Loading...
HomeMy WebLinkAboutMinutes TAC 04-17-02 .r: .j West Carmel Center, Block D (Replat) The site is located at the northeast comer of US 421 (Michigan Road) and Retail Parkway. The site is zoned B-3/BusinessIUS 421 Overlay. Filed by Jamie Poczekay of American Consulting, Inc., for 421 Realty, Inc. Jamie Poczekay explained the project and introduced Jack Lashenik, also of American Consulting. There are no design plans for this replat because this is not a new development. They are just establishing lot lines for the potential outlots along Michigan Road. David Warshauer, Barnes & Thornburg, was also in attendance. Steve Broermann wrote a letter. He needs the instrument numbers for the purchased proposed right of way. The land has been bought as limited access. There will only be the access points that now exist. Chuck Shupperd stated there is gas on the other side of Michigan Road. As each business comes in, they can hook up to gas service. Sharon Prater stated this project does not affect them. Their pipeline is on the north end of the lot. Jim Blanchard, Gary Hoyt, Bill Akers, John South, Tom Skolak, and Phil Bennett had no comments. Jon Dobosiewicz said it appears the Target site lot line and outlot run along the pavement edge. The required yard width is five feet. The petitioner may write a shared parking agreement to allow the shared lot line to fall within the yard width, or they may file for a variance to eliminate the side yard requirement. The lot line would move west to obtain the five-foot distance. David Warshauer stated there is an easement or shared parking agreement in place with Target. The Target sign on the comer of one ofthe out lots will require a variance because it will become an off-premise sign. It was not originally on a subdivided outlot. Laurence Lillig believes a developmental standards variance for height was granted previously for this sign. Steve Cash sent a letter. He has no objections to the proposed change in plat. Laurence Lillig repeated that Ms. Poczekay should file a sign variance and provide a copy ofthe shared parking agreement. s:TechnicalAdvisoryCommittee\Minutes \tac2002apr 4 'l' I .. CARMEL/CLAY TECHNICAL ADVISORY COMMITTEE MINUTES April 17 , 2002 Laurence Lillig - DOCS Brian Hanson -"DOCS Gary Hoyt - Carmel Fire Dept. Chuck Shupperd - Vectren Energy Phil Bennett - Carmel Parks Bill Akers - Communications Mike McBride - Carmel Engineer. Jim Blanchard - Carmel Bldg. Dept. Jon Dobosiewicz - Carmel DOCS Tom Skolak - Carmel Postmaster Steve Broermann - Ham.Co.Highway Sharon Prater - Panhandle Eastern Dean Groves - Cinergy/PSI Dick Hill- Carmel Engineering John South-Ham. Co. Soil & Water Steve Cash - Ham. Co. Surveyor's s:TechnicalAdvisoryCommittee\Minutes\tac2002apr 1