Loading...
HomeMy WebLinkAboutIcon Solar Array PlansIcon on Main Solar – Page Index N DESCRIPTIONPAGE Page Index1 General Notes and Safety Notes2 Array Production Estimates3 Site Layout4 Array Layout5 Solar Single Line Diagram6 PV MDP7 Communication Diagram8 Rack Cut Sheet9 Inverter Cut Sheet10 Module Cut Sheet11 Rapid Shutdown Device Cut Sheet12 Bussed Gutter Cut Sheet13 Wire Cut Sheet14 Labels15 Project: Icon on Main Solar Location: 1025 West Main Street, Carmel, IN 46032 Size: 89.0 kWdc / 62.4 kWac Panels: JA Solar JAM72S30-530 (168) Inverters: SMA Sunny Boy 7.0 (12) Racking: Unirac Ecofoot 2+ Drawing: Draft Revision: 1 Date: 6/23/23 Drawn by: Morley Page: 1 SAFETY NOTES: 1. Each employee will be given a safety orientation. The orientation will cover the following items: 1. A description of the accident prevention program: 1. A formal written accident prevention program as described in local OSHA regulations. It consists of this safety orientation, safety meetings, and self-inspections. 2. Basic safety rules that all employees must follow. They are: 1. Never do anything that is unsafe in order to get the job done. 2. Do not remove or disable any safety device! Keep guards in place at all times on operating machinery. 3. Never operate a piece of equipment unless you have been trained and are authorized. 4. Use your personal protective equipment whenever it is required. 5. Obey all safety warning signs. 6. Working under the influence of alcohol or illegal drugs or using them at work is prohibited. 7. Do not bring firearms or explosives onto company property. 8. Horseplay, running and fighting are prohibited 9. Clean up spills immediately. Replace all tools and supplies after use. Do not allow scraps to accumulate where they will become a hazard. Good housekeeping helps prevent accidents. 3. Job Attire and Personal Protective Equipment 1. Suitable clothing must be worn; long pants, at least short- sleeved shirts, and adequate footwear. 2. Hard hats, safety glasses or goggles must be used when a potential hazard exists. 3. Hearing protection must be used in high noise areas. • 4. Gloves (as needed). Icon on Main Solar – General Notes and Safety Notes GENERAL NOTES: 1. All work shall be in accordance with the following Indiana codes: 1. 2014 Indiana Building Code – IBC Code – 2012 Edition 2. 2009 Indiana Electrical Code – NFPA 70 – NEC 2008 Edition 3. 2014 Indiana Fire Code – IFC – 2012 Edition 2. The photovoltaic system described herein shall be built by a locally licensed electrical contractor or a licensed general contractor 3. All equipment shall be listed and labeled per recognized electrical testing laboratory and installed per the listing requirements and the manufacturer’s instructions. 4. All inverters shall be inspected before commissioning, testing, and operation of the system. 5. All outdoor equipment shall be NEMA 3R rated or greater. 6. Any substituted material, substituted equipment, or installation changes must be submitted to the Engineer for evaluation and approval prior to final installation. 7. Contractor is responsible for providing any additional work or adjustments caused by substituted equipment needed for compliance or proper installation. 8. The Contractor shall ensure that the complete system is installed as described in these drawings. 