ON-SITE
UATION FOR EROSION AND SEDIMf 'J CONTROL
Hamilton County Soil and Water Conservation D1!fpfct
] ] 08 South 9th Street, Noblesville, IN 46060
Ph: 3]7-773-2]8] Fax: 3]7-776-]]0]
I,DL3~~
Project Name:
Present at Site: John South, Hami]ton Co. SWCD,
This Report Provided To: S t eC)c Hoe J .,/
C Of4' '1 11tAt4t: S
Fttt- 818 -'IOZ"
~4rJ
~t e..
tcr Initial
o Follow-up
o Complaint
TYPE OF EVALUATION:
o
Routine
This evaluation is intended to assess the level of compliance with 327 lAC 15-5 (Rule 5). It is also intended to identifY areas
where additional measures may be required to control erosion and sedimentation. All practices recommended in this report
should be evaluated as to their feasibility by a qualified individual with structural practices designed by a qualified engineer.
All erosion and sediment control measures shall meet the design criteria, standards, and specifications outlined in the "Indiana
Handbookfor Erosion Control in Developing Areas" or similar guidance documents.
Curr,nt Sholnfonn ation: L a..J J 011(.1 () f.... ,J CD ....y/elt!rl
,
""$/-"''' iJed Ik'M $ /Ire.
...R 41'(.4. "h1
S"()- ~1.
t'.l-tr fA)"Y
IU'Jf ,)
The Following Items Have Been Evaluated and Assigned a Designation of:
S = Satisfactory M = Marginal U = Unsatisfactory NA = Not Applicable
Construction Site Management for Erosion and Sediment Control
S €) U NA (1) Disturbed areas have been adequately protected through seeding or other appropriate erosion and
sediment control measures.
(2) Appropriate perimeter sediment control measures have been implemented.
(3) Conveyance channels have been stabilized or protected with appropriate sediment control measures.
(4) Erosion & sediment control measures are installed properly.
(5) Storm drain inlets have been adequately protected.
(6) Outlets have been adequately stabilized.
(7) Existing erosion & sediment control measures are being maintained.
(8) Public & private roadways are being kept clear of accumulated sediment or tracked soil.
(9) Erosion & sediment control measures have been installed and maintained on individual building sites.
G) M U
G)MU
>R~ ~
~M U
~MU
S@U
S@U
NA
NA
NA
NA
NA
NA
NA
NA
Status of Sediment Retention On-Site
96 Site conditions present a high potential for off-site sedimentation.
o There is evidence of off-site sedimentation.
Describe:
~ Please Refer to the Comments Section of this Report
Definitions
The item is currently in compliance with the Rule
A concern has been identified; corrective action is strongly recommended to remain in compliance
A violation has been identified and the site is not in compliance; corrective action is required
Does not apply at this stage of construction
Satisfactory:
Marginal:
Unsatisfactory:
Not Applicable:
Reviset/4 / 98
'"
ON-SI
ALVA nON FOR EROSION AND SEDIM ' CONTROL
COMMENTS
PROJECT NAME:
"I,//; OM' ,e,.oj e.
Page 2
The items checked below must be corrected prior to , unless otherwise noted.
o Install an appropriate sediment control practice between construction areas and lower lying areas.
o Replace/Repair silt fence and/or straw bale barriers.
o Entrench silt fence (6-8 in.) and/or straw bale barriers (4 -6 in.) and stake straw bales.
o Remove accumulated sediment from: 0 sediment traps/basins, 0 behind silt fence/straw bales, 0 around storm drain inlet
protection devices, 0 streets and gutters (Do not flush with water)
o Temporary seed, fertilize, and/or mulch:
J( Permanent seed, fertilize, and mulch areas that are at final
grade: e;, ..
o Protect storm drain inlets: 0 curb inlets, 0 drop inlets
o Reshape and stabilize sides lopes of: 0 sediment traps/basins, 0 detention/retention basins
o Install/Maintain construction entrance(s):
o Reshape and stabilize conveyance channels:
o Place greater emphasis on erosion and sediment control on building sites; contractors, subcontractors, material vendors, and
others should be made aware of erosion and sediment control requirements. Appropriate perimeter sediment controls
(e.g. silt fence) and stable construction entrances shall be utilized on aU sites. Sediment tracked into the street shall be
removed (do not flush with water) at the end of each work day.
o Other Requirements:
tJ}iI"
~ '11+ (.'t:lIC.C~
t.r ~L,
,'s df'.~
I1fj,'l!:.e.
....1) ~~
Th is report subm itted by:
(JL {j.b
/
Revised 4 / 98
"
I
1-"------
r'-~U------~ > -.. fl\S ~ <s:) - oL- . -~
r--
!--------?fi-<.\ ~----- "
I. . O;:o;;a
,-------- ---~--.~-- .h-------~.._'~5t1>-~ _ -v---~:S'.!i ~"U-fjl\~M-
r.-~---.-----
---""--~......._"'=~----.-..-~- '_._-- "- -----....... ---
-'--------------------
r"'- -_.......--~
I
~---
._''-'-=---- .,.....---~-----"-
.-'.---------------
-----------------
~-_._-
I
r----.-~--
1- <
L__
I
-~-------_..'-'-~,~~-'
I
~---
YTC33"'1 '3-o-qtt '3.
19"l':J::S3"C~_'K3~ ~ ID--::::-Vfll<:Ql!:i--~"1I>'\
:...... -'-----'-----.~--------------___~..u..___.-______.., _-",__"".
-~~~-=_t~,~~ ~J-~"'<IA~~Q --- -: '76i1"j:,~... a:5
-&~QN---;~-:>\~9"l'-
.
. --~-----.---"'~.-.....,..---.--.______....c._=o.c~___.=_..._....._....._~______.._"_.-_..~~_~ ~.-----_____""'.__.J_.._ _--'____. '"'_____.__=-'-~__~_"_=.__ ._
I
--- -.", --1
I
-------..-1
I
------1
I
--_._~--J
I
--=l
--- -"-'-'-1
I
"--'--~" -----.-,-.-.------~ .----------~-----~- .---. .-.---~..----- --_. -----.. ----. --------'-1
"- "--- -" ~------- -----,,""""'1">'3<1 '3> 1ft.Qtl.~":!ci-X<r"f~--~ - " --- - ---
-.~~="~~==.~.=--"- -=--.- .~- ~~~-~ t~~~-::~~-,_~~~~-.
20f'0/-8
u
----- --
~~'b S~\"''''\M
:i. ~
""
u C)
EROSION AND SEDIMENT CONTROL PLAN
TECHNICAL REVIEW AND COMMENT
Hamilton County Soil and Water Conservation District
1108 South 9th Street, Noblesville IN 46060
Ph- 317-773-1432 or Email at john-south@iaswcd.org
PROJECT NAME:
Williams Ridge
SUBMITTED BY:
Conley Homes Inc.
PO Box 3154
Carmel, IN 46032
317-818-9024
Weihe Engineers
10505 N. College Avenue
Indianapolis, IN 46280
Contact- Max Mouser
REVIEWED BY:
John B. South P.E.
