Loading...
HomeMy WebLinkAboutA921 - TRASH ENCLOSURE DRAWINGSA921 5 A921 4 A921 2 A9213 13 ' - 4 " 1 4 ' - 1 1 1 / 4 " 7 3/4" M2 M2 M2 M2 WB1 M2 0'-6" 0'-6" 0'-0"0'-0" 0'-0" 0'-6" 0'-6" 0'-0" 0'-0" 5' - 4 1 / 4 " 7 A921 7 A921 T.O. SLAB EL: +0'-0" METAL COPING 4" CONCRETE BOLLARD - SEE CIVIL NOTE: REF. CIVIL DWGS. FOR LOCATION OF GRADING 6 A921 T.O. WALL EL: +10'-0" T.O. SLAB EL: +0'-0" FACE BRICK 4" CONCRETE BOLLARD - SEE CIVIL METAL COPING NOTE: REF. CIVIL DWGS. FOR LOCATION OF GRADING T.O. WALL EL: +10'-0" T.O. SLAB EL: +0'-0" METAL COPING CONTROL JOINT SPLIT FACE CMU NOTE: REF. CIVIL DWGS. FOR LOCATION OF GRADING 4" CONCRETE BOLLARD - SEE CIVIL FACE BRICK METAL COPING ADA COMPLIANT HANDLE PROVIDED AT BOTTOM OF DOOR NOTE: REF. CIVIL DWGS. FOR LOCATION OF GRADING COORDINATE CHUTE DOOR INSTALL WITH GRADING -SEE CIVIL DRAWINGS 2' - 0 " 3' - 9 " 3 ' - 4 " 3' - 9" T.O. SLAB EL: +0'-0" T.O. WALL EL: +10'-0" WB1 PRE-FINISHED MANUFACTURED METAL COPING 2x TREATED WOOD NAILER 8" CMU BOND BEAM -SEE STRUCTURAL (1) LAYER SHEATHING T.O. WALL EL: +10'-0" LATCH. STOP PLATE ATTACHED TO ONE LEAF ONLYPRE-FINISHED CORRUGATED STEEL PANEL ON STEEL TUBE FRAM W/(3) PAIR OF 6" HINGES -PAINT TO MATCH ENCLOSURE 4" O.D. PIPE AS GATE SUPPORT, FILL WITH CONCRETE. PROVIDE THREE PIPE HINGES PER LEAF 2"x2"x1/4" PRE-FINISHED STEEL TUBE FRAME WITH 4 VERT. INTERMEDIATES PER LEAF EQUALLY SPACED. GATE AND PANEL PRE-FINISHED (TYP.) LATCH. CANE BOLT ASSEMBLY (ONE PER LEAF) EQ EQ T.O. SLAB EL: +0'-0" 7 A921 14 ' - 1 1 1 / 4 " M2 M2 0'-0" 0'-0" 0'-0" 0'-0" A92110 A921 11 A921 9 A921 10 MIR. 6 A921 SIM. T.O. SLAB EL: +0'-0" METAL COPING 4" CONCRETE BOLLARD - SEE CIVIL NOTE: REF. CIVIL DWGS. FOR LOCATION OF GRADING T.O. WALL EL: +10'-0" T.O. SLAB EL: +0'-0" METAL COPING FACE BRICK NOTE: REF. CIVIL DWGS. FOR LOCATION OF GRADING T.O. WALL EL: +10'-0" T.O. SLAB EL: +0'-0" FACE BRICK 4" CONCRETE BOLLARD - SEE CIVIL METAL COPING NOTE: REF. CIVIL DWGS. FOR LOCATION OF GRADING T.O. WALL EL: +10'-0" 1. REFER TO CIVIL DRAWINGS FOR TRASH ENCLOSURE LOCATIONS. 2. METAL COPING COLOR TO MATCH APARTMENT TRIM COLOR. 3. CMU COLOR TO BE SELECTED BY ARCHITECT FROM MANUFACTURER'S STANDARDS. 4. GATE TO BE PRE-FINISHED TO MATCH APARTMENT COLOR TRIM. 5. TRASH CHITE DOOR TO MATCH APARTMENT COLOR TRIM. TRASH ENCLOSURE GENERAL NOTES MATERIAL COLOR SCHEME SW7004 SNOWBOUND GENERAL SHALE, TERRE HAUTE COLLECTION, "BOURBON TRAIL" PR O J E C T DR A W I N G T I T L E SE A L SH E E T PR O J E C T I N F O RE V I S I O N S ARCHITECT GC/CM CLIENT Autodesk Docs://22028_Buckingham_GramercyApartments/22028_BHGramercy_Amenities_Central.rvt 12/17/2024 4:21:03 PM 22028 DECEMBER 13, 2024 50% DD SET A921 TR A S H E N C L O S U R E DR A W I N G S BU C K I N G H A M A T GR A M E R C Y SCALE: 1/4" = 1'-0"1 TRASH ENCLOSURE FLOOR PLAN SCALE: 1/4" = 1'-0"2 TRASH ENCLOSURE - FRONT ELEVATION SCALE: 1/4" = 1'-0"3 TRASH ENCLOSURE - SIDE ELEVATION SCALE: 1/4" = 1'-0"4 TRASH ENCLOSURE - BACK ELEVATION SCALE: 1/4" = 1'-0"5 TRASH ENCLOSURE - SIDE ELEVATION SCALE: 1 1/2" = 1'-0"7 WALL SECTION SCALE: 1/2" = 1'-0"6 TYPICAL GATE DETAIL SCALE: 1/4" = 1'-0"8 TRASH ENCLOSURE (SMALL) FLOOR PLAN SCALE: 1/4" = 1'-0"9 TRASH ENCLOSURE (SMALL) - FRONT ELEVATION SCALE: 1/4" = 1'-0"11 TRASH ENCLOSURE (SMALL) - BACK ELEVATION SCALE: 1/4" = 1'-0"10 TRASH ENCLOSURE (SMALL) - SIDE ELEVATION #DESCRIPTION DATE