9. Contractor shall provide and install all equipment shown on the drawings except work labeled “by others” or “by utility”. 10. All string wiring from PV modules to inverters shall be a minimum of #10AWG copper PV Wire, 2000V insulation. 11. Color code: 480/277V-BOY (Brown, Orange, Yellow), 120/240V-BOB (Black, Orange (or lagged high leg), Blue), 120/208V-BRB (Black, Red, Blue) 12. All conduit dimensions are reference inside diameter of conduit. 13. Contact Indiana 811 (https://indiana 811.org) before performing any underground work. 14. All exposed electrical connections to be coated in NO-OX-ID to prevent corrosion. Check at year one to assure application is still present. 15. Toque all connections, mechanical and electrical to manufacturers specifications. Check torque at year one to assure proper connection. 16. Contractor is responsible for acquiring all electrical and construction permits. 17. Contractor is responsible for project Storm Water Pollution Prevention Plan. Project: Icon on Main Solar Location: 1025 West Main Street, Carmel, IN 46032 Size: 89.0 kWdc / 62.4 kWac Panels: JA Solar JAM72S30-530 (168) Inverters: SMA Sunny Boy 7.0 (12) Racking: Unirac Ecofoot 2+ Drawing: Draft Revision: 1 Date: 6/23/23 Drawn by: Morley Page: 2 Icon on Main Solar – Array Production Estimates Project: Icon on Main Solar Location: 1025 West Main Street, Carmel, IN 46032 Size: 89.0 kWdc / 62.4 kWac Panels: JA Solar JAM72S30-530 (168) Inverters: SMA Sunny Boy 7.0 (12) Racking: Unirac Ecofoot 2+ Drawing: Draft Revision: 1 Date: 6/23/23 Drawn by: Morley Page: 3 Icon on Main Solar – Site Layout N INVERTERS MODULES Project: Icon on Main Solar Location: 1025 West Main Street, Carmel, IN 46032 Size: 89.0 kWdc / 62.4 kWac Panels: JA Solar JAM72S30-530 (168) Inverters: SMA Sunny Boy 7.0 (12) Racking: Unirac Ecofoot 2+ Drawing: Draft Revision: 1 Date: 6/23/23 Drawn by: Morley Page: 4 Icon on Main Solar – Array Layout EXISTING 800AMP BUSSED GUTTER ON ELEVATOR EXTENSION EXISTING CONDUITS THROUGH TO FIRST FLOOR THROUGH ELEVATOR WALL TO ELECTRICAL ROOM •ONE (1) – 4” •ONE (1) – 1” SOLAR ARRAY Project: Icon on Main Solar Location: 1025 West Main Street, Carmel, IN 46032 Size: 89.0 kWdc / 62.4 kWac Panels: JA Solar JAM72S30-530 (168) Inverters: SMA Sunny Boy 7.0 (12) Racking: Unirac Ecofoot 2+ Drawing: Draft Revision: 1 Date: 6/23/23 Drawn by: Morley Page: 5 Icon on Main Solar – Solar Single Line Diagram SUNNY BOY 6.0 (5.2W @208V) DC TO AC JA SOLAR 530 16 PANELS WITH RSD 40A – 3NG 250A – 3NG NEW DISCONNECT NEMA 3R 208/120V 600AS 400AF NEW PV MDP 208/120V MLO NEMA 3R 250AF 6–40A 2P SOLAR 1–60A 3P SPD 1-20A 1P DAS 2-20A 1P SPARE UTILITY EXISTING CT CABINET FROM UTILITY M LOCATED IN BUILDING MECHANICAL ROOM LOCATED ON BUILDING ROOF 500A – 3NG 600A – 3NG 10 AWG CU 2000V PV WIRE WITH MC4 CONNECTORS TYPICAL OF SIX SUNNY BOY 6.0 (5.2W @208V) DC TO AC JA SOLAR 530 16 PANELS WITH RSD 40A – 3NG NEW PV MDP 208/120V MLO NEMA 3R 250AF 6–40A 2P SOLAR 1–60A 3P SPD 1-20A 1P DAS 2-20A 1P SPARE TYPICAL OF SIX NEW BUSSED GUTTER BOX 208/120V NEMA 3R 500A MIN EXISTING MDP Project: Icon on Main Solar Location: 1025 West Main Street, Carmel, IN 46032 Size: 89.0 kWdc / 62.4 kWac Panels: JA Solar JAM72S30-530 (168) Inverters: SMA Sunny Boy 7.0 (12) Racking: Unirac Ecofoot 2+ Drawing: Draft Revision: 1 Date: 6/23/23 Drawn by: Morley Page: 6 Icon on Main Solar – PV MDP DESCRIPTION TRIP SIZE POLES CIRC # LOAD A B C LOAD CIRC # POLES TRIP SIZE DESCRIPTION : : : : : : :-8 1 20 DAS :-9 1 20 SPARE :-10 1 20 SPARE -6 2 40 SUNNY BOY 6.0 -4 2 40 SUNNY BOY 6.0 -2 2 40 SUNNY BOY 6.0 AMPS 22 KAICNEW PV PANEL: 120/208V - 3ø -4W NEMA 3R 250A BUSS 250A MLO SUNNY BOY 6.0 40 2 5 - SUNNY BOY 6.0 40 2 1 - SUNNY BOY 6.0 40 2 3 - SPD 60 3 7 - Project: Icon on Main Solar Location: 1025 West Main Street, Carmel, IN 46032 Size: 89.0 kWdc / 62.4 kWac Panels: JA Solar JAM72S30-530 (168) Inverters: SMA Sunny Boy 7.0 (12) Racking: Unirac Ecofoot 2+ Drawing: Draft Revision: 1 Date: 6/23/23 Drawn by: Morley Page: 7 120 VAC FROM NEW PV MDP TO 12 VDC POWER SUPPLY CAT 6 SMA DATA MANAGER EDMM – US -10 SMA INVERTERS CELLULAR INTERNET CONNECTION INSTALL IN NEMA 3R CABINET OR INSTALL IN AN INDOOR AREA Icon on Main Solar – Communication Diagram Project: Icon on Main Solar Location: 1025 West Main Street, Carmel, IN 46032 Size: 89.0 kWdc / 62.4 kWac Panels: JA Solar JAM72S30-530 (168) Inverters: SMA Sunny Boy 7.0 (12) Racking: Unirac Ecofoot 2+ Drawing: Draft Revision: 1 Date: 6/23/23 Drawn by: Morley Page: 8 Icon on Main Solar – Rack Cut Sheet Project: Icon on Main Solar Location: 1025 West Main Street, Carmel, IN 46032 Size: 89.0 kWdc / 62.4 kWac Panels: JA Solar JAM72S30-530 (168) Inverters: SMA Sunny Boy 7.0 (12) Racking: Unirac Ecofoot 2+ Drawing: Draft Revision: 1 Date: 6/23/23 Drawn by: Morley Page: 9 Icon on Main Solar – Inverter Cut Sheet Project: Icon on Main Solar Location: 1025 West Main Street, Carmel, IN 46032 Size: 89.0 kWdc / 62.4 kWac Panels: JA Solar JAM72S30-530 (168) Inverters: SMA Sunny Boy 7.0 (12) Racking: Unirac Ecofoot 2+ Drawing: Draft Revision: 1 Date: 6/23/23 Drawn by: Morley Page: 10 Icon on Main Solar – Module Cut Sheet Project: Icon on Main Solar Location: 1025 West Main Street, Carmel, IN 46032 Size: 89.0 kWdc / 62.4 kWac Panels: JA Solar JAM72S30-530 (168) Inverters: SMA Sunny Boy 7.0 (12) Racking: Unirac Ecofoot 2+ Drawing: Draft Revision: 1 Date: 6/23/23 Drawn by: Morley Page: 11 Icon on Main Solar – Rapid Shutdown Device Cut Sheet Project: Icon on Main Solar Location: 1025 West Main Street, Carmel, IN 46032 Size: 89.0 kWdc / 62.4 kWac Panels: JA Solar JAM72S30-530 (168) Inverters: SMA Sunny Boy 7.0 (12) Racking: Unirac Ecofoot 2+ Drawing: Draft Revision: 1 Date: 6/23/23 Drawn by: Morley Page: 12 Icon on Main Solar – Bussed Gutter Cut Sheet Project: Icon on Main Solar Location: 1025 West Main Street, Carmel, IN 46032 Size: 89.0 kWdc / 62.4 kWac Panels: JA Solar JAM72S30-530 (168) Inverters: SMA Sunny Boy 7.0 (12) Racking: Unirac Ecofoot 2+ Drawing: Draft Revision: 1 Date: 6/23/23 Drawn by: Morley Page: 13 Icon on Main Solar – Wire Cut Sheet Project: Icon on Main Solar Location: 1025 West Main Street, Carmel, IN 46032 Size: 89.0 kWdc / 62.4 kWac Panels: JA Solar JAM72S30-530 (168) Inverters: SMA Sunny Boy 7.0 (12) Racking: Unirac Ecofoot 2+ Drawing: Draft Revision: 1 Date: 6/23/23 Drawn by: Morley Page: 14 Icon on Main Solar – Labels Project: Icon on Main Solar Location: 1025 West Main Street, Carmel, IN 46032 Size: 89.0 kWdc / 62.4 kWac Panels: JA Solar JAM72S30-530 (168) Inverters: SMA Sunny Boy 7.0 (12) Racking: Unirac Ecofoot 2+ Drawing: Draft Revision: 1 Date: 6/23/23 Drawn by: Morley Page: 15