Loading...
HomeMy WebLinkAboutA030.0 - EXTERIOR ELEVATIONSINTERNALLY-LIT SIGNAGE FORMED METAL CORNICE ENTRANCE CANOPY FORMED METAL CORNICE METAL WRAPPED ACCENT BRACKETS FRAMED ALUMINUM LOUVER METAL WRAPPED ACCENT BRACKETS SPLIT-FACE CONCRETE BLOCK (CMU-1)SPLIT-FACE CONCRETE BLOCK (CMU-1) BLACK ALUMINUM- FRAMED STOREFRONT CAST STONE SILL (CS-1) SOLDIER COURSE (BRK-3) SOLDIER COURSE (BRK-1) FORMED METAL CORNICE METAL-WRAPPED ACCENT BRACKETS BRICK (BRK-1) EIFS BAND (EIFS-1) T . O . M E C H A N I C A L S C R E E N 25 ' - 0 " THIN BRICK (BRK-2) FORMED METAL CORNICE BLACK ALUMINUM FRAMED STOREFRONT SOLDIER COURSE (BRK-2) BRICK (BRK-2) UP-DOWN WALL SCONCE 11' - 8" T. O . E N T R A N C E 1 9 ' - 1 0 " T. O . P A R A P E T 18 ' - 0 " 6' - 3 " FORMED METAL CORNICE FRAMED ALUMINUM LOUVER SPLIT-FACE CONCRETE BLOCK (CMU-1) SPLIT-FACE CONCRETE BLOCK (CMU-1) BLACK ALUMINUM- FRAMED STOREFRONT FORMED METAL CORNICE METAL-WRAPPED ACCENT BRACKETS BRICK (BRK-3) INTERNALLY-LIT SIGNAGE ENTRANCE CANOPY FORMED METAL CORNICE FRAMED ALUMINUM LOUVER FORMED METAL CORNICE THIN BRICK (BRK-2) SOLDIER COURSE (BRK-1) BRICK (BRK-1) UTILITY METERS SOLDIER COURSE (BRK-3) CAST STONE SILL (CS-1) EIFS BAND (EIFS-1) UP-DOWN WALL SCONCE T. O . P A R A P E T 18 ' - 0 " T . O . M E C H A N I C A L S C R E E N 25 ' - 0 " SPANDREL GLAZING 11' - 8" 6' - 3 " EXTERIOR MATERIAL LEGEND BRICK VENEER (BRK-1): EXTERIOR INSULATION FINISH SYSTEM (EIFS-1): CAST STONE SILL (CS-1) SPLIT-FACE CONCRETE BLOCK (CMU-1): COLORS SHOWN ARE APPROXIMATE. FINAL COLORS WILL BE DETERMINED THROUGH SELECTION OF ACTUAL MATERIALS. THIN BRICK VENEER (BRK-2): BRICK VENEER (BRK-3): MATERIAL CALCULATIONS EAST ELEVATION OVERALL WALL AREA: 1,261 SF WALL AREA (W/OUT GLAZING): 805 SF EIFS: 85 SF (10%) MASONRY: 720 SF (90%) GLAZING: 456 SF SOUTH ELEVATION OVERALL WALL AREA: 1,315 SF WALL AREA (W/OUT GLAZING): 1,027 SF EIFS: 78 SF (8%) MASONRY: 949 SF (92%) GLAZING: 288 SF WEST ELEVATION OVERALL WALL AREA: 1,255 SF WALL AREA (W/OUT GLAZING): 1,084 SF EIFS: 74 SF (7%) MASONRY: 1,010 SF (93%) GLAZING: 171 SF *LOUVERS NOT INCLUDED IN OVERALL CALCULATIONS NORTH ELEVATION OVERALL WALL AREA: 1,320 SF WALL AREA (W/OUT GLAZING): 1,010 SF EIFS: 90 SF (9%) MASONRY: 920 SF (91%) GLAZING: 310 SF FRAMED ALUMINUM LOUVER METAL WRAPPED ACCENT BRACKETS SPLIT-FACE CONCRETE BLOCK (CMU-1) BLACK ALUMINUM- FRAMED STOREFRONT CAST STONE SILL (CS-1) SOLDIER COURSE (BRK-3) SOLDIER COURSE (BRK-1) FORMED METAL CORNICE