Certified Professional in Erosion and Sediment Control
PLAN REVIEW PROCEDURE: Site Visit Date:
Plan Review Date: 8-19-02
Acreage: 6 Ac.
LOCATION: North side of I 16th Street, west of Gray Road
LEGAL DESCRIPTION: Sec. 32
TOWNSHIP: 18N
RANGE: 4E
CIVIL TOWNSHIP: Clay
SOIL SURVEY MAP SHEET: 51
The technical review and comments are intended to evaluate the completeness of the erosion and sediment control plan for the
project, The erosion and sediment control plan submitted was not reviewed for the adequacy of the engineering design. All
practices included in the plan, as well as those recommended in the comments should be evaluated as to their feasibility by a
qualified individual with structural practices designed by a qualified engineer, The plan has not been reviewedfor local, state,
or federal permits that may be required to proceed with this project. Additional information, including design calculations may
be requested to further evaluate the erosion and sediment control plan.
The erosion and sediment control plan has been reviewed and it has been determined that the plan:
1. Will likely disturbed less than five acres. An NOI does not need to be submitted for projects less
than five acres. If the site work and home construction is estimated to disturb more than five
acres an NOI for Rule 5 must be submitted.
Proper implementation of the erosion and sediment control plan and inspections of the construction site by the developer or a
representative are necessary to minimize off-site sedimentation. The developer should be aware that unforeseen construction
activities and weather conditions may effect the performance of a practice or the erosion and sediment control plan. The plan
must be aflexible document, with provisions to modify or substitute practices as necessary.
Revised 4 / 97
",,"
-+
ERO~ON AND SEDIMENT CONTRQpLAN
TECHNICAL REVIEW
COMMENTS
..
PROJECT: Williams Ridge
Page 2 of 2
Note: All erosion and sediment control measures shown on the plans and referenced in this review must meet the design
criteria, standards, and specifications outlined in the "Indiana Handbookfor Erosion Control in Developing Areas" from the
Indiana Department of Natural Resources, Division of Soil Conservation or similar Guidance Documents.
1. A construction sequence is recommended. The dry detention basin should be completed and seeded
early in the construction schedule.
2. The permanent seeding needs to be labeled. The seeding in the dry basin should be permanent.
3. Erosion control blanket is needed for the swale at the rear oflots 4 & 5. Blanket S75 is not adequate
for the swale at the rear of lots 4 & 5.
4. Water bars were recommended for the swale behind lots 4 & 5.
5. A temporary riser is recommended for the outlet of the dry basin. The riser could be five feet high.
6. The silt fence that crosses the front of the property should turn north at the east and west ends.
7. Existing wells need to be abandoned properly.
Cc: Carmel DOCS
Ha. Co. Surveyor
File
(
u
!v
CITY OF CARMEL
Department of Community SelVices
One Civic SqI.mre
Carmel, IN 4SJ32
(317) 571-2417
Fax: (317) 571-2426
Fax
Pages:
V~Q:
b
1"..... /S-OOl
To: Hd'K filpO-SlZ.r
Fax: .J'~.3 - t5-;'6
From:
Phone:
Date:
Re: D!;pt:lrf/l7OJf "..f'~l'r CC:
o Urgent D For Review 0 Please Comment 0 Please Reply
o Please Recycle
!)()ckfZ~ #-
'ltJ-CJ~ ff
Jt;'~d~ ,e~ JJM~:"'';;l
( 7tJ-6',;2 6 J'N 474t)
""__ J
.w
u
CITY OF CARMEL
Department of Community Services
One Civic Square
Carme', IN 4€032
(317) 571-2417
Fax: (317) 571-2426
Fax
Fax:
Pages:
Voya:
Ie,
j?,... /S-OcQ
To:
)11ft )f4JJ>tZr
;?-ya - t!J5-Yt
From:
Phone:
Ileo Dz,P(lrf/l}MI "f'~t'1
Date:
CC:
o Urgent 0 For Review 0 Please Comment 0 Please Reply
o Please Recycle
UOCkfZ/ .#
1tJ~ tJ.:{ rP .
J/J/ .. /1 L7.er: " 9~~;"~c.o~
"" '/IO/nJ ~. ~~
.'
-"":.
u ()
WEIHE ENGINEERS, INC.
CIVIL ENGINEERS. LAND SURVEYORS. LAND PLANNERS. LANDSCAPE ARCHITECTS
I
LETTER OF TRANSMITTAL
To: City of Carmel Prujed: Williams Ridge Estates
Department of Community Services Job #: W02..Q039
One Civic Square Date: August14,2002
Carmel, Indiana 46032 Phone:
Attn: Jon Dobosiewicz Fax:
We are sending you 1m Attached 0 Under separate cover via delivery the following items:
o Shop Drawings IRI Prints 0 Copy of Letter
o Product Data 0 Specifications 0 Meeting Minutes
o Samples 0 Change Order( s) 0 fuspection Report
0 o SketcheslDrawings o Application( s) for Payment
o Sets Document Document Description
IRI Copies Date Number
I Secondary plat
These are transmitted as indicated below:
o Approved
o Approved as Noted
o Not Approved, Revise and Resubmit
o Action Not Required
o Action Indicated on Item Transmitted
o For Signature. Return _ Copies to Us
o For Your Review or Use
IRI For Your Review & Comment
o As Requested
o For Your Records
IRI For Your Approval
o
I Remarks:
By:
Max Mouser
cc:
ALLAN H. WEIHE, P.E.. L.S. . PRESIDENT
10505 NORTH COLLEGE AVENUE INDIANAPOLIS. INDIANA 46260 (317) 846-6611 (800) 452-6408 FAX: (317)843-0546
...-----
,-~'~~~ -~~
\
""-...-.-.....=--_._~~~
c..-,...""....-..,..,~
.---~~----
I..
~-~....-
l '..
1--......... ........
I
\, ~
f--
I
\
u
8/4> 2.
u
.._~---~....---...-:..""""...-...-.-.-- .....,.-
~~....~, ~~,.,~~~f::\I:"\~- _,6~b'V-'~L~~-.- ---
~ ~ -
f-'cu'-~ ""~.~._~-~~---
1 }!
--,y-~....-._--_.._~- -
~-----...-.,,--=."'-
-.-..---'-- ------_._.._---------....--..~-- --._---...-.~
.
~._~~'t~ ·
___'r'-_'__._~
.------
--- .,.----.-.--
"" ---,.~-....------ -~-- -. ------
I
?- ._~~~-e~~-.c--<--~ ----~-
~_: ~~~~ ~~~~.6""-~f'!F<<rU~E-.
..,.....,---,--------.-~----'"
-,,"","",---,=,<---'"
"",,'-'~"'--'=--~------~
.........._______.--_~~--..-.- __.-,,---c.,.---~--- -~_............,--~..--~
~.-"""""~"-------.~-----
---,,_..__..~~-~"'--
:
~ -;J- ~~------------~~.-
t-r- -----. ~
-~---
.
--=~-'----
~~b~ ~
~E~~:
~A
~~.
~~
n_.~~-----.---"...
_CA,"-,.~--- "1h'9-(/E~
____--'- ~_~ _.J
.-------..--.---- .-
,
_.__.._-~--
--=.-~..~....
