HomeMy WebLinkAboutEP102A - LEVEL 02 ELECTRICAL PLAN-AREA AF
F F F
F
F
F
FFF
F
F
F
F
F
F
S
S
F S
J
J
J
J
VEST
203
CAS-31 CO / NO2 SENSOR
CONTROL PANEL
2
GP2-48
3
GDP
GP2
PL2
3
4
4
AR
C
H
I
T
E
C
T
CL
I
E
N
T
CO
N
S
U
L
T
A
N
T
PR
O
J
E
C
T
DR
A
W
I
N
G
T
I
T
L
E
SE
A
L
SH
E
E
T
PR
O
J
E
C
T
I
N
F
O
RE
V
I
S
I
O
N
S
10
1
7
W
e
s
t
M
a
i
n
S
t
r
e
e
t
Ca
r
m
e
l
,
I
N
4
6
0
3
2
22028
05-19-23
PERMIT SET
EP102A
LE
V
E
L
0
2
E
L
E
C
T
R
I
C
A
L
PL
A
N
-
A
R
E
A
A
N
1/8" = 1'-0"
LEVEL 02 ELECTRICAL PLAN1
GENERAL NOTES
A REFER TO SHEET E-000 FOR GENERAL ELECTRICAL NOTES, SYMBOLS AND
ABBREVIATIONS.
B REFER TO SHEET E-601 FOR PANEL CIRCUIT SCHEDULES.
C ALL EXPOSED CONDUIT MOUNTED BELOW 6'-0" AFF TO BE GRC. USE
GALVONIZED EMT ELSEWHERE.
D COORDINATE ALL CONDUIT PENETRATIONS BETWEEN LEVELS WITH
STRUCTURAL ENGINEER PRIOR TO SLABS BEING POURED.
E UTILIZE MOUNTING INSERTS CAST INTO STRUCTURE/SLAB WHERE
PRACTICAL. COORDINATE ALL INSERTS AND STRUCTURAL ANCHORS WITH
STRUCTURAL ENGINEER PRIOR TO SLABS BEING POURED.
SHEET KEYNOTES
1 THIS DUCTLESS SPLIT IS TO RECEIVE POWER AND BE CONNECTED TO
ITS ASSOCIATED HP-3.
2 PROVIDE 20A,120V,1PH CIRCUIT FOR CO/N02 CONTROL PANEL.
PROVIDE 2#12 AND 1#12G IN 1/2" CONDUIT.
3 PROVIDE ROUGH IN AND 1" CONDUIT FOR FUTURE EV CHARGERS ON
POWER SHARING MODE .THESE ARE TO BE FED FROM GP1 PANEL.
4 PROVIDE 40A/208V/1PH CIRCUIT FOR EV CHARGER TO BE INSTALLED
DURING CONSTRUCTION.PROVIDE 2#8 AND 1#10 G IN 1" CONDUIT