August 25, 2004
THE SKILLMAN CORPORATION
Tony Heath "
Cl:Tne.SKillmar1'Gotp'fi't~tr;n'ZI
3834 South Emerson Avenue, Building A
Indianapolis, IN 46203
4D1-0 1,0
{l'O
Re: College Wood Elementary School
Carmel Clay Schools
Carmel, IN
Project No. 201101.02
Dear Tony:
In response to the Carmel Building Inspector's Item No.4, regarding the handrail at the stage, we
offer the following:
1. IBC 1003.3.3.6 Handrails indicates that for stairways' required be more than 88 inches in '
width" intermediate handrails are required to be provl . The occupant load for the stage '
does not generate required exit width in excess of 88 inches. At 7 SF/person, the occupant.
load is 124 people, which would require total egress width of 38 inches. Two means of ,
egress are required as a minimum. We have provided a ramp with a width of 44 inches as I
one means of egress at the back of the stage. The steps at the front of the stage provide a
second means of egress. We are adding handrails at each side of the proscenium to
provide an additional two means of egress. These would only be required to be the
minimum 30 inches in width.
2. IBC 509.1 Guardrails recognizes that stages are different from other egress situations and
Exception 2 eliminates the need for guardrails on the auditorium side of a stage, raised
platform, and other raised floor areas.
The conditions at College Wood Elementary School are similar to other completed and accepted
installations throughout Carmel, Hamilton County, and the State of Indiana. We would ask the
Inspector to reconsider this issue with the addition of the proscenium wall handrails.
If you have any questions or require any further information, please do not hesitate to contact our
office.
Sincerely,
FANNING/HOWEY ASSOCIATES, INC.
~I}
Charles R. T er,
Owner-in-Cha
c: Rollin E. Farrand, Jr., RA, Carmel Clay Schools
9025 North Rivt:r Road, Suite 200 ~ Indianapolis, Indiana 46240
(317) 848-0966' Fax (317) 848-0843' http://www.fhai.com
AU(;-U'o-2004 H'(] 03: 23 PM
ENCO\'llPASS NOTE PAD - 08/06/04
NOTES FOR: 030095B 08 1 - PI
DATE TIME NOTE TEXT
FAX NO.
---------~ -------- ----------------------------------------
2004-08-06 15:12;23 1 Seal all joints on exterior masonry,
brick and sills.
2 Install soffit vent on north side
eve.
~ OCCUPIED WITH FURNI.TUR AND PERSONNEL.
? (i) Install handrail for stage side
entrance with 2 or more risers and
spaced at max 88 inches. IBC
1003.3.3.1 and 1003.3.3.6.
5 Install air shock on quick closing
hand hose in kitchen.
6 Remove ceiling tile and junction box
to supply freezer electrical for
insulation inspection of conduit.
7 Properly lable all panel boards.
8 Connect 3/0 GEe to cold water pipe in
corner of boiler room.
9 Complete all misc. electical boxes,
switches, outlets and receptacles.
10 Power up all stage lights and exit
lighting required for RAMP egress with
directional exit at bottom or ramp.
11 Remove all dust covers from smoke
deetectors and signal alarms.
12 Install restroom signage.
13 Need to conduct generator test and
witness egress lighing and emergency
sign lighting.
14 Install anti-tip on stove in teacher
lounge.
15 Install gfci outlet in music room
at sink.
Other corrections may be observed on
next inspection, construction personnel,
school employees and suppller
obstruction inspection.
TOTAL LINES OF NOTES: 36
P. 02
PAGE 1
OPERATOR
jblancha
r~
'----.
September 3; 2004
,
1
THE SKILLMAN CORPORATION
PROJEpT 40MINIS!RATIONl
CONSTRUCTION MANAGEMENT
Mr. JeffKendl!1l
City'of Carmel
Department.of CommUnity Services.
One Civic Square
Cannel, IN 46032
Refel'ence: . College Wood Elementary School
Skillman Project No. 2'01143
Subject: Occupancy Inspection Item
Dear Mr. Kendall:
Attachedisa.Jetter from Fanning(HoweyAssociates, Inc. in response to Item No.4 on'the
,inspection report (attached)' which wasge'nerated during the occupancyinspection.at
College Wood Elementary School.
Please ,review this response and advise on' the appropriate action necessary to resolveelhis
matter
Sincerely,
,
TIlE SKILLMAN CORPORA nON
--:zj;r;L-t(
Project Manager
THlcp
cc: Ron.Farrand, Carmel Clay Schools
Chatles Tyler, FmminglHowey Associates, Inc.
Al Cox, The,Skillman Corporation
File (2)
3834 S. Emerson Avenue P:O. Box 33518 . Indianapolis, IN 46203 317-783-6151. Fax:;317-782'2926
8006 Aelna Slreet . Merrillville, IN 46410 219-.942-2787. Fax: 219-.942,9287