,.---.-... ,--,.-
____~:...--.c------~-~-"~----~...---
~~~---~---=----
r___-___
..
---.-
--~-~
____.--....-~--...---.------.--o-.-~--.--.
-------------~~--_.
..__.___1 1-.
-.. ------...----------.---------- -----.
._-_...-".._._---~_._--~._._-
To: #t2,( #Q&ty'<z r
Fax: f~ -05~b
Phone: p~ - ~ ~ II
Re: j)z.p/- ~;l)f) r7-
... ,
Fax
u
u
CITY OF CARMEL
Department of Community SelVices
One Civic Square
Carmel, IN 46032
(317) 571-2417
Fax: (317) 571-2426
From:
~yq
,
Pages:
f'-/-o~
Date:
CCI
o Urgent 0 For Review 0 Please Comment Cl Please Reply
a Please Recycle
71) - Oa. ~"o
?t> -OtX*/ SW
fY/ I/Ul~ k:1tq. CXI6~;':S'~/l
~
\..-'
To: 4a X ~(}ustt~
Fax: c1~ - tJ~,g
Phone: f% - 66/1
Re: tt-/ltti/J'IJ ~d~ ~~~~~;/)
."
Fax
( ,
U
u
CITY OF CARMEL
Department of Community Services
One Civic Square
Carmel, IN 4€032
(317) 571-~417
Fax: (317) 571-2426
From: ~'-fCe..-
F
Pages: (::S"
Date: ?-~- -r.;>c
CC:
o Urgent 0 For Review 0 Please Comment 0 Please Reply
o Please Recycle
~~a10~~~~ a/TJm/-/~e ~~~
.2:bc~e-/- 40. 1o-tJ~ yp
.-;? 0'- t'o? q sly'
1.fi'rR l.:\IL . l>lJ 3' ~ '"' .. c.., n It. U 7 /J tjO"L
w\\...l..a ~ 5a 1:\ ~~ 70 .... C> 2..-PP
- -
t"\~_~ ou SE<<. , 1. SLt:!CL~"".s
.
I 2.. 6~~
I -
34 OR.\~1ML~ i)f: ~-Ei ON L..~ t>~N I
Y. /
I
2 Vfr<<.\ ~./ """"'~ at=- ~ 1IfoJlJlW1~ P\o1lS....1c. u~,..
/
i
I
'3. ev6l-\c.. .
..
-
._~,.;.......- -+
A-. '" \ <:.+i ~ ~lI.D1I. S~~M~~ t'I\~&E~ eo .~-- ..
. ~um~C\ p- ---. ~
..
L-i. ~~= {,.~ L-~~
s: eo"",~, s.SJ o~ : ~~~~~-~~~~
~ $~_S ~
-
-
-- .~
-~
='<-~'" - ~-->
._-~.~-- --. - ----,.,----~-, ~
-~~ .~~,._~~ ----- -----~-_..._----_..-. ----. --- .-------- .._._---~~.._-_._-- ---,-,-~---
To: Mce K U(flU..5(l~
Fax: ?~- O&~
Phone:dn - b6/1 Date: ~-/dJ--OO\
Re: /JI;/Ja~ g?je- 1506d~~.sI'~/} cc:
Fax
u
"U
CITY OF CARMEL
Department of Community SelVices
One Civic Square
Carmel, IN 46032
(317) 571-~417
Fax: (317) 571-2426
From:
~yc~
Pages:
o Urgent 0 For Review 0 P.lease Comment 0 Please Reply
o Please Recycle
'~ckd //4'0
7 o..--o~ /P
~o - O~q .:7W
w
w
ENGINEERS. INC,
CIVIL ENGINEERS, LAND SURVEYORS, LAND PLANNERS, LANDSCAPE ARCHITECTS
July 9, 2002
~" ~jJ~~~
gff:-' I
'.$' ~
~:!/ .t '<(6;\
-~~' RECEWEO \--
,'8\ JUl 9 2002 ~
~~."\ DOCS J.v!
\(<;~~ ~f/
//~, ,--'~1
I;?,;'" .....(' ')
'v:~'~I':i'~/'--l-"';-"Y' \"C
-.,0. !,,<;
, "-"
City of Cannel Planning
Jon C. Dobosiewicz
One Civic Square
Cannel, Indiana 46032
RE: Williams Ridge Subdivision
Secondary Plat application
Dear Mr. Dobosiewicz:
I am writing this letter to explain the action taken to resolve the items outlined in your review
comment letter dated May 28 2002. This letter will address the review comments for Secondary
Plat. I have addressed each item individually using item designation consistent with your letter.
1. Signature block for the Hamilton County Commissioners has been removed.
2. Signature block for the Carmel Board of Works and Safety has been added.
3. The Primary and Secondary Plat Docket numbers have been added.
4. Source of title and instrument numbers has been added to sheet 1, which was made the last
sheet (sheet 3) per comment 10.
5. Address note has been removed from the legend.
6. Legend has been revised and monuments have been added to each sheet.
7. See enclosed Landscape Plan.
8. See enclosed Covenants and Restrictions.
9. After all comments have been successfully addressed then we will send a signed mylar copy
for the directors signature.
10. Signature page has been made the last sheet (sheet 3).
If you have any further questions or comments please feel free to contact me at your convenience.
Sincerely,
p-~./~
David L. Harden
Weihe Engineers, Inc.
ALLAN H. WEIHE, P.E., L.S. - PRESIDENT
10505 NORTH COLLEGE AVENUE INDIANAPOLIS, INDIANA 46280 (317) 846-6611 (BOO) 452-6408 FAX: (317) 843'()546
o
WEIH
ENGI
Q
ERSt INC.
CIVIL ENGINEERS, LAND SURVEYORS, LAND PLANNERS, LANDSCAPE ARCHITECTS
July 9, 2002
----:-5,~'---
....../\ \ (,,'":J U ! '''jl "
~ .) ,,")..-~ -'-.:2t i >~
1(.:;'" ...' ..... I
/. v' '-<. / .
J>>/ ~'<\\t)
L,' OECE\\lEO \-.-\
, -'""f f\ 9 t')(\f\t') \p~\
k:rJ JU\. t.V\Jt. F=~
\=\ noCS )i~/
\ <:'>, .. ...... /
\, /;' 'I
," /',>-- .., '/
'" / )--'" /-\"v.
V ,/."0 '_. -r" /'
"<t ;,?'! -}""""\ \ >
~<:'i::..~_J...g;./'
City of Carmel Planning
Jon C. Dobosiewicz
One Civic Square
Carmel, Indiana 46032
RE: Williams Ridge Subdivision
Primary Plat application
Dear Mr. Dobosiewicz:
I am writing this letter to explain the action taken to resolve the items outlined in your review
comment letter dated May 28 2002. This letter will address the review comments for Primary
Plat. I have addressed each item individually using item designation consistent with your letter.
1. East 116th Street and been changed and added.
2. "Plans Prepared For" and "Plans Prepared By" has been changed to "Owner/Subdivider and
"Surveyor" respectively.
