 7+ 0 0 8+ 0 0 9+ 0 0 51+00 52+00 53+00 Begin Project Sta. 3+50.00 "PR-A" Begin Construction Sta. 51+10.50 "PR-B" End Project Sta. 8+95.00 "PR-A" WESTFIELD BLVD P.C. = 51+93.52 "PR-B" P.T. = 52+90.50 "PR-B" P.R.C. = 52+44.73 "PR-B" P.I. = 6+61.68 "PR-A" P.C. = 5+20.94 "PR-A" P.C. = 7+06.07 "PR-A" P.T. = 6+19.14 "PR-A" P.T. = 7+62.15 "PR-A" P.R.C. = 5+62.90 "PR-A" L4 L3 L2 L1 L5 L6 NE P L Exist R/W Exist R/W Exist R/W Exist R/W Exist R/WExist R/W E x i s t R / W Ex i s t R / W Exist R/WExist R/W R/W R/W R/ W R / W R/ W R/ W R/ W R/ W R/ W R/W Te m p R / W Constr. Limits Constr. Limits Constr. L i m i t s Constr. Limits Constr. Limits C o n s t r . L i m i t s Co n s t r . L i m i t s Co n s t r . L i m i t s Co n s t r . L i m i t s EP . / E X . R / W EP . / E X . R / W Co n s t r . L i m i t s LINE "PR-A" LI N E " P R - B " LINE "PR-A" +56.2 "PR-A" 27.0 Rt. +71.6 "PR-B" 30.2 Rt. +59.0 "PR-A" 19.3 Rt. +75.0 "PR-A" 20.4 Rt. +62.2 "PR-A"23.6 Lt. RECOMMENDED FOR APPROVAL DESIGN ENGINEER DATE DESIGNED: CHECKED: DRAWN: CHECKED: SURVEY BOOK CONTRACT DESIGNATION SHEETS of PROJECT BRIDGE FILESCALE CLAY TOWNSHIP VERT. SCALE 1" = 20' N.A.N.A. 16-ENG-41N.A. 25 N.A. N.A.38MHS/RDR JRE JRE NCK 1/10/20 P: \ 2 0 1 7 \ 1 7 0 0 5 3 1 1 1 t h & R a n g e l i n e R o u n d a b o u t \ E n g D e s i g n \ D r a w i n g s \ S h e e t s \ 1 7 0 0 5 3 L i g h t i n g P l a n . d w g LIGHTING PLAN L LEGEND PROPOSED LED LUMINARE ON NEW POLE AND FOUNDATION 4 1/C NO. 4 COPPER WIRE, IN PLASTIC DUCT, IN TRENCH 4 1/C NO. 4 COPPER WIRE, IN PLASTIC DUCT, IN 2" GALVANIZED STEEL CONDUIT PROPOSED 30' LIGHT POLE WITH 8' MAST ARM (SEE CARMEL STANDARD DWGS. ) PROPOSED TRAFFIC SIGNAL HANDHOLE PROPOSED SERVICE AND CONTROL CABINET ON NEW FOUNDATION (SEE CARMEL STANDARD DWGS.) Notes 1.The locations of underground and overhead utilities shown on this plan are based on survey, above ground evidence, and proposed utility relocation work plans. The contractor shall field verify all utility locations prior to any and all construction activities associated with this construction plan. Should the location of a proposed light pole foundation require moving due to a utility conflict, the contractor shall notify the engineer prior to any excavation. The new foundation location shall be approved by the engineer. 