Loading...
HomeMy WebLinkAboutA101_OVERALL FIRST FLOOR PLANA3002 A300 4 A3 0 0 3 A3 0 0 1 80' - 11 3/8"13' - 11" 80' - 3 1/4" 13' - 11"119' - 5 1/4" 43' - 10 3/8"45' - 3" 214 ' - 0 5 / 8 " 79' - 9 1/4"80' - 3 1/4"80' - 3 1/4" 12 0 ' - 0 " WATER W102 ELEC & DATA 102 Ar e a B 2 Ar e a B 1 Area A Ar e a E Area E Ar e a D Area A Area D Ar e a C 2 Ar e a C 1 Area D Ar e a C 1 Ar e a B 2 75' - 8 7/8" 14 5 ' - 1 1 / 8 " 50' - 6 7/8" 14 5 ' - 1 1 / 8 " 14 5 ' - 1 1 / 8 " 14 5 ' - 1 1 / 8 " Stair-7 ST7-1 RETAIL BOH RE101D STAIR-5 ST5-1 ELV-4 EL4-1 MECH M102 ELEC. E102B ELV-3 EL3-1 STAIR-3 ST3-1 STAIR-1 ST1-1 STAIR-9 ST9-1 STAIR-10 ST10-1 STAIR-2 ST2-1 OPEN LEASING/LOBBY L100 A3101 A310 2 A310 3 A311 1 A311 2 A311 3 A311 4 A312 1 A 312 2 A 312 3 A 312 4 A313 1 A313 2 A313 4 A314 1 A314 2 A3151 A315 2 A316 1 A3171 A317 2 A318 1 A3191 A313 3 A316 2 A318 2 Area C1 C3 132 A233 B1 126 A221 A1 131 A211 A1 133 A211 A2 134 A212 A2 135 A212 A2 136 A212 A1 137 A211 A1 138 A211 A2 140 A212 B1 141 A221 A1 139 A211 A1 148 A211 A2 149 A211 A2 150 A211 A1 151 A211 A1 152 A211 B2 153 A222B1 130 A221 B1 128 A221 C2 124 A3 123 A215 B1 125 A221 B1 127 A221 B1 129 A221 B1 144 A221 A3 146 A215 C2 147 A242 B1 145 A221 B1 154 A221 B1 156 A221 B1 158 A221 A3 160 A215 C2 161 A232 B1 159 A221 B1 157 A221 B1 155 A221 CONDO 3C C101 A243C CONDO 3B C102 A243B CONDO 2 C103 A242A CONDO 1A C104 A241A CONDO 1A C105 A241A CONDO 1B C106 A241B CONDO 3A C107 A243A CONDO 3A C108 A243A CONDO 1B C109 A241B CONDO 1A C110 A241A CONDO 1C C111 A241C CORRIDOR 106 GROTTO CORRIDOR 107 A CORRIDOR 108 CORRIDOR 105 CORRIDOR 101 CORRIDOR 100 RETAIL RE101B RETAIL RE101C ABCDEFGHJKLMNP RSTUVWXYZ AA BB DD CC 1 2 3.4 4.1 C.5 C.3C.4 B.1D.1E.1F.1J.9K.9P.6P.7P.8P.9QQ.1 U.3 U.1V.7W.1W.4W.9 CC.9 0.9 1.1 1.2 1.4 1.5 1.7 1.9 2.9 3.0 4 5.4 5.1 5.2 5.25 5.3 5.35 5.8 5.5 6 6.7 6.8 6.9 7 21 21.3 23 24 25 8 9 10 D1 D2 D3 D4 DA DA.1 DB.1 DB STAIR-8 ST8-1 5' - 8" ELEC. E103 ELEC. E102A LOADING ZONE V102 RETAIL R101A FUTURE RETAIL CA100 FUTURE RETAIL CA101 CLUBROOM CH101 FITNESS F101 CORRIDOR 107 B 19 6 ' - 1 3 / 8 " 74' - 6 " 30' - 1 1 5 / 8 " 37' - 11"4' - 11" ELV-1 EL1-1 ELV-2 EL2-1 60' - 9 1/8" 16 ' - 6 7 / 8 " 95' - 2 3/8" 98' - 4 5 / 8 " 348' - 4" 25' - 2 1 / 8 " 1 2 ' - 9 3 / 8 " 1 ID401 1 ID403 TYP. 3 ID402 7 ID132 A243E 11 General Notes • The General Contractor shall verify all conditions at the jobsite. Notify Architect of any deviations from those conditions as they are noted on the drawings. • The General Contractor shall coordinate and schedule all work with the Owner. • The General Contractor is responsible for compliance with all state and local building codes and government regulatory agencies. • The General Contractor is to submit shop drawings, project data, and samples to Owner/Architect for approval prior to fabrication of all millwork and wall finishes. • Do not scale any drawings. Any dimensions are to be obtained from the Architect if not noted on the drawings. Refer all questions to the Architect or Engineer on Record. • All dimensions are to C.L. of demising wall of units and face of framing. • The General Contractor shall keep one set of plans at the jobsite for the specific purpose of recording actual construction conditions. Such project record documents shall be provided to the Owner upon completion of the project. • The General Contractor shall verify size, location, and characteristics of all works and equipment supplied by the Owner or others with the manufacturer or supplier prior to the start of the work. • The General Contractor shall see that all Subcontractors receive complete working drawings and assume full responsibility for coordination of work. • See Enlarged Area Plans for Additional Information. AR C H I T E C T CL I E N T CO N S U L T A N T PR O J E C T DR A W I N G T I T L E SE A L SH E E T PR O J E C T I N F O RE V I S I O N S 21059 1-19-24 Bid Docs A101 Ov e r a l l F i r s t F l o o r Pl a n 10 2 5 W e s t M a i n S t r e e t Ca r m e l , I N 4 6 0 3 2 SCALE: 1" = 20'-0"A101 1 First Floor Plan IDF ELEC 2/24/2025