3. The zoning has been corrected to R -1.
4. Sidewalks have been changed to 5'.
5. The 10' Asphalt Path is under review and either a 5' sidewalk to match existing conditions or
the asphalt path will be installed (to be decided by D.O.C.S.).
6. See enclosed Landscape Plan.
If you have any further questions or comments please feel free to contact me at your convenience.
Sincerely,
?~;/.J~
David L. Harden
Weihe Engineers, Inc.
ALLAN H. WEIHE, P.E., L.S. - PRESIDENT
10505 NORTH COLLEGE AVENUE INDIANAPOLIS, INDIANA 46280 (317) 846-6611 (800) 452-6408 FAX: (317) 843-0546
u W
WEIHE ENGINEERS, INC.
CIVIL ENGINEERS, LAND SURVEYORS, LAND PLANNERS, LANDSCAPE ARCHITECTS
, ..b1lJ I <J!
bJ'y-' ---<.. ,\~ '
'-.:P
~'jy .t '<~\
Letter of Transmittal ,,;1 RECEIVED ~
,G\11 JUl 9 2002 ~~\
To: City of Carmel Planning Project: Williams Ridge Subdivision \01 !::!
Carmel, Indiana 46032
Date: July 9, 2002
One Civic Square
Job #: W02-0039
Phone: 571-2417
Attn: Jon C, Dobosiewicz
Fax:
571-2426
We are sending you ~Attached DUnder separate cover via courier the following items:
DShop Drawings ~Prints DCoPY of Letter
DFloppy Disk/Compact Disk DSpecifications DMeeting Minutes
DSamples DChange Order(s) DInspection Report
D_ DSketcheslDrawings DApplication(s) for Payment
~ Sets Document Document Description
~Copies Date Number
1 7/2/02 1 Revised Preliminary Plat
1 7/9/02 Response Letter for Primary Plat
1 7/9/02 1-3 Revised Secondary Plat
1 7/9/02 Response Letter Secondary Plat
1 Covenants & Restrictions
2 7/2/02 10 Landscape Plan
1 7/2/02 set Revised Construction Plans
These are transmitted as indicated below:
DApproved
DApproved as Noted
DNot Approved, Revise and Resubmit
DAction Not Required
DAction Indicated on Item Transmitted
DFor Signature. Return _Copies to Us
~For Your Review or Use
~For Your Review & Comment
DAs Requested
~For Your Records
~For Your Approval
D
Remarks:
Please, feel free to call if you have any questions.
By.~~
David L. Harden
cc: File
ALLAN H. WEIHE, P.E., L.S. . PRESIDENT
10506 NORTH COLLEGE AVENUE INDIANAPOLIS. INDIANA 46280 (317) 846-6611 (800) 452-6408 FAX' (317)843-0546
To: ki:t X ~tDUJe/'"
Fax: /Y3 - t:)~~
Phone: ,~ - ~6//
Re: 7tJ-CJ~ ~
Fax
u
u
CITY OF CARMEL
Department of Community Services
One Civic Square
Carmel, IN 4SJ32
(317) 571-2417
Fax: (317) 571-2426
From:
~yce
~
7-/-0<<.
Pages:
Date:
cc:
o Urgent 0 For Review 0 P.]ease Comment 0 Please Reply
d-fOE~.j)A 7-/~ -~
)?'/"/h4r1u ~~~ cYJ.ba1;"/.s,~
o Please Recycle
"', ~ :'t::,,-,~_
~I-O\:: c:.q;,
,,', ':<" ""\/"---<!..~:
<'c5,/u/'\~:'
'- /1 ~\ \:,
.:~ . \~ ~i ._/~:
.....~:?;~_/"~<),);'
<'(ION CO,
. .- -
u u
City of Carmel
DEPARTMENT OF ENGINEERING
June 25, 2002
~ -'-;.';'f;--~~
./; \ \ /', I (/""
.,', v' . .j )"
/",;' './ /,
I" / 1." e-\
/"~', ; ,\,;..\
K~/ nce \:\
L_l JI/i' '[]Vc/) ,."
k::::i If 25 ;:_'1
i.-'\ ^ 2oa? 1--;'
\ .-\ u(l/'l 't; ,h_
\./\ Vv'S ' I
\y'\ I....::.~)/
';;()"'..", /$)1/'-
v/'->~ "'\),'
....' t" /--.,-- ''''''~\ \
"'":!-UJ;~/
Mr. Max Mouser
Weihe Engineers, Inc.
10505 North College Avenue
Indianapolis, IN 46280
RE: Williams Ridge Subdivision-Project Review #2
Dear Mr. Mouser:
As stated in our Project Review Letter #1, dated May 13,2002, we reserved the right to make additional
comments after the City Engineer reviewed the drawings. She has now reviewed the plans. We offer the
following additional comments from the City Engineer:
DRAINAGE COMMENTS
. Need additional topo or spot shots shown (proposed) to ensure side/rear yard drainage works for
each lot. Show installation of rear yard swales (high and low points).
. Still need to show more detail for detention area, including:
Limits of detention area? Provide easement on both lots 5 and 6.
Contours are too close at scale shown (on Sheet 4). Show blow-up detail with proposed
tops of banks, emergency overflow (with elevations), easements, etc.
. The basic goal in detention is to hold the post -developed 100-year rate to at or below the existing
10-year rate. I don't believe this is shown in the report.
. Show the proposed grade on profile section of Sheet 5 (this will represent the flow line of the rear
yard swale behind lot 3, 4 and 5).
OTHER COMMENTS
. How is the sanitary sewer to connect in Valleybrook? Show property (lot #'s) and easements
across which the proposed line will be constructed.
. Is the common area an easement? It needs to be labeled as such.
. Eliminate concrete saddles. We utilize stone saddles.
. Notify this office prior to entrance work on 1 16th Street. This note should be placed on the plans.
. What is the spacing of barrels? The spacing scales 40' = or -, but it is not "noted" as legend
suggests.
. Is there a legend for the Erosion Control Plan Sheet? What are the crosshatched and
honeycombed areas, materials?
. The sidewalk ramp detail (Sheet 11) does not seem to match proposed ramp locations.
. If sidewalks are planned in the 1 16th Street right of way, would recommend all new sidewalks
along 1 16th Street as this construction may cause additional breaks/cracks in existing segments,
and the City may require new panels where condition is unacceptable (it is not desired to have
vastly different aged concrete walks as it creates maintenance problems.
If we remember correctly from T.A. C. comments, an asphalt path is required in the 11 (/h Street
right of way so the above comments would not be applicable.
ONE CIVIC SQUARE CARMEL, INDIANA 46032 317/571-2441
"" 'i> '"
u
u
Mr. Max Mouser
June 25, 2002
Page 2
. Are there any additional improvements planned at the entrance in the right of way (landscaping,
lighting, walls, subdivision signs, irrigation systems, etc.)?
If you have questions, contact Kate Weese, Mike McBride or me at 571-2441.
