HomeMy WebLinkAboutApplication
u
u
/:<~<}3.-.
/'-:", )/
~
~~(GrE:1~~[Q)
MAY 6 2002
DOCS
APPLICATION FOR SECONDARY PLAT OR REPLAT
Fee: $500.00
/--.
/'---'
I
Date: 5/6/02
Docket #:
The undersigned agrees that any construction, reconstruction, enlargement, relocation of alteration of structure, or any
change in the use of land or structures requested by this application will comply with, and conform to; all applicable laws
of the State of Indiana, and the Zoning Ordinance of Carmel, Indiana - 1980, adopted under the authority of Acts of 1979,
Public Law 178, Sec. 1, et.seq, General Assembly of the State of Indiana, and all Acts amendatory thereto.
Name of Applicant:
Brenwick TND Communites, LLC
Phone # (317) 574-3400
Address of Applicant: 12821 E. New Market Street S-200, Carmel, IN 46032
Name of Subdivision: Village of West Clay, Section 3004, Block "C"
Legal Description (To be typewritten on separate sheet and attached).
Number of Lots: 11 Blocks
(40 Lots)
Area (in acres) 2.33
Length of miles of new streets to be dedicated to public use: -0-
Surveyor certifying plat:
Edward Giacoletti
Surveyor's address and phone#:
(Printed) Dave Sexton, P.E.
Signature of Applicant:
TITLE: Director - Residential Development, The Schneider
Corporation, Agent
******************************************************************************************************************************************
STATE OF INDIANA
County of ~; \hn
Before me, the undersigned, a Notary Public for Ho.mi1hn. County, State of Indiana, personally appeared Dave Sexton
and acknowledge the execution of the foregoing instrument this 6th Day of May 2002.
8<~ tV. J-t.~
Notary Public ~ol..tU'lnc.. tU. ~t.U'1' " ~
My Commission Expires: April 22, 2008
5.1.10 Application for Secondary Plat Two (2) copies, or more if necessary, of the secondary plat and the construqtion ___
plans, together with supporting documents, shall be submitted to the Building commissioner with this application and the -=-
application fee as indicated in Section 29.6 of the Zoning Ordinance. ' '.
Additional plans to be distributed to necessary authorities by applicant.
Fee: $
Received by:
J:\DOCS\CIVIL\FORMS\Carmel\SECONDARY PLAT OR REPLAT APPL.doc
u
u
LAND DESCRIPTION
!
~~(C~~~~(D)
M~~ 6 2u02
DOCS
All of Block "C" in the Village of West Clay, Section 3004, Village Center, Part I as recorded in
instrument number 199909965089, Plat Cabinet 2, Slide 345, in the Office of the Recorder of Hamilton
County Indiana, located in the Southwest Quarter of Section 28, Township 18 North, Range 3 East, of the
Second Principal Meridian, Clay Township, Hamilton County, Indiana.
\\CARMEL_ NT! \jobs\ 1238\0 15\docs\BlockC\LAND DESCRIPTION .doc
u
u
~
~fc,t~~~~\g
\\~~ 6 2a~2
DOCS
Report on Water Distribution, Sanitary Sewer and Storm Sewer System
VILLAGE OF WEST CLAY
SECTION 3004 - BLOCK "C" TOWNHOMES
1. Water Distribution
The potable water to the site will be provided by the Indianapolis Water Company (IWC).
Townhome units facing Broad, Grenville and Broughton Streets will be served from existing
mains in the aforementioned streets. A new main will be extend from Broughton Street to serve
interior townhome units.
Approval for the extension of the water main will be required from the Indiana Department of
Environmental Management, and the main will be designed and installed in accordance with
IWC rules and regulation.
2. Sanitary Sewer
Sanitary sewer effluent for the site will be accepted by the Clay Township Regional Waste
District (CTRWD). The project will be served by extending an existing sewer main located
along Grenville Street into the site.
Approvals for the design and construction of the sanitary sewers must also be obtained, in
addition to the CTRWD and it's consultant, from the Indiana Department of Environmental
Management.
3. Storm Sewer
The surface runoff on the site will be conveyed by a system of onsite swales and pipes to a
network of retention lakes within the Village of West Clay and will constructed in accordance
with the requirements of the Hamilton County Surveyor's requirements.
4. Erosion Control
During all phases of the construction the Site General Contractor and all Subcontractors shall
exercise measures to prevent the erosion of soils due to the action of water and wind. All erosion
and sediment control measures shall be implemented prior to earth moving activities.
Sediment in run-off water shall be trapped by the use of such methods as debris basins, siltation
sumps and silt fences until the disturbed area is stabilized. These shall be in place before any
land alterations/grading.
\\CARMEL _ NTl \jobs\l238\O l5\docs\BlockC\Narrative05-06-02.doc
u
u
Trapping devices shall be periodically inspected during dry periods and after each rainfall event
by the Site Contractor. Trapping devices shall be replaced if determined to be incapable of
performing intended function of sediment trapping.
The Contractor shall have available on the construction site a water source capable of applying
water to dry exposed soil in order to prevent wind erosion. The application rate and manner shall
be such that soil moisture is attained and no surface run-off is created.
~
"..(2. ~~~Iij
~~~0\'e~ rL~~l
~\\~ e
DOCv
\\CARMEL _ NTI \jobs\1238\O 15\docs\BlockC\Narrative05-06-02.doc