2.Foundations for lighting shall be in accordance with Carmel Standard Dwg. 10-43A. Foundation bolt pattern shall be oriented such that the light pole mast arm will be perpendicular to the curb. 3.Contractor shall exercise caution when working near overhead power lines. All applicable NESC and OSHA regulations be followed. RECOMMENDED FOR APPROVAL DESIGN ENGINEER DATE DESIGNED: CHECKED: DRAWN: CHECKED: SURVEY BOOK CONTRACT DESIGNATION SHEETS of PROJECT BRIDGE FILESCALE CLAY TOWNSHIP VERT. SCALE N.A. N.A.N.A. 16-ENG-41N.A. 26 N.A. N.A.38MHS/RDR JRE JRE NCK 1/10/20 P: \ 2 0 1 7 \ 1 7 0 0 5 3 1 1 1 t h & R a n g e l i n e R o u n d a b o u t \ E n g D e s i g n \ D r a w i n g s \ S h e e t s \ 1 7 0 0 5 3 M i s c T a b l e s . d w g MISCELLANEOUS TABLES RECOMMENDED FOR APPROVAL DESIGN ENGINEER DATE DESIGNED: CHECKED: DRAWN: CHECKED: SURVEY BOOK CONTRACT DESIGNATION SHEETS of PROJECT BRIDGE FILESCALE CLAY TOWNSHIP VERT. SCALE N.A. N.A.N.A. 16-ENG-41N.A. 27 N.A. N.A.38MHS/RDR JRE JRE NCK 1/10/20 P: \ 2 0 1 7 \ 1 7 0 0 5 3 1 1 1 t h & R a n g e l i n e R o u n d a b o u t \ E n g D e s i g n \ D r a w i n g s \ S h e e t s \ 1 7 0 0 5 3 M i s c T a b l e s . d w g UNDERDRAIN TABLE RECOMMENDED FOR APPROVAL DESIGN ENGINEER DATE DESIGNED: CHECKED: DRAWN: CHECKED: SURVEY BOOK CONTRACT DESIGNATION SHEETS of PROJECT BRIDGE FILESCALE CLAY TOWNSHIP VERT. SCALE N.A. N.A.N.A. 16-ENG-41N.A. 28 N.A. N.A.38MHS/RDR JRE JRE NCK 1/10/20 P: \ 2 0 1 7 \ 1 7 0 0 5 3 1 1 1 t h & R a n g e l i n e R o u n d a b o u t \ E n g D e s i g n \ D r a w i n g s \ S h e e t s \ 1 7 0 0 5 3 M i s c T a b l e s . d w g STRUCTURE DATA TABLE RECOMMENDED FOR APPROVAL DESIGN ENGINEER DATE DESIGNED: CHECKED: DRAWN: CHECKED: SURVEY BOOK CONTRACT DESIGNATION SHEETS of PROJECT BRIDGE FILESCALE CLAY TOWNSHIP VERT. SCALE N.A. N.A.N.A. 16-ENG-41N.A. 29 N.A. N.A.38MHS/RDR JRE JRE NCK 1/10/20 P: \ 2 0 1 7 \ 1 7 0 0 5 3 1 1 1 t h & R a n g e l i n e R o u n d a b o u t \ E n g D e s i g n \ D r a w i n g s \ S h e e t s \ 1 7 0 0 5 3 M i s c T a b l e s . d w g SIGN TABLE Notes 1.All sign posts shall have Black Powder Coating, refer to City of Carmel Standard Drawings Numbers 10-11A, 10-11B, 10-11C. 2.The Mounting Height for Sign Code R6-1 shall be 4' from bottom of sign to finished grade of adjacent roadway, refer to City of Carmel Standard Drawings Number 10-25B. 3.The Mounting Height for all other standard Sign Codes shall be 7' from bottom of top sign to finished grade of adjacent roadway, refer to INDOT Standard Drawings 802-SNGS-07 thru 802-SNGS-10. *See City of Carmel Standard Drawing 10-11A 3+58.00 805 810 815 820 825 805 810 815 820 825 3+50.00 805 810 815 820 825 805 810 815 820 825 4+00.00 805 810 815 820 825 805 810 815 820 825 -70 -60 -50 -40 -30 -20 -10 0 10 20 30 40 50 60 70 -70 -60 -50 -40 -30 -20 -10 0 10 20 30 40 50 60 70 -70 -60 -50 -40 -30 -20 -10 0 10 20 30 40 50 60 70 Residential Drive Req'd. LT 8' 0.11% Ex RW Ex RW Ex RW Ex RW Ex RW Ex RW RECOMMENDED FOR APPROVAL DESIGN ENGINEER DATE DESIGNED: CHECKED: DRAWN: CHECKED: SURVEY BOOK CONTRACT DESIGNATION SHEETS of PROJECT BRIDGE FILESCALE CLAY TOWNSHIP VERT. SCALE 1" = 5' 1" = 5'N.A. 16-ENG-41N.A. 30 N.A. N.A.38MHS/RDR JRE JRE NCK 1/10/20 P: \ 2 0 1 7 \ 1 7 0 0 5 3 1 1 1 t h & R a n g e l i n e R o u n d a b o u t \ E n g D e s i g n \ D r a w i n g s \ S h e e t s \ 1 7 0 0 5 3 X S e c t i o n s . d w g CROSS SECTIONS LINE "PR-A" 4+96.00 800 805 810 815 820 800 805 810 815 820 4+50.00 805 810 815 820 825 805 810 815 820 825 5+00.00 800 805 810 815 820 800 805 810 815 820 -70 -60 -50 -40 -30 -20 -10 0 10 20 30 40 50 60 70 -70 -60 -50 -40 -30 -20 -10 0 10 20 30 40 50 60 70 -70 -60 -50 -40 -30 -20 -10 0 10 20 30 40 50 60 70 Residential Drive Req'd. LT 0.42% Ex RW Ex RW Ex RW Ex RW Ex RW Ex RW 8' RECOMMENDED FOR APPROVAL DESIGN ENGINEER DATE DESIGNED: CHECKED: DRAWN: CHECKED: SURVEY BOOK CONTRACT DESIGNATION SHEETS of PROJECT BRIDGE FILESCALE CLAY TOWNSHIP VERT. SCALE CROSS SECTIONS LINE "PR-A" 1" = 5' 1" = 5'N.A. 16-ENG-41N.A. 31 N.A. N.A.38MHS/RDR JRE JRE NCK 1/10/20 P: \ 2 0 1 7 \ 1 7 0 0 5 3 1 1 1 t h & R a n g e l i n e R o u n d a b o u t \ E n g D e s i g n \ D r a w i n g s \ S h e e t s \ 1 7 0 0 5 3 X S e c t i o n s . d w g 5+50.00 800 805 810 815 820 800 805 810 815 820 6+00.00 800 805 810 815 820 800 805 810 815 820 6+09.18 800 805 810 815 820 800 805 810 815 820 -70 -60 -50 -40 -30 -20 -10 0 10 20 30 40 50 60 70 -70 -60 -50 -40 -30 -20 -10 0 10 20 30 40 50 60 70 -70 -60 -50 -40 -30 -20 -10 0 10 20 30 40 50 60 70 Inv. 807.47+92, Str. No. 16 Ex RW Ex RW Prop RW Prop RW Ex RW Ex RW Prop RW Prop RW Ex RW Ex RW Inv. 807.20 Inv. 806.40 Inv. 806.49 +89, Str. No. 13 +90, Str. No. 14 +91, Str. No. 15 Inv. 806.27 Inv. 806.10 +89, Str. No. 12 Inv. 805.79 RECOMMENDED FOR APPROVAL DESIGN ENGINEER DATE DESIGNED: CHECKED: DRAWN: CHECKED: SURVEY BOOK CONTRACT DESIGNATION SHEETS of PROJECT BRIDGE FILESCALE CLAY TOWNSHIP VERT. SCALE CROSS SECTIONS LINE "PR-A" 1" = 5' 1" = 5'N.A. 16-ENG-41N.A. 32 N.A. N.A.38MHS/RDR JRE JRE NCK 1/10/20 P: \ 2 0 1 7 \ 1 7 0 0 5 3 1 1 1 t h & R a n g e l i n e R o u n d a b o u t \ E n g D e s i g n \ D r a w i n g s \ S h e e t s \ 1 7 0 0 5 3 X S e c t i o n s . d w g 8+00.00 800 805 810 815 820 800 805 810 815 820 7+14.18 800 805 810 815 820 800 805 810 815 820 7+50.00 800 805 810 815 820 800 805 810 815 820 -70 -60 -50 -40 -30 -20 -10 0 10 20 30 40 50 60 70 -70 -60 -50 -40 -30 -20 -10 0 10 20 30 40 50 60 70 -70 -60 -50 -40 -30 -20 -10 0 10 20 30 40 50 60 70 Inv. 805.64 Inv. 805.61 Inv. 805.41 Inv. 805.38 Inv. 805.61 +30, Str. No. 18 +29, Str. No. 17 +36, Str. No. 20 +38, Str. No. 21 Inv. 805.41 Inv. 803.81 Prop RW Ex RW Ex RW Ex RW Prop RW Prop RW Ex RW Ex RW Ex RW Ex RW RECOMMENDED FOR APPROVAL DESIGN ENGINEER DATE DESIGNED: CHECKED: DRAWN: CHECKED: SURVEY BOOK CONTRACT DESIGNATION SHEETS of PROJECT BRIDGE FILESCALE CLAY TOWNSHIP VERT. SCALE CROSS SECTIONS LINE "PR-A" 1" = 5' 1" = 5'N.A. 16-ENG-41N.A. 33 N.A. N.A.38MHS/RDR JRE JRE NCK 1/10/20 P: \ 2 0 1 7 \ 1 7 0 0 5 3 1 1 1 t h & R a n g e l i n e R o u n d a b o u t \ E n g D e s i g n \ D r a w i n g s \ S h e e t s \ 1 7 0 0 5 3 X S e c t i o n s . d w g 8+50.00 795 800 805 810 815 795 800 805 810 815 8+94.50 795 800 805 810 815 795 800 805 810 815 8+95.00 -70 -60 -50 -40 -30 -20 -10 0 10 20 30 40 50 60 70 -70 -60 -50 -40 -30 -20 -10 0 10 20 30 40 50 60 70 Ex RW Ex RW Ex RW Ex RW RECOMMENDED FOR APPROVAL DESIGN ENGINEER DATE DESIGNED: CHECKED: DRAWN: CHECKED: SURVEY BOOK CONTRACT DESIGNATION SHEETS of PROJECT BRIDGE FILESCALE CLAY TOWNSHIP VERT. SCALE CROSS SECTIONS LINE "PR-A" 1" = 5' 1" = 5'N.A. 16-ENG-41N.A. 34 N.A. N.A.38MHS/RDR JRE JRE NCK 1/10/20 P: \ 2 0 1 7 \ 1 7 0 0 5 3 1 1 1 t h & R a n g e l i n e R o u n d a b o u t \ E n g D e s i g n \ D r a w i n g s \ S h e e t s \ 1 7 0 0 5 3 X S e c t i o n s . d w g 51+50.00 805 810 815 820 825 805 810 815 820 825 51+79.50 805 810 815 820 825 805 810 815 820 825 51+11.32 805 810 815 820 825 805 810 815 820 825 -70 -60 -50 -40 -30 -20 -10 0 10 20 30 40 50 60 70 -70 -60 -50 -40 -30 -20 -10 0 10 20 30 40 50 60 70 -70 -60 -50 -40 -30 -20 -10 0 10 20 30 40 50 60 70 5.66% 24' Inv. 808.40 Inv. 808.97 +50, Str. No. 24 +50, Str. No. 25 Temp RW Prop RW Prop RW Ex RW Ex RW Prop RW Prop RW Ex RW Ex RW Prop RW Prop RW Ex RW Ex RW 51+10.50 Residential Drive Req'd. RT RECOMMENDED FOR APPROVAL DESIGN ENGINEER DATE DESIGNED: CHECKED: DRAWN: CHECKED: SURVEY BOOK CONTRACT DESIGNATION SHEETS of PROJECT BRIDGE FILESCALE CLAY TOWNSHIP VERT. SCALE CROSS SECTIONS LINE "PR-B" 1" = 5' 1" = 5'N.A. 16-ENG-41N.A. 35 N.A. N.A.38MHS/RDR JRE JRE NCK 1/10/20 P: \ 2 0 1 7 \ 1 7 0 0 5 3 1 1 1 t h & R a n g e l i n e R o u n d a b o u t \ E n g D e s i g n \ D r a w i n g s \ S h e e t s \ 1 7 0 0 5 3 X S e c t i o n s . d w g 52+50.00 800 805 810 815 820 800 805 810 815 820 52+00.00 805 810 815 820 825 805 810 815 820 825 52+93.57 800 805 810 815 820 800 805 810 815 820 -70 -60 -50 -40 -30 -20 -10 0 10 20 30 40 