V~
Dick Hill, Assistant Director
Department of Engineering
Cc: M. Kate Weese, City Engineer
Mike McBride, Assistant City Engineer
Jon Dobosiewicz, Department of Community Services
Laurence Lillig, Department of Community Services
John Duffy, Director Cannel Utilities
Steve Mood, Conley Homes
S:\PROJREV02\ WILLIAMSRIDG E#2
Fax
o
u
CITY OF CARMEL
Department ofComml.lnity Services
One Civic Square
Carmel, IN 4SJ32
(317) 571-2417
Fax: (317) 571-2426
From: /J
( ~L'-/
Pages: ~
Date: {; -;3:> -b 2--
To: /}(~~-/
Fax: >?'-f~-O~'-I~
Phone: [fir; -~ ~ //
ReI 70 r() 2. ;:> jJ
ee:
C1 Urgent C1 For Review C1 P.lease Comment 0 Please Reply
o Please Recycle
<
u
o
..,
Johnson, Sue E
From:
Sent:
To:
Cc:
Subject:
Dobosiewicz, Jon C
Thursday, May 30, 2002 11 :41 AM
Johnson, Sue E
Lillig, Laurence M; Lawrence, Kelli A; Hollibaugh, Mike P; Hanson, Brian P
Docket Number Assignment - PP, SP; Williams Ridge Subdivision (Subdivision Waiver)
Sue Ellen,
Please issue the necessary Docket Numbers for the Williams Ridge Subdivision, Subdivision Waiver. It will
be the following:
70-02a SW $630
Total Fee: $630
Docket No. 70-02 PP; Williams Ridge Subdivision
The applicant seeks approval to plat a 6-1ot residential subdivision. The site is located on the north side of 116th
Street, Y2 mile west of Gray Road. The site is zoned R-I/Residence.
The petitioner also seeks approval of the following Subdivision Waivers:
70-00a SW sea 8.9.1 sidewalks
Filed by Max Mouser of Weihe Engineers.
Please note the following:
· This Item appeared on the Wednesday, May 22nd agenda of the Technical Advisory Committee.
· Mailed and Published Public Notice needed to occur no later than Friday, May 24, 2002. However, go
ahead and send notice out on this item ASAP and we will request that the Plan Commission waive its
Rules Of Procedure on the notice time and hear both the Primary Plat and Subdivision Waiver on June
18th.
· This Item will appear on the June 18,2002, agenda of the Plan Commission under Public Hearings.
· This Item will also appear on the July 2, 2002, agenda ofthe Plan Commission Subdivision Committee.
· The petitioner will need to provide fifteen (15) fully filled out Findings-of-Fact sheets for the Primary Plat the
night of the meeting at which the Plan Commission takes final action on the request. Please remember to fill
out the Docket No. and date on each findings sheet for the Commission.
Please contact Max Mouser at 846-6611 (Fax: 843-0546) with this information.
please return the file to my office.
\ ~"*~
Once the docket is assigned
Thanks,
~_~-e 8-
I "lr'.u~ ,..,...~-A
Jon
.
~
1
.'
p
Fax
To:
Fax:
u
u
CITY OF CARMEL
Department of Community Services
One Civic Square
Carmel, IN 46032
(31'7) 571-2417
Fax: (31'7) 571-2426
From:
Pages:
~N....'i1L
bL,
S-ao-O~
{l\~~ m~U~
8tf=:rDS'/ (p
Phone:
A,~~
Date:
Re: ~
cc:
o Urgent
o For Review 0 P.lease Comment 0 Please Reply
o Please Recycle
(~'
'.....'"
u
w
City of Carmel
VIA FAX: 843-0546
Original by mail
May 28, 2002
David Barnes
Weihe Engineers, INC.
10505 N. College Ave.
Indianapolis, IN 46260
RE: Williams Ridge Subdivision, Primary Plat application.
Dear Mr. Barnes:
This letter is in response to your Primary application for Williams Ridge subdivision. The
following issues need to be addressed and plans updated accordingly.
1. Change "116st Street" to "116th Street" in the title, and add "East" before it.
2. Change "Plans Prepared For" to "Owner/Subdividor," and "Plans Prepared By" to
"Surveyor."
3. Note: this site is zoned R-1, not S-1.
4. All sidewalks must be 5 feet in width.
5. A 10' asphalt path is required along the E. 116th Street frontage.
6. Provide landscape plan that shows the wall, signs, landscaping, and detailed tree
preservation plan. Note: the plans need to be submitted to our department by the
commission date for review by the Plan Commission.
Please submit a revised Primary Plat with the above-mentioned changes for further consideration.
Sincerely,
~ ~~Si~~CZ
Planning Administrator
Williams Ridge-PPl
Page 1
ONE CIVIC SQUARE
CARMEL, INDIANA 46032
317/571-2417
Q
u
City of Carmel
VIA FAX: 843-0546
Original by mail
May 28, 2002
David Barnes
Weihe Engineers, INC.
10505 N. College Ave.
Indianapolis, IN 46260
RE: Williams Ridge Subdivision, Secondary Plat application.
Dear Mr. Barnes:
This letter is in response to your Secondary Plat application for Williams Ridge subdivision. The following issues
need to be addressed and plans updated accordingly.
1. Remove signature block for the Hamilton County Commissioners.
2. Add signature block for the Carmel Board of Works and Safety.
3. Add Primary and Secondary Plat Docket numbers to sheet 1 (70-02 PP & 71-02 SP.)
4. Add a source of title and instrument number to sheet 1.
5. Remove street address note from the legend. Addresses are not required on a secondary plat.
6. Revise Legend and add to each sheet where appropriate: The monuments and markers should be
as required under Section 8.2 of the sca.
a. Add concrete monuments at all comers that form the boundary of the plat, as required
under sca 8.2.1.
b. Add monuments at the beginning and ending of all curves along street centerlines, as
required under SCO 8.2.2.
7. Provide construction grade landscape plan as approved by Scott Brewer, DOCS Urban Forester.
8. Provide a copy of the covenants and restrictions.
9. Have Mylar signed by property owner and surveyor (with R.L.S. seal) prior to signature by
director.
10. Please make the signature page the last sheet in the secondary plat set.
Please submit a revised Secondary Plat with the above-mentioned changes. Once these changes have been made and
comments addressed, please produce a Mylar copy for signature by this Department. Two paper copies of the plat
must be filed with the Mylar prior to recording, and three paper copies and a Mylar of the recorded plat must be
submitted following recording. Our approval of the secondary plat (signature) will be forthcoming upon revision of
the plans according to the items listed above.
Sincerely,
~.~
Planning Administrator
Williams Ridge- SPI
Page 1
ONE CIVIC SQUARE
CARMEL, INDIANA 46032
317/571-2417
.}()-a d J I-ad
,
.-'
ER~ON AND SEDIMENT CONTUL PLAN
TECHNICAL REVIEW AND COMMENT
Hamilton County Soil and Water Conservation District
1108 South 9th Street, Noblesville IN 46060
Ph- 317-773-1432 or Email at john-south@iaswcd.org
~----
SUBMITTED BY:
Conley Homes Inc.
PO Box 3154
Carmel, IN 46032
317-818-9024
Weihe Engineers
10505 N. College Avenue
Indianapolis, IN 46280
Contact- Max Mouser
i
\~~\
\;:/\
'~?,.
/"',.,
, />
~
RECEIVED
NA y 24 2002
DOCS
",
j
PROJECT NAME:
Williams Ridge
/.
