STAFF REPORT
May 26, 1999
Request of Martin Marietta Materials. Inc. (applicant) for Mart
Materials. Inc. (option pending). Bedrock Investment. LLC. Sawyer Place LLC.
and Guttman Enterprise Limited Partnership (owners) to consider a Zoning Map
Amendment from Agriculture (A-1), Agricultural Estate (A-2), and Commercial
Services (C-3) to Industrial Four "Subsurface Mining District" (1-4) for an
approximate 575 acre site located on the north side of 1-275 at the Petersburg (KY
8) interchange, and along both sides of Garrison ,Creek Road, Boone County,
Kentucky. The request is for a zone change to allow the underground extraction,
processing, and sale of processed materials and all related activities pertaining to
subsurface mining operations.
Request of Martin Marietta Materials. Inc. (applicant) for Martin Marietta
Materials. Inc. (option pending). Bedrock Investment. LLC. Sawyer Place LLC.
and Guttman Enterprise Limited Partnership (owners) to, consider a Zoning Map
Amendment from Agriculture (A-1), Agricultural Estate (A-2), and Commercial
Services (C.:.3) to Industrial Four .Subsurface Mining District"/Planned Development
(1-4/PD) for an approximate 575 acre site located on the north side of 1-275 at the
Petersburg (KY 8) interchange, and along both sides of Garrison Creek Road,
Boone Cou'nty, Kentucky. The request is for a zone change to allow tbe
underground extraction, processing, and sale of processed materials and all related
activities pertaining to subsurface mining operations, and ,an outdoor recreational
trail facility.
Request of Martin Marietta Materials. Inc. (applicant) for Martin Marietta
Materials. Inc. (option pending). Bedrock Investment. LLC. Sawyer Place LLC.
and Guttman Enterprise Limited Partnership (owners) to consider a Zoning Map
, Amendment from Agriculture (A-1), Agricultural Estate (A-2) , an,d Commercial
Services (C-3) to Industrial Four "Subsurface Mining District" (1-4), and a Varia~ce
from Section 1189 "Geographic Requirements," Subsection 2, for an approximate
575 acre site located on the north side of 1-275 at the Petersburg (KY 8)
interchange, and along both sides of Garrison Creek Road, Boone County,
Kentucky. The request is for a zone change to allow the underground extraction,
processing, and sale of processed materials and all related activities pertaining to
subsurface mining operations, and a variance from a 3,000 foot separation standard
required between the proposed 1-4 zone and certain types of residential areas.
I .. I~
(
(
STAFF REPORT - Martin Marietta Materials, Inc.
May 26, 1999
Page 2
REQUEST
As noted above, the applicant has submitted three different zone change applications from
Agriculture (A-1), Agricultural Estate (A-2), and Commercial Services (C-3) to Industrial
Four (1-4) for 575 acres that is located on the north side of 1-275 at the Petersburg
interchange. The zone change area is located on both sides of Garrison Creek Road; the
area on the north side of Garrison Creek Road extends westward from nearby the
Bullitsburg Baptist Church to the area adjoining the tenninus of Garrison Creek Road. The
.. site is predominately zoned A-1 and A-2, with a small area near the interchange that is
zoned C-3.
The first application is simply for a zone change to the 1-4 .zone. '" The second application
is for a zone change to 1-4 in conjunction with a variance request from Section 1189
"Geographic Requirements," Subsection 2 to allow a reduction in the minimum 3,000 foot
separation required between the 1-4 zone and certain types of residential uses (1,500'
shown .for subsurface activities: approximately 1,800' separation shown to the existing
Gaines House that is proposed to be reused as an on-site residence and field office,.
approximately 2,100' separation shown to the "office and scale house," and 2,350' shown
to the closest stockpile). The written variance application materials request this separation
. to be reduced to 1,500 feet for subsurface activities and 1,000 feet. for surface activities.
The third application is for a zone change to 1-4/PD. In addition to tl:te subsurface mining
related uses, this application also includes a recreational loop trail and ancillary parking in
the western part of the site on the north side of Garrison Creek Road.. A variance per se
is not requested with this application, but the application does request a relaxation in the'
3,000 foot separation requirement discussed above as pennitted by the Planned
Development overlay zone.
The following basic components of the facility are unifonn in all three applications:
. Construction of a paved driveway from the Petersburg interchange into the site.
This driveway will essentially act as an extension of KY 8 from the interchange into
the site. Garrison Creek Road will remain in place' (the new driveway will intersect
with Garrison Creek Road). Garrison Creek Road between this new driveway and
Garrison Creek itself and the portal area: is proposed to be upgraded to subcollector
standards (28' pavement width). Landscape buffering and stonemasonry signage
monuments are proposed along the new driveway.
"
(
C.
STAFF REPORT - Martin Marietta Materials, Inc.
May 26. 1999
Page 3
. Surface operations are proposed in the eastem part of the site, just north of the first
curve in the Garrison Creek Road (where the road changes from basically a
north/south road to an eastlwest road). These operations include office uses, scale
house, sorting, crushing, stockpiling, water sedimentation basins, etc. Future
asphalt and concrete production areas are planned in the surface operations area,
however, such facilities are not part of the present applications (these uses are
Conditional Uses in the 1-4 zone). A minimum 200 foot "no disturb" area setback is
shown along the property lines that are immediately north and east of the surface
operations area. Berming is proposed around the perimeter of the surface
operations area. . A wheel wash facility is proposed to be. located on the main
driveway approximately 580 feet north of Garrison Creek Road, and the driveway
between the wheel wash facility and Garrison Creek Road is proposed to be paved,
both for the 1-4/variance and the 1-4/PD applications. For the "straight" 1-4
application. the wheel wash facility is located outside of the required 3,000 foot
separation and the main driveway is paved for the initial 625 feet that is immediately
north of Garrison Creek Road.
