Loading...
HomeMy WebLinkAboutA104_OVERALL FOURTH FLOOR PLANA3002 A300 4 A3 0 0 3 A3 0 0 1 45' - 9 7 / 8 " 44' - 2 3/8" 44' - 11" 79' - 5 1/4"79' - 7 1/4"79' - 7 1/4" 79' - 3 1/8" 188' - 6 5/8" Ar e a B 2 Ar e a B 1 Area A Ar e a E Area E Ar e a D Area A Area D Ar e a C 2 Ar e a C 1 Area D Ar e a C 1 Ar e a B 2 75' - 8 7/8" 14 5 ' - 1 1 / 8 " 14 5 ' - 1 1 / 4 " 50' - 7" 14 5 ' - 1 1 / 4 " 14 5 ' - 1 1 / 4 " STAIR-5 ST5-4 STAIR-3 ST3-4 STAIR-7 ST7-4 STAIR-2 ST2-4 ELV-3 EL3-4 STAIR-8 ST8-4 STAIR-9 ST9-4 STAIR-10 ST10-4 STAIR-1 ST1-4 ELV-4 EL4-4 A3101 A310 2 A310 3 A311 1 A311 2 A311 3 A311 4 A312 1 A 312 2 A 312 3 A 312 4 A313 1 A313 2 A313 4 A314 1 A314 2 A3151 A315 2 A316 1 A3171 A317 2 A318 1 A3191 A313 3 A316 2 A318 2 Area C1 C3 432 A233 B1 430 A221 B1 428 A221 B1 426 A221 C2 424 A232 A3 423 A215 B1 425 A221 B1 427 A221 B1 429 A221 A1 431 A211 A1 433 A211 A2 434 A212 A2 435 A212 A2 436 A212 A1 437 A211 A1 438 A211 B1 440 A221 B1 442 A221 B1 444 A221 A3 446 A215 C2 447 A232 B1 445 A221 B1 443 A221 B1 441 A221 A1 439 A211 A1 448 A211 A2 449 A212 A2 450 A212 A1 451 A211 A1 452 A211 B1 454 A221 B1 456 A221 B1 458 A221 A3 460 A215 C2 461 A232 B1 459 A221 B1 457 A221 B1 455 A221 B2 453 A222 B4 422 A224 A1 421 A211 A1 405 A211 A2 407 A212 B1 413 A221 A4 415 A216 A2 417 A212 C2 420 A232 A2 418 A212 B3 416 A223 A2 414 A212 B1 412 A221 A2b 410 A214 B1 408 A221 A2 406 A212 A1 404 A211 A1 403 A211 Unit B1 402 A221 C1 C401 A231 Condo 4 C309 A244 Condo 4 C310 A244 Condo 4 C311 A244 Condo 6 C308 A246 Condo 6 C307 A246 Condo 4 C306 A244 Condo 4 C305 A244 Condo 4 C304 A244 Condo 5 C303 A245 Condo 6 C301 A246 Condo 6 C302 A246 CORRIDOR 406 CORRIDOR 407 CORRIDOR 405 CORRIDOR 403 CORRIDOR 402 CORRIDOR 404 CORRIDOR 408 ABCDEFGHJKLMNP RSTUVWXYZ AA BB DD CC 1 2 3.4 4.1 C.5 C.3C.4 B.1D.1E.1F.1J.9K.9P.6P.7P.8P.9QQ.1 U.3 U.1V.7W.1W.4W.9 CC.9 0.9 1.1 1.2 1.4 1.5 1.7 1.9 2.9 3.0 4 5.4 5.1 5.2 5.25 5.3 5.35 5.8 5.5 6 6.7 6.86.9 7 21 21.3 23 24 25 8 9 10 D1 D2 D3 D4 DA DA.1 DB.1 DB 347' - 4" 85' - 1 1 1 / 2 " 11' - 3 1 / 2 " 5 5 ' - 3 " 1 2 ' - 9 5 / 8 " 4 1 ' - 8 " 96' - 6 " 2 0 4 ' - 1 1 " 60' - 9 1/4" 212 ' - 1 1 1 / 4 " ELV-1 EL1-4 B1 409 A221 A2 411 A212 A3 419 A215 ELV-2 EL2-4 1 ID132 SIM. 1 ID403 TYP. General Notes • The General Contractor shall verify all conditions at the jobsite. Notify Architect of any deviations from those conditions as they are noted on the drawings. • The General Contractor shall coordinate and schedule all work with the Owner. • The General Contractor is responsible for compliance with all state and local building codes and government regulatory agencies. • The General Contractor is to submit shop drawings, project data, and samples to Owner/Architect for approval prior to fabrication of all millwork and wall finishes. • Do not scale any drawings. Any dimensions are to be obtained from the Architect if not noted on the drawings. Refer all questions to the Architect or Engineer on Record. • All dimensions are to C.L. of demising wall of units and face of framing. • The General Contractor shall keep one set of plans at the jobsite for the specific purpose of recording actual construction conditions. Such project record documents shall be provided to the Owner upon completion of the project. • The General Contractor shall verify size, location, and characteristics of all works and equipment supplied by the Owner or others with the manufacturer or supplier prior to the start of the work. • The General Contractor shall see that all Subcontractors receive complete working drawings and assume full responsibility for coordination of work. • See Enlarged Area Plans for Additional Information. AR C H I T E C T CL I E N T CO N S U L T A N T PR O J E C T DR A W I N G T I T L E SE A L SH E E T PR O J E C T I N F O RE V I S I O N S 21059 1-19-24 Bid Docs A104 Ov e r a l F o u r t h Fl o o r P l a n 10 2 5 W e s t M a i n S t r e e t Ca r m e l , I N 4 6 0 3 2 SCALE: 1" = 20'-0"A104 1 Fourth Floor Plan IDF ELEC IDF IDF ID F ELEC EL E C EL E C Storage 2/24/2025