I,' /
REVIEWED BY:
John B. South P.E.
Certified Professional in Erosion and Sediment Control
PLAN REVIEW PROCEDURE: Site Visit Date:
Plan Review Date: 5/21/02
Acreage: 6 Ac.
LOCATION: North side of 116th Street, west of Gray Road
LEGAL DESCRIPTION: Sec. 32
TOWNSHIP: 18N
RANGE: 4E
CIVIL TOWNSHIP: Clay
SOIL SURVEY MAP SHEET: 51
The technical review and comments are intended to evaluate the completeness of the erosion and sediment control plan for the
project. The erosion and sediment control plan submitted was not reviewedfor the adequacy of the engineering design. All
practices included in the plan, as well as those recommended in the comments should be evaluated as to their feasibility by a
qualified individual with structural practices designed by a qualified engineer. The plan has not been reviewedfor local, state,
or federal permits that may be required to proceed with this project. Additional information, including design calculations may
be requested to further evaluate the erosion and sediment control plan.
The erosion and sediment control plan has been reviewed and it has been determined that the plan:
1. Will likely disturbed less than five acres. An NOI does not need to be submitted for projects less
than five acres. If the site work and home construction is estimated to disturb more than five
acres an NOI for Rule 5 must be submitted.
Proper implementation of the erosion and sediment control plan and inspections of the construction site by the developer or a
representative are necessary to minimize off-site sedimentation. The developer should be aware that uriforeseen construction
activities and weather conditions may effect the performance of a practice or the erosion and sediment control plan. The plan
must be aflexible document, with provisions to modify or substitute practices as necessary.
Revised 4 / 97
.-
;';,
ERUION AND SEDIMENT CONTV PLAN
TECHNICAL REVIEW
COMMENTS
PROJECT: Williams Ridge
Page 2 of 2
Note: All erosion and sediment control measures shown on the plans and referenced in this review must meet the design
criteria, standards, and specifications outlined in the "Indiana Handbookfor Erosion Control in Developing Areas" from the
Indiana Department of Natural Resources, Division of Soil Conservation or similar Guidance Documents.
1. The upper pipe that goes through the dry dam should not discharge on the back side of the dam. The
pipe should be extended through the fill and discharge at the toe of the back slope.
2. One or two water bars are recommended to help stabilize the path of the storm sewer going down the
steep slope.
3. Show seeding behind the curbs.
Cc: Carmel DOCS
Ha. Co. Surveyor
File
OS/22/02
08: 20 FAX
HAMILTON CO HWY. ~~~ Carmel DOCD
U (j
HAMILTON COUNTY
HIGHWAY DEPARTMENT
~ 001/001
May 22. 2002
Mr. Max Mouser
Weihe Engineers, Inc.
10505 North COllege Avenue
Indianapolis, Indiana 46280
RE: Williams Creek Subdivision
Construction Plans
N of 116th Street I W of Gray Road
Clay Township
Dear Max:
This letter serves to acknowledge receipt of a transmittal containing the plans for the above-
mentioned project. After reviewing the plans the Highway Department has the following
comments:
1. It appears that this project lies entirely within the limits of the City of Carmel. Therefore, all
future comments should be directed toward the City, if you have any information contrary to
this statement, please contact me immediately.
If you have any questions or comments concerning this letter, please feel free to contact me at
anytime.
Sincerely,
/J;-I$~-
Steven J. Broermann
Staff Engineer
cc: Jon Dobosiewicz
Steve Cash
G:\USERS\SB\02T AC\05-22-02willlamsridge.doc
1700 South 100 Street
Noblesville, In. 46060
www.co.hamilton.in.us
Office (317) 773-7770
Fax (317) 776-9814
o
u
CARMEL/CLAY TECHNICAL ADVISORY COMMI.T,tEit
AGENDA ' , 1-
NA1EQEIVED
./.1 20aJ
DOCS ..
Date: May 22, 2002
Place:Department of Community Services Conference Room
3rd Floor - Carmel City BaD
.)v C).oo H m
C).']O H m
~("
~ 1((.1 c)'40 H m
.J V 10.00 a m
,.)V )0'20 am
rJ U 10'40 P m
C-)C/ 11 '00 H m
Village of West Clay, Commercial BuDding No. 21Construction Plans) "
The site is located at the southeast comer of 131 Street and Towne Road within the
Village of West Clay. The site is zoned PUD/Planned Unit Development (Z-330).
Filed by Dave Sexton of the Schneider Corporation for Brenwick TND Communities.
Village of West Clay, Section 3004, Block C; Townhomes
(Secondary Plat & Construction Plans)
The site is located at the southeast comer of 131 st Street and Towne Road within the
Village of West Clay. The site is zoned PUD/Planned Unit Development (Z-330).
Filed by Dave Sexton of the Schneider Corporation for Brenwick TND Communities.
West Carmel Center, Block D, Lot 2- Fifth Third Bank (Development Plan)
The applicant seeks development plan approval to construct a financial institution.
Filed by Jeffery C. Klump of Klump & Associates.
Hayden Run, Section 2 (Secondary Plat & Constrnction Plans)
The site is located on the south side of West 131 st Street approximately one half mile west
of Towne Road. The site is zoned S-llResidential.
Filed by Edward E. Fleming of Stoeppelwerth & Associates, Inc. for Centex Homes.
Settlers Ridge at Haverstick, Section 3 (Secondary Plat &Constrnction Plans)
The site is located northwest of East 131 st Street and River Road. The site is zoned
S-l/residence.
Filed by Edward E. Fleming of Stoeppelwerth & Associates for Centex Homes.
Williams Ridge Subdivision (Primary & Secondary Plat)
The site is located on the north side of 1 16th Street, Y2 mile west of Gray Road. The site is
zoned R-IlResidence.
Filed by David R. Barnes of Weihe Engineers.
Old National Bank - Carmel Banking Center (Development Plan)
Petitioner seeks approval to Remodel and expand the existing building (Walden
Bookstore) into a financial institution. The site is located at 1430 South Rangeline
Road. The site is zoned B-3/Business.
Filed by J. William White of A.J. Armstrong, Inc.
-Next Page-
~:).~nhF..Hld~{:; FiipennG (}o.
\'\<':103 no corr,pany FacHities
"
u
u
Johnson, Sue E
From:
Sent:
To:
Cc:
Subject:
Dobosiewicz, Jon C
Tuesday, May 14, 2002 3:17 PM
Johnson, Sue E
Lillig, Laurence M; Lawrence, Kelli A; Hollibaugh, Mike P; Hanson, Brian P
Docket Number Assignment - PP, SP; Williams Ridge Subdivision (Primary and Secondary
Plats
Sue Ellen,
Please issue the necessary Docket Numbers for the Williams Ridge Subdivision, Primary Plat and
Secondary Plat. It will be the following:
")0
.-02 PP
~-02 SP
$910 ($700 + $25 per lot @ 6 lots)
$700
Total Fee: $910 (now)
$700 (prior to Secondary Plat Approval)
'10
Docket No. ...02 PP; Williams Ridge Subdivision
The applicant seeks approval to plat a 6-10t residential subdivision. The site is located on the north side of 116th
Street, Yz mile west of Gray Road. The site is zoned R-l/Residence.