. Use of the existing Gaines House as an on-site residence and field office.
. The subsurface portal area is proposed in the approximate midpoint of the site
along the north side of Garrison Creek Road and along the east side of Garrison
Creek itself. The portal area will include employee parking, several ancillary
~tructures.and an overland conveyor that would transport materials between the
portal area and the surface. operations area in the eastern part of the site. . The
portal area includes approximately 4 acres on the surface. .
. A "potential" water storage lake/basin and several ventilation shafts are proposed
in the western part of the site (i.e., west of Garrison Creek and the portal area):
. No surface activities, except for the proposed driveway, are proposed in the
southern part of the site (between 1-275 and Garrison Creek Road). .
. The surface areas outside of the surface operations area, portal area, above ground
conveyor, ventilation shafts, and potential water storage basin (and related pipe
work) are proposed to be undisturbed. .
. Primary crushing of materials is proposed to occur in the subsurface area of the.
mine as soon as adequate space has been created. Secondary crushing is
proposed to occur in the surface operations area.
(
('
STAFF REPORT - Martin Marietta Materials, Inc.
May 26, 1999
Page 4
The following basic components of the proposal vary depending on the specific application:
. The surface operations areas are identical for the 1-4/variance and 1-4/PD
applications (approximately 64 acres). The requested encroachment into the
required 3,000 foot separation area by the surface operations area is discussed
above. The surface operations area is smaller for the "straight" 1-4 application at
approximately 32 acres (is proposed to observe the 3,000 foot requirement).
. The subsurface operations for the straight 1-4 application is proposed to observe the
3,000 foot separation requirement discussed above.(contained completely on the
north side of Garrison Creek Road) whereas this separation is proposed to be
reduced to 1,500 feet for the other two applications (would include some area on .
the south side of Garrison Creek Road).
. The recreational loop trail is proposed only as part.of the 1-4/PD application in an
effort to create a mixed-use development as sought .by Article 15 "Planned
Development District" of the Boone County Zoning Regulations.
Centralized water and sanitary disposal systems are not proposed. Water supply and
sanitary disposal are discussed in the application materials. In addition, a traffic report,
discussion of archaeological and historic resources, noise .and vibration studies, and an
overview of the proposed operations are also provided in the application materials. The
application materials include discussions on how the applicant contends that these
applications fulfill the statutory criteria for the granting of zone changes and how the
requested variance fulfills the statutory criteria for the granting of the same.
SITE CHARACTERISTICS
The site contains approximately 575 acres. The southern-most part of the site adjoins the
Petersburg/KY 8 interchange, and the site is located along both sides of Garrison Creek
Road where said road I'!Jns between the interchange and the Delph House (near the
entrance to the Baptist Association church camp). The site is mostly wooded hillside area,
but it does have pasture areas in the flatter portions of the southern part of the site near .
the interchange and in the eastern part of the site. The site contains a cluster of structures
(mostly agricultural structures), including the historic Gaines House. A farm pond is
located near this cluster of structures. Several overhead utility lines exist on the site.
Garrison Creek runs across the northern boundary of the eastern part of the site, and then
curves and runs through the approximate center of the site in a north/south manner; a
.' .
"
(
c
STAFF REPORT - Martin Marietta Materials, Inc.
May 26,1999
Page 5
driveway/gravel road that is used to access the unrelated property to the north of the
subject site r,uns along this part of the creek (gravel road runs through the subject
property). The 1883 Atlas of Boone, Kenton and Campbell Counties shows "a road that
connects to Garrison Creek Road just north of the Bullitsburg Baptist Church cemetery and
runs along the eastern boundary of the site. Public water and sanitary sewer service are
not currently in the vicinity.
ADJOINING LAND USES AND ZONING
A. The area to the north and east of the site is largely wooded hillsides that contain a
few residences (A-1). A cellular communications monopole is located to the north
adjacent to one of these residences. The Ohio River is located further to the north.
The Williams Road/Merrell Road area is located further to the east and includes
farms, wooded areas, residences, and a golf course (A-1, A-2, SR-1, and R).
B. The area to the south of the eastern part of the site (east of the Petersburg
interchange) includes the Bullitsburg Baptist Church and cemetery (C-3), a
residence on Garrison Creek Road immediately north of the church (C-3), a couple
residences along the old Bullitsburg Church Road (RSE)~ a cellular commun.ications
monopole along the north side of 1-275 (PF), and wooded areas and- pasture areas
to the east of these uses (A-1).
C. A combination of pastures and residences (RSE, RS, and .c-3), the Answers in
Genesis site including a cellular communications lattice tower (PF), and a concrete
plant (1-2) are located further to the south across 1-275.
D. Several residences are located to the west of the subject site along the north/south
section of Garrison Creek Road near the Ohio River (A-1). The areas adjoining this
section of Garrison Creek Road are largely wooded hillsides (A-1).
E. The area along the east/west section of Garrison Creek Road (middle section
immediately south of the western section of the subject site that is on the north side
of the road, and immediately west of the southern section of the subject site that is
on the south side of the road) contains a few single family residences (including the
historic Delph House). pasture and wooded hillside areas (all are zoned A-1), and
the Baptist Association church camp (R). Garrison Creek itself parallels the road
in this area.
. ,
(
(
STAFF REPORT - Martin Marietta Materials, Inc.
May 26, 1999
Page 6
F. The area along the south side of L-275, west of the interchange, contains several
farms, wooded areas, a number of single-family residences, and a bed and
breakfast, notably along Stevens Road (combination of A-1, RSE, and C-3 near the
interchange itself).
