HomeMy WebLinkAboutA101_OVERALL FIRST FLOOR PLANA3002
A300 4
A3
0
0
3
A3
0
0
1
80' - 11 3/8"13' - 11"
80' - 3 1/4"
13' - 11"119' - 5 1/4"
43' - 10 3/8"45' - 3"
214
'
-
0
5
/
8
"
79' - 9 1/4"80' - 3 1/4"80' - 3 1/4"
12
0
'
-
0
"
WATER
W102
ELEC & DATA
102
Ar
e
a
B
2
Ar
e
a
B
1
Area A
Ar
e
a
E
Area E
Ar
e
a
D
Area A
Area D
Ar
e
a
C
2
Ar
e
a
C
1
Area D
Ar
e
a
C
1
Ar
e
a
B
2
75' - 8 7/8"
14
5
'
-
1
1
/
8
"
50' - 6 7/8"
14
5
'
-
1
1
/
8
"
14
5
'
-
1
1
/
8
"
14
5
'
-
1
1
/
8
"
Stair-7
ST7-1
RETAIL BOH
RE101D
STAIR-5
ST5-1
ELV-4
EL4-1
MECH
M102
ELEC.
E102B
ELV-3
EL3-1
STAIR-3
ST3-1
STAIR-1
ST1-1
STAIR-9
ST9-1
STAIR-10
ST10-1
STAIR-2
ST2-1
OPEN
LEASING/LOBBY
L100
A3101
A310
2
A310
3
A311
1
A311
2
A311 3
A311
4
A312
1
A
312
2
A
312
3
A
312
4
A313
1
A313
2
A313
4
A314 1
A314
2
A3151
A315
2
A316 1
A3171
A317
2
A318 1
A3191
A313 3
A316
2
A318
2
Area C1
C3
132
A233
B1
126
A221
A1
131
A211
A1
133
A211
A2
134
A212
A2
135
A212
A2
136
A212
A1
137
A211
A1
138
A211
A2
140
A212
B1
141
A221
A1
139
A211
A1
148
A211
A2
149
A211
A2
150
A211
A1
151
A211
A1
152
A211
B2
153
A222B1
130
A221
B1
128
A221
C2
124
A3
123
A215
B1
125
A221
B1
127
A221
B1
129
A221
B1
144
A221
A3
146
A215
C2
147
A242
B1
145
A221
B1
154
A221
B1
156
A221
B1
158
A221
A3
160
A215
C2
161
A232
B1
159
A221
B1
157
A221
B1
155
A221
CONDO 3C
C101
A243C
CONDO 3B
C102
A243B
CONDO 2
C103
A242A
CONDO 1A
C104
A241A
CONDO 1A
C105
A241A
CONDO 1B
C106
A241B
CONDO 3A
C107
A243A
CONDO 3A
C108
A243A
CONDO 1B
C109
A241B
CONDO 1A
C110
A241A
CONDO 1C
C111
A241C
CORRIDOR
106
GROTTO
CORRIDOR
107 A
CORRIDOR
108
CORRIDOR
105
CORRIDOR
101
CORRIDOR
100
RETAIL
RE101B
RETAIL
RE101C
ABCDEFGHJKLMNP
RSTUVWXYZ
AA
BB
DD
CC
1
2
3.4
4.1
C.5 C.3C.4 B.1D.1E.1F.1J.9K.9P.6P.7P.8P.9QQ.1
U.3 U.1V.7W.1W.4W.9
CC.9
0.9
1.1
1.2
1.4 1.5
1.7
1.9
2.9
3.0
4
5.4
5.1
5.2
5.25
5.3
5.35
5.8
5.5
6
6.7
6.8
6.9
7
21
21.3
23
24
25
8
9
10
D1
D2
D3
D4
DA DA.1 DB.1 DB
STAIR-8
ST8-1
5' - 8"
ELEC.
E103
ELEC.
E102A
LOADING ZONE
V102
RETAIL
R101A
FUTURE RETAIL
CA100
FUTURE RETAIL
CA101
CLUBROOM
CH101
FITNESS
F101
CORRIDOR
107 B
19
6
'
-
1
3
/
8
"
74'
-
6
"
30'
-
1
1
5
/
8
"
37' - 11"4' - 11"
ELV-1
EL1-1
ELV-2
EL2-1
60' - 9 1/8"
16
'
-
6
7
/
8
"
95' - 2 3/8"
98'
-
4
5
/
8
"
348' - 4"
25'
-
2
1
/
8
"
1
2
'
-
9
3
/
8
"
1
ID401
1
ID403
TYP.
3
ID402
7
ID132
A243E 11
General Notes
• The General Contractor shall
verify all conditions at the
jobsite. Notify Architect of any
deviations from those conditions
as they are noted on the
drawings.
• The General Contractor shall
coordinate and schedule all work
with the Owner.
• The General Contractor is
responsible for compliance with
all state and local building codes
and government regulatory
agencies.
• The General Contractor is to
submit shop drawings, project
data, and samples to
Owner/Architect for approval
prior to fabrication of all millwork
and wall finishes.
• Do not scale any drawings. Any
dimensions are to be obtained
from the Architect if not noted
on the drawings. Refer all
questions to the Architect or
Engineer on Record.
• All dimensions are to C.L. of
demising wall of units and face of
framing.
• The General Contractor shall
keep one set of plans at the
jobsite for the specific purpose
of recording actual construction
conditions. Such project record
documents shall be provided to
the Owner upon completion of the
project.
• The General Contractor shall
verify size, location, and
characteristics of all works and
equipment supplied by the Owner
or others with the manufacturer
or supplier prior to the start of
the work.
• The General Contractor shall see
that all Subcontractors receive
complete working drawings and
assume full responsibility for
coordination of work.
• See Enlarged Area Plans for
Additional Information.
AR
C
H
I
T
E
C
T
CL
I
E
N
T
CO
N
S
U
L
T
A
N
T
PR
O
J
E
C
T
DR
A
W
I
N
G
T
I
T
L
E
SE
A
L
SH
E
E
T
PR
O
J
E
C
T
I
N
F
O
RE
V
I
S
I
O
N
S
21059
1-19-24
Bid Docs
A101
Ov
e
r
a
l
l
F
i
r
s
t
F
l
o
o
r
Pl
a
n
10
2
5
W
e
s
t
M
a
i
n
S
t
r
e
e
t
Ca
r
m
e
l
,
I
N
4
6
0
3
2
SCALE: 1" = 20'-0"A101
1 First Floor Plan
IDF
ELEC
2/24/2025