HomeMy WebLinkAboutCorrespondencePlan Review - Review Comments Report
Project Name: PZ-2025-00008 Bovaconti ADLS Amend-Sign
Workflow Started: 1/14/2025 10:00:13 AM
Report Generated: 01/31/2025 10:28 AM
REF #CYCLE REVIEWED BY TYPE FILENAME DISCUSSION STATUS
1 1 Sign Permits
Aliza Shalit
1/29/25 3:02 PM
Changemark
Sign Package specifics
Please provide a similar letter that specifies the items not crossed out. If
specific colors are included then that is what every sign for now until this
document is updates will have to abide by. If that is not what you would like,
then do not include specific return/trim colors. For the sign package this
information is only required if it is expected from all signs at all times.
Important information: All signs (lighted) must be facelit All signs must be
mounted on raceways painted to match the fascia. All signs will be made up
of Individual channel letters All signs will follow UDO sign Standards
Cover Letter_Bovaconti.pdf Resolved
REVIEW COMMENTS