HISTORY OF ISSUE AND SITE
1974 A zone change from Agricultural Three to Planned Development for a portion of the
subject property (approximately 155 acres) was recommended for approval by the
Planning Commission on January 9. This zone change later became moot as a
result of the Creative Displays decision.
1980. The current A-1, A-2, and C-3 zoning for the site was adopted in 1980 as part of the
Official Zoning Map and Zoning Regulations that were prepared by KZF, Inc.
1995 On March 15, a staff report on The Feasibility.of a Text Amendment to the Boone
County Zoning Regulations was presented to the Boone County Planning.
Commission to evaluate subsurface mining as a permitted use. This report was
subsequently revised by the Planning Commission's Long Range Planning
Commission. The amended report was presented to the Boone County Fiscal Court '.
on May 9.
1996 Draft regulations to permit subsurface mining in Boone County where considered
through the 1996 Zoning Update, but were not included in the Zoning Regulations
that were recommended for approval by the Planning Commission and
subsequently adopted by the legislative bodies.
1997 On October 29, the Planning Commission conducted a Public Hearing for a Zoning.
Text Amendment which would add the -Industrial Four"(I-4) zone to the Boone
County Zoning Regulations. This amendment would permit subsurface mining and
related activities in Boone County. The Planning Commission recommended that
the 1-4 amendments be adopted on December 17.
1998 The Fiscal Court adopted the 1-4 Zoning Text Amendments on February 10.
RELATIONSHIP TO 1995 BOONE COUNTY COMPREHENSIVE PLAN
The site is described on the Boone County 2020 Future Land Use Map as Rural Lands
(RL), Developmentally Sensitive (OS) and Rural Density Residential (RD). As noted on
page 207 of the Land Use Element, the Comprehensive Plan utilizes a 25 year planning
horizon. As a result the Future Land Use Map indicates planned land uses for the year
(
(
STAFF REPORT - Martin Marietta Materials, Inc.
May 26,1999
Page 7
2020. The Plan is a tool designed to enable Boone County and the Planning Commission
to manage the location and timing of the various types of development to assure that
adjoining land uses are compatible, and to assure that negative impacts to the. environment
are minimized.
The land Use Element addresses urban service areas, and recommends that some areas
ofthe county remain rural or low density development until it is reasonable to extend urban
seniices and there is enough development mass to efficiently make use of the services.
The land Use Element also states on page 207 that urban services are not the only
criteria, but that there are many other considerations to take into account to determine
whether development is appropriate or not.
. The Developmentally Sensitive (OS) classification is described on pages 207 and 208, and
provides notification that there are slope or other stability considerations that must be
addressed in proposed development.
The Rural lands classification calls for very low density residential development in a mainly
agricultural or open space area.
Rural Density Residential could develop as one dwelling unit per acre as a general
maximum density over the affected area.
The Future land Use Development Guidelines section of this element. recommends
utilizing existing topography and vegetation on development sites. This is particularly
important where areas are designated as OS. The portal area and settling ponds of the
mine development are shown in the OS area. The Element goes on to recommend
retaining wooded stream valleys as greenbelts. The Environment Goals and Objectives
and the Environment Element recommend that detailed inventory and analysis of
resources within the OS area occur for each development. The applicant has not
performed such an analysis, and staff is concerned that the proposed portal area and
conveyor system directly impacts a OS area.
According to U.S. Geological Survey Maps, parts of the site contain the Kope Formation,
which consists of interbedded ~hale and limestone bedrock layers. Where exposed, these
layers are prone to slippage and landslide conditions. . The portions of the site most
affected by this situation are the lower portions of the Garrison Creek and tributary valley
walls. With the topography present in this area, the Kope formation is exposed generally
within approximately 600 to 700 feet as measured horizontally from Garrison Creek. This
includes the proposed portal area and some of the proposed conveyor location. Staff is
concerned that this formation may require extra attention and precautions, and there may
be some areas that should not be developed at all based on site specific analysis.
c
(
STAFF REPORT - Martin Marietta Materials. Inc.
May 26.1999
Page 8
The Element also recommends proper usage or treatment of historic resources such as
the Gaines House and outbuildings near the access road. The applicant has indicated that
the main structure would be used as a caretaker quarters and office.
Section B-1. River Road Area. page 214 of the Comprehensive Plan discusses a possible
connection between KY 8 along the Ohio River to the 1-275 interchange at Bullitsburg
Church Road. A letter dated May 21. 1999 from George Hoffman of the Kentucky
Transportation Cabinet regarding this issue is attached to this report. The Plan
recommends that a connection between the Petersburg Interchange and the Graves
Road/Williams Road area and a possible connection between Williams Road and KY 8
would be a better way to serve future development and minimize impacts on the
Developmentally Sensitive hillsides and stream valleys than the above mentioned
connection. This is reaffinned on page 215 in section B-2. This road is shown
conceptually in Figure 3-6 in the 1996 Boone County Transportation Plan. It is shown as
a special funding project for the years 2015 to 2020.
Garrison Creek is recommended to "remain intact as. a greenbelt." Later, the Plan
recommends that the stream valleys and ridge bluff lines remain in their current state for
future recreation opportunities to serve ridge top residential development. Staff is
concerned that the noise associated with the. proposed materials conveyors would not
make the Cirea desirable for a natural areas path or similar passive recreation use..
In general, Sections B-1 and B-2 refer the area north of 1..275 near the proposed mine site.
as future residential development land when infrastructure is present. There are several
references to protection of the hillsides and good residential development design. The
Traditions Golf Course is mentioned as a residential growth catalyst.
The Idlewild interchange area is described as supporting gradual highway related
commercial development with some future orientation toward tourism uses in Western
Boone County. This is recommended to occur south of the interchange to directly serve
traffic and to take advantage of visibility.
