Loading...
HomeMy WebLinkAboutEP104A - LEVEL 04 ELECTRICAL PLAN-AREA AS S F F F S F F F F J S S S J J J GP 4 CAS-3 UH-1 GP 4 - 5, 7 , 9 123 GP 4 - 6, 8 , 1 0 GP 4 - 11 , 1 3 4 GP 4 - 12 , 1 4 5 6 7 GP4-18 8 9 10 11GP4-29 GP4-28GP4-30 5 12 12 AR C H I T E C T CL I E N T CO N S U L T A N T PR O J E C T DR A W I N G T I T L E SE A L SH E E T PR O J E C T I N F O RE V I S I O N S 10 1 7 W e s t M a i n S t r e e t Ca r m e l , I N 4 6 0 3 2 22028 05-19-23 PERMIT SET EP104A LE V E L 0 4 E L E C T R I C A L PL A N - A R E A A N 1/8" = 1'-0" LEVEL 04 ELECTRICAL PLAN1 GENERAL NOTES A REFER TO SHEET E-000 FOR GENERAL ELECTRICAL NOTES, SYMBOLS AND ABBREVIATIONS. B REFER TO SHEET E-601 FOR PANEL CIRCUIT SCHEDULES. C ALL EXPOSED CONDUIT MOUNTED BELOW 6'-0" AFF TO BE GRC. USE GALVONIZED EMT ELSEWHERE. D COORDINATE ALL CONDUIT PENETRATIONS BETWEEN LEVELS WITH STRUCTURAL ENGINEER PRIOR TO SLABS BEING POURED. E UTILIZE MOUNTING INSERTS CAST INTO STRUCTURE/SLAB WHERE PRACTICAL. COORDINATE ALL INSERTS AND STRUCTURAL ANCHORS WITH STRUCTURAL ENGINEER PRIOR TO SLABS BEING POURED. SHEET KEYNOTES 1 PROVIDE SIZE NEMA 2 COMBINATION MOTOR STARTER IN NEMA 1 ENCLOSURE FOR GEF-1. PROVIDE 40A,208V,3PH CIRCUIT. USE 3#8 AND 1#10G IN 1" CONDUIT. PROVIDE FINAL CONNECTION TO FAN MOTOR.MOTOR CONTROLLED BY GARAGE CO ALARM PANEL.PANEL AND LOW VOLTAGE CONTROL WIRING PROVIDED BY TCC. 2 PROVIDE SIZE NEMA 3 COMBINATION MOTOR STARTER IN NEMA 1 ENCLOSURE FOR GEF-2. PROVIDE 80A,208V,3PH CIRCUIT. USE 3#3 AND 1#8G IN 1-1/2" CONDUIT. PROVIDE FINAL CONNECTION TO FAN MOTOR.MOTOR CONTROLLED BY GARAGE CO ALARM PANEL.PANEL AND LOW VOLTAGE CONTROL WIRING PROVIDED BY TCC. 3 PROVIDE SIZE NEMA 0 COMBINATION MOTOR STARTER IN NEMA 1 ENCLOSURE FOR GEF-4. PROVIDE 15A,208V,1PH CIRCUIT. USE 2#14 AND 1#14G IN 1/2" CONDUIT. PROVIDE FINAL CONNECTION TO FAN MOTOR.MOTOR CONTROLLED BY GARAGE CO ALARM PANEL.PANEL AND LOW VOLTAGE CONTROL WIRING PROVIDED BY TCC. 4 PROVIDE FRACTIONAL HP MOTOR STARTER FOR GEF-3. PROVIDE 15A,208V,1PH CIRCUIT. USE 2#14 AND 1#14G IN 1/2" CONDUIT. PROVIDE FINAL CONNECTION TO FAN MOTOR.MOTOR CONTROLLED BY GARAGE CO ALARM PANEL.PANEL AND LOW VOLTAGE CONTROL WIRING PROVIDED BY TCC. 5 PROVIDE ROUGH IN AND 1" CONDUIT FOR FUTURE EV CHARGERS ON POWER SHARING MODE .THESE ARE TO BE FED FROM GP4 PANEL. 6 THIS DUCTLESS SPLIT IS TO RECEIVE POWER AND BE CONNECTED TO ITS ASSOCIATED HP-3. 7 PROVIDE 20A,120V,1PH CIRCUIT FOR UH-1. PROVIDE 2#12 AND 1#12 G IN 1/2" CONDUIT. SHEET KEYNOTES 8 PROVIDE DISCONNECT FOR ELEVATOR CONTROLLER.COORDINATE LOCATION OF DISCONNECT WITH ELEVATOR INSTALLER PRIOR TO ROUGH-IN. 9 PROVIDE DISCONNECT FOR ELEVATOR LIGHTS AND RECEPTACLES.COORDINATE LOCATION OF DISCONNECT WITH ELEVATOR INSTALLER PRIOR TO ROUGH-IN. 10 PROVIDE DISCONNECT FOR ELEVATOR.COORDINATE LOCATION OF DISCONNECT WITH ELEVATOR INSTALLER PRIOR TO ROUGH IN.COORDINATE SIZE OF DISCONNECT,CONDUCTORS AND BREAKER SIZE WITH ELEVATOR SHOP DRAWINGS PRIOR TO ORDERING. 11 PIT RECEPTACLE.COORDINATE LOCATION OF DISCONNECT WITH ELEVATOR INSTALLER PRIOR TO ROUGH-IN. 12 PROVIDE 40A/208V/1PH CIRCUIT FOR EV CHARGER TO BE INSTALLED DURING CONSTRUCTION.PROVIDE 2#8 AND 1#10 G IN 1" CONDUIT