SUMMARY OF TAC MEETING
April 21 st, 2004
This will record the items that were discussed at the TAC
meeting as to which Martin Marietta was requested to provide
additional information, together with its partial response. At the
City's request, MMA will submit a formal response to Jon D's letter
of 4/20/04.
2.01 MM will provide a Mine map with the requested existing
contours.
3.01 MM requested a copy of the applicable city noise
ordinance, which the City is to provide. If necessary, MM
would like the City to explain what the standards are. It
was acknowledged that there is no noise ordinance
specific to mining and that the existing ordinance may not
adequately address noise. Jason Kappel recommended
looking at levels used by other governments. MM
remarked that it is difficult to respond on noise without
knowing what the permissible levels are. The City would
like recommendations for industry standards on noise.
Spectra would like to know what the existing levels are
and how noise propagation from this application will
affect it.
3.03 MM will clarify what it is proposing as far as hours of
operation. It will also clarify that when it refers to
overburden that is the waste material above the sand and
gravel.
5.01- 03 There was an extensive discussion about groundwater
information, generally, and its impact on reclamation
specifically. After further discussion with Spectra, however, it
was determined that the current plan may be acceptable if MM
clarifies it to explain how dry reclamation will be accomplished
by routing the water to the existing open pit operation.
Many of Spectra's questions have been addressed by
information submitted to the City's hydro-geology consultant,
I I
.
t..... t
Jack Whitman, but John Duffy will provide additional questions
to Martin Marietta and would like to have a subsequent meeting
to go over them. MM is agreeable to that.
5.04 The surveyor wants a bond and maintenance agreement
and a copy of the letter showing the permit is still valid for the
creek relocation. The bond amount will be provided by the
Department. MM will also submit another copy of the Feb. 25,
2003 letter. MM will forward a copy of the Bwe relocation
plan to Spectra Engineering.
6.01 MM will acknowledge its obligation to have the topsoil
specified in the plans available for reclamation. (depth of
topsoil)
6.02 MM will add two more species of shade trees and one
species of ornamental trees to the reclamation plan.
6.03-04
See discussion in 5.01-.03 re reclamation issues.
7.01, .03 See discussion in 5.01-.03. MM to provide
Utilities Dept. with a complete set of project booklets and
materials.
McBride, Engineering-MM will provide a copy of its NPDES
permi t & full book.
Fire Dept.-MM is to commit to provide the fire Dept with an
updated SPCC plan whenever MM adopts one.
Misc. MM will provide BZA information packets in PDF format.
MM will provide a copy of distribution list from Request for
Information March 17,2004.