The Interchange area appears as a recommended planning project in the Western Boone
County Study. This is not an officially adopted document, nor does it propose lan~ use
regulations. It does. however, suggest that this area, among others.. be considered for
future detailed planning efforts. such as a corridor plan.
The Economy Goal recommends a sustainable economy that reflects innovation and
prosperity and protects the environment.
The Business Activity Goals and Objectives. as well as the Business Activity Element
address the location of industrial development and specifically recommend that industrial
districts be properly located in advance of other development to lessen negative impacts
on future development. In addition to location, development design is important to
minimize dust. noise. and other impacts on adjacent land uses and the public
infrastructu re.
c
c-
STAFF REPORT - Martin Marietta Materials, Inc.
May 26,1999
Page 9
The Element notes that base industries like mining are necessary for the economy of an
area and to bring investment to an area. As described on page 77, however, Boone
County already has mining activity and other base industries like manufacturing and. .. .
agriculture. The provision of base industries must be balanced with their impacts on the
community. Page 84 specifically notes that "Other types of mining activities may occur in
the future of Boone County, but only with an evaluation of its benefits and costs to the
community, including its impact on existing businesses and residential/agricultural uses."
Figure 5.3, the Future Industrial and Commercial Development map on page 87 of the
Business Activity Element, does not show the subject site for industrial development.
As shown in Table 5.1, Boone County Base Industries, 1970 - 1989, mining involves
significantly fewer numbers of businesses and fewer employees than other forrT:Is of
industry in Boone County.
The Recreation Element recommends that areas adjoining the Ohio River and major
stream valleys like Garrison Creek be studied in detail for public recreation opportunities.
The Element also notes that the area north of 1-275 is in particular need of public recreation
sites.
The Preservation Element recommends that historic buildings, like those present on this
site, should be protected or proper1y used within development. Archeology is another
important issue, especially in areas Iike.this near the Ohio River. These resources must
be dealt with proper1y.
A Transportation Objective is to give priority to protecting capacity and improving the
existing road system.
Page 187 of the Transportation Element indicates that Boone County's .ohio River
shoreline is generally an undeveloped resource because of poor access, and .the
Comprehensive Plan calls for study of the riverfront's potential for a variety of land uses,
including industrial and port operations. Staff is concerned that this proposed limestone
mine does not make use of this notable resource, and may depend too much on the road
system. The proposal does nothing to further the realization of the potential for connecting
surface transportation and these types of land uses to the Ohio River.
STAFF CONCERNS
1 . Comprehensive Plan
First, the Planning Commission and Fiscal Court will need to determine whether all
three applications are in agreement with the Comprehensive Plan. Highlights of
issues dealing with the Comprehensive Plan include:
(
(
STAFF REPORT - Martin Marietta Materials, Inc.
May 26,1999
Page 10
/
C.
D.
E.
F.
G.
A.
The Future Land Use Map designates the site predominately as
Developmentally Sensitive Areas (including the location of the portal) and
Rural Lands (encompasses most of the surface operations area on the
eastern plateau), and notably smaller portions of the site for Rural Density
Residential uses near the interchange. Concerns are noted above in detail
regarding disturbance within the OS areas.
B.
The text of the Land Use Element expressly states "the Garrison Creek
valley should remain intact as greenbelt adjacent to Rural Density
Residential growth, and should be considered for future outdoor recreational
opportunities," therefore, it will need to be detennined whether this provision
of the Comprehensive Plan is met when considering the substantive surface
o'perations and portal areas that are. proposed, . the substantive wooded
hillside areas that are proposed to be'retained. and the fact that recreational
facilities are only proposed with the 1-4/PD application although they could
conceivably be provided with any of the three applications.
The Land Use Element also describes the Idlewild interchange area as
supporting gradual highway related commercial developm~nt with some
future orientation toward tourism uses in Western Boone County.
As noted above, the Recreation .Element recommends that areas adjoining
the Ohio River and major stream valleys like Garrison Creek be studied in
detail for public recreation opportunities. The Elements also notes that the
area north of 1-275 is in particular need of public recreation sites. Again,
recreational facilities are only proposed with the 1-4/PD application.
Figure 5.3, the Future Industrial and Commercial Development map on page
87 of the Business Activity Element, does not designate the subject site for
industrial development.
The Business Activity Element specifically notes that "other types of mining
activities may occur in the future of Boone County, but only with an
evaluation of its benefits and costs to the community. including its impact on
existing businesses and residential/agricultural uses."
The proposal does not make use of the Ohio River shoreline at all for port
purposes, but depends entirely on the road system.
The Planning Commission and Fiscal Court will also need to detennine whether the
three applications fulfill the alternate findings for the granting of zone changes.
.
~
c
(
STAFF REPORT - Martin Marietta Materials, Inc.
May 26,1999
Page 11
2. 3.000 Foot Residential Separation
As discussed previously, two of the three applications (1-4/variance and 1-4/PD
applications) seek a reduction in the 3,000 foot separation required between the 1-4
zone and certain types of residential uses (Section 1189 "Geographic
Requirements," Subsection 2). While the criteria for granting such a reduction is
different for the two applications, tangible impacts and possible nuisances that may
be created by such a reduction need to be considered regardless. Of particular
concern to staff is the fact that the Vibration Study provided by the applicant notes
that a test seismograph (#10) that was placed a surface distance of 2,700 feet and
a direct distance of 2,745 feet from the test blast recorded a peak particle velocity
of "less than 0.050 ips" (inches per second) (1-4/variance application booklet, pg. C-
60). This same vibration study states on the following page that "vibrations of the
magnitude recorded in this study are perceptible. The human body can sense
vibration levels as low as 0.03 ips."
