HomeMy WebLinkAboutPrimary Plat Supporting DataTABLE OF CONTENTS
Location Map…………………………………………………..…………. 1
Watershed Location Map…………………………………………………. 2
Zoning Map………………………………………………………………. 3
Soils Survey Map………………………………………………………… 4
F.E.M.A. Flood Map…………………………………………………….. 5
Erosion Control Map…………………………………………………….. 6
Primary Plat Check List…………………………………………………. 7-7a
PRIMARY PLAT CHECKLIST
NAME OF APPLICANT:_____________________________________________________________
NAME OF SUBDIVISION: ____________________________________________________________
DATE OF PLAN COMMISSION MEETING:________________________________________________
PREPARED BY: ___________________________ DATE: ___________________
A. Two Copies of Plat to Illustrate:
_____ 1. Name of subdivision (5.2.1)
_____ 2. Words "PRIMARY PLAT" (5.2.1)
_____ 3. Date of submission of latest revisions (5.2.1)
_____ 4. Name of subdivision designer (5.2.1)
_____ 5. Present zoning classification (5.2.1)
_____ 6. Total acreage of the plat (5.2.1)
_____ 7. Name, address, telephone number of owner, subdivider & registered land surveyor (5.2.2)
_____ 8. Street and rights-of-way: (5.2.3)
a. Locations
b. Names
c. Street width
d. Right-of-way width
_____ 9. Location, size and capacity of: (5.2.5)
a. Proposed sanitary sewers
b. Water mains, hydrants
c. Drainage system
_____ 10. Layout of lots showing dimensions, lot number & square footage (5.2.6)
_____ 11. Parcels to be dedicated or reserved for public use (5.2.7)
_____ 12. Contour slopes (5.2.8)
_____ 13. Tract boundary lines showing dimensions, angle bearings, existing monuments, markers
and benchmarks. (5.2.9)
_____ 14. Location of flood plains (FP, FF and FW) (5.2.10)
_____ 15. Building setback lines (5.2.11)
_____ 16. Legends and notes (5.2.12)
B. Supporting Data:
_____ 1. Area location map of 1" = 500' to show: (5.3.1)
a) Existing adjacent uses
b) Watershed boundaries
c) Thoroughfares directly related to proposed subdivision
d) Existing adjoining zoning classifications and proposed uses
e) Title on area location map, its scale, north arrow and date information was placed on
map
7
Mukkaish Patel
Patel Estates
October 2, 2007
Vincent Barr July 27, 2007
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
_____ 2. Service reports of statements (5.3.3)
a) Police and Sheriff
b) Fire Department
c) Water and sanitary sewer utilities
d) Electric, gas and telephone utilities
e) Carmel/Clay schools
f) Hamilton County Health Department
g) Surveyor, Drainage Board, County Commissioners
h) Indiana Natural Resources Commission
i) Carmel Board of Public Works
j) Director of the Dept. of Community Development
_____ 3. Report describing water system, sanitary sewer system and storm drainage system
_____ 4. Statement from State Highway, County Highway or City Street Dept.
_____ 5. Soils map and report from Hamilton County Soils & Water Districts (5.3.6)
_____ 6. A description of the protective covenants or private restrictions (5.3.7)
_____ 7. Erosion control plan (5.3.9)
_____ 8. Statement from the Carmel Board of Public Works or other appropriate authority stating that
said authority has capacity for sewer/water hookups (5.3.10)
_____ 9. Landscape plan
_____ 10. Proposed signage plan
7a
X
X
N/A
X
N/A
N/A
N/A