Filed by David R. Barnes of Weihe Engineers.
Please note the following:
· This Item will appear on the Wednesday, May 22nd agenda ofthe Technical Advisory Committee.
· Mailed and Published Public Notice needs to occur no later than Friday, May 24, 2002.
· Ten (20) Informational Packets must be delivered to Plan Commission Secretary Ramona Hancock no later
than noon, Friday, June 7, 2002. Failure to submit Informational Packets by this time will result in the tabling
of the petition to the Tuesday, July 16, 2002, agenda of the Plan Commission.
· Proof of Notice will need to be received by this Department no later than noon, Monday, June 17,2002.
Failure to submit Proof of Notice by this time will result in the tabling of the petition.
· This Item will appear on the June 18, 2002, agenda of the Plan Commission under Public Hearings.
· This Item will also appear on the July 2, 2002, agenda of the Plan Commission Subdivision Committee.
· The petitioner will need to provide fifteen (15) fully filled out Findings-of-Fact sheets for the Primary Plat the
night ofthe meeting at which the Plan Commission takes final action on the request. Please remember to fill
out the Docket No. and date on each findings sheet for the Commission.
· The Secondary Plat is an administrative process that will occur after the Primary Plat Amendment is approved.
No additional public hearings will be required for that process.
Please contact David Barnes at 846-6611 (Fax: 843-0546) with this information. Once the docket is assigned
please return the file to my office. ~
Thanks, ( f-'f"'-1(~O S-,Ic." 0 a- H. ~ ~ ~ 'lV\.
Jon
Ac;
1
I...."
\. :
u
o
CITY OF CARMEL
Department of Community Services
One CMc SC(uare
Carmel, IN 4aJ32
(317) 571.2417
Fax: (317) 571-2426
-Fax
To:
~ ~~~~~
~ 13-EJS4Cp
From:
~~
cQ..
5~ I t...o -€) d-'
-Fa)C
Pages:
Phone:
Re~ W~ A'~6 ~~..
Date!
eel
o Urgent 0 Far-Review 0 P.lease Comment 0 Please Reply
D Please Rec~le
-'
I) t) ,-cs~
u
u
Carmel
, j. JJ?:j
q~ --".(n~
~r'.... "'" ,
" '}: '\
l'~~\) '0""
~t\,,\ ~ 't~~t \'~,
_ u~ L_
(?\ " C'\I"~ JI:'!~ I
~~' \)\J\J /----
\ /, I
/~}., /,.I,~'''''''
0."':.,"'" "I
,,/j--. ...-<'\ '/
'-J... nHn",;, \ /'
"'-~=:""~.L':"l;.::'''''''''
May 13, 2002
Mr. Max Mouser
Weihe Engineers, INC.
10505 N. college Avenue
Indianapolis, IN 46280
RE: Williams Ridge
Job No.: W02-0039
Dear Mr. Mouser:
I have received and reviewed the plans for the above-mentioned project.
At the present time, I see nothing in the plans that would hamper law
enforcement efforts.
If we can be of any further assistance to you, please contact us.
Respectfully,
/lttdtttd }). ~
Michael D. Fogarty
Chief of Police
MDF:vb
cc: Dept. of Community Services
Fax (317) 571.2512
rcement Agency
A Nationally Accredit
(317) 571.2500
l · '.
~:~~3i~~~:'c_
.....()<U'~ -:
," f~ .~\ .'
',", -.
" * '- ~..
,", i~ 5:1
::;.\, /~.
-<~% ,..--~... *'".'
,..:( )'"ON r:p.....
u u
City of Carmel
DEPARTMENT OF ENGINEERING
Mr. Max _
Weihe En .
10505 Nortfi
Indianapolis,
Dear Mr. Mouser:
RE: Williams Ridge Subdivision-Project Review #1
We have reviewed the plans submitted for this project and offer the following comments:
GENERAL INFORMATION
I. The project site is located within current City of Cannel Corporate Limits.
2. Jurisdictions:
. Streets and Right of Way - City of Cannel
. Water, Sanitary Sewers, Storm SewersIDrainage - City of Cannel
3. Board of Public Works and Safety Requirements:
. Water and Sanitary Sewer Availability
. Temporary Construction Entrance
· Any permanent improvement to be installed within dedicated right of way or dedicated
easements. This approval would require a Consent to Encroach Agreement between the
Owner and the City of Cannel.
I am also enclosing a schedule for Board of Public Works and Safety meeting dates and agenda
deadlines for your use. Please use the Engineering Department deadlines for submissions to the
Board.
Any submission to the Board requires prior approval by the Carmel Clay Plan Commission
and/or the Board of Zoning Appeals (if applicable) and completion of review by the Technical
Advisory Committee. AU written requests to be placed on the Board's agenda must include the
appropriate Docket Number and the date (or dates) of approval by the Plan Commission and/or
the Board of Zoning Appeals (if applicable).
4. T.A.C. Review/Drawings submitted for approval:
We request that all comments and comment letters generated by this office be answered in writing
and be accompanied by a drawing reflecting requested revisions. Final drawings will not be
approved for construction until all Engineering Department and Utility Department issues have
been resolved. The design engineer must certify all drawings submitted for final approval. This
office will require a minimum of five-sets of drawings for approval after all issues have been
resolved. The drawings will be stamped as approved and will be signed by the City Engineer and
Director of Cannel Utilities. The Owner will receive one-set which is to be maintained on the
construction site at all times. Carmel Utilities will receive two-sets, our Public Works Inspector
will receive one-set and one-set will be maintained in the Engineering Department
5. Please be advised that any installation of signs, walls, irrigation systems, etc. within dedicated
right of way or dedicated easements will require a Consent to Encroach Agreement with the City
of Carmel.
ONE CIVIC SQUARE CARMEL, INDIANA 46032 317/571.2441
u
w
Mr. Max Mouser
May 13, 2002
Page 2
6. Cannel Utilities should be provided drawings for review of water and sanitary sewer issues. They
will provide a separate review regarding these issues.
7. Cannel Utilities does not subscribe to "Holey Moley" and should be contacted directly for all
water main and sanitary sewer main locations.
8. I am including copies of the following with this correspondence:
. Subdivision Project Approval Procedures
. Performance Release Procedure
. Subdivision Building Pennits
. Pennit Data, Contacts, etc.
BONDING REQUIREMENTS
9. Individual Performance Guarantees will be required for the following subdivision improvements:
. Streets
. Curbs
. Water Mains
. Sanitary Sewers
. Storm SewersIDrainage
. Monuments and Markers
. Street Signs
· Sidewalks (builders lot sidewalks and common area/perimeter right of way sidewalks may be
bonded separately).
The amount of the Performance Guarantee is based upon a certified Engineer's Estimate for 100%
of the cost of labor and materials to construct the individual improvements, to be provided by the
design engineer. Upon completion and release of individual Performance Guarantees, a three-year
Maintenance Guarantee will be required. The Maintenance Guarantee amount is based upon 15%
of the Performance amount for Streets and Curbs and 10010 of the Performance amount for all other
improvements. Performance Guarantees may be Performance or Subdivision Bonds, Irrevocable
Letters of Credit or Cashier's1CertifiedlOfficial Checks. Please reference the enclosures for more
detailed explanation of our procedures.