Thus, the levels of vibration' measured at seismograph #10 are within.the range of
being perceptible and should be evaluated as to whether they would create an
unacceptable impact or nuisance. Minimally; the results ofthis report give credence.
. to the 3,000 foot separation requirement in a general sense.
Overall, the Planning Commission and Fiscal Court will need to consider the criteria
for the granting otvariances as outlined in Section 251 of the Boone County Zoning.
Regulations. A portion of the applicant's arguments regarding the requested
variance pertain to economiclfinancial concerns, however, economic hardship is not
a legitimate basis for the granting of variances. In addition, the application for the
"straight 1-4" zone demonstrates that the 3,000 foot separation requirement can be
met.
~
3. Planned Development Requirements
Relative to the application for the 1-4(PD zone, staff offers the following comments
regarding the standards set forth in Section 1514 "Planned Development
Standards. of the Boone County Zoning Regulations. Concept Development Plan
proposals in Planned Developments are to be primarily evaluated against these
criteria. These comments are offered relative to these specific standards, and do
not serve as a staff recommendation for the proposal as a whole.
1. Mixed Use Development and Pedestrian Orientation: The Concept Development
Plan combines subsurface mining related uses, an outdoor recreational trail facility,
and undisturbed hillside/open space areas. When considering the
rural/undeveloped character of the area, and the fact that most "active" land uses
such as retail, office, industrial, dwelling units, etc., are not commonly conceived as
being appropriately "mixed" with subsurface mining operations, staff considers the
proposed mixed-use concept to be reasonable, provided that the subsurface mining
c
c
STAFF REPORT - Martin Marietta Materials, Inc.
May 26, 1999
Page 12
use is found to be acceptable at th~s location. Although the subsurface mining use
is not a "pedestrian friendly" use, possible links from the proposed trail facility to
other areas such as the west end of River Road and the North Bend area should
be explored.
2. Compatibility of Uses: Staff considers the proposed physical design/arrangement
of the proposal to be reasonable relative to this standard. The plan elements that
lead staff to this conclusion include the location of the surface operations area on
the eastern plateau of the site, the retention of the existing tree buffer area around
the disturbed areas, the provision of berming around the disturbed areas, the
provision of additional landscaping, and the fact that the surface operations should
be largely concealed from adjoining areas as indicated on the submitted site
sections. However, staff does have the following concerns relative to the physical
design for all three applications:
A. Substantial screening should be provided around the south and west sides
of the proposed portal area (sides bordering Garrison Creek Road and a
driveway that runs through the property, but serves the abutting property to
the north). Staff is concerned that without substantial vegetative screening
(a mix of evergreen and large hardwood trees), this area will be visible from
areas frequented by the public and adjoining property owners.
B. The site plan states that berming will be provided along the new driveway
near the interchange (between the new driveway and the Bu/litsburg Baptist
Church property) "if requested: Staff contends that this berming is
absolutely necessary in order to lessen the visual and truck traffic impacts
on the church property, and should be included as a. condition in the.
approval of any of the three applications.
C. In order to assure that the surface operations area is fully screened from the
Garrison Creek Road area to the south, and to help minimize noise impacts,
staff suggests that the berm height around this area be increased to at least
15 feet. Also, mature trees should be planted on/along this berm in addition
to a seed mix (deciduous/ev.ergreen seed mix only is proposed for the berms
on the landscape plan). The berm constructed along Conrad Lane as part
of the Gateway International Business Park is an example of this type of
berm.
Other issues regarding the compatibility of the proposed use (noise, vibration, etc.)
are discussed in the report provided by the Planning Commission's subsurface
mining consultant.
(-
(
STAFF REPORT - Martin Marietta Materials, Inc.
May 26,1999
Page 13
3. Open Space: Staff believes that this standard has been effectively met by the
Concept Development Plan. This conclusion is based on the substantial amount
of undisturbed open space that is proposed to be retained, as well as the provision
of the recreational trail facility. Additional comments on this issue and possible trail
links to other areas may be forthcoming from the Boone County Parks Department.
4. Multi-Modal Transportation System: Staff agrees with the applicant's contention
that the proposed use and facilities largely do not lend themselves to multi-modal
transportation facilities, particularly bicycle and pedestrian facilities. However, a bus
stop .could be reasonably incorporated into the design of the entrance drive near the
interchange to accommodate possible future bus service in the.area. This would
serve not only mine employees, but could serve residents in the area as '!Vel/,
particularly if a park and ride lot was provided iflwhen bus service became available.
5. Preservation of Existing Site Features: The majority of the site is proposed to
remain undisturbed. Additionally, a minimum 200 foot wide buff~r of existing
vegetation is proposed to be retained around the surface operations area. As noted
above, staff is concerned with development of the Developmentally Sensitive areas.
6. Landscaping: A fair amount of landscaping is proposed for all three applications.
Concerns regarding landscaping are discussed under standards #2 "Compatibility
of Uses" above and are further discussed below relative to the 1-4 zone
. requirements.
7. Architecture: The historic Gaines House is proposed to be retained and used as
a field office and on-site residence. The proposed structures that would serve the
mining use are very utilitarian in nature, but they are proposed to be concealed from
public view.
8. Historic and Prehistoric Features: These issues are discussed under staff issue
#6 below.
9. Signage: Stone entry monuments are proposed along the proposed entry drive
near the interchange. Further discussion on signage is provided below relative to
the 1-4 zone requirements.
