Loading...
HomeMy WebLinkAbout0095.03 Correspondence rplCJrpanningIHowey Lj''lIIuij Associates, me. Architects Engineers Consultants RECEIVED AUG 2 7 2004 August 25, 2004 THE SKILLMAN CORPORATION Tony Heath " Cl:Tne.SKillmar1'Gotp'fi't~tr;n'ZI 3834 South Emerson Avenue, Building A Indianapolis, IN 46203 4D1-0 1,0 {l'O Re: College Wood Elementary School Carmel Clay Schools Carmel, IN Project No. 201101.02 Dear Tony: In response to the Carmel Building Inspector's Item No.4, regarding the handrail at the stage, we offer the following: 1. IBC 1003.3.3.6 Handrails indicates that for stairways' required be more than 88 inches in ' width" intermediate handrails are required to be provl . The occupant load for the stage ' does not generate required exit width in excess of 88 inches. At 7 SF/person, the occupant. load is 124 people, which would require total egress width of 38 inches. Two means of , egress are required as a minimum. We have provided a ramp with a width of 44 inches as I one means of egress at the back of the stage. The steps at the front of the stage provide a second means of egress. We are adding handrails at each side of the proscenium to provide an additional two means of egress. These would only be required to be the minimum 30 inches in width. 2. IBC 509.1 Guardrails recognizes that stages are different from other egress situations and Exception 2 eliminates the need for guardrails on the auditorium side of a stage, raised platform, and other raised floor areas. The conditions at College Wood Elementary School are similar to other completed and accepted installations throughout Carmel, Hamilton County, and the State of Indiana. We would ask the Inspector to reconsider this issue with the addition of the proscenium wall handrails. If you have any questions or require any further information, please do not hesitate to contact our office. Sincerely, FANNING/HOWEY ASSOCIATES, INC. ~I} Charles R. T er, Owner-in-Cha c: Rollin E. Farrand, Jr., RA, Carmel Clay Schools 9025 North Rivt:r Road, Suite 200 ~ Indianapolis, Indiana 46240 (317) 848-0966' Fax (317) 848-0843' http://www.fhai.com AU(;-U'o-2004 H'(] 03: 23 PM ENCO\'llPASS NOTE PAD - 08/06/04 NOTES FOR: 030095B 08 1 - PI DATE TIME NOTE TEXT FAX NO. ---------~ -------- ---------------------------------------- 2004-08-06 15:12;23 1 Seal all joints on exterior masonry, brick and sills. 2 Install soffit vent on north side eve. ~ OCCUPIED WITH FURNI.TUR AND PERSONNEL. ? (i) Install handrail for stage side entrance with 2 or more risers and spaced at max 88 inches. IBC 1003.3.3.1 and 1003.3.3.6. 5 Install air shock on quick closing hand hose in kitchen. 6 Remove ceiling tile and junction box to supply freezer electrical for insulation inspection of conduit. 7 Properly lable all panel boards. 8 Connect 3/0 GEe to cold water pipe in corner of boiler room. 9 Complete all misc. electical boxes, switches, outlets and receptacles. 10 Power up all stage lights and exit lighting required for RAMP egress with directional exit at bottom or ramp. 11 Remove all dust covers from smoke deetectors and signal alarms. 12 Install restroom signage. 13 Need to conduct generator test and witness egress lighing and emergency sign lighting. 14 Install anti-tip on stove in teacher lounge. 15 Install gfci outlet in music room at sink. Other corrections may be observed on next inspection, construction personnel, school employees and suppller obstruction inspection. TOTAL LINES OF NOTES: 36 P. 02 PAGE 1 OPERATOR jblancha r~ '----. September 3; 2004 , 1 THE SKILLMAN CORPORATION PROJEpT 40MINIS!RATIONl CONSTRUCTION MANAGEMENT Mr. JeffKendl!1l City'of Carmel Department.of CommUnity Services. One Civic Square Cannel, IN 46032 Refel'ence: . College Wood Elementary School Skillman Project No. 2'01143 Subject: Occupancy Inspection Item Dear Mr. Kendall: Attachedisa.Jetter from Fanning(HoweyAssociates, Inc. in response to Item No.4 on'the ,inspection report (attached)' which wasge'nerated during the occupancyinspection.at College Wood Elementary School. Please ,review this response and advise on' the appropriate action necessary to resolveelhis matter Sincerely, , TIlE SKILLMAN CORPORA nON --:zj;r;L-t( Project Manager THlcp cc: Ron.Farrand, Carmel Clay Schools Chatles Tyler, FmminglHowey Associates, Inc. Al Cox, The,Skillman Corporation File (2) 3834 S. Emerson Avenue P:O. Box 33518 . Indianapolis, IN 46203 317-783-6151. Fax:;317-782'2926 8006 Aelna Slreet . Merrillville, IN 46410 219-.942-2787. Fax: 219-.942,9287