CO
V
E
R
C0.0
COVER
REVISIONSERS OLD MERIDIAN & MAIN
1025 W. MAIN ST.,
CARMEL, IN 46032
UTILITY CONTACT INFORMATION:
LOCATION MAP
SOILS MAP SOILS LEGEND
SITE MAP
SHEET LIST TABLE
Sheet Title Sheet Description
C0.0 COVER
C1.0
SITE IMPROVEMENTS PLAN
AREA LOCATION MAP: STATE OF INDIANA
PROJECT LOCATION:
CITY OF CARMEL
HAMILTON COUNTY
SURVEYOR:
STORM WATER ADMIN.:
CABLE:
WATER:
ELECTRIC:SANITARY:
DEPARTMENT:
GAS:TELEPHONE:
CARMEL ENGINEERING
CARMEL ENGINEERING DEPT.
DEVELOPER:
EDWARD ROSE DEVELOPMENT CARMEL, LLC
11611 NORTH MERIDIAN STREET, SUITE 800
CARMEL, INDIANA 46032
CONTACT: BRAD SCHRAGE
(317) 569-7629
Bradley_Schrage@edwardrose.com
TOTAL SITE DISTURBANCE = 5.59 AC
CIVIL ENGINEER & SURVEYOR:
HWC ENGINEERING
135 N. PENNSYLVANIA ST., SUITE 2800
INDIANAPOLIS, IN 46204
(317) 347-3663
cjames@hwcengineering.com
FLOOD HAZARD STATEMENT:
C1.2
INDIANAPOLIS - TERRE HAUTE
LAFAYETTE - MUNCIE - NEW ALBANY
www.hwcengineering.com
C1.5
C1.7
C1.3-C1.3B
POST STORMWATER POLLUTION
PREVENTION PLAN
C1.4
EMERGENCY FLOOD ROUTE PLAN
C1.1
GRADING AND DRAINAGE PLAN
C0.1
EXISTING CONDITIONS
C8.0 STORMWATER POLLUTION PREVENTION NOTES
C8.1 STORMWATER POLLUTION PREVENTION DETAILS
C8.2-C8.8 CONSTRUCTION DETAILS
REENIGNELANOISSEF
O
R
P
No.
PE11700769
NOT FOR CONSTRUCTION
PRELIMINARY
ESTIMATED START DATE: MARCH 2023
ESTIMATED COMPLETION DATE: MARCH 2028
DECEMBER 11, 2023
GENERAL NOTES
DEMOLITION PLAN
SITE UTILITY PLAN
C6.0-C6.3 STORM PLAN & PROFILE
C3.0-C3.1 MAINTENANCE OF TRAFFIC PLAN
BENCHMARK INFORMATION:
C4.0 SANITARY PLAN & PROFILE
C6.4 STORM STRUCTURE DATA TABLES
C1.6 PRE-STORMWATER POLLUTION
PREVENTION PLANCall 811 or 800-382-5544 Before you Dig!
C8.9-C8.11 CARMEL WATER STANDARD DETAILS