10. Transportation Connections and Entry Points: As noted immediately above,
stone entry monuments are proposed to be provided along the main driveway near
the interchange. Possible road connections are discussed below in relation to the
submitted Traffic Impact Analysis (staff concern #5). In addition, an easement
should be provided for the driveway that runs through the middle section of the
property to the unrelated property to the north (should be considered as a condition
of approval for any of the three applications); staff has not found that an access
easement exists for this driveway, although some older maps label it as "Garrison
Creek Road."
~.
(
c
STAFF REPORT - Martin Marietta Materials, Inc.
May 26,1999
Page 14
11. Conformance with Comprehensive Plan: The relationship of this proposal to the
Comprehensive Plan is discussed above. .
In addition to the standards outlined in Section 1514, the Concept Development
Plan criteria outlined in Section 1520 "Approval in Principle by Planning
Commission" of the Zoning Regulations will need to be considered.
4. 1-4 Zone Requirements
Staff has the following comments relative to certain requirements of the 1-4 zone.
Only requirements that are applicable at the zone change level are discussed in this
report. These comments apply to all three zone change applications. .
Section 1189 Geographic Requirements (pg. 11.41 of Zoning Regulations):
1. The proposed 1-4 zone is located within 1,500 feet of an existing interstate
interchange ramp and the site does directly access an arterial roadway. Garrison
Creek Road (from the proposed access drive to the portal area) runs through the
proposed 1-4 zone (an industrial district) and is proposed to be upgraded to meet
current subcollector requirements (28! pavement width required). A memorandum
from Greg Sketch, Boone County Engineer, regarding the upgrading of Garrison
Creek Road is attached. In addition to meeting the current subcollector standards,
Mr. Sketch recommends that the pavement design- should accommodate a.
minimum 20 year life and consider any increased mining traffic in the future.
2. The 3,000 foot separation area indicated on the "straight 1-4" plan (and 1,500
feet for the subsurface aspects of the other two applications) has been verified as
accurate by the Planning Commission's staff. The proposed 1-4 area which
immediately adjoins 1-275 is proposed for access and buffer (i.e., maintain existing
undeveloped conditions) purposes only, and is not propo~ed for m!ning or related
purposes. As noted above, the existing Gaines House is proposed to be used as
an on-site residence and field office - this structure is approximately 1,800 feet from
the specified types of residential uses, thus, a use ancillary to the mining operation
in this structure would not comply with the 3,000 foot requirement. If the Planning
Commission and Fiscal:eourt were inclined to approv~ the subsurface mining use
in some fashion but not the entire exception to the 3,000 foot requirement sought
by the 1-4/PD and 1-4/variance applications, a limited exception through either
application could be approved (upon the determination of appropriate findings) so
that the Gaines House could be utilized for those proposed uses.
3. The site sections provided by the applicant indicate that a complete visual screen
will be provided for the surface operations area from 1-275, although staff has
suggested that modifications to the berming along the southern part of the surface
operations area be made as discussed above.
(
("
STAFF REPORT - Martin Marietta Materials, Inc.
May 26.1999
Page 15
.. -
Geographic Guidelines (pg. 11.42 of Zoning Regulations):
1. Centralized/public water and sanitary sewer systems are not proposed. The
Comprehensive Plan's land Use Eiement states for this area "development in this
area should not be accompanied by major sanitary sewer facilities that could
commit the ldlewild area to development" (Area B-2: ldlewild Area, pg. 215).
2. The historic Bullitsburg Baptist Church building is the near the subject site and
may be sensitive to vibration. The Planning Commission's subsurface mining
consultant may provide more definitive information on this issue.
Section 11100 Performance Requirements (pp. 11.48 - 11.50):
2. This section requires excess stone and spoil to be stored within the underground
mine as soon as adequate space exists, and/or to be used as a construction
material for benning around the site. Although berming is proposed, staff did not
identify in the applications that this material would be used to construct the benning,
or how any excess materials would be handled. Also, primary crushing is proposed
to occur in the subsurface area when adequate space exists, however, the applicant
should explain the feasibility of performing other operations in the quarry, such as
secondary crushing, screening, etc.
3. through 6. These sections outline blasting requirements. The Planning
Commission's subsurface mining consultant may provide infonnation regarding
these sections.
8. This section states -no trucking shall occur on Saturday after daylight hours or .
on Sunday. The Planning Commission and Fiscal Court can impose additional
restrictions on nighttime trucking activity depending on specific site considerations."
Based on this requirement, the applicant needs to darify the intended trucking
schedule. In addition, the governing bodies will need to detennine whether there
are circumstances specific to this site that warrant additional nighttime trucking
restrictions.
9. This section outlines dust control standards and requires truck wheel washing
facilities that are at leasf500 feet from the nearest public roadway, and requires the
driveway to be paved for this 500 feet length. Both of these requirements have
been met by the 1-4/PD and 1-4/variance applications. The straight 1-4 application
does not show that the entire driveway between the road and the wheel washing
facility will be paved, although it does show that the driveway is paved for the initial
625 feet from the road. In order to make the most effective use of the wheel
washing facility for the straight 1-4 request, staff contends that the entire driveway
between the road and the wheel washing facility should be hard surfaced.
This section also requires exiting trucks to be covered with tarps. Although the
applicant has proposed a seemingly comprehensive dust control program (pg. 31
in the straight 1-4 request binder), the tarp requirement has not been addressed.
~
(
("
STAFF REPORT - Martin Marietta Materials, Inc.
May 26,1999
Page 15
Geographic Guidelines (pg. 11.42 of Zoning Regulations):
1. Centralized/public water and sanitary sewer systems are not proposed. The
Comprehensive Plan's Land Use Element states for this area "development iA -this _.
area should not be accompanied by major sanitary sewer facilities that could
commit the Idlewild area to development" (Area B-2: Idlewild Area, pg. 215).