AVAILABILITY AND CONNECTION FEES
10. Availability (acreage) Fees must be paid after all other Engineering Department requirements have
been satisfied and prior to start of construction activities (the exception is that you are allowed to
move dirt on site). Availability Fees are based upon total platted acreage for the development at
the rate of$I,OlO.OO per acre for Water Availability and $1,365.00 per acre for Sanitary Sewer
Availability. Connection Fees are $1,310.00 per single-family residence and $795.00 per single-
family residence. Connection Fees are paid when the infrastructure has been completed,
satisfactory test results obtained and the subdivision has been released for permits. Connection
Fees are paid on a lot-to-lot basis.
PROJECT COMMENTS
Sheet 3
11. It appears that there will be open pavement cuts required in existing dedicated streets. One area is
located in the pavement area of Valleybrook Place in the Briar Cove subdivision. This cut is
required to provide sanitary sewer service to Williams Ridge. The other location is in the
pavement area of eastbound 1 16th Street, close to the curb line on the south side of the street. This
cut is required to provide water service to Williams Ridge. These pavement cuts will require prior
Board of Public Works and Safety approval. Please provide a detailed plan for both cuts,
including a traffic control plan for 116th Street. We request that the plans minimize the amount of
l
u
Q
Mr. Max Mouser
May 13, 2002
Page 3
pavement that must be cut wherever possible. It is very doubtful that you will be allowed to close
more than one lane of 116th Street and you will be required to maintain two-way traffic at all times
on 116th Street. Be advised that the Board may require the Developer to resurface a larger area of
116th Street as a condition of approval of the open cut.
12. Please designate existing right of way lines as existing right of way on all sheets.
13. The pipe designation for the run of pipe from storm structure 711 to 712 is pointing to the wrong
run of pipe.
14. Please place the following statement on Sheet 3, Site Development Plan, close to the Storm Sewer
Structure Table. Also place this statement on the Storm Sewer Plan and Profile Sheets, Sheets 5
and 6.
THE STORM SEWER SYSTEM SHALL BE CONSTRUCTED PER DESIGN SPECIFIED
AND AS APPROVED BY THE CITY OF CARMEL ON THE FINAL APPROVED
CONSTRUCTION PLANS*. DEVIATIONS FROM THE APPROVED DESIGN SHALL
ONLY BE PERMITTED DUE TO SPECIAL CIRCUMSTANCES OR DIFFICULTY DURING
CONSTRUCTION AND WILL REQUIRE PRIOR FIELD APPROVAL FROM A
DESIGNATED REPRESENTATIVE OF THE CITY OF CARMEL IN ADDITION TO
SUPPLEMENTAL APPROVAL BY THE DESIGN ENGINEER. AN EXPLANATION OF
ANY SUCH DEVIATION SHALL BE INCLUDED AS A REQUIREMENT ON AS.
BUILT/RECORD DRAWINGS SUBMITTED FOR RELEASE OF PERFORMANCE
GUARANTEES. APPROVED DESIGN SLOPES IDENTIFIED AS GENERATING
VELOCITIES OF 2.5 FPS OR LESS SHALL REQUIRE AS-BUILT CERTIFICATION AT
THE TIME OF CONSTRUCTION.
*THE CONTRACTOR SHALL FIELD CHECK EACH SECTION OF STORM PIPE AS IT IS
BEING INSTALLED TO ENSURE COMPLIANCE WITH THE DESIGN PLANS.
15. Identify the structure numbers on the levee cross section.
16. Even though the structure tables are on this sheet, we request that the top of casting and invert
elevations be placed on the plan view sheets.
17. The detention area is confusing. Is it intended to be wet or dry detention? Perhaps a detail of this
area in larger scale would better illustrate how this is intended to function.
Sheet 5
18. The run of pipe from storm structure 702 to 701 exceeds our maximum length requirement.
Please install another storm structure to assure that anyone length of pipe does not exceed 400
feet in length.
19. This office would prefer alignment of the tops of the inlet and outlet rather than inverts when
possible. If it is not possible to align the tops of pipes, we would request the inlet pipe invert to be
raised above the outlet pipe invert.
Sheet 7
20. Please identify all sanitary sewer laterals on the plans including size, length and type of pipe and
the distance from the nearest downstream sanitary structure.
Sheet 13
21. Please show and identify all water laterals on the plans including size, length and type of pipe and
the distance from the nearest lot property line.
The above comments are based upon the Engineering Department's initial review of this project. Please
provide our office with a follow up letter and revised plans indicating all revisions. Second and subsequent
reviews will focus only on revised items. It is critical that this office be made aware of all modifications
made on the plans being re-submitted, particularly if any such changes are considered "new" or fall outside
of our initial review.
u
u
Mr. Max Mouser
May 13, 2002
Page 4
The City Engineer is out of town this week and has not had the opportunity to review the plans or the
drainage calculations. Therefore, we reserve the right to provide additional comments after she has
reviewed the plans and the calculations.
If you have questions, contact Kate Weese, Mike McBride or me at 571-2441.
7J:jd
Dick Hill, Assistant Director
Department of Engineering
Enclosures
Cc: M. Kate Weese, City Engineer (w/o encl.)
Mike McBride, Assistant City Engineer (w/o encl.)
Jon Dobosiewicz, Department of Community Services (w/o encl.)
Laurence Lillig, Department of Community Services (w/o encl.)
John Duffy, Director Carmel Utilities (w/o encl.)
Steve Moed, Conley Homes
S:\PROJREV02\WILLIAMSRIDGE
u
u
Max Mouser
Weihe Engineers, Inc.
10505 N. College Ave.
Indianapolis, IN 46280
RE: Williams Ridge
LETTER OF APPROVAL
The undersigned has reviewed the proposed plans for
Williams Ridge
and has approved the plans subject to the following:
1. We are requesting that an additional fire hydrant be installed at the end of the line water line on
William Ridge Lane.
2.
3.
4.
5.
6.
Please respond to the above noted condition(s) in writing and submit to our office prior to the
scheduled Technical Advisory Meeting for this project.
Date: May 13. 2002
By: Gary Hoyt, Fire Marshal
Carmel Fire Department
w
(.;)
CITY OF CARMEL
Department of Community Services
One CMo Square
Carmel, IN 4al32
(317) 571-2417
Fax: (317) 571-2426
-Fax
To: ~~V e. l3c.t.t- n. e2>
Fax: <6 '-1-3 - (9 s-t.f (P
From:
~~~
?
~ -\e-O~
Pages:
Phone:
Date!
Re! ~i ~~' C ~ ~~ Q... cc:
Cl Urgent 0 Far" Review [J P.lease CQll1ment Cl Please Reply
CI Please Recyele
~1-_ ...... -a...
~,E:
(O;'fO. - W.......... ~s.. ~ I~~ ~~t;)1 \JI"-' en,.)
5 { l () . 0<6 f-r
\ -z;-