50 60 70 -70 -60 -50 -40 -30 -20 -10 0 10 20 30 40 50 60 70 -70 -60 -50 -40 -30 -20 -10 0 10 20 30 40 50 60 70 Inv. 806.61 Inv. 806.11Inv. 806.06 Inv. 806.11 +42, Str. No. 28 +42, Str. No. 29 +42, Str. No. 30 Prop RW Prop RW Ex RW Ex RW Prop RW Temp RW Prop RW Ex RW Prop RW Ex RW Ex RW Ex RW Ex RW RECOMMENDED FOR APPROVAL DESIGN ENGINEER DATE DESIGNED: CHECKED: DRAWN: CHECKED: SURVEY BOOK CONTRACT DESIGNATION SHEETS of PROJECT BRIDGE FILESCALE CLAY TOWNSHIP VERT. SCALE CROSS SECTIONS LINE "PR-B" 1" = 5' 1" = 5'N.A. 16-ENG-41N.A. 36 N.A. N.A.38MHS/RDR JRE JRE NCK 1/10/20 P: \ 2 0 1 7 \ 1 7 0 0 5 3 1 1 1 t h & R a n g e l i n e R o u n d a b o u t \ E n g D e s i g n \ D r a w i n g s \ S h e e t s \ 1 7 0 0 5 3 X S e c t i o n s . d w g 0+50.00 800 805 810 815 820 800 805 810 815 820 0+00.00 800 805 810 815 820 800 805 810 815 820 1+00.00 800 805 810 815 820 800 805 810 815 820 -40 -30 -20 -10 0 10 20 30 40 50 60 70 -40 -30 -20 -10 0 10 20 30 40 50 60 70 -40 -30 -20 -10 0 10 20 30 40 50 60 70 Ex RW Ex RW Ex RW Prop RW MA T C H L I N E 52 + 9 3 . 5 7 " P R - B " MA T C H L I N E 6+ 0 9 . 1 8 " P R - A " CE N T E R O F R O U N D A B O U T CE N T E R O F R O U N D A B O U T CE N T E R O F R O U N D A B O U T RECOMMENDED FOR APPROVAL DESIGN ENGINEER DATE DESIGNED: CHECKED: DRAWN: CHECKED: SURVEY BOOK CONTRACT DESIGNATION SHEETS of PROJECT BRIDGE FILESCALE CLAY TOWNSHIP VERT. SCALE CROSS SECTIONS LINE "PR-EOP-CENTER" 1" = 5' 1" = 5'N.A. 16-ENG-41N.A. 37 N.A. N.A.38MHS/RDR JRE JRE NCK 1/10/20 P: \ 2 0 1 7 \ 1 7 0 0 5 3 1 1 1 t h & R a n g e l i n e R o u n d a b o u t \ E n g D e s i g n \ D r a w i n g s \ S h e e t s \ 1 7 0 0 5 3 X S e c t i o n s . d w g 2+29.34 800 805 810 815 820 800 805 810 815 820 1+50.00 800 805 810 815 820 800 805 810 815 820 2+00.00 800 805 810 815 820 800 805 810 815 820 -40 -30 -20 -10 0 10 20 30 40 50 60 70 -40 -30 -20 -10 0 10 20 30 40 50 60 70 -40 -30 -20 -10 0 10 20 30 40 50 60 70 Ex RW Ex RW Ex RW Prop RW MA T C H L I N E 7+ 1 4 . 1 8 " P R - A " CE N T E R O F R O U N D A B O U T CE N T E R O F R O U N D A B O U T CE N T E R O F R O U N D A B O U T RECOMMENDED FOR APPROVAL DESIGN ENGINEER DATE DESIGNED: CHECKED: DRAWN: CHECKED: SURVEY BOOK CONTRACT DESIGNATION SHEETS of PROJECT BRIDGE FILESCALE CLAY TOWNSHIP VERT. SCALE CROSS SECTIONS LINE "PR-EOP-CENTER" 1" = 5' 1" = 5'N.A. 16-ENG-41N.A. 38 N.A. N.A.38MHS/RDR JRE JRE NCK 1/10/20 P: \ 2 0 1 7 \ 1 7 0 0 5 3 1 1 1 t h & R a n g e l i n e R o u n d a b o u t \ E n g D e s i g n \ D r a w i n g s \ S h e e t s \ 1 7 0 0 5 3 X S e c t i o n s . d w g