2. The historic Bullitsburg Baptist Church building is the near the subject site and
may be sensitive to vibration. The Planning Commission's subsurface mining
consultant may provide more definitive information on this issue.
Section 11100 Performance Requirements (pp. 11.48 - 11.50):
2. . This section requires excess stone and spoil to be stored within the underground
mine as soon as adequate space exists, and/or to be used as a construction
material for berming around the site. Although berming is proposedi staff did not
identify in the applications that this material would be used to construct the berming,
or how any excess materials would be handled. Also, primary crushing is proposed
to occur in the subsurface area when adequate space exists, however, the applicant
should explain the feasibility of performing other operations in the quarry, such as
secondary crushing, screening, etc.
3. through 6. . These sections outline blasting requirements. The Planning
Commission's subsurface mining consultant may provide information regarding
these sections.
8. This section states "no trucking shall occur on Saturday after daylight hours or .
on Sunday. The Planning Commission and Fiscal Court can impose additional
restrictions on nighttime trucking activity depending on specific site considerations. n
Based on this requirement, the applicant needs to clarify the intended trucking
schedule. In addition, the governing bodies will need to determine whether there
are circumstances specific to this site that warrant additional nighttime trucking
restrictions.
9. This section outline:) dust control standards and requires truck wheel washing
facilities that are at least 500 feet from the nearest public roadway, and requires the
driveway to be paved for this 500 feet length. Both of these requirements have.
been met by the 1-4/PD and 1-4/variance applications. The straight 1-4 application
does not show that the entire driveway between the road and the wheel washing
facility will be paved, although it does show that the driveway is paved for the initial
625 feet from the road. In order to make the most effective use of the wheel
washing facility for the straight 1-4 request, staff contends that the entire driveway
between the road and the wheel Washing facility should be hard surfaced.
This section also requires exiting trucks to be covered with tarps. Although the
applicant has proposed a seemingly comprehensive dust control program (pg. 31
in the straight 1-4 request binder), the tarp requirement has not been addressed.
.
.,
.)
(
(
STAFF REPORT - Martin Marietta Materials, Inc.
May 26,1999
Page 16
11. Benning and landscape buffer.requirements are discussed in this section. The
minimum requirements of this section have been met by the submitted plans with
the exception of the berming'between the proposed access drive and the church
property discussed previously. Staff continues to contend that additional landscape
screening should be provided around the portal area, and the benn height should
be increased around the south side of the surfaced operations (and include mature
trees on this benn), both as discussed above. Additional screening/buffering can
be required if warranted in specific instances.
.12. This section discusses requirements pertaining to security. The applicant
needs to outline plans that would demonstrate compliance with these requirements.
16. This section outlines standards for the required entrance sign. One sign with
a maximum size of 32 square feet is pennitted, however, ~o signs that are
approximately 16 square feet each have been proposed (Le., one sign must be
eliminated but the remaining sign may be increased in area - the stone monument
for the eliminated sign may be retained as an entry feature). Further, the mining
pennit number will need to be displayed on the sign.
Section 11102 "General Requirements" (pg. 11.52 of the Zoning Regulations):
This section describes setback, building height, parking, and access road
requirements. Staffs only comment relative to these requirements is that the auto
parking areas are required to be hard surfaced as per the nonnal parking. lot
requirements referenced therein. This section also notes that all laws of the
Commonwealth of Kentucky relative to nuisances and the environment must be
followed. Relative to this issue, a letter from Gretchen Bartley of the Kentucky
Division of Water is attached concerning water related issues and required pennits.
Section 11104 "Minimum Size" (pg. 11.52 of Zoning Regulations):
This section requires an 1-4 zone to include at least 200 acres, and limits surface
operations to 250 acres maximum. All three applications are in compliance with
these requirements.
5. Traffic Impact Analysis.
A. The Traffic Impact Analysis (TIA) indicates that subsurface mining is a low
traffic generator, relatively speaking. Staffs concern, however, is not with
the amount of traffic, but the impacts of the type of traffic - trucks. The TIA
maintains that there are no peak hours like other types of traffic generators.
Staff maintains that there may be peak hours, however, such as the
beginning of day, before and after lunch, and near end of the day. In
addition, the TIA does not indicate if the year 2006 figures are applicable
beyond that period (Le., what are the long term impacts?).
~
~
(
c-
STAFF REPORT - Martin Marietta Materials, Inc.
May 26,1999
Page 17
B. The TIA maintains that 185 feet of storage is adequate for the left turn lane
onto eastbound 1-275. Staff compares this to a left turn lane at KY 18 and.
KY 237 in Burlington, which is an intersection that experiences a
considerable amount of truck traffic. The left turn lane from eastbound KY
18 to northbound KY 237 is approximately 260 feet long with a 200 foot
preceding taper. With the future growth potential of the area west of the
interchange in the KY 20 corridor, it will become more difficult to turn left at
this location. Staff questions the adequacy of the storage lane.
C. On page A-5, No 3 of the TIA, it is assumed that the mine will decrease
hauling distances for aggregate trucks. There is no evidence that the mine
will decrease hauling distances for projects in Boone County, especially if the
trip distribution for the mine is 65 percent to the east. This indicates that the
mine may be on the edge of its service area, and may be less strategically
located than river port sites near Cincinnati or Covington where the product
can be offloaded from barges. This could be compounded if the potential
asphalt and concrete mix plants are located at this site.