METAL-WRAPPED ACCENT BRACKETS BRICK (BRK-1) EIFS BAND (EIFS-1) THIN BRICK (BRK-2) FORMED METAL CORNICE SPLIT-FACE CONCRETE BLOCK (CMU-1) FRAMED ALUMINUM LOUVER FORMED METAL CORNICE THIN BRICK (BRK-2) SOLDIER COURSE (BRK-1) BRICK (BRK-1) SOLDIER COURSE (BRK-3) CAST STONE SILL (CS-1) EIFS BAND (EIFS-1) UP-DOWN WALL SCONCE T . O . M E C H A N I C A L S C R E E N 2 5 ' - 0 " T. O . P A R A P E T 1 8 ' - 0 " SPANDREL GLAZING T . O . E N T R A N C E 19 ' - 1 0 " FRAMED ALUMINUM LOUVER METAL WRAPPED ACCENT BRACKETS SPLIT-FACE CONCRETE BLOCK (CMU-1) CAST STONE SILL (CS-1) SOLDIER COURSE (BRK-1) FORMED METAL CORNICE METAL-WRAPPED ACCENT BRACKETS BRICK (BRK-1) EIFS BAND (EIFS-1) THIN BRICK (BRK-2) FORMED METAL CORNICE SPLIT-FACE CONCRETE BLOCK (CMU-1) FRAMED ALUMINUM LOUVER FORMED METAL CORNICE THIN BRICK (BRK-2) SOLDIER COURSE (BRK-1) BRICK (BRK-1) SOLDIER COURSE (BRK-3) CAST STONE SILL (CS-1) EIFS BAND (EIFS-1) UP-DOWN WALL SCONCE T . O . M E C H A N I C A L S C R E E N 2 5 ' - 0 " T. O . P A R A P E T 1 8 ' - 0 " EXTERIOR WALL PACK LIGHT SPANDREL GLAZING NIGHT DEPOSIT BOX UTILITY METERS A030.07 A030.0 6 A030.0 8 12 ' - 4 " 4' - 3 1/4"11' - 8" 6' - 0 " CAST STONE COPING (CS-1) COMPOSITE BOARD DUMPSTER GATE WITH PADLOCK AND CANE BOLT BRICK (BRK-1) BOLLARD; PAINTED TO MATCH CS-1 BOLLARD; PAINTED TO MATCH CS-1 CAST STONE COPING (CS-1) BRICK (BRK-3) BRICK (BRK-1) CAST STONE COPING (CS-1) 1/8" = 1'-0" WEST ELEV PRESENTATION4 1/8" = 1'-0" SOUTH ELEV PRESENTATION1 c The Redmond Company Date Project Number Revisions W2 2 8 N 7 4 5 W E S T M O U N D D R I V E | W A U K E S H A , W I S C O N S I N 5 3 1 86 | P : 2 6 2 . 5 4 9 . 9 6 0 0 2022 1 2 3 4 5 D C B A 1 2 3 4 5 D C B A A030.0 BUILDING ELEVATIONS 24022 05/29/2024 Ev e r w i s e C r e d i t U n i o n 10 9 2 0 N . M i c h i g a n R D . Zi o n s v i l l e , I N 4 6 0 7 7 MUNICIPAL REVIEW 1/8" = 1'-0" EAST ELEV PRESENTATION2 1/8" = 1'-0" NORTH ELEV PRESENTATION3 1/4" = 1'-0" ENLARGED DUMPSTER ENCLOSURE PLAN5 1/4" = 1'-0" DUMPSTER ENCLOSURE - FRONT ELEV.6 1/4" = 1'-0" DUMPSTER ENCLOSURE - SIDE ELEV.7 1/4" = 1'-0" DUMPSTER ENCLOSURE - REAR ELEV.8 QTY: 2 SIGNAGE BACKING (W)= 11' -8" SIGNAGE (W)= 5' -11" PERCENTAGE = 50.7% SIGNAGE BACKING (H)= 6' -3" SIGNAGE (H)= 4' -1" PERCENTAGE = 65.3% SIGNAGE BACKING (W)= 11' -8" SIGNAGE (W)= 5' -11" PERCENTAGE = 50.7% SIGNAGE BACKING (H)= 6' -3" SIGNAGE (H)= 4' -1" PERCENTAGE = 65.3% # Description Date 71.52" 49 . 0 6 " 24 " 9.6" 4.08" 24.36 1/31/2025