D. The conclusion that the mine is not adding any additional truck trips to
regional roadways is probably true, however,. the mine has the effect of
concentrating these trips to a specific location. Staffs concern is not so
much with the main line of 1-275, but the interstate ramps that serve it at this
interchange. In particular, the eastbound entrance ramp to 1-275 will
experience 65 percent of the exiting truck traffic. This ramp is inclined and
the trucks will be full while trying to reach operating speed going uphill. The
TIA also indicates that the trip distribution of traffic not associated with the
mine reflects the mine distribution in the AM peak hOUf.. 66 percent of the
area traffic currently proceeds eastbound on 1-275, thereby creating potential
conflict with the slow-moving trucks on the interchange ramp. The traffic
counts at this location will increase over time as the area west of the
interchange on KY 20 develops.
E. The TIA indicates that the Trip Generation Analysis is an average over a 12
month period and that peaks in trip generation may occur with seasonal
demands. A specific construction project in Northern Kentucky, for example,
could result in higher traffic volumes, as well as an altered trip distribution.
At times this could increase the potential impacts noted above. In fact, the
TIA indicates that a peak amount of aggregate transported could be 300,000
tons per month, almost double the monthly average of 166,667 tons in the
year 2006.
.
,
c
c
STAFF REPORT - Martin Marietta Materials, Inc.
May 26,1999
Page 18
F. The submitted figures indicate that on average, at seven years of operation,
42 (AM peak) and 73 (PM peak) trips will turn left per hour from KY 8 to 1-
275. This averages out to roughly one per minute. Although the TIA
forecasts a level of service A for this movement, it does not reflect the. impact
bf these trucks on the entrance ramp itself. With the peak monthly transport
of aggregate these figures could be 75 (AM peak) and 131 trips (PM peak).
In staff's opinion, when the PM peak of over two trucks per minute is
combined with traffic associated with future growth west of the interchange,
the entrance ramp itself cannot function at level of servrce A. Staff believes
that the applicant has not adequately addressed this issue.
G. With the straight 1-4 application, the location of the truck wheel wash does
'not accomplish the objective of keeping dust off the public roads because
according to the submitted maps, the trucks must travel 2,500 feet of gravel
road between the wash location and the paved access .road. There is
disagreement between the submitted maps and the TIA in this regard.
6. Historic and Prehistoric Resources
Staff has the following comments relative to historic and prehistoric resources on
the project site and in the immediate area.
A. Staff appreciates the thorough approach to the identification of historic and
prehistoric sites within the project and surrounding areas. However, it has.
been determined that the majority of the applicant's site, especially those
areas that will be impacted most heavily, have never been thoroughly
surveyed by a professional archaeologist. As is evident by the map
provided, there are numerous identified prehistoric archaeological sites
around the project site. Similar settings (on the ridges and fields directly
adjacent to the Ohio River as well as in close proximity to the mouth of a
primary creek) in other parts of Boone County have yielded important historic
and scientific information, including burial site locations, about the people
who previously inhabited this land. Staff recommends that a Phase 1
archaeological survey for the entire tract be conducted prior to any site
disturbance. If 'N.ithin the project area there are sites that are recommended
for further study, that work should be completed or the site should be
avoided and left undisturbed.
B. Staff is concerned about the c. 1797 Gaines House (BE-85), and later
outbuildings, that are located in the project area. It has been stated that they
will remain and be used by the applicant. Staff recommends a condition that
all currently existing historic buildings will remain, in their current condition,
unless changes are approved by action of the Planning Commission at a
later date. The existing house was, at one time, eligible for listing on the
National Register of Historic Places. A recent insensitive renovation has
eliminated that possibility for the time being, but proper restoration could take
place in the future.
I
\
J
(-
c
/'
7'
STAFF REPORT - Martin Marietta Materials, Inc.
May 26, 1999
Page 19
C. Staff is concemed about the c. 1892 National Register fann (BE-8?) located
just to the southwest of the central portion of the project area boundaries.
It is essential that this historic property not be negatively impacted by this
proposed project. Staff recommends that extensive buffering be maintained
between this property and the proposed project area - the buffering
recommended above for the portal area should help in this regard.
7. A memorandum dated May 19, 1999 from Captain Jim Adams of the Hebron Fire
Protection District is attached. This memorandum discusses the District's concems
regarding emergency service issues.
8. A written report from the Planning Commission's subsurface mining consultant will
be provided at the Public Hearing.
CONCLUSION
All three applications need to be evaluated by the Boone County Planning Commission
and the Boone County Fiscal Court in terms of the three criteria necessary for approving
a Zoning Map Amendment as stated in Article 3, "Amendment" of the Boone County
Zoning Regulations and the potential impacts on the existing and planned uses in the area.
In addition, the requested variance needs to be evaluated relative to the criteria outlined
in Section 251 -Application and Standards for Variances" of the Boone County Zoning
Regulations. The application requesting the 1-4/PD zone needs to be evaluated relative
to the Planned Development requirements outlined in Article 15 of the Zoning Regulations.
The Future land Use Map will need to be amended if the Planning Commission and Fiscal
Court approve this request.
7l1Y~ed.
Kevin T. Wall, AICP COT
Director, Zoning Services
<y-21). k~~
David Geohegan, AICP
Director, Planning Services
~ 1(. &U-
Susan M. Cabot
Historic Preservation Planner
KTW/DG/SMC:pr
I
/
/
\
)
c'
rr
c
c
STAFF REPORT - Martin Marietta Materials, Inc.
May 26, 1999
Page 20
attachments:
. aerial photo wi existing zoning
. Future'Land Use Map excerpt
. letter dated May 21, 1999 from George Hoffman, Kentucky Transportation Cabinet
. memorandum dated May 18, 1999 from Greg Sketch, P.E., L.S., Boone County
Engineer
. letter dated May 17,1999 from Gretchen M. Bartley, Kentucky Division of Water
. memorandum dated May 19,1999 from Captain James Adams ofthe Hebron Fire
Protection District
. zone change applications
. Concept Development Plans for the